Search NASA⌕ Search

SEARCH · Search NASA

Results for “allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Internal Architecture of the Common Habitat

The core stage liquid oxygen tank of the Space Launch System can be manufactured as a habitat instead of as a propellant tank, with a common design such that it is equally suitable for use in 0g, 1/6g, 3/8g, 1g, or variable artificial gravity. It is capable of sustaining a crew size of eight for missions up to 1200 days in duration. This Common Habitat can be the central element of a human spaceflight architecture that encompasses the Moon, Mars, and other destinations within the inner solar system. Within this archtiecture, the Common Habitat is specifically used as the core habitation element within a Lunar Base Camp, Mars Base Camp, and the Deep Space Exploration Vehicle. The Common Habitat internal architecture applies a design philosophy to separate crew functions according to deck. The lower deck is reserved for private functions. It includes eight private crew quarters and four waste and hygiene clusters – each with a private waste management compartment, private full body hygiene compartment, and private foyer/clothes changing area. The mid deck is primarily allocated to mission-related functions. It includes an exercise facility, fabrication / maintenance / repair facility, physical science laboratory (physics, geology, and remote sensing: astronomy, heliophysics, planetary science, and Earth science), and life science laboratory (biology and human research). The mid deck also has four external hatches, clocked one every 90 degrees, centered on the vehicle vertical centerline. Each hatch has a 60-inch tall by 40-inch wide opening with the mid deck floor 16 inches below the bottom lip of the hatch opening. The upper deck also includes some mission functions, but is primarily allocated to social functions. It includes a large galley, wardroom with projector and display screen, plant growth chambers, bulk stowage, command and control station, medical facility, hygiene compartment, and vehicle subsystems.

Habitability↗

Soluble Organic Matter (SOM) analysis of the Hayabusa2 samples: The first results

The Hayabusa2 spacecraft successfully collected the surface and possible sub-surface materials of the asteroid 162173 Ryugu. Ryugu is a C-type asteroid characterized by a low-albedo surface probably consisting of hydrous minerals and carbonaceous materials. [1] The direct optical and spectral analysis of the returned samples indicates that Ryugu material is dominated by hydrous carbonaceous chondrite-like matter (similar to CI chondrites) [2]. Since carbonaceous chondrites have generally yielded various types of organic matter, the collected Ryugu grains are expected to contain diverse types of organic compounds including bio-related molecules. The occurrence of organic compounds in the Ryugu surface will provide clues to the evolution of prebiotic molecules and their preservations associated with aqueous alteration of the primitive asteroid. The initial analysis of soluble organic matter (SOM) of the Hayabusa2-returned samples has been performed by an international team consisting of 32 members. Because the sample amount available for comprehensive SOM analyses is limited, and because the SOM is expected to be present as a complex mixture of various types of organic compounds with very small concentrations of each compound, high-sensitivity and high-resolution analytical techniques have been developed using carbonaceous meteorites [e.g. 3]. Two aggregate samples of the Ryugu grains (A106 and C107) were allocated for the solvent extractions and bulk carbon (C), hydrogen (H), nitrogen (N), sulfur (S) and oxygen (O) measurements. The A106 sample was collected during the 1st sampling in February 2019 and the C107 sample was collected during the 2nd sampling in July 2019 after the Small Carry Impactor (SCI) operation. They consist mainly of particles smaller than 1 mm in diameter, and each sample mass was 38-39 mg. They were firstly investigated spectroscopically in the near infrared wavelength range by the Stone Team prior to the solvent extractions. Other small grains (A0080 and C0057) were also allocated for this study to investigate the spatial distribution of organic compounds on the sample surface. The extraction and analytical measurements implemented by the SOM Team are summarized in Figure 1. Each powder sample was extracted sequentially with non-polar to polar solvents, i.e., hexane, dichloromethane (DCM), methanol (MeOH) and H2O, for non-targeted analysis to reveal the compound composition. Each solvent extract was analyzed by solution state nuclear magnetic resonance (NMR) spectroscopy [4], Fourier transform- ion cyclotron resonance/mass spectrometry (FT-ICR/MS) with ESI and APPI ionization [5] and by high-resolution mass spectroscopy using Orbitrap MS coupled with nano-liquid chromatography (nanoLC/Orbitrap MS) [6], and using two dimensional gas chromatography/mass spectrometry (GC×GC/MS). The extracted residues were passed to the Chemistry Team for further inorganic element analysis. The other powder sample was subjected to the hot water extraction for amino acid analyses including chiral isomer separation, which was performed by three-dimensional (3D) high-performance liquid chromatography (HPLC) with high-sensitivity fluorescence detection (FD) [7] and by HPLC/FD coupled with quadrupole-time of flight/mass spectrometry (QToF/MS) [8]. After the hot water extraction, the residue was split into two halves. One half was further extracted with hydrochloric acid (HCl) to analyze for amino acids in bound-form. The other half was sequentially extracted with DCM/MeOH (1/1) to analyze semi-polar compounds such as polycyclic aromatic hydrocarbons (PAHs) by GC/MS, followed by further extraction with formic acid to analyze polar heterocyclic compounds, and subsequent extraction with HCl to detect bound-form polar compounds. The extracted residues were passed to the IOM Team for the analysis of insoluble organic matter (IOM). Compound-specific stable isotope analyses will be performed using GC/combustion/isotope ratio mass spectrometry (GC/C/IRMS) if the compound concentration is high enough to enable such an isotopic measurement. All extraction procedures were performed on an ISO 6 (Class 100) clean bench inside an ISO 5 (Class 1000) clean room. Baked serpentine powder was also analyzed as a procedural blank. In situ organic compound analysis with the molecular imaging was performed using desorption electrospray ionization (DESI) equipped with Orbitrap MS [9, 10], followed by spatial imaging of organic compounds using ToF/secondary ion mass spectrometry (ToF/SIMS) [11]. The bulk chemical and isotopic compositions of CNS and HO were determined using nano-elemental analysis/isotope ratio mass spectrometry (nanoEA/IRMS) [12] and EA/pyrolysis/IRMS, respectively. We have identified a variety of indigenous organic compounds in the extracts of both A106 and C107 samples. The Ryugu grains host organic molecules under the high-vacuum and cosmic-ray irradiation environment of the asteroid surface. The analysis of extracted molecules is in progress, and the first results will be presented at the symposium.

Hiroshi Naraoka↗

Characterizing Detailed Grain Shape and Size Distribution Properties of Lunar Regolith

Introduction: As the nation prepares to return to the Moon, there is an increasing need for testing tools, instruments, and equipment in simulated environments on Earth to ensure successful operations during lunar missions. Regolith will affect all aspects of future lunar missions, from plume interactions during landing to space suit and tool design [1]. Because of this, it is important to understand the grain shape and size properties of lunar regolith and how those influence regolith behavior in order to prepare for these missions. This knowledge is also vital to create more accurate lunar regolith simulants for testing equipment in a lunar environment. While particle size analyses have been performed on most Apollo soils using simple sieving, shape has only been crudely addressed [2]. This work analyzes 4 lunar regolith samples to provide a better understanding of these size and shape parameters and will provide a more accurate baseline of data to create high-fidelity lunar regolith simulants. Methods: New technologies exist today that are capable of measuring size and shape simultaneously for hundreds of thousands of particles in a single measurement. We conducted a rigorous analysis of the particle size distribution (PSD) as well as the size-dependent 2D and 3D shape parameters of lunar regolith samples of different compositions and maturity levels. This analysis was done using a Microtrac SYNC which provides a unique combination of tri-laser diffraction and Dynamic Image Analysis (DIA). Sample Selection. Four regolith samples were selected for analysis based on maturity level and lunar terrain type: • 10084 – Mature high-Ti mare regolith • 15601 – Immature low-Ti mare regolith • 64501 – Mature highland regolith • 67461 – Immature highland regolith Sample Analysis. After receiving the samples, each sample was imaged with an optical microscope (Figure 1). To obtain 2D and 3D particle size and shape, 0.1 g of each sample was then added to the SYNC for analysis, which outputs more than 30 size and shape parameters for each individual grain as well as the complete size distribution from 0.01-2000 μm by blending laser diffraction and DIA together. For the 0.1 g sample masses requested, ~100,000 grains per sample were captured by DIA. Results: From the PSD analysis, it can be seen that the average particle size of 10084 is ~24.5 µm which is much smaller than the average particle size of the Apollo sample collection (~72 µm) [3], while the average particle size of samples 15601, 64501, and 67461 are larger than the Apollo sample average at ~106 µm, ~103 µm, and ~118.5 µm respectively. The size and shape measurements for the samples output ~30 parameters, four of which were focused on for this study: sphericity, aspect ratio, roundness, and concavity (Figure 3). However, after analyzing the plots it was found that only sphericity and aspect ratio showed differences between the samples. These two parameters are measured on a scale from 0 to 1, with 1 being a perfect sphere with equal dimensions. The results show that the sphericity values are slightly high-er for the mature samples 10084 and 64501 (~0.96) than they are for samples 15601 and 67461 (~0.95) (Figure 4). The aspect ratio values are slightly lower for samples 64501 (~0.7) and 67461 (~0.74) than they are for samples 10084 (~0.76) and 15601 (~0.8) (Figure 5). Discussion: Mature regoliths are those that have been exposed to micrometeorite and solar wind bombardment for long periods of time, breaking up particles and causing them to become more rounded [4]. Therefore, the smaller particle sizes and higher sphericity values for samples 10084 and 64501 are expected due to their higher maturity level compared to 15601 and 67461. However, the aspect ratio values are not dependent on maturity and are instead dependent on terrain type. The lower aspect ratio values for the high-land samples is potentially due to the higher plagioclase content, which occurs in elongated particles and does not break down as easily as the pyroxenes or olivines that are present in the mare. Conclusion and Future Work: The results of this work provide a baseline of high-quality data that will contribute to the creation of high-fidelity lunar simulants and will greatly benefit NASA’s efforts of establishing a human presence on the Moon. Future work includes performing unsupervised image classification on the ~105 particle images per sample in order to identify different classes of grains. These grain classes can then be linked to detailed shape properties, and the relative abundance of each class in the samples can be compared. Acknowledgments: We would like to thank the Extraterrestrial Materials Analysis Group (ExMAG) and the Astromaterials Allocation Review Board (AARB) for allocating lunar regolith samples 10084,9010, 15601,365, 64501,249, and 67461,171 for this work. References: [1] Taylor, L. A. et al. (2005) AIAA #2510. [2] Katagiri et al. (2015) ASCE. [3] Carrier III, W. D. (2005) Lunar Geotech Institute Tech Report. [4] McKay, D. S. et al. (1991) The Lunar Sourcebook, Chapter 7.

S R Deitrick↗

Space Ground Sensorwebs for Volcano Monitoring

Increased space and ground sensing is enabling dramatic new measurements of a wide range of Earth Science and Applied Earth Science phenomena, including: volcanism, flooding, wildfires, weather, and many other phenomena. New Space ventures have produced significantly greater access to data and miniaturization of sensing has enabled cubesats and smallsats to deliver data of outstanding resolution. The advent of the internet of things has produced incredible amounts of relevant terrestrial data as well. Artificial Intelligence offers the potential to automate both data interpretation and resource allocation to best allocate sensing assets. We describe efforts to build and experiment with such “sensorweb” systems and offer some direction for the future sensorweb observation systems.

Zuleta, Ignacio↗

Sheaf Theoretic Models for Routing in Delay Tolerant Networks

One key to communications scalability is routing; as such the goal of this paper is to build upon successful efforts towards general routing for space-based networks. With the ever-increasing accessibility of space, the number of assets is increasing, which becomes a critical communications burden in terms of scheduling, spectrum allocation, and resource allocation. In order to mitigate these concerns, a true networking approach is necessary; a standard approach for space systems is Delay Tolerant Networking (DTN). For DTN to be a meaningful answer to the Solar System Internet (SSI) question, DTN must offer meaningful routing solutions that span the heterogeneous collection of links and nodes. This, in turn, depends on the general structure of these disconnected networks -- a structure that remains largely unknown. In ground communications networks, routing decisions are made based on several pathfinding algorithms working in tandem. In previous work, we modeled Dijkstra's pathfinding algorithm using sheaves and provided a more general framework for determining paths using sheaves over graphs. Continuing our sheaf-theoretic approach, we introduce here an expansion of our pathfinding sheaf to handle more general information, and we expand on additional pathfinding algorithms that can be represented using sheaves. Moreover, we demonstrate means of combining multiple algorithms into a single sheaf structure so that changes of scale can be presented in the language of sheaves. In addition, space communications networks rely upon radio transmitter antennas which can establish broadcast and multicast communications options, rather than the primarily unicast options available to wired networks. Last year, we also introduced a multicast routing sheaf for presenting broadcast, unicast, and multicast communications over a graph. Extending that work, we also introduce queuing sheaves so that we can blend these communications options together to simulate a variety of routing options across space networks. In addition, we include examples to illustrate the applicability of this abstract theory to routing in disconnected networks.

Robert Short↗

Communication Demand in the National Airspace - A Federated Learning Approach

Within the national airspace system (NAS), efficient use of spectrum remains a challenge; as UAS and UAM missions evolve, the amount of mission-critical aircraft communications are expected to significantly grow. To accommodate the increased demand, NASA Glenn Research Center is investigating artificial intelligence approaches that could dynamically allocate spectrum; however, these solutions are driven by communication and aviation data items, many of which are not directly available. One such cornerstone data item is communication demand, parameterizing the needs within a sector in terms that may directly inform spectrum allocation, such as channel access duration, bandwidth, and modulation type. This paper considers the complexity of predicting communication demand as a function of NAS behaviors. Unlike prior prediction work in communications, this research must consider how the NAS may be impacted by external factors - such as convective weather and closures - rather than estimating demand from time-series forecasting alone. Much of this research considers a federated learning design to predict communication events in terms of the type of event occurring (sector coordination, conflict resolution, etc.). To do so, an investigation of products from Sherlock Data Warehouse is conducted, identifying the trends, sufficiency, and correlations of each product to identified events. Additionally, a preliminary discussion for inferring associations between these event types and their communication parameters (duration, bandwidth, modulation) is presented. By utilizing federated learning, imbalances in the types of events and data present throughout the NAS can inform local models without impairing global training. Furthermore, the two-stage approach proposed allows for robust and speculative communication modelling, as communication techniques continue to evolve. As a result, this model enables a generalized approach to understanding NAS communications which is able to inform long-term changes to aviation spectrum management.

Nathan Schimpf↗

Pointing Error Budget Development and Methodology on the Psyche Project

The Psyche mission was selected by NASA as the 14th mission in the Discovery Program in 2017. The Psyche spacecraft utilizes solar electric propulsion, and will journey to the asteroid (16) Psyche during a 3.5 year trajectory after its planned 2022 launch. The spacecraft instrument suite includes a magnetometer, a multispectral imager, a gamma ray neutron spectrometer, and an X-band radio telecommunications system. It also includes the Deep Space Optical Communication technical demonstration. These instruments along with other spacecraft components require pointing accuracy to meet their scientific and engineering performance requirements. Early on in the project development, the team established a methodology by which pointing accuracy (knowledge and control) is analyzed against the system requirements by means of pointing error budgets and requirement allocations. A margin policy was implemented to ensure the instrument and engineering component pointing accuracy requirements will be met during verification and in flight. Psyche’s pointing management framework defines detailed rationales for the system and subsystem error allocations of the top level pointing accuracy requirements, with sufficient project level pointing margin, and supports end-to-end pointing requirement verification. This paper will present an overview of the Psyche project’s pointing error budget development process, and discuss the rationale behind the methodology. Psyche’s pointing budget methodology integrates best practices and lessons learned from heritage missions, while focusing on the specific needs of the Psyche spacecraft and its science instruments. Key challenges in the pointing error budget development will be reviewed, and a deep dive into two key Psyche pointing budgets are presented. The systems engineering of Psyche’s pointing budget methodology outlined in this paper will serve as a resource for future deep space missions.

Lai, Peter↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign is a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR will, for the firsttime ever, present a need to communicate with multiple surfaceassets that are co-located on Mars in a coordinated effort toaccomplish the unified objective of fetching, transporting, andreturning samples from Mars. Currently, Mars surface assetsrelay data to and from Earth using a number of orbiters inwhat’s known as the Mars Relay Network (MRN). This networkis characterized by a small number of surface assets distributedacross the Martian globe and a larger number of orbiters toprovide relay services. As of June 2020, there are two surfaceassets for which five orbiters are providing relay. During theMSR Campaign, there will be two rovers and a lander that allwill require relay communication from a small number of Marsorbiters to meet the aggressive MSR timeline. The inversion ofthe current MRN paradigm, a system of many surface assetsrequiring relay and few orbiters to provide relay, necessitatesthe unique challenge of optimally allocating relay passes tomaximize the operational capability of all assets. The allocationmust consider a large number of trade variables includingMars asset operational requirements and Earth ground systemconstraints, including staffing schedules, operations planningacross time zones, and more. To address these telecommunicationchallenges, the Mars Asset Relay Mission Link AllocationDesign Environment (MARMLADE) tool was developed. Itis a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets andquantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbitergeometry and telecommunication capabilities provided by JPL’sTelecom Orbit Analysis and Simulation Tool (TOAST) softwareto compute which asset should get each pass based on a seriesof heuristics and predictions of all assets’ states. WithinMARMLADE, the user can provide inputs including the optionfor time-based pass splitting, fixed FWD data rate capabilities,DFE communication capabilities, and link parameters allowingfor the assessment of complex operations and hardware tradesusing surface mission operational efficiency as a primary figureof merit. As the MSR mission concepts continue to mature,MARMLADE is being used to assess ability of all MSR elementsto meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.

Lee, Charles↗

A Federated Learning Approach to Predicting Communication Demand in the National Airspace

Within the national airspace system (NAS), efficient use of spectrum remains a challenge; as UAS and UAM missions evolve, the amount of mission-critical aircraft communications are expected to significantly grow. To accommodate the increased demand, NASA Glenn Research Center is investigating artificial intelligence approaches that could dynamically allocate spectrum; however, these solutions are driven by communication and aviation data items, many of which are not directly available. One such cornerstone data item is communication demand, parameterizing the needs within a sector in terms that may directly inform spectrum allocation, such as channel access duration, bandwidth, and modulation type. This paper considers the complexity of predicting communication demand as a function of NAS behaviors. Unlike prior prediction work in communications, this research must consider how the NAS may be impacted by external factors - such as convective weather and closures - rather than estimating demand from time-series forecasting alone. Much of this research considers a federated learning design to predict communication events in terms of the type of event occurring (sector coordination, conflict resolution, etc). To do so, an investigation of products from Sherlock Data Warehouse is conducted, identifying the trends, sufficiency, and correlations of each product to identified events. Additionally, a preliminary discussion for inferring associations between these event types and their communication parameters (duration, bandwidth, modulation) is presented. By utilizing federated learning, imbalances in the types of events and data present throughout the NAS can inform local models without impairing global training. Furthermore, the two-stage approach proposed allows for robust and speculative communication modelling, as communication techniques continue to evolve. As a result, this model enables a generalized approach to understanding NAS communications which is able to inform long-term changes to aviation spectrum management.

Nathan Schimpf↗

Evaluation and Intercomparison of Wildfire Smoke Forecasts from Multiple Modeling Systems for the 2019 Williams Flats Fire

Wildfire smoke is one of the most significant concerns of human and environmental health, associated with its substantial impacts on air quality, weather, and climate. However, biomass burning emissions and smoke remain among the largest sources of uncertainties in air quality forecasts. In this study, we evaluate the smoke emissions and plume forecasts from 12 state-of-the-art air quality forecasting systems during the Williams Flats fire in Washington State, US, August 2019, which was intensively observed during the Fire Influence on Regional to Global Environments and Air Quality (FIREX-AQ) field campaign. Model forecasts with lead times within 1 d are intercompared under the same framework based on observations from multiple platforms to reveal their performance regarding fire emissions, aerosol optical depth (AOD), surface PM2.5, plume injection, and surface PM2.5 to AOD ratio. The comparison of smoke organic carbon (OC) emissions suggests a large range of daily totals among the models, with a factor of 20 to 50. Limited representations of the diurnal patterns and day-to-day variations of emissions highlight the need to incorporate new methodologies to predict the temporal evolution and reduce uncertainty of smoke emission estimates. The evaluation of smoke AOD (sAOD) forecasts suggests overall underpredictions in both the magnitude and smoke plume area for nearly all models, although the high-resolution models have a better representation of the fine-scale structures of smoke plumes. The models driven by fire radiative power (FRP)-based fire emissions or assimilating satellite AOD data generally outperform the others. Additionally, limitations of the persistence assumption used when predicting smoke emissions are revealed by substantial underpredictions of sAOD on 8 August 2019, mainly over the transported smoke plumes, owing to the underestimated emissions on 7 August. In contrast, the surface smoke PM2.5 (sPM2.5) forecasts show both positive and negative overall biases for these models, with most members presenting more considerable diurnal variations of sPM2.5. Overpredictions of sPM2.5 are found for the models driven by FRP-based emissions during nighttime, suggesting the necessity to improve vertical emission allocation within and above the planetary boundary layer (PBL). Smoke injection heights are further evaluated using the NASA Langley Research Center's Differential Absorption High Spectral Resolution Lidar (DIAL-HSRL) data collected during the flight observations. As the fire became stronger over 3–8 August, the plume height became deeper, with a day-to-day range of about 2–9 km a.g.l. However, narrower ranges are found for all models, with a tendency of overpredicting the plume heights for the shallower injection transects and underpredicting for the days showing deeper injections. The misrepresented plume injection heights lead to inaccurate vertical plume allocations along the transects corresponding to transported smoke that is 1 d old. Discrepancies in model performance for surface PM2.5 and AOD are further suggested by the evaluation of their ratio, which cannot be compensated for by solely adjusting the smoke emissions but are more attributable to model representations of plume injections, besides other possible factors including the evolution of PBL depths and aerosol optical property assumptions. By consolidating multiple forecast systems, these results provide strategic insight on pathways to improve smoke forecasts.

AOD↗

NASA’s Evolving Ka-band Network Capabilities to Meet Mission Demand

Space missions are increasingly demanding higher data rates to support the growth in information-intensive mission operations. This growth is reflected in planned and operational missions from low Earth orbit, such as the upcoming NASA-Indian Space Research Organization (ISRO) Synthetic Aperture Radar (NISAR) and Plankton, Aerosol, Cloud and Ocean Ecosystem (PACE) missions, to the future Artemis lunar campaign, and the recently launched James Webb Space Telescope orbiting at the Sun-Earth L2 Lagrange point. JWST was the first L2 mission to be defined as a high data rate mission transmitting at 8 Mbps, or 270 gigabits of science data per day. ISRO and PACE anticipate achieving data throughputs of 5-40 terabits per day. These data rates exceed the capabilities of S-band and X-band frequency allocations and are a key driver for migrating to the 26 GHz Ka-band frequency allocation. The NASA Space Communications and Navigation (SCaN) program has been preparing the networks to support this demand by pursuing critical Ka-band infrastructure. The status of current and evolving network capability, including the Near Space Network’s Initiative for Ka-band Advancement (NIKA), and the Deep Space Network’s Lunar Exploration Upgrades (DLEU), as well as profiling mission usage of Ka-band services, are discussed in detail. The push toward Ka-band, is not only an opportunity for increased performance, but alleviates current challenges with contentious and cluttered spectrum access in S- and X-band. The paper provides an overview of these advantages and advanced techniques that optimize its use before the transition to optical communications becomes an imperative. The challenges and potential mitigations for missions considering selection of Ka-band network services are also discussed.

space communications↗

NASA's Efforts to Commercialize Communications Services for Mission in Near-Earth Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN)Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is pursuing the use of demonstrated commercial services for all its future near-Earth requirements through a flexible, multi-provider approach that minimizes risks to the user missions and ensures costs to user missions are reasonable. Progress toward this goal is advancing in multiple key areas including direct to Earth (DTE), space-based relay, technology investments, required spectrum regulatory changes and mission engagement and infusion. The transition to commercial DTE services is already underway, with a target for transition by 2024. The primary functions to execute SCaN’s DTE strategy include increasing commercial service allocations by leveraging current commercial network providers and enabling seamless onboarding of additional providers into the network. Furthermore, moving away from government DTE services will allow operational costs to be optimized. A more gradual approach is planned for the transition to commercial space-based relay services to allow for demonstration and operationalization of commercial services for future users by 2030. In June of 2022, six American SATCOM vendors were awarded a combined $278.5 million through Funded Space Act Agreements (FSAAs) for the first cycle of demonstration and validation activities. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. Successful user mission transition to commercial services, both DTE and space-based relay, are dependent on the technologies and capabilities that address gaps in commercial capability. NASA is investing in technology development and pursuing a new strategic approach to the creation or adoption of space communications standards to move the agency toward a commercial paradigm. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. NASA holds a leadership role in multiple civil space standards bodies and international coordination groups to ensure that standards supporting interoperability are developed with defined functions, interfaces, and performance. However, to successfully meet commercialization objectives, NASA seeks to collaborate with industry, and as applicable adopt or adapt to commercially defined standards. As such, NASA joined the 3rd Generation Partnership Project (3GPP) as an official member in 2021 to advocate for the inclusion of space missions as a unique user segment in future 5G non-terrestrial networks, and to better understand the scope of 3GPP releases and implications for space users. Further, engagement in Spectrum regulatory bodies is being undertaken to augment existing space-Earth and inter-satellite frequency allocations available for both government and commercial space systems. This paper addresses the recent progress toward NASA’s commercial space communications transition objectives and how key challenges are being navigated.

Gregory W Heckler↗

NASA’s Evolving Ka-Band Network Capabilities to Meet Mission Demand

Space missions are increasingly demanding higher data rates to support the growth in information-intensive mission operations. This growth is reflected in planned and operational missions from low Earth orbit, such as the upcoming NASA-Indian Space Research Organization (ISRO) Synthetic Aperture Radar (NISAR) and Plankton, Aerosol, Cloud and Ocean Ecosystem (PACE) missions, to the future Artemis lunar campaign, and the recently launched James Webb Space Telescope (JWST) orbiting at the Sun-Earth L2 Lagrange point. JWST was the first L2 mission to be defined as a high data rate mission transmitting at 28 Megabits per second (Mbps), or 270 Gigabits of science data per day. ISRO and PACE anticipate achieving data throughputs of 5-40 Terabits per day. These data rates exceed the capabilities of S-band and X-band frequency allocations and are a key driver for migrating to the 26 GHz Ka-band frequency allocation. The NASA Space Communications and Navigation (SCaN) program has been preparing the networks to support this demand by pursuing critical Ka-band infrastructure. The status of current and evolving network capability, including the Near Space Network’s Initiative for Ka-band Advancement (NIKA), and the Deep Space Network’s Lunar Exploration Upgrades (DLEU), as well as profiling mission usage of Ka-band services, are discussed in detail. The push toward Kaband, is not only an opportunity for increased performance, but alleviates current challenges with contentious and cluttered spectrum access in S- and X-band. The paper provides an overview of these advantages and advanced techniques that optimize its use before the transition to optical communications becomes an imperative. The challenges and potential mitigations for missions considering selection of Ka-band network services are also discussed.

Ka-band↗

A Study of the Curation Protocol by Sample Analysis Working Team (SAWT) in Martian Moons eXploration (MMX) Project

Japan Aerospace Exploration Agency (JAXA) will launch a spacecraft in 2024 for a sample return mission from Phobos (Martian Moons eXploration: MMX). The major scientific goals of MMX are to constrain (1) the origin of Phobos and Deimos and (2) the evolution of the Mars-moon system [1]. The touchdown operations are planned to be performed twice at different landing sites on the Phobos surface to collect > 10 g of the surface materials [2]. After the return to the Earth, the Phobos samples will be collected from the individual sample canisters and introduced to the clean chamber installed at ISAS (Institute of Space and Astronautical Science). The Sample Analysis Working Team (SAWT) of MMX designed the procedure of Phobos sample analysis mainly conducted by the initial analysis teams [3]. For the next step, the SAWT will define the procedure of the curation process (mostly non-destructive analysis) of the Phobos samples, which will be presented here. The protocols of the Phobos sample curation is illustrated in figure 1. First, the headspace gas from the sample container will be collected during the Quick Analysis phase. The Quick Analysis will be operated by the sampler and curation teams in ISAS/JAXA. The terrestrial leak and contamination from the sampling systems will be tested using a quadrupole mass spectrometer equipped with a gas sampling system. Second, the bulk Phobos sample will be observed in the clean chamber under purified-N2 gas with an ambient condition (Pre-basic Characterization). This phase will be operated by the curation team in ISAS/JAXA and the instrument team of the MMX mission. The consistency between the data from the instruments in the clean chamber and the spacecraft will then be evaluated. Subsequently, the curation will distribute the small amount of Phobos samples to the Initial analysis team of MMX to conduct the "Preliminary Examination". The objectives of the preliminary examination are to provide (1) feedback on the subsequent sample allocation process, (2) preliminary scientific results that will address parts of MMX mission goals, and (3) evaluation of the sampling system and terrestrial alteration on Phobos samples. Because multiple models are proposed for the origin of Phobos [1] (e.g., giant impact, the capture of asteroids), the chemical and mineralogical characteristics of Phobos must be assessed before the allocation of the samples to the individual initial analysis teams. Simultaneously, the curation team in JAXA will observe the individual grains and aliquots of the samples in the clean chamber (Basic Characterization).

R Fukai↗

Architecting Safer Autonomous Aviation Systems

The aviation literature gives relatively little guidance to practitioners about the specifics of architecting systems for safety, particularly the impact of architecture on allocating safety requirements, or the relative ease of system assurance resulting from system or subsystem level architectural choices. As an exemplar, this paper considers common architectural patterns used within traditional aviation systems and explores their safety and safety assurance implications when applied in the context of integrating artificial intelligence (AI) and machine learning (ML) based functionality. Considering safety as an architectural property, we discuss both the allocation of safety requirements and the architectural trade-offs involved early in the design lifecycle. This approach could be extended to other assured properties, similar to safety, such as security. We conclude with a discussion of the safety considerations that emerge in the context of candidate architectural patterns that have been proposed in the recent literature for enabling autonomy capabilities by integrating AI and ML. A recommendation is made for the generation of a property-driven architectural pattern catalogue.

Architecture patterns↗

Architecting Safer Autonomous Aviation Systems

The aviation literature gives relatively little guidance to practitioners about the specifics of architecting systems for safety, particularly the impact of architecture on allocating safety requirements, or the relative ease of system assurance resulting from system or subsystem level architectural choices. As an exemplar, this paper considers common architectural patterns used within traditional aviation systems and explores their safety and safety assurance implications when applied in the context of integrating artificial intelligence (AI) and machine learning (ML) based functionality. Considering safety as an architectural property, we discuss both the allocation of safety requirements and the architectural trade-offs involved early in the design lifecycle. This approach could be extended to other assured properties, similar to safety, such as security. We conclude with a discussion of the safety considerations that emerge in the context of candidate architectural patterns that have been proposed in the recent literature for enabling autonomy capabilities by integrating AI and ML. A recommendation is made for the generation of a property-driven architectural pattern catalogue.

Architecture patterns↗

Assessment of Near-Angle Scatter on Exo-Earth Coronagraphy

A first order single surface analysis indicates that, to enable coronagraphic detection and characterization of exo-Earth planets, near angle scatter must be considered when specifying optical surfaces for a potential Habitable World Observatory. Based on arbitrary error budget allocations and using Rayleigh-Rice Vector Scatter Theory, Generalized Harvey-Shack Scalar Scatter Theory, and Greynolds Approximation, ‘placeholder’ specifications for the primary mirror are derived: Static Surface Roughness < 1 nm rms, and Dynamic Surface Roughness < 1 pm PV. These specifications will change once error budget allocations are defined. Analysis does not include scatter from more than just the primary mirror, coating structure, edges, contamination, micrometeoroid impacts, etc.

H. Philip Stahl↗

Achieving Large-Scale, High-Resolution, Full Shell Replicated X-Ray Optics: Budgeting for Sources of Spatial Resolution Errors

Technology for a large-area, high-angular resolution mirror module for a future Great Observatory x-ray mission is progressing along different paths. To date, none of these are fully developed. Work at the Marshall Space Flight Center (MSFC) seeks to leverage the benefits of full shell optics while exploring the limits of using shell replication technology for optics production. Here, we provide an updated accounting of spatial-resolution-constraining error terms to give context to recent improvements in MSFC replicated optics, as well as guidance and justification for current and future directions of research. Content includes strawman error allocations for an optical system that is parametrically Lynx-like, where the replicated-optics technology stands relative to these allocations, and methodology for mapping development plans to efficiently identify the limiting factors and approaches to overcoming these.

error budget↗