Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 685 records · Page 38

Airspace Technology Demonstration 3 (ATD-3): Dynamic Routes for Arrivals in Weather (DRAW) Technology Transfer Document Summary Version 2.0

Airspace Technology Demonstration – 3 (ATD-3) is part of NASA’s Airspace Operations and Safety Program (AOSP) – specifically, its Airspace Technology Demonstrations (ATD) Project. ATD-3 is a multi-year research and development effort which proposes to develop and demonstrate automation technologies and operating concepts that enable air navigation service providers and airspace users to continuously assess weather, winds, traffic, and other information to identify, evaluate, and implement workable opportunities for flight plan route corrections that can result in significant flight time and fuel savings in en route airspace. In order to ensure that the products of this tech-transfer are relevant and useful, NASA has created strong partnerships with the FAA and key industry stakeholders. This summary document and accompanying technology artifacts satisfy the third Research Transition Product (RTP) defined in the Applied Traffic Flow Management (ATFM) Research Transition Team (RTT) Plan, which is Dynamic Routes for Arrivals in Weather (DRAW). This technology transfer consists of artifacts for DRAW Arrival Metering (AM) Operations delivered in June 2018, DRAW AM updates, and DRAW Extended Metering (XM) Operations. Blue highlighting indicates the new or modified deliverables. Some of the artifacts in this technology transfer have distribution restrictions that need to be followed. Distribution information is noted in each section. DRAW is a trajectory-based system that combines the legacy Dynamic Weather Routes (DWR) weather avoidance technology with an arrival-specific rerouting algorithm and arrival scheduler to improve traffic flows on weather-impacted arrival routes into major airports. First, DRAW identifies flights that could be rerouted to more efficient Standard Terminal Arrival Routes (STARs) that may have previously been impacted by weather. Second, when weather is impacting the arrival routing, DRAW proposes simple arrival route corrections that enable aircraft to stay on their flight plan while avoiding weather. The DRAW system proposes reroutes early enough to allow Time Based Flow Management (TBFM) to make the necessary schedule adjustments. As a result, metering operations can be sustained longer and more consistently in the presence of weather because the arrival schedule accounts for the dynamic routing intent of arrival flights to deviate around weather. The first DRAW tech transfer in June 2018 focused on arrival metering operations with the DRAW algorithm implemented in the NASA Center TRACON Automation System (CTAS) automation software. This tech transfer delivery includes updates for DRAW implemented in FAA’s TBFM 4.7 automation software and preliminary research into DRAW for XM operations.

Isaacson, Douglas R.↗

Aerospace Regenerative Fuel Cell Fluidic Component Design Challenges

A discrete regenerative fuel cell (RFC) system is currently under development at the NASA Glenn Research Center and Johnson Space Center. The objective of this activity is to produce an energy storage system with a higher specific energy (W·hr/kg) than the state-of-the-art battery technologies then test that system within an environment simulating the temperatures and pressures expected over a full lunar day cycle on the lunar surface. The system is designed to be as flight-like as possible given resource and commercially available technology limitations. The RFC system is comprised of a fuel cell power system, a high pressure electrolysis system, fluidic and electronic balance of plant systems, avionics, power management and distribution system, and software. This technical memorandum discusses components and subsystems that present challenges in developing flight ready RFCs. To remedy identified issues, functional application test plans are presented for components and subsystems primarily constructed with commercially available options due to the budget and schedule constraints of this ground technology demonstration project.

fuel cell↗

Commanding Curiosity from the Couch: MSL Remote Operations, Challenges, and Path Ahead

This paper describes how the Mars ScienceLaboratory (MSL) project prepared for and successfully beganCuriosity rover Mars operations from their homes in responseto the COVID-19 work-from-home orders. In a very shortperiod, the team developed procedures and executed a remoteoperations readiness test in parallel with the team's support fornominal operations. Continuing regular rover operations withan entirely remote team had not previously been consideredfeasible due to a variety of factors. These included both thehuman factors, such as multiple concurrent person-to-personinteractions of the uplink planning team, as well as technicalfactors, such as reliance on powerful workstations dedicated tographically intensive software tools used for planning. The testwas conducted on March 12th, with both the downlink anduplink teams successfully simulating a near full planning day.The JPL administration announced the transition to mandatorytelework on Monday, March 16th. MSL stood down the uplinkplanning originally scheduled for the next day while downlinkcontinued monitoring the rover. Full operations then resumedper schedule with nearly the entire operations team teleworkingon Friday, March 20th, during which the team planned roveractivities for three Martian days (sols). These activities includedthe successful drilling of the "Edinburgh" rock target, a highlycomplex contact science activity.As of October 1st, 2020, the Mars Science Laboratory missionoperations team has conducted 88 remote tactical uplink shiftsfor a total of 190 sols of planned rover activity, which accountsfor more than 6% of the mission to date. In this period the roverhas completed four drilling campaigns and driven over 1150meters towards its next major science target – a sulfate bearinggeologic unit at the foot of Mount Sharp. Success has not beenwithout its challenges. Many of these have been addressed whileothers will remain in some form until the team can safely returnto JPL, which in turn is the largest challenge for the future.

Stroupe, Ashley↗

Space Shuttle - The new baseline

Recent design alterations and refinements in the Space Shuttle program are considered with particular attention to the present baseline Shuttle configurations, performance characteristics, mission profiles, and flight and ground operations. Hardware and software development and testing, propulsion systems, entry trajectory events, and payload capability are covered. The refined Space Shuttle system design is characterized as one reflecting firm technical and economic considerations. Systems development is well under way, with all major contractors progressing on schedule.

Malkin, M. S.↗

Ground data systems resource allocation process

The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

Berner, Carol A.↗

Environmental concept for engineering software on MIMD computers

The issues related to developing an environment in which engineering systems can be implemented on MIMD machines are discussed. The problem is presented in terms of implementing the finite element method under such an environment. However, neither the concepts nor the prototype implementation environment are limited to this application. The topics discussed include: the ability to schedule and synchronize tasks efficiently; granularity of tasks; load balancing; and the use of a high level language to specify parallel constructs, manage data, and achieve portability. The objective of developing a virtual machine concept which incorporates solutions to the above issues leads to a design that can be mapped onto loosely coupled, tightly coupled, and hybrid systems.

Lopez, L. A.↗

Software For Integer Programming

Improved Exploratory Search Technique for Pure Integer Linear Programming Problems (IESIP) program optimizes objective function of variables subject to confining functions or constraints, using discrete optimization or integer programming. Enables rapid solution of problems up to 10 variables in size. Integer programming required for accuracy in modeling systems containing small number of components, distribution of goods, scheduling operations on machine tools, and scheduling production in general. Written in Borland's TURBO Pascal.

Fogle, F. R.↗

Autonomous Rendezvous and Docking Conference, volume 3

This document consists of the presentation submitted at the Autonomous Rendezvous and Docking (ARD) Conference. The document contains three volumes: ARD hardware technology; ARD software technology; and ARD operations. The purpose of this conference is to identify the technologies required for an on orbit demonstration of ARD, assess the maturity of these technologies, and provide the necessary insight for a quality assessment of programmatic management, technical, schedule, and cost risks.

Source record↗

Comprehensive Design Reliability Activities for Aerospace Propulsion Systems

This technical publication describes the methodology, model, software tool, input data, and analysis result that support aerospace design reliability studies. The focus of these activities is on propulsion systems mechanical design reliability. The goal of these activities is to support design from a reliability perspective. Paralleling performance analyses in schedule and method, this requires the proper use of metrics in a validated reliability model useful for design, sensitivity, and trade studies. Design reliability analysis in this view is one of several critical design functions. A design reliability method is detailed and two example analyses are provided-one qualitative and the other quantitative. The use of aerospace and commercial data sources for quantification is discussed and sources listed. A tool that was developed to support both types of analyses is presented. Finally, special topics discussed include the development of design criteria, issues of reliability quantification, quality control, and reliability verification.

Christenson, R. L.↗

A Proposed Strategy for the U.S. to Develop and Maintain a Mainstream Capability Suite ("Warehouse") for Automated/Autonomous Rendezvous and Docking in Low Earth Orbit and Beyond

The ability of space assets to rendezvous and dock/capture/berth is a fundamental enabler for numerous classes of NASA fs missions, and is therefore an essential capability for the future of NASA. Mission classes include: ISS crew rotation, crewed exploration beyond low-Earth-orbit (LEO), on-orbit assembly, ISS cargo supply, crewed satellite servicing, robotic satellite servicing / debris mitigation, robotic sample return, and robotic small body (e.g. near-Earth object, NEO) proximity operations. For a variety of reasons to be described, NASA programs requiring Automated/Autonomous Rendezvous and Docking/Capture/Berthing (AR&D) capabilities are currently spending an order-of-magnitude more than necessary and taking twice as long as necessary to achieve their AR&D capability, "reinventing the wheel" for each program, and have fallen behind all of our foreign counterparts in AR&D technology (especially autonomy) in the process. To ensure future missions' reliability and crew safety (when applicable), to achieve the noted cost and schedule savings by eliminate costs of continually "reinventing the wheel ", the NASA AR&D Community of Practice (CoP) recommends NASA develop an AR&D Warehouse, detailed herein, which does not exist today. The term "warehouse" is used herein to refer to a toolbox or capability suite that has pre-integrated selectable supply-chain hardware and reusable software components that are considered ready-to-fly, low-risk, reliable, versatile, scalable, cost-effective, architecture and destination independent, that can be confidently utilized operationally on human spaceflight and robotic vehicles over a variety of mission classes and design reference missions, especially beyond LEO. The CoP also believes that it is imperative that NASA coordinate and integrate all current and proposed technology development activities into a cohesive cross-Agency strategy to produce and utilize this AR&D warehouse. An initial estimate indicates that if NASA strategically coordinates the development of a robust AR&D capability across the Agency, the cost of implementing AR&D on a spacecraft could be reduced from roughly $70M per mission to as low as $7M per mission, and the associated development time could be reduced from 4 years to 2 years, after the warehouse is completely developed. Table 1 shows the clear long-term benefits to the Agency in term of costs and schedules for various missions. (The methods used to arrive at the Table 1 numbers is presented in Appendices A and B.)

Krishnakumar, Kalmanje S.↗

GRACE Final Technical Report

The GRACE project (Grid that is Risk-Aware for Clean Electricity) was a five-year research initiative funded by the U.S. Department of Energy's Advanced Research Projects Agency- Energy (ARPA-E) under the PERFORM program. Led by Duke University's Nicholas School of the Environment, with contributions from The Ohio State University, North Carolina State University, Dartmouth College, and Pacific Northwest National Laboratory, the project addressed a fundamental challenge in grid management: conventional software plans for a single most-likely outcome and relies on reserves as a buffer, leaving utilities poorly equipped for the growing variability introduced by renewable energy. GRACE demonstrated a better approach: explicitly representing thousands of plausible future scenarios and choosing operating schedules that perform well across all of them.

14 SOLAR ENERGY↗

X-29A technology demonstrator flight test program overview

An overview of the X-29A functional flight program and concept evaluation program is presented, including some of the unique and different preparations for the first flight. Included are a discussion of the many organizational responsibilities and a description of the program management structure for the test team. Also discussed are preflight ground, flight functional envelope expansion, and flight research test objectives and qualitive results to date for both a limited-envelope flight control system and an expanded-envelope system. The aircraft, including the instrumentation system and measurements, is described. In addition, a discussion is included regarding the use of major support facilities, such as ground and flight simulators, the NASA Western Aeronautical Test Range and mission control center, and the Grumman automated telemetry station. An overview of the associated real-time and postflight batch data processing software approaches is presented. The use of hardware-in-the-loop simulation for independent verification and validation and mission planning and practice is discussed. Also included is a description of the flight-readiness review, the airworthiness and flight safety review, work scheduling, technical briefings, and preflight and postflight crew briefings. The configuration control process used on the X-29A program is described, and its relationship to both simulation and aircraft operations is discussed. An X-29A schedule overview is presented with an outline of a proposed follow-on program.

Sefic, W. J.↗

Maintaining an expert system for the Hubble Space Telescope ground support

The transformation portion of the Hubble Space Telescope (HST) Proposal Entry Processor System converts astronomer-oriented description of a scientific observing program into a detailed description of the parameters needed for planning and scheduling. The transformation system is one of a very few rulebased expert systems that has ever entered an operational phase. The day to day operations of the system and its rulebase are no longer the responsibility of the original developer. As a result, software engineering properties of the rulebased approach become more important. Maintenance issues associated with the coupling of rules within a rulebased system are discussed and a method is offered for partitioning a rulebase so that the amount of knowledge needed to modify the rulebase is minimized. This method is also used to develop a measure of the coupling strength of the rulebase.

Lindenmayer, Kelly↗

Future space transportation system architecture avionics requirements

NASA began a multi-center study in January 1993 to examine options for providing the most cost effective space transportation system in the future. The key advanced avionics requirements for these vehicle concepts are envisioned to provide significantly improved operational efficiency and effectiveness. It is very desirable to have adaptive guidance, navigation, and control approaches that will allow launch and return in almost any weather condition. The vehicles must be able to accommodate atmospheric density variations and winds without software changes. The flight operations must become much more autonomous in all flight regimes like an aircraft, and preflight checkout should make use of the onboard systems. When the vehicle returns to the launch site, subsystem health must be known and maintenance tasks scheduled accordingly. Ground testing of most subsystems must be eliminated. Also, the health monitoring system must be designed to enhance the ability to abort the mission significantly and save the crew and the vehicle. The displays and controls must be much less complex than current systems and must significantly reduce pilot work load. It is important to have low power, light weight displays and controls. Rendezvous and docking and all flight phases must have autopilot capability to reduce pilot work load for routine operations and in abort situations. The vehicles must have the demonstrated ability to return to the launch site. Abort from all mission phases can put additional demands on the communications system.

Stone, Howard↗

Leveraging Commercial Software Defined Radio for Low Cost Deep Space Testing

In a typical space mission development life cycle, there is a stage where the spacecraft needs to test against the ground station for interface compatibility to ensure that the spacecraft will be properly tracked after launch. This testing normally requires the spacecraft team to bring their flight equipment to the ground station facility. While recognizing that testing with actual flight or engineering module is the most preferred option because of maximum fidelity, there are occasion when the use of actual flight hardware is a logistically challenge because of spacecraft development. Having another test tool that can emulate the spacecraft signal – by recording the signal transmitted by the spacecraft and regenerate an RF signal for ground system testing - would be very useful. It is even more an attractive option if such spacecraft emulator is inexpensive and highly portable. In this paper, we describe a low-cost, light-weight recorder/playback assembly (RPA) that supports deep space missions testing. The equipment leverages on commercially available software defined radios (SDR) and public-domain software. The RPA has been used to support two missions. One effort is to validate that the Uchinoura 34-m tracking station of the Japanese Aerospace Exploration Agency (JAXA) would be able to track the upcoming NASA Exploration Mission 1 (EM-1) spacecraft, scheduled for launch in 2019. The second effort is to help with the testing and certification of the 21-m antenna ground station at the Morehead State University (MSU) in Kentucky, United States, prior to the time when the Lunar IceCube spacecraft is ready for actual compatibility testing. The RPA also enables students/staff training of the new ground station, using the RPA signal as test input into the system. This low-cost test signal allows the MSU team to save money on not having to develop a full-scale self-generated telemetry test signal source.

White, Leslie↗

Apollo experience report: Guidance and control systems. Engineering simulation program

The Apollo Program experience from early 1962 to July 1969 with respect to the engineering-simulation support and the problems encountered is summarized in this report. Engineering simulation in support of the Apollo guidance and control system is discussed in terms of design analysis and verification, certification of hardware in closed-loop operation, verification of hardware/software compatibility, and verification of both software and procedures for each mission. The magnitude, time, and cost of the engineering simulations are described with respect to hardware availability, NASA and contractor facilities (for verification of the command module, the lunar module, and the primary guidance, navigation, and control system), and scheduling and planning considerations. Recommendations are made regarding implementation of similar, large-scale simulations for future programs.

Gilbert, D. W.↗

Autonomous Rendezvous and Docking Conference, volume 1

This document consists of the presentation submitted at the Autonomous Rendezvous and Docking (ARD) Conference. It contains three volumes: ARD hardware technology; ARD software technology; and ARD operations. The purpose of this conference is to identify the technologies required for an on orbit demonstration of the ARD, assess the maturity of these technologies, and provide the necessary insight for a quality assessment of the programmatic management, technical, schedule, and cost risks.

Source record↗

Infrastructure for Training and Partnershipes: California Water and Coastal Ocean Resources

The purpose of this project was to advance the existing ICESS/Bren School computing infrastructure to allow scientists, students, and research trainees the opportunity to interact with environmental data and simulations in near-real time. Improvements made with the funding from this project have helped to strengthen the research efforts within both units, fostered graduate research training, and helped fortify partnerships with government and industry. With this funding, we were able to expand our computational environment in which computer resources, software, and data sets are shared by ICESS/Bren School faculty researchers in all areas of Earth system science. All of the graduate and undergraduate students associated with the Donald Bren School of Environmental Science and Management and the Institute for Computational Earth System Science have benefited from the infrastructure upgrades accomplished by this project. Additionally, the upgrades fostered a significant number of research projects (attached is a list of the projects that benefited from the upgrades). As originally proposed, funding for this project provided the following infrastructure upgrades: 1) a modem file management system capable of interoperating UNIX and NT file systems that can scale to 6.7 TB, 2) a Qualstar 40-slot tape library with two AIT tape drives and Legato Networker backup/archive software, 3) previously unavailable import/export capability for data sets on Zip, Jaz, DAT, 8mm, CD, and DLT media in addition to a 622Mb/s Internet 2 connection, 4) network switches capable of 100 Mbps to 128 desktop workstations, 5) Portable Batch System (PBS) computational task scheduler, and vi) two Compaq/Digital Alpha XP1000 compute servers each with 1.5 GB of RAM along with an SGI Origin 2000 (purchased partially using funds from this project along with funding from various other sources) to be used for very large computations, as required for simulation of mesoscale meteorology or climate.

Siegel, David A.↗