Search NASA⌕ Search

SEARCH · Search NASA

Results for “statistically designed experiments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

671 records · Page 38

Statistical Analyses of Second Indoor Bio-Release Field Evaluation Study at Idaho National Laboratory

In September 2008 a large-scale testing operation (referred to as the INL-2 test) was performed within a two-story building (PBF-632) at the Idaho National Laboratory (INL). The report “Operational Observations on the INL-2 Experiment” defines the seven objectives for this test and discusses the results and conclusions. This is further discussed in the introduction of this report. The INL-2 test consisted of five tests (events) in which a floor (level) of the building was contaminated with the harmless biological warfare agent simulant Bg and samples were taken in most, if not all, of the rooms on the contaminated floor. After the sampling, the building was decontaminated, and the next test performed. Judgmental samples and probabilistic samples were determined and taken during each test. Vacuum, wipe, and swab samples were taken within each room. The purpose of this report is to study an additional four topics that were not within the scope of the original report. These topics are: 1) assess the quantitative assumptions about the data being normally or log-normally distributed; 2) evaluate differences and quantify the sample to sample variability within a room and across the rooms; 3) perform geostatistical types of analyses to study spatial correlations; and 4) quantify the differences observed between surface types and sampling methods for each scenario and study the consistency across the scenarios. The following four paragraphs summarize the results of each of the four additional analyses. All samples after decontamination came back negative. Because of this, it was not appropriate to determine if these clearance samples were normally distributed. As Table 1 shows, the characterization data consists of values between and inclusive of 0 and 100 CFU/cm2 (100 was the value assigned when the number is too numerous to count). The 100 values are generally much bigger than the rest of the data, causing the data to be right skewed. There are also a significant number of zeros. Using QQ plots these data characteristics show a lack of normality from the data after contamination. Normality is improved when looking at log(CFU/cm2). Variance component analysis (VCA) and analysis of variance (ANOVA) were used to estimate the amount of variance due to each source and to determine which sources of variability were statistically significant. In general, the sampling methods interacted with the across event variability and with the across room variability. For this reason, it was decided to do analyses for each sampling method, individually. The between event variability and between room variability were significant for each method, except for the between event variability for the swabs. For both the wipes and vacuums, the within room standard deviation was much larger (26.9 for wipes and 7.086 for vacuums) than the between event standard deviation (6.552 for wipes and 1.348 for vacuums) and the between room standard deviation (6.783 for wipes and 1.040 for vacuums). Swabs between room standard deviation was 0.151, while both the within room and between event standard deviations are less than 0.10 (all measurements in CFU/cm2).

experimental design↗

Evaluation of Zero-Net-Rate Pumping Tests

Accurately estimating the distribution of aquifer properties is key to understanding contaminant movement in the subsurface. The distribution of aquifer properties is typically addressed using slug or constant-rate well tests, and the pros and cons of these tests are well known. Slug tests are appealing because they avoid removing contaminated water, but their results are affected by well skin and the small volume of displaced water limits the volume of aquifer that can be evaluated. Constant-rate well tests have the disadvantage of requiring disposal of potentially contaminated water, but they can generate properties that are more representative than slug tests, and they can be used to estimate well efficiency and storativity, which are difficult to characterize using slug tests. Periodic pumping tests are appealing because they have many of the advantages and few of the disadvantages of slug and constant-rate well tests. Periodic pumping tests involve cycling the pumping rate with a regular period and measuring the resulting response in monitoring wells. Some of these tests involve imposing a periodic rate on a constant mean rate. However, other tests involve moving water out and back into the well at rates that are balanced so the net rate after each period is zero. Some zero-net-rate (ZNR) well tests use rates that follow a sinusoidal pattern, whereas others use a square wave pattern that switches between a constant rate of pumping and a constant rate of injection to achieve a zero-net rate. ZNR well tests appear to be a useful compromise between slug and constant rate tests, but methods for conducting and analyzing the results from these tests have received limited evaluation. Periodic pumping tests are typically evaluated through recorded pressure responses to a disturbance source. Recent work has demonstrated that the strain field in the vadose zone shows a response to disturbances in the underlying aquifer. Various instrument designs are available that can record vertical and horizontal strain to very precise resolutions (10-9 ε). Measuring the strain in the vadose zone can present lower costs than measuring pressure in a monitoring well, so using strain could improve the resolution of ZNR tests, as well as make these tests potentially cheaper. A ZNR periodic pumping system was constructed and used to perform tests in the Clemson, South Carolina area. The system was designed to pump and inject with a periodic square-wave, so pumping occurs at a constant rate for half the period and is followed by injection at the same rate for half the period resulting in no net gain or loss of water from the aquifer. The system is designed to generate flow rates from 1 to 3.5 gallons per minute (gpm) with a capacity of 875-gallon per half period. Pressure and strain monitoring points are located in the vicinity of the pumping well. A series of 10 ZNR periodic pumping tests were conducted at the field site, with periods ranging from 2 to 540 minutes. Pressure data were collected and recorded in four monitoring wells in various locations around the pumping well. In addition, vertical and horizontal strain and tilt data were recorded in various locations around the pumping well. Traditional aquifer tests, including slug tests and constant-rate pumping tests were conducted at the field site to provide a baseline of aquifer parameter estimates that are compared the results of ZNR tests. Pressure data measured at monitoring wells during ZNR tests were analyzed utilizing an analytical solution (Streltsova, 1988) that assumes a confined aquifer and estimates hydraulic diffusivity and transmissivity using the time lag and amplitude of the pressure signal. The storativity can be separated out from the hydraulic diffusivity using the transmissivity estimate. The time-lag and amplitude of the pressure signals were estimated using a Fourier transform. The time-lag of the primary period of the pressure increases as a linear function of distance from the pumping well, and it increases as the square root of the period of the ZNR test over a range of periods spanning two orders of magnitudes. The first few harmonics follow similar trends, but the higher frequency harmonics diverge from this trend. Strain and tilt data from various instruments in the vadose and saturated zones are periodic during ZNR tests. The time lags of the strain components increase roughly linearly with distance from the well. Many of the time lags of the strain data from the vadose zone are similar to the time lags observed in the pressure data from a similar distance and pumping period. Theoretical experiments were performed to understand how pressure and strain responds to ZNR periodic pumping. The time-lags of the simulated pressure responses match the field data trends. The results were used to validate the Streltsova (1988) solution for periodic pumping to estimate hydraulic diffusivity. Hydraulic diffusivity was estimated to be 1.8 x 10-2 m2s-1 < Dh < 9.0 x 10-2 m2s-1 using pressure data from all the wells during ZNR tests. Transmissivity was estimated to be 0.8 x 10-4 m2s-1 < T < 4.3 x 10-4 m2s-1. Assuming Storativity = T/Dh gives 1.1 x 10-3 < S < 19 x10-3. Transmissivity is used to estimate the hydraulic conductivity, K, by dividing by the assumed aquifer thickness. Two constant-rate pumping tests were conducted and analyzed using two conceptual models: The Hantush (1961) solution was used to analyze data assuming confined conditions and the Neuman (1974) solution was used to analyze data assuming unconfined conditions. The Hantush (1961) solution estimated transmissivity to be 1.6 x 10-4 m2s-1 < T < 1.8 x 10-4 m2s-1 when using data from all the wells. Storativity was estimated to be 4.4 x 10-3 < S < 8.2 x 10-3. Assuming Dh = T/S gives 0.22 x 10-2 m2s-1 < Dh < 3.6 x 10-2 m2s-1. The Neuman (1974) solution estimated transmissivity to be 0.80 x 10-4 m2s-1 < T < 0.84 x 10-4 m2s-1. Total storativity (S + Sy) was estimated to be 22 x 10-3 < S < 110 x 10-3. Storativity excluding the Sy term was estimated to be 2.2 x 10-3 < S < 2.5 x 10-3. Assuming Dh = T/S gives 0.073 x 10-2 m2s-1 < S < 0.36 x 10-2 m2s-1. Two slug tests were performed on the pumping well, PW-2. The Bouwer and Rice (1976) solution for slug tests was used to analyze the data. This solution works for both confined and unconfined conditions, so both conceptual models were covered through the analysis. Hydraulic conductivity was estimated to be 1.95 x 10-6 ms-1 < K < 2.49 x 10-6 ms-1. Statistical comparison show generally no significant difference in the estimates of Dh, K, or S made using ZNR and conventional pumping tests.. However, the total storage estimated by the Neuman (1974) solution for unconfined settings is larger than that estimate using the Streltsove analysis applied to the ZNR tests. This is likely because the Neuman solution considers delayed yield from storage that the water table, whereas the Streltsova (1988) solution assumes confined conditions. The analysis also indicates that there is a statistically significant difference between parameters estimated with conventional slug tests and those measured with either constant-rate pumping tests or ZNR tests. Hydraulic diffusivity is estimated from the time-lag and the distance from the well. The time-lags of the strain data from the vadose zone are similar to the lags of the pressure data from a similar distance. This indicates that hydraulic diffusivities estimated from the strain data measured in the vadose zone would be similar to the estimates from the pressure data measured in the aquifer. There appear to be sign reversals in some of the strain data that were corrected to estimate the time lag. The dissolved oxygen (CO) concentration was measured during several ZNR tests to evaluate the feasibility of using the procedure to increase contaminant degradation kinetics that are related to DO. The results indicate that DO can be increased during the cycling of ZNR tests in some cases.

Smith-Jones, Austin↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exploring HOD-dependent systematics for the DESI 2024 Full-Shape galaxy clustering analysis

We analyze the robustness of the DESI 2024 cosmological inference from the full shape of the galaxy power spectrum to uncertainties in the Halo Occupation Distribution (HOD) model of the galaxy-halo connection and the choice of priors on nuisance parameters. We assess variations in the recovered cosmological parameters across a range of mocks populated with different HOD models and find that shifts are often greater than 20% of the expected statistical uncertainties from the DESI data. We encapsulate the effect of such shifts in terms of a systematic covariance term, C HOD , and an additional diagonal contribution quantifying the impact of our choice of nuisance parameter priors on the ability of the effective field theory (EFT) model to correctly recover the cosmological parameters of the simulations. These two covariance contributions are designed to be added to the usual covariance term, C stat , describing the statistical uncertainty in the power spectrum measurement, in order to fairly represent these sources of systematic uncertainty. This novel approach should be more general and robust to the choice of model or additional external datasets used in cosmological fits than the alternative approach of adding systematic uncertainties to the recovered marginalised parameter posteriors. We compare the approaches within the context of a fixed ΛCDM model and demonstrate that our method gives conservative estimates of the systematic uncertainty that nevertheless have little impact on the final posteriors obtained from DESI data.

79 ASTRONOMY AND ASTROPHYSICS↗

Activation, Heating and Exposure Rates for Mo‐99 Experiments with 25‐Disk Targets

An MCNPX model of the 25-disk target assembly inside the vacuum cube inside the shielded box was prepared. This was used to calculate heating and photon and neutron fluxes throughout the model. Production rates for photonuclear reaction products were calculated using the photon fluxes and ENDF/B-VII cross sections. Measured isomer to ground state yield ratios were used where available. Where not available the new correlation between spin deficit and isomer to ground state yield ratios presented at AccApp'11 was used. The photonuclear production rates and neutron fluxes were input to CINDER2008 for transmutation calculations. A cross section update file was used to supply (n,n') reactions missing from CINDER2008 libraries. Decay photon spectra produced by CINDER2008 were then used to calculate exposure rates using the MCNPX model. Two electron beam irradiations were evaluated. The first was for a thermal test at 15 MeV with 1300 μA incident on one target end and the second was for a production test at 35 MeV with 350 μA incident on both target ends (700 μA total current on target). For the thermal test 1, 2, 3, 4, 5 and 6 h irradiation times were simulated, each followed by decay time steps out to 42 days. For the production test 6, 12, 18, 24, 30 and 36 h irradiation times were simulated followed by the same decay periods. For all simulations beam FWHMs in x and y were both assumed to be 6 mm. Simulations were run for Mo-100 enriched and natural Mo targets for both tests. It is planned that thermal test will be run for 4 h with natural target disks and production test will be run for 24 h with enriched target disks. Results for these two simulations only are presented in this report. Other results can be made available upon request. Post irradiation exposure rates were calculated at 30 cm distances from left, right, front and back of the following configurations: (1) Shielded box with everything in it (beam pipes, cooling pipes, vacuum cube, target housing weldment and target assembly), (2) Shielded box with everything in it except the target assembly, (3) Shielded box with nothing in it, (4) Target assembly taken outside of shielded box, (5) Target disks in cradle (target assembly with thermocouple weldment and flange removed), (6) Empty cradle, and (7) Target disks alone. Decay photon spectra from the CINDER2008 calculations were used as sources for the exposure rate calculations in the same model used for the flux calculations with beam on. As components were removed to simulate the seven cases considered the material compositions were changed to air and their respective sources were turned off. The MCNPX model geometry is plotted in Figure 1. The left and right detector locations for cases 1, 2 and 3 were 30 cm from the shielded box walls and 30 cm from the beam pipe openings in the left and right sides of the model (they are not in the beam line). A zoomed in plot of the target assembly alone is in Figure 2. Exposure rates for the seven cases are plotted as a function of time after irradiation in Figures 3, 4 and 5. To aid in comparison between the cases, all of these figures have been plotted using the same scale. Figures 3 and 4 are respectively the thermal and production test results for cases 1 through 6. Figure 5 includes case 7 results for both. Differences between cases 1 and 2 for both tests are not statistically significant showing that activation of components other than the target assembly, many of which are also shielding the target assembly, dominates exposure rates outside the shielded box. Case 3 shows the contribution from activation of the shield box itself. In front where shielded box wall is thickest box activation accounts for essentially all of the exposure rate outside. Differences between cases 4 and 5 are also minimal, showing that the contribution to target assembly exposure rates from the thermocouple flange and weldment are small compared to the target disks and cradle. From the numerical results the contribution is about 1%. Results for case 6, the cradle itself, are initially about half of the target assembly exposure rates. For the thermal test maximum shielded box exposure rates with or without the target assembly in it are about 1 mR/h 1 h after shutdown versus 65 mR/h for the production test. In front of the shielded box where a person would be positioned for target removal activities the calculated exposure rate is about 20% of the maximum for the production test, and after a few hours of decay is less than 1 mR/h. However, the window was not modeled. Typically lead glass is about one quarter as effective as solid lead for the same thickness and drawing indicates a window thickness about double the front wall thickness suggesting exposure rate in front of the window will likely be comparable to what it is in the back, 25 mR/h 1 h after shutdown and about 10 mR/h at 1 d.

07 ISOTOPE AND RADIATION SOURCES↗