Test processing system (SEE)

The SEE data processing system, developed in 1985, manages and process test results. General information is provided on the SEE system: objectives, characteristics, basic principles, general organization, and operation. Full documentation is accessible by computer using the HELP SEE command.

Gaulene, P.↗

Microwave Structure Construction Capability Year One Accomplishments

The Microwave Structure Construction Capability (MSCC) element, part of the Moon to Mars Planetary Autonomous Construction Project (MMPACT) was initiated in 2020. MSCC is responsible for creating horizontal and vertical infrastructure on the moon using microwave energy. Microwave energy was selected since it is the only method to volumetrically heat the regolith. All other sintering/melting methods rely on thermal conduction through the very low conductivity surface, resulting in an inefficient process. Advances were achieved in materials characterization and understanding, microwave sintering in vacuum, and microwave design and analyses. Two dielectric property testing systems have been developed at Radiance Technologies and JPL. These will examine dielectric properties at cryogenic temperatures and over a broad frequency range. Permittivity and permeability testing at -60 ̊C in vacuum from 0.05 to 3 GHz has been generated at JPL. Additional modifications will be made to go to -190 ̊C (LN2). Radiance Technologies created a test system to measure dielectric properties at greater than 10 GHz and initiated work on developing a vacuum capable, portable test system to measure dielectric properties of Apollo regolith and simulants from 100 MHz to 18 GHz. These tests are to identify optimal heating frequencies and protocols. During microwave sintering at about 1100 ̊C, volatiles were creating difficulty in achieving a reasonably dense specimen. Due to processing in vacuum and the nature of the lunar regolith, some volatiles and porosity are expected. However, the Earth produced simulants have non-lunar materials in them that create volatiles that aren’t representative of lunar regolith. Therefore, a five month effort was conducted to establish a heat treat method to remove these non-lunar materials. Tests were conducted using TGA mass spectrometry, heating in vacuum and conducting mass spectrometry, dielectric and DTA, Raman, BET, particle size analysis, morphological analysis, carbon and sulfur chemical content determination and microscopy. The process has been scaled-up to 6 kg batch size and undergoing evaluation. A 36 kg batch size is the target for JSC-1A and other limited availability simulants. These calcining protocols will be standard for NASA and beyond. MSCC has also created scalable processes for fabricating synthetic lunar materials. Processes to fabricate Anorthite (plagioclase CaAl2Si2O8), Diopside (pyroxene CaMgSi₂O₆), and Enstatite (pyroxene Mg2Si2O6) have been generated. These materials will enable generation of microwave sintering models to bound various composition ranges anticipated on the Moon, therefore mitigating the need for a precise simulant with respect to location on the Moon. Successful microwave sintering in air using a horn applicator was demonstrated. All previous microwave vacuum sintering in the literature was at small scale and in a contained enclosure thus taking advantage of reflections. This is the first to use a lunar like microwave applicator to sinter ceramic in a bed as it would be done on the Moon. Small scale and inert sintering were conducted to assist in developing protocols with quicker turnaround times than larger scale testing. Testing has anchored thermal analysis predicting heat flow in vacuum during microwave sintering. Thermal conductivity testing was also initiated. Microwave coupling to the regolith has been modeled by multiple organizations and with different software packages. At least six horn designs and applicator configurations for both magnetron and solid state sources are being examined. Optimal simulant container designs for microwaves have also been generated. The power and electronics design for the solid state microwave system has been initiated. Concept designs for a lander based microwave sintering have been evaluated.

microwave↗

Human Exploration System Test-Bed for Integration and Advancement (HESTIA) Support of Future NASA Deep-Space Missions

The Engineering Directorate at the NASA - Johnson Space Center is outfitting a 20-Foot diameter hypobaric chamber in Building 7 to support future deep-space Environmental Control & Life Support System (ECLSS) research as part of the Human Exploration System Test-bed for Integration and Advancement (HESTIA) Project. This human-rated chamber is the only NASA facility that has the unique experience, chamber geometry, infrastructure, and support systems capable of conducting this research. The chamber was used to support Gemini, Apollo, and SkyLab Missions. More recently, it was used to conduct 30-, 60-, and 90-day human ECLSS closed-loop testing in the 1990s to support the International Space Station and life support technology development. NASA studies show that both planetary surface and deep-space transit crew habitats will be 3-4 story cylindrical structures driven by human occupancy volumetric needs and launch vehicle constraints. The HESTIA facility offers a 3-story, 20-foot diameter habitat consistent with the studies' recommendations. HESTIA operations follow stringent processes by a certified test team that including human testing. Project management, analysis, design, acquisition, fabrication, assembly and certification of facility build-ups are available to support this research. HESTIA offers close proximity to key stakeholders including astronauts, Human Research Program (who direct space human research for the agency), Mission Operations, Safety & Mission Assurance, and Engineering Directorate. The HESTIA chamber can operate at reduced pressure and elevated oxygen environments including those proposed for deep-space exploration. Data acquisition, power, fluids and other facility resources are available to support a wide range of research. Recently completed HESTIA research consisted of unmanned testing of ECLSS technologies. Eventually, the HESTIA research will include humans for extended durations at reduced pressure and elevated oxygen to demonstrate very high reliability of critical ECLSS and other technologies.

Marmolejo, Jose↗

Mars Science Laboratory Rover System Thermal Test

On November 26, 2011, NASA launched a large (900 kg) rover as part of the Mars Science Laboratory (MSL) mission to Mars. The MSL rover is scheduled to land on Mars on August 5, 2012. Prior to launch, the Rover was successfully operated in simulated mission extreme environments during a 16-day long Rover System Thermal Test (STT). This paper describes the MSL Rover STT, test planning, test execution, test results, thermal model correlation and flight predictions. The rover was tested in the JPL 25-Foot Diameter Space Simulator Facility at the Jet Propulsion Laboratory (JPL). The Rover operated in simulated Cruise (vacuum) and Mars Surface environments (8 Torr nitrogen gas) with mission extreme hot and cold boundary conditions. A Xenon lamp solar simulator was used to impose simulated solar loads on the rover during a bounding hot case and during a simulated Mars diurnal test case. All thermal hardware was exercised and performed nominally. The Rover Heat Rejection System, a liquid-phase fluid loop used to transport heat in and out of the electronics boxes inside the rover chassis, performed better than predicted. Steady state and transient data were collected to allow correlation of analytical thermal models. These thermal models were subsequently used to predict rover thermal performance for the MSL Gale Crater landing site. Models predict that critical hardware temperatures will be maintained within allowable flight limits over the entire 669 Sol surface mission.

Novak, Keith S.↗

Mars Science Laboratory Rover System Thermal Test

On November 26, 2011, NASA launched a large (900 kg) rover as part of the Mars Science Laboratory (MSL) mission to Mars. The MSL rover is scheduled to land on Mars on August 5, 2012. Prior to launch, the Rover was successfully operated in simulated mission extreme environments during a 16-day long Rover System Thermal Test (STT). This paper describes the MSL Rover STT, test planning, test execution, test results, thermal model correlation and flight predictions. The rover was tested in the JPL 25-Foot Diameter Space Simulator Facility at the Jet Propulsion Laboratory (JPL). The Rover operated in simulated Cruise (vacuum) and Mars Surface environments (8 Torr nitrogen gas) with mission extreme hot and cold boundary conditions. A Xenon lamp solar simulator was used to impose simulated solar loads on the rover during a bounding hot case and during a simulated Mars diurnal test case. All thermal hardware was exercised and performed nominally. The Rover Heat Rejection System, a liquid-phase fluid loop used to transport heat in and out of the electronics boxes inside the rover chassis, performed better than predicted. Steady state and transient data were collected to allow correlation of analytical thermal models. These thermal models were subsequently used to predict rover thermal performance for the MSL Gale Crater landing site. Models predict that critical hardware temperatures will be maintained within allowable flight limits over the entire 669 Sol surface mission.

Novak, Keith S.↗

Development of the Flight Test Telemetry System for Clipper Graham: A New Way to do Business

Since the beginning of NASA, there has been one way to do business. To procedure flight hardware you did things a certain way, to monitor contracts you did things a certain way and to support tests you did things a certain way. When the Delta Clipper Experimental (DC-X) space flight test vehicle was being upgraded (to the DC-XA, later called the Clipper Graham), the opportunity to change the way NASA did business presented itself The development of a flight test telemetry system (FTTS) for the Clipper Graham presented the perfect opportunity to change the way NASA did business. This paper will discuss the differences from the old way to the new way of doing business during the development of the FTTS from the conceptual stage thru the flight stages. The major focus will be the pulse code modulation system of the FTTS. Topics that will be discussed are working with procurement, working with contractors and subcontractors, supporting ground and flight testing and lessons learned.

Blue, Lisa↗

Initial operation of a solar heating and cooling system in a full-scale solar building test facility

The Solar Building Test Facility (SBTF) located at Hampton, Virginia became operational in early summer of 1976. This facility is a joint effort by NASA-Lewis and NASA-Langley to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test performance of complete solar heating and cooling system, (3) investigate component interactions and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is given here, along with the objectives, test approach, expected system performance and some preliminary results.

Knoll, R. H.↗

Cumulative Measurement Errors for Dynamic Testing of Space Flight Hardware

Located at the NASA Johnson Space Center in Houston, TX, the Six-Degree-of-Freedom Dynamic Test System (SDTS) is a real-time, six degree-of-freedom, short range motion base simulator originally designed to simulate the relative dynamics of two bodies in space mating together (i.e., docking or berthing). The SDTS has the capability to test full scale docking and berthing systems utilizing a two body dynamic docking simulation for docking operations and a Space Station Remote Manipulator System (SSRMS) simulation for berthing operations. The SDTS can also be used for nonmating applications such as sensors and instruments evaluations requiring proximity or short range motion operations. The motion base is a hydraulic powered Stewart platform, capable of supporting a 3,500 lb payload with a positional accuracy of 0.03 inches. The SDTS is currently being used for the NASA Docking System testing and has been also used by other government agencies. The SDTS is also under consideration for use by commercial companies. Examples of tests include the verification of on-orbit robotic inspection systems, space vehicle assembly procedures and docking/berthing systems. The facility integrates a dynamic simulation of on-orbit spacecraft mating or de-mating using flight-like mechanical interface hardware. A force moment sensor is used for input during the contact phase, thus simulating the contact dynamics. While the verification of flight hardware presents unique challenges, one particular area of interest involves the use of external measurement systems to ensure accurate feedback of dynamic contact. The measurement systems for the test facility have two separate functions. The first is to take static measurements of facility and test hardware to determine both the static and moving frames used in the simulation and control system. The test hardware must be measured after each configuration change to determine both sets of reference frames. The second function is to take dynamic measurements during hardware motion and contact. While performing dynamic testing of an active docking system, researchers found that the data from the motion platform, test hardware and two external measurement systems exhibited frame offsets and rotational errors. While the errors were relatively small when considering the motion scale overall, they substantially exceeded the individual accuracies for each component. After evaluating both the static and dynamic measurements, researchers found that the static measurements introduced significantly more error into the system than the dynamic measurements even though, in theory, the static measurement errors should be smaller than the dynamic. In several cases, the magnitude of the errors varied widely for the static measurements. Upon further investigation, researchers found the larger errors to be a consequence of hardware alignment issues, frame location and measurement technique whereas the smaller errors were dependent on the number of measurement points. This paper details and quantifies the individual and cumulative errors of the docking system and describes methods for reducing the overall measurement error. The overall quality of the dynamic docking tests for flight hardware verification was improved by implementing these error reductions.

Winnitoy, Susan↗

ECLSS regenerative systems comparative testing and subsystem selection

In support of Space Station Freedom Phase C/D Environmental Control and Life Support Systems (ECLSS) regenerative systems development, comparative testing was performed on predevelopment hardware of competing technologies for each regenerative function. The purpose of the test program was to collect data on latest generation hardware in order to make final technology selections for each subassembly in the oxygen recovery and water reclamation strings. This paper discusses the testing performed, test results, and evaluation of these results relative to subsystem selections for CO2 reduction, O2 generation, potable water processing, hygiene water processing, and urine processing.

Carasquillo, Robyn L.↗

System for Automated Calibration of Vector Modulators

Vector modulators are used to impose baseband modulation on RF signals, but non-ideal behavior limits the overall performance. The non-ideal behavior of the vector modulator is compensated using data collected with the use of an automated test system driven by a LabVIEW program that systematically applies thousands of control-signal values to the device under test and collects RF measurement data. The technology innovation automates several steps in the process. First, an automated test system, using computer controlled digital-to-analog converters (DACs) and a computer-controlled vector network analyzer (VNA) systematically can apply different I and Q signals (which represent the complex number by which the RF signal is multiplied) to the vector modulator under test (VMUT), while measuring the RF performance specifically, gain and phase. The automated test system uses the LabVIEW software to control the test equipment, collect the data, and write it to a file. The input to the Lab - VIEW program is either user-input for systematic variation, or is provided in a file containing specific test values that should be fed to the VMUT. The output file contains both the control signals and the measured data. The second step is to post-process the file to determine the correction functions as needed. The result of the entire process is a tabular representation, which allows translation of a desired I/Q value to the required analog control signals to produce a particular RF behavior. In some applications, corrected performance is needed only for a limited range. If the vector modulator is being used as a phase shifter, there is only a need to correct I and Q values that represent points on a circle, not the entire plane. This innovation has been used to calibrate 2-GHz MMIC (monolithic microwave integrated circuit) vector modulators in the High EIRP Cluster Array project (EIRP is high effective isotropic radiated power). These calibrations were then used to create correction tables to allow the commanding of the phase shift in each of four channels used as a phased array for beam steering of a Ka-band (32-GHz) signal. The system also was the basis of a breadboard electronic beam steering system. In this breadboard, the goal was not to make systematic measurements of the properties of a vector modulator, but to drive the breadboard with a series of test patterns varying in phase and amplitude. This is essentially the same calibration process, but with the difference that the data collection process is oriented toward collecting breadboard performance, rather than the measurement of output from a network analyzer.

Lux, James↗

A Two-Stage Current Limiting Control Strategy for Direct-Droop-Controlled Grid-Forming Inverters

This paper presents a two-stage current limiting control strategy with fault ride-through capability for the direct-droop-controlled grid-forming (GFM) inverters. The proposed approach comprises Stage 1 and Stage 2 current limiting controls. During faults, Stage 1 current limiting control instantly clamps the inverter output current magnitude to its maximum transient limit by blocking the switching pulses to the insulated-gate bipolar transistors (IGBTs) with the help of a hysteresis loop control, and Stage 2 current limiting control limits the inverter output current magnitude to its steady-state limit by regulating the amplitude and frequency of the modulating waveform utilizing the active and reactive current limiting control loops. By implementing the current limiting actions in two stages, this approach can effectively limit the over-current within a few cycles after the fault occurrence and ensure synchronism to the grid after long-term fault events. The efficacy of the proposed control approach is validated through electromagnetic transient (EMT) simulation results conducted on a single GFM inverter-based test system and the IEEE 39-bus test system with multiple GFM inverters in the PSCAD platform.

Mohiuddin, Sheik Mohammad↗

Comprehensive testing of a defense systems communications satellite

The system level testing of the defense satellite communications system (DSCS) 3 program is reviewed. Concentration is on the results of the systems tests of the DSCS 3 development test model (DTM). The DSCS 3DTM consisted of engineering components interconnected in an open bench layout. The DTM tests were performed to demonstrate satellite electrical performance characteristics and to uncover design deficiencies and interface problems. The availability of the DTM test results prior to the fabrication of the flight model hardware permited the incorporation of necessary design changes with a minimum impact on program costs and schedules.

Shirk, N. K.↗

Ultrasonic Measurement Of Elastic Constants Of Composites

Ultrasonic testing system yields data on elastic constants of matrix/fiber laminated composite material. Related to one described in "Ultrasonic System Measures Elastic Properties of Composites" (NPO-18729). Tests performed nondestructive, and involve access by ultrasonic probes to only one side of material specimen. In comparison with other available ultrasonic testing systems, this system relatively inexpensive, and based on testing technique that is simpler and rapidly yields more-accurate results.

Bar-Cohen, Yoseph↗

Launch Abort System Flight Test Overview

This viewgraph presentation is an overview of the Launch Abort System (LAS) for the Constellation Program. The purpose of the paper is to review the planned tests for the LAS. The program will evaluate the performance of the crew escape functions of the Launch Abort System (LAS) specifically: the ability of the LAS to separate from the crew module, to gather flight test data for future design and implementation and to reduce system development risks.

Williams-Hayes, Peggy↗

Command and Control System Automated Testing

To support the National Aeronautics and Space Administration’s (NASA) Space Launch System (SLS) rocket and the Orion capsule, designed to take humans back to the moon in 2024, Kennedy Space Center (KSC) has developed the Spaceport Command and Control System (SCCS) to monitor and control the launch. Within SCCS, the Launch Control System (LCS) is designed to allow console engineers to control and monitor the status of the launch and flight hardware, as well as issue commands to ground control systems and launch vehicles. The messaging software of LCS is responsible for handling the various data types that can be sent between the hardware and software components of the LCS. Since this system is interacting with numerous devices, controllers, and viewports in real time, the distribution of data across the system must be fast, but also reliable and accurate. To verify the accuracy and reliability of the system, developers on the project have created a set of tests to be performed that covers all operations allowed by the system. Given the extensive Application Programming Interface(API) provided by the messaging software, these unit tests are rather time-consuming and costly (in terms of man-hours) to perform. Therefore, an automated testing framework is used to perform supplemental tests automatically when updates are made to the code base.

Rebecca McFadden↗

Re-design and fabrication of titanium multi-wall Thermal Protection System (TPS) test panels

The Titanium Multi-wall Thermal Protection System (TIPS) panel was re-designed to incorporate Ti-6-2-4-2 outer sheets for the hot surface, ninety degree side closures for ease of construction and through panel fastness for ease of panel removal. Thermal and structural tests were performed to verify the design. Twenty-five panels were fabricated and delivered to NASA for evaluation at Langley Research Center and Johnson Space Center.

Blair, W.↗

Space Telescope precision pointing control system

The Hubble Space Telescope has the most stringent pointing requirements imposed on any spacecraft to date. The overall HST stability shall not exceed 0.007 arc-seconds rms. The Pointing Control System utilizes fine guidance sensors and rate gyros for attitude reference and rate information. Control torques are provided by reaction wheels. A digital computer collects the sensor data, performs the control law computations, and sends torque commands to the reaction wheels. To attain this precision pointing, improvements were made to the rate gyros to lower their noise characteristics and to the reaction wheels to reduce their emitted vibration levels. The control system design was validated in a test sequence which progressed from model verification tests on an air-bearing to operations-oriented, closed loop testing on the assembled vehicle. A test system is described which allowed the simultaneous production of test case command loads for the flight computer and plots of predicted profiles to assist in test data analysis. Workarounds were required during system test to accommodate gyro biases and noise introduced into the closed loop system. Testing and analysis indicate that the HST will provide the capability to meet the requirements for precision pointing.

Beals, G. A.↗

Initial operation of a solar heating and cooling system in a full-scale solar building test facility

The Solar Building Test Facility (SBTF) was constructed to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test the performance of a complete solar heating and cooling system, (3) investigate component interactions, and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is printed along with the objectives, test approach, expected system performance, and some preliminary results.

Knoll, R. H.↗