The design and operation of a large tube-vehicle aerodynamic testing facility.
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Ten tipping bucket rain gauges have been installed at the NASA WSTF for the purpose of determining rainfall characteristics in this area which may affect the performance of the NASA Tracking and Data Relay Satellite System. A plan is presented for analyzing and utilizing the data which will be obtained during the course of this experiment. Also included is a description of a computer program which has been written to aid in the analysis.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Vacuum-enclosed system is used to analyze instantaneous thermal and electrical characteristics of batteries. Data can be used to determine efficiency and provide for more effective utilization of available power.
Projects which relate to the current national thrust toward demonstrating applied solar energy are discussed. The first project has as its primary objective the application of a system comprised of a flat plate collector field, an absorption air conditioning system, and a hot water heating system to satisfy most of the annual cooling and heating requirements of a large commercial office building. The other project addresses the application of solar collector technology to the heating and hot water requirements of a domestic residence. In this case, however, the solar system represents only one of several important technology items, the primary objective for the project being the application of space technology to the American home.
Field strength measurements on a single row of panels indicates that the operational mode of the array as configured presents no radiated EMI problems. Only one relatively significant frequency band near 200 kHz showed any degree of intensity (9 muV/m including a background level of 5 muV/m). The level was measured very near the array (at 20 ft distance) while Federal Communications Commission (FCC) regulations limit spurious emissions to 15 muV/m at 1,000 ft. No field strength readings could be obtained even at 35 ft distant.
The effects of outdoor exposure were determined by comparing standard I-V data obtained for the as-received modules with similar data obtained after removal from the field and cleaning with detergent solution. All modules measured in this way exhibited nonrecoverable degradation in P sub maximum varying from 4 to 7 percent. One module exposed for 41 days exhibited partial cell discoloration, loss of front surface metallization over the discolored portion, and a decrease in P sub maximum of 7 percent, tentatively attributed to cell damage. Measurements before and after cleaning showed a recoverable degradation due to dirt accumulation. This recoverable loss in power was 11 percent after 245 days in the field for one brand of module, 6 percent after 48 days for another brand, and 4 1/2 percent for the third brand.
Facility provides broad and flexible capability for evaluating photovoltaic systems and design concepts. As 'breadboard' system, it can be used to check out complete systems, subsystems, and components before installation in actual service.
Discusses facility constructed at Marshall Space Flight Center to evaluate performance of solar energy collectors under simulated outdoor conditions. Facility simulates sunfall properties such as radiation intensity, spectrum, collimation, uniformity, and direction.
In the present paper, the status and technical capabilities of the National Aeronautical Facility Program and several support facilities for future aeronautical RDT&E are briefly reviewed. It is seen that these facilities deserve support by government and industry, since aeronautical technology will be constantly required to resolve uncertainties arising in new designs, new materials, and new synthetic fuel systems.
The terminal configured vehicle (TCV) program was established to conduct research and to develop and evaluate aircraft and flight management system technology concepts that will benefit conventional take off and landing operations in the terminal area. Emphasis is placed on the development of operating methods for the highly automated environment anticipated in the future. The program involves analyses, simulation, and flight experiments. Flight experiments are conducted using a modified Boeing 737 airplane equipped with highly flexible display and control equipment and an aft flight deck for research purposes. The experimental systems of the Boeing 737 are described including the flight control computer systems, the navigation/guidance system, the control and command panel, and the electronic display system. The ground based facilities used in the program are described including the visual motion simulator, the fixed base simulator, the verification and validation laboratory, and the radio frequency anechoic facility.
A facility to evaluate the risk associated with the exposure of electrical and electronic equipment to airborne carbon/graphite fibers was constructed. A wide variety of instrumentation is described and illustrated.
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.
The results of magnet system special investigations listed below are summarized: 4 Tesla Magnet Alternate Design Study; 6 Tesla Magnet Manufacturability Study. The conceptual design for a 4 Tesla superconducting magnet system for use with an alternate (supersonic) ETF power train is described, and estimated schedule and cost are identified. The magnet design is scaled from the ETF 6 T Tesla design. Results of a manufacturability study and a revised schedule and cost estimate for the ETF 6 T magnet are reported. Both investigations are extensions of the conceptual design of a 6 T magnet system performed earlier as a part of the overall MED-ETF conceptual design described in Conceptual Design Engineering Report (CDER) Vol. V, System Design Description (SDD) 503 dated September, 1981, DOE/NASA/0224-1; NASA CR-165/52.