Search NASA⌕ Search

SEARCH · Search NASA

Results for “Building controls”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Experimental Study for Validation of Resilient Response of Controls - Thrust 2 Controls Assessment

The focus of this project is to design, execute, and analyze experiments around resilience response. As part of the Resilience through Data-Driven, Intelligently Designed Control (RD2C) initiative, this project builds upon the previously designed control algorithms and experiments. It designs detailed uses cases to test RD2C-developed mitigation schemes in specific realistic scenarios, analyze and save the measurement data sets. Having a high-confidence and consistent data set is crucial for identifying relevant metrics to describe the system resilience in specific real-life-like scenarios of power grid operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Case Study about Energy and Cost Impacts for Different Community Scenarios Using a Community-Scale Building Energy Modeling Tool

The United States building sector consumed approximately 75% of electricity in 2019. By implementing renewable energy technologies and control strategies into buildings, future buildings will serve as energy generators as well as consumers. To accommodate this transition, communications among buildings and between buildings and the grid could provide more possibilities to optimize the energy performance of buildings. This paper develops a community-scale building energy model tool and conducts a case study adopting behind-the-meter distributed energy resources, sharing energy in different buildings, and using different electricity tariff structures. Three scenarios are studied: (1) electricity only supplied by the grid, (2) photovoltaic (PV) panels installed on and available to some but not all buildings, and (3) a connected community. To consider the impacts of locations and energy tariffs, this paper selects four cities and three electricity tariffs to evaluate the energy and cost performances of these three scenarios. The results show that the PV panels in Scenario 2 reduce 25% to 33% of the community-level electricity consumption and 20% to 30% of the community-level electricity cost compared with Scenario 1 in all studied locations and energy tariffs. By considering power management in the connected community (Scenario 3), the electricity consumption and cost can be further reduced by 6% to 7% and 5% to 11%, respectively, compared with Scenario 2.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Northwest Open Automated Demand Response Technology Demonstration Project

Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) performed a technology demonstration and evaluation for Bonneville Power Administration (BPA) in Seattle City Light's (SCL) service territory. This report summarizes the process and results of deploying open automated demand response (OpenADR) in Seattle area with winter morning peaking commercial buildings. The field tests were designed to evaluate the feasibility of deploying fully automated demand response (DR) in four to six sites in the winter and the savings from various building systems. The project started in November of 2008 and lasted 6 months. The methodology for the study included site recruitment, control strategy development, automation system deployment and enhancements, and evaluation of sites participation in DR test events. LBNL subcontracted McKinstry and Akuacom for this project. McKinstry assisted with recruitment, site survey collection, strategy development and overall participant and control vendor management. Akuacom established a new server and enhanced its operations to allow for scheduling winter morning day-of and day-ahead events. Each site signed a Memorandum of Agreement with SCL. SCL offered each site $3,000 for agreeing to participate in the study and an additional $1,000 for each event they participated. Each facility and their control vendor worked with LBNL and McKinstry to select and implement control strategies for DR and developed their automation based on the existing Internet connectivity and building control system. Once the DR strategies were programmed, McKinstry commissioned them before actual test events. McKinstry worked with LBNL to identify control points that can be archived at each facility. For each site LBNL collected meter data and trend logs from the energy management and control system. The communication system allowed the sites to receive day-ahead as well as day-of DR test event signals. Measurement of DR was conducted using three different baseline models for estimation peak load reductions. One was three-in-ten baseline, which is based on the site electricity consumption from 7 am to 10 am for the three days with the highest consumption of the previous ten business days. The second model, the LBNL outside air temperature (OAT) regression baseline model, is based on OAT data and site electricity consumption from the previous ten days, adjusted using weather regressions from the fifteen-minute electric load data during each DR test event for each site. A third baseline that simply averages the available load data was used for sites less with less than 10 days of historical meter data. The evaluation also included surveying sites regarding any problems or issues that arose during the DR test events. Question covered occupant comfort, control issues and other potential problems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Deep Reinforcement Learning in Buildings: Implicit Assumptions and their Impact

As deep reinforcement learning (DRL) continues to gain interest in the smart building research community, there is a transition from simulation-based evaluations to deploying DRL control strategies in actual buildings. While the efficacy of a solution could depend on a particular implementation, there are common obstacles that developers have to overcome to deliver an effective controller. Additionally, a deployment in a physical building can invalidate some of the assumptions made during the controller development. Assumptions on the sensor placement or on the equipment behavior can quickly come undone. This paper presents some of the significant assumptions made during the development of DRL based controllers that could affect their operations in a physical building. Furthermore, a preliminary evaluation revealed that controllers developed with some of these assumptions can incur twice the expected costs when they are deployed in a building.

Prakash, Anand Krishnan↗

Integrating Electric Vehicle Charging Infrastructure into Commercial Buildings and Mixed-Use Communities: Design, Modeling, and Control Optimization Opportunities: Preprint

This paper discusses modeling and field studies of controlled EV charging that have been performed with the goal of minimizing requirements for infrastructure upgrades, minimizing building peak demand charges, and maximizing the use of on-site generation. We present a large-scale workplace charging pilot of a demand-controlled scheduled EV charging system with over 250 active daily commuters, successfully demonstrating management of aggregate charging power to avoid new infrastructure investments, mitigate peak demand charges, and provide cost-effective workplace charging to users. In addition to understanding opportunities for demand management, integrating these controllable loads into the energy modeling process for new buildings will also be necessary. This paper then presents an example energy modeling process that evaluates the potential effects of EV charging on building load profiles and infrastructure requirements for a mixed-use community. Finally, we discuss an illustration of how EV charging can be controlled to be synergistic with other building loads and distributed generation.

buildings↗

Design of Controller Hardware-In-the-Loop Model of Microgrid with Modular Building Blocks and Automated Design Script

The scalability of controller hardware-in-the-loop (CHIL) simulation is critical for validating control coordination and energy management in microgrids with distributed energy resources, especially as these modern systems become more complex and decentralized. This paper presents a CHIL modeling methodology that combines modular building blocks with an automated design script to streamline the development of high-fidelity microgrid models. Standardized subsystem templates for resources, converters, and buses are integrated with a Python-based script that compiles structured JSON configuration files into simulation-ready initialization code. The proposed approach reduces development time, improves model consistency, and enhances simulation fidelity. The methodology is validated on a Typhoon HIL604 platform and is broadly applicable to real-time simulation of complex, networked microgrid systems. This framework establishes a foundation for automated, scalable CHIL validation and accelerates the design of next-generation distributed energy systems.

Kim, Namwon [ORNL] (ORCID:0000000200438489)↗

Comparison of effectiveness and energy use of airborne pathogen mitigation measures to meet clean air targets in a prototypical office building

Organizations such as ASHRAE and the Centers for Disease Control and Prevention (CDC) have proposed guidelines for controlling infectious aerosols in buildings, which can be met through measures such as modified operation of the heating, ventilation, and air-conditioning (HVAC) system or incorporating air-cleaning technologies. However, more research is needed to understand the trade-offs between health, energy, and comfort aspects when designing measures for these guidelines. To address this gap, this paper presents an analysis using new models for air-cleaning technologies, including in-duct and in-room germicidal ultraviolet (GUV) systems and portable air cleaners (PACs). These models are incorporated into an existing prototypical office building model and six measures are designed to meet ASHRAE Standard 241 and CDC clean air targets: MERV 13 HVAC filtration, maximum outdoor air supplied to the building, PACs, and in-duct, upper-room, and whole-room GUV. The measures are simulated for an office building in a cool and humid climate compared against a baseline simulation using MERV 8 filtration. The results show that all measures, except for the maximum outdoor air case, can meet the ASHRAE 241 standard without significant impacts on energy or comfort. The HVAC system measures were not able to meet the CDC target with the default system sizing and lead to significant energy increases, while the in-room measures were able to meet the CDC target with small impacts on energy consumption. Finally, this paper consolidates the simulation findings and provides practical guidance for building operators to meet clean air targets while limiting energy and comfort impacts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foundation Heat Exchanger Final Report: Demonstration, Measured Performance, and Validated Model and Design Tool

Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first cost of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foundation Heat Exchanger Final Report: Demonstration, Measured Performance, and Validated Model and Design Tool

Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first cost of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.

15 GEOTHERMAL ENERGY↗

THE XAL INFRASTRUCTURE FOR HIGH LEVEL CONTROL ROOM APPLICATIONS

XAL is a Java programming framework for building high-level control applications related to accelerator physics. The structure, details of implementation, and interaction between components, auxiliary XAL packages, and the latest modifications are discussed. A general overview of XAL applications created for the SNS project is presented.

43 PARTICLE ACCELERATORS↗

Cascaded systems and methods for controlling energy use during a demand limiting period

A cascaded control system is configured to control power consumption of a building during a demand limiting period. The cascaded control system includes an energy use setpoint generator and a feedback controller. The energy use setpoint generator is configured to use energy pricing data and measurements of a variable condition within the building to generate an energy use setpoint during the demand limiting period. The feedback controller is configured to use a difference between the energy use setpoint and a measured energy use to generate a control signal for building equipment that operate to affect the variable condition within the building during the demand limiting period.

Wenzel, Michael J.↗

Cascaded systems and methods for controlling energy use during a demand limiting period

A cascaded control system is configured to control power consumption of a building during a demand limiting period. The cascaded control system includes an energy use setpoint generator and a feedback controller. The energy use setpoint generator is configured to use energy pricing data and measurements of a variable condition within the building to generate an energy use setpoint during the demand limiting period. The feedback controller is configured to use a difference between the energy use setpoint and a measured energy use to generate a control signal for building equipment that operate to affect the variable condition within the building during the demand limiting period.

Wenzel, Michael J.↗

Networked Lighting Power and Control Platform for Solid State Lighting in Commercial Office Applications

Redwood Systems' objective is to further accelerate the acceptance of solid state lighting (SSL) with fine grain and easy-to-use control. In addition, increased and improved sensor capability allows the building owner or user to gather data on the environment within the building. All of this at a cost equal to or less than that of code-compliant fluorescent lighting. The grant we requested and received has been used to further enhance the system with power conversion efficiency improvements and additional features. Some of these features, such as building management system (BMS) control, allow additional energy savings in non-lighting building systems.

42 ENGINEERING↗

Recent Advances In Structural Vibration And Failure Mode Control In Mainland China: Theory, Experiments And Applications

A number of researchers have been focused on structural vibration control in the past three decades over the world and fruit achievements have been made. This paper introduces the recent advances in structural vibration control including passive, active and semiactive control in mainland China. Additionally, the co-author extends the structural vibration control to failure mode control. The research on the failure mode control is also involved in this paper. For passive control, this paper introduces full scale tests of buckling-restrained braces conducted to investigate the performance of the dampers and the second-editor of the Code of Seismic Design for Buildings. For active control, this paper introduces the HMD system for wind-induced vibration control of the Guangzhou TV tower. For semiactive control, the smart damping devices, algorithms for semi-active control, design methods and applications of semi-active control for structures are introduced in this paper. The failure mode control for bridges is also introduced.

58 GEOSCIENCES↗

Machine-Learning-Driven, Site-Specific Weather Forecasting for Grid-Interactive Efficient Buildings: Preprint

Emerging grid-interactive efficient buildings (GEBs) have great potential to provide much-needed demand flexibility to electric grids while fulfilling their own control targets by co-optimizing smart appliances, solar photovoltaics, electric vehicles, and energy storage at buildings. To enable the optimal operation of GEBs, site-specific weather information—such as temperature, solar irradiance, relative humidity, and wind speed—is crucial; however, this information is generally unavailable or expensive to obtain. This paper develops advanced machine learning methods to provide precise weather forecasts for individual building sites using readily available weather station data. Support vector regression and artificial neural networks have been employed to learn the spatiotemporal correlations between the weather conditions at nearby weather stations and the individual building site. The proposed site-specific weather forecasting methods have been validated using 1-year actual weather measurement data collected in the Denver metro area. Results show that the developed machine-learning-driven methods can accurately forecast the temperature at the target building site 1 hour ahead with mean absolute error less than 0.72°C and a 48% improvement over the persistence method. Site-specific weather forecasts will improve the understanding of the microclimate effect and its impact on building energy consumption. This information will drive efficiency upgrades and adjustments of building control strategies to improve energy savings and increase flexibility in building loads.

30 DIRECT ENERGY CONVERSION↗

Energy Efficiency Potential in Existing Commercial Buildings: Review of Selected Recent Studies

This report reviews six recent studies (from 2002 through 2006) by states and utilities to assess the energy saving potential in existing commercial buildings. The studies cover all or portions of California, Connecticut, Vermont, Colorado, Illinois, and the Pacific Northwest. The studies clearly reveal that lighting remains the single largest and most cost effective end use that can be reduced to save energy. Overall the study indicated that with existing technologies and costs, a reasonable range of economic savings potential in existing commercial buildings is between 10 and 20 percent of current energy use. While not a focus of the study, an additional conclusion is that implementation of commercial building monitoring and controls would also play an important role in the nation’s efforts to improve energy efficiency of existing buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Flexible and Generic Functional Mock-up Unit Based Threat Injection Framework for Grid-interactive Efficient Buildings: A Case Study in Modelica

Grid-interactive efficient buildings (GEBs) have been considered as an important asset to support the power grid reliability by utilizing the demand flexibility offered by GEBs. GEBs are enabled by advances in sensors and controls, and the communication between building equipment, whole buildings, and the grid. The integration of different building technologies and network-based communication system makes GEBs vulnerable to passive threats such as equipment failure and active threats such as cyber-attacks. Modeling and simulation is an effective way to evaluate the impact of threats on the system performance. This paper proposes a generic and flexible threat injection framework for commonly-used building energy simulators such as EnergyPlus and Modelica to support threat modeling and evaluation. This framework leverages functional mock-up unit (FMU) to develop a general modeling interface for threat injection and simulation. A numerical case study using Modelica as a building energy simulator is conducted to demonstrate the capability of the framework for supporting single/multiple-order threat modeling and simulation of a GEB. Four threats and their combinations are injected on a Modelica-based threat-free building energy and control system, including operating supply fan at its full speed, remotely cycling the chiller on and off, blocking the chiller from receiving the chilled water supply temperature setpoints, and hijacking the global zone air temperature setpoint. Simulation results show that the cyber-attack that leads to short-term signal blocking has small effects on the system operation due to the "self-healing" feature of the heating, ventilation, and air-conditioning (HVAC) interactive control system. The threat that takes control of resetting the global zone air temperature setpoints has the most adverse impact on the system energy use, peak power demand, thermal comfort and the provision of demand flexibility. The combination of four threats have aggregative effects on the system but the effects are less than the additive effects of the individual threat.

Fu, Yanyang↗