Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPACITY PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Hosting Capacity Analysis for Developers

NREL's dynamic hosting capacity analysis can help you better understand the thresholds at which new distributed photovoltaic (DPV) systems will trigger upgrades to the electrical distribution system. This fact sheet is for PV developers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Implications of Disruption to Natural Gas Deliverability

This project was sponsored by Department of Energy/Office of Electricity Delivery and Energy Reliability and managed by the National Energy Technology Laboratory. The primary purpose of the project was to analyze the capability of the natural gas production, transmission and supply systems to continue to provide service in the event of a major disruption in capacity of one or more natural gas transmission pipelines. The project was specifically designed to detail the ability of natural gas market to absorb facility losses and efficiently reallocate gas supplies during a significant pipeline capacity disruption in terms that allowed federal and state agencies and interests to develop effective policies and action plans to prioritize natural gas deliveries from a regional and national perspective. The analyses for each regional study were based on four primary considerations: (1) operating conditions (pipeline capacity, storage capacity, local production, power dispatch decision making and end user options); (2) weather; (3) magnitude and location of the disruption; and, (4) normal versus emergency situation. The detailed information contained in the region reports as generated from this project are Unclassified Controlled Information; and as such are subject to disclosure in accordance with the Freedom of Information Act. Therefore, this report defines the regions that were analyzed and the basic methodologies and assumptions used to completing the analysis.

03 NATURAL GAS↗

Developments of the Versa-Pac to Expand Use for the Industry - 17475

The Versa-Pac is a certified Type AF packaging (USA NRC Certificate no. USA/9342/AF-96), designed as a replacement for USA DOT 6M drum-type transportation packaging, which was retired approximately ten years ago. The Versa-Pac can be used directly or in conjunction with pails, drums, or inserts, and a variety of smaller containers and vessels. The Versa-Pac comes in two sizes: the VP-55 (i.e. 200-liter drum version) and VP-110 (i.e. 400-liter drum version). It features a patented design that, in combination with the drum exterior, provides enhanced structural protection to payloads under Normal Conditions of Transport and Hypothetical Accident Conditions. Since its introduction in 2010, the Versa-Pac has been utilized mainly as a one-time-use package for disposing of radioactive waste. However, the Versa-Pac package, which has the familiar simplicity of a drum, is a reusable transport package with the capability of shipping a variety of radioactive materials. In the spirit of simplicity yet versatility, the capability of the package has been improved several times in collaboration with our customers. The latest design improvements include a new configuration designated the VP-55HC (high capacity), which utilizes an internal safe geometry pipe container that increases the U-235 capacity. The pipe container is similar in design to the historic USA DOT 2R vessel. Other planned and proposed improvements include provisions to transport UF{sub 6} in 1S, 2S, and 5A/5B cylinders; design changes that further increase the amount of U-235 at enrichments less than 20 wt.%; increasing the capacity of the VP-110 with a VP-110-specific analysis; developing a new, lighter 113-liter version of the package; and introducing content limits specific to uranium oxides in multiple forms. This paper traces the engineering and design efforts involved in expanding the Versa-Pac's versatility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pulmonary Changes After Radiotherapy for Conservative Treatment of Breast Cancer: A Prospective Study

Purpose: Radiotherapy (RT) after conservative surgery for breast cancer involves part of the pulmonary parenchyma with a potential detrimental effect of reducing the normal functional reserve. Such an effect deserves to be studied in depth, considering the given long life expectancy of these women. We prospectively analyzed high-resolution computed tomography (HRCT) and pulmonary function tests (PFTs) with correlation with dosimetric data from RT. Methods and Materials: Lung HRCT and PFTs were performed in 41 women who had undergone conservative surgery for breast cancer before and 3 and 9 months after postoperative RT. The PFTs included forced vital capacity, forced expiratory volume in 1 s, total lung capacity, maximal expiratory flow at 50% and 25% of vital capacity, and the diffusion capacity of carbon monoxide. HRCT was matched with the RT treatment plan images to analyze the dosimetric correlation. Results: At 3 months after RT, the lung alterations were classified at HRCT as follows: 46.3% were Grade 1, 24.4% Grade 2, and 7.3% Grade 3, and at 9 months, 58.5% were Grade 1, 19.5% Grade 2, and 0% Grade 3. The PFTs showed a significant decrease at 3 months, with only partial recovery at 9 months. Chemotherapy, but not hormonal therapy, was associated with PFT changes. The grade of fibrosis increased with increasing lung volume treated to a dose {>=}25 Gy. Conclusion: Lung changes, mainly related to damage to the alveolar-capillary barrier and smallest airway ramifications, were observed at 3 months, with only partial recovery at 9 months after RT. Minimizing the lung volume receiving {>=}25 Gy could reduce pulmonary toxicity.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A multi-echelon supply chain model for municipal solid waste management system

In this paper, a multi-echelon multi-period solid waste management system (MSWM) was developed by inoculating with multi-echelon supply chain. Waste managers, suppliers, industries and distributors could be engaged in joint strategic planning and operational execution. The principal of MSWM system is interactive planning of transportation and inventory for each organization in waste collection, delivery and disposal. An efficient inventory management plan for MSWM would lead to optimized productivity levels under available capacities (e.g., transportation and operational capacities). The applicability of the proposed system was illustrated by a case with three cities, one distribution and two waste disposal facilities. Solutions of the decision variable values under different significant levels indicate a consistent trend. With an increased significant level, the total generated waste would be decreased, and the total transported waste through distribution center to waste to energy and landfill would be decreased as well.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NLR Engage™: A Calliope Web Environment for Collaborative Energy Systems Modeling and Planning [SWR-20-16]

NLR Engage™ is a free, open-access energy system planning tool that allows multiple users/stakeholders to develop and collaborate on capacity expansion models. The tool, developed at the National Laboratory of the Rockies (NLR), provides a collaborative and easy-to-use interface built on Calliope, a multi-scale energy systems modeling framework. Visit the NLR hosted webtool at https://engage.nlr.gov/en/login/?next=/en/

Harris, Tom↗

Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

Thermal Energy Corporation Combined Heat and Power Project

To meet the planned heating and cooling load growth at the Texas Medical Center (TMC), Thermal Energy Corporation (TECO) implemented Phase 1 of a Master Plan to install an additional 32,000 tons of chilled water capacity, a 75,000 ton-hour (8.8 million gallon) Thermal Energy Storage (TES) tank, and a 48 MW Combined Heat and Power (CHP) system. The Department of Energy selected TMC for a $10 million grant award as part of the Financial Assistance Funding Opportunity Announcement, U.S. Department of Energy National Energy Technology, Recovery Act: Deployment of Combined Heat and Power (CHP) Systems, District Energy Systems, Waste Energy Recovery Systems, and Efficiency Industrial Equipment Funding Opportunity Number: DE-FOA-0000044 to support the installation of a new 48 MW CHP system at the TMC located just outside downtown Houston. As the largest medical center in the world, TMC is home to many of the nation's best hospitals, physicians, researchers, educational institutions, and health care providers. TMC provides care to approximately six million patients each year, and medical instruction to over 71,000 students. A medical center the size of TMC has enormous electricity and thermal energy demands to help it carry out its mission. Reliable, high-quality steam and chilled water are of utmost importance to the operations of its many facilities. For example, advanced medical equipment, laboratories, laundry facilities, space heating and cooling all rely on the generation of heat and power. As result of this project TECO provides this mission critical heating and cooling to TMC utilizing a system that is both energy-efficient and reliable since it provides the capability to run on power independent of the already strained regional electric grid. This allows the medical center to focus on its primary mission providing top quality medical care and instruction without worrying about excessive energy costs or the loss of heating and cooling due to the risk of power outages. TECO's operation is the largest Chilled Water District Energy System in the United States. The company used DOE's funding to help install a new high efficiency CHP system consisting of a Combustion Turbine and a Heat Recovery Steam Generator. This CHP installation was just part of a larger project undertaken by TECO to ensure that it can continue to meet TMC's growing needs. The complete efficiency overhaul that TECO undertook supported more than 1,000 direct and indirect jobs in manufacturing, engineering, and construction, with approximately 400 of those being jobs directly associated with construction of the combined heat and power plant. This showcase industrial scale CHP project, serving a critical component of the nation's healthcare infrastructure, directly and immediately supported the energy efficiency and job creation goals established by ARRA and DOE. It also provided an unsurpassed model of a district energy CHP application that can be replicated within other energy intensive applications in the industrial, institutional and commercial sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Test Plan: Reducing Soft Costs of Rooftop Solar Installations Attributed to Structural Considerations

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.↗

Integrating the Design of Desalination Technologies into Produced Water Network Optimization

The oil and gas energy sector uses billions of gallons of water for hydraulic fracturing each year to extract oil and gas. The water injected into the ground for fracturing along with naturally occurring formation water from oil wells surfaces back in the form of produced water. Produced water can contain high concentrations of total dissolved solids and is unfit for reuse outside the oil and gas industry without desalination. In semi-arid shale plays, produced water desalination for beneficial reuse could play a crucial role in alleviating water shortages and addressing extreme drought conditions. In this poster we co-optimize the design and operation of desalination technologies along with operational decisions across produced water networks. A multi-period produced water network model with simplified split-fraction-based desalination nodes is developed. Rigorous steady-state desalination mathematical models based on mechanical vapor recompression are developed and embedded at the desalination sites in the network model. An optimal common design across all periods is ensured using global capacity constraints. The solution approach is demonstrated for multi-period planning problems on networks from the PARETO open-source library. Model formulation and challenges associated with scalability are discussed.

Naik, Sakshi↗

Integrating the Design of Desalination Technologies into Produced Water Network Optimization

The oil and gas energy sector uses billions of gallons of water for hydraulic fracturing each year to extract oil and gas. The water injected into the ground for fracturing along with naturally occur-ring formation water from the oil wells surfaces back in the form of produced water. Produced water can contain high concentrations of total dissolved solids and is unfit for reuse outside the oil and gas industry without desalination. In semi-arid shale plays, produced water desalination for beneficial reuse could play a crucial role in alleviating water shortages and addressing extreme drought conditions. In this paper we co-optimize the design and operation of desalination technologies along with operational decisions across produced water networks. A multi-period produced water network model with simplified split-fraction-based desalination nodes is developed. Rigorous steady-state desalination mathematical models based on mechanical vapor recompression are developed and embedded at the desalination sites in the network model. An optimal common design is ensured across all periods using global capacity constraints. The solution approach is demonstrated for multi-period planning problems on networks from the PARETO open-source library. Model formulation and challenges associated with scalability are discussed.

Naik, Sakshi↗

Total Probability of Collision as a Metric for Finite Conjunction Assessment and Collision Risk Management

On-orbit collision risk is becoming an increasing mission risk to all operational satellites in Earth orbit. Managing this risk can be disruptive to mission and operations, present challenges for decision-makers, and is time-consuming for all parties involved. With the planned capability improvements to detecting and tracking smaller orbital debris and capacity improvements to routinely predict on-orbit conjunctions, this mission risk will continue to grow in terms of likelihood and effort. It is very real possibility that the future space environment will not allow collision risk management and mission operations to be conducted in the same manner as it is today. This paper presents the concept of a finite conjunction assessment-one where each discrete conjunction is not treated separately but, rather, as a continuous event that must be managed concurrently. The paper also introduces the Total Probability of Collision as an analogous metric for finite conjunction assessment operations and provides several options for its usage in a Concept of Operations.

Conjunction Assessment↗

How Western Does Business: An Explanation of Western's Products and Services

The mission of the Western Area Power Administration is to market and deliver reliable, renewable, cost-based hydroelectric power and related services. This guide provides an overview of Western’s history and how Western carries out that mission and provides electrical, transmission and ancillary services. It also discusses how we develop plans for marketing our most valuable resources—long-term firm capacity and energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Filtration Improvements in Support of Increased Salt Waste Processing Throughput at the Savannah River Site - 16173

Crossflow Filtration is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for the removal of actinides, strontium and sludge solids from the high-level salt waste stored in underground tanks. At SRS, crossflow filtration is deployed in the Actinide Removal Process (ARP). Salt waste is transferred from an underground waste tank to one of two strike tanks where it is struck with Monosodium Titanate (MST), which adsorbs uranium, plutonium and strontium. The MST laden salt waste is then transferred to the ARP filtration facility, which contains the crossflow filter. The filtrate, which is called Clarified Salt Solution (CSS), is sent to a downstream facility for cesium removal, while the MST and sludge solids are concentrated at the filtration facility and eventually sent to the Defense Waste Processing Facility (DWPF) for vitrification. ARP and the downstream cesium removal facility, the Modular Caustic Side Solvent Extraction Unit (MCU), were both developed as an interim salt waste processing technology and as smaller scale radioactive demonstration plants for the Salt Waste Processing Facility (SWPF), which is currently under construction. Since the beginning of ARP in 2008, there have been challenges with achieving desired filtration rates through the crossflow filter system. Historically the crossflow filter system has been the flow limiter in salt waste processing and many changes have been made and are planned to achieve desired throughput, especially as MCU increases its processing capacity. Some of these changes include the design of a new crossflow filter, the implementation of a new process chemistry flowsheet and several operational changes. The modifications to the ARP crossflow filter have helped contribute to periods of record throughput in salt waste processing in FY 2015. This paper will discuss the technical challenges and system limitations of retrofitting an older facility as well as past, present and future modifications to the ARP filtration process in order to achieve salt waste processing goals at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The development of a high-capacity instrument module heat transport system, appendixes

Data sheets provide temperature requirements for 82 individual instruments that are under development or planned for grouping on a space platform or pallet. The scientific objectives of these instrument packages are related to solar physics, space plasma physics, astronomy, high energy astrophysics, resources observations, environmental observations, materials processing, and life sciences. System specifications are given for a high capacity instrument module heat transport system to be used with future payloads.

Source record↗

Valuing National and Basin Level Geologic CO2 Storage Capacity Assessments in a Broader Context

The technical literature and much of the public policy dialogue about national or basin scale geologic carbon dioxide storage capacity estimates emphasizes the short comings in the methodologies employed in these studies because of their need to employ simplifying assumptions over large volumes of deep geologic structures. This short communication seeks to bring forward a better understanding of the role of these macroscale assessments and their value. In doing so, the author hopes that the there will be a more balanced discussion of macroscale geologic carbon dioxide storage assessments as compliments to the detailed site specific assessments needed to site any given carbon dioxide capture and storage facility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A decision-support system for sustainable urban metabolism in Europe

Urban metabolism components define the energy and material exchanges within a city and, therefore, can provide valuable information on the environmental quality of urban areas. Assessing the potential impact of urban planning alternatives on urban metabolism components (such as energy, water, carbon and pollutants fluxes) can provide a quantitative estimation of their sustainability performance. Urban metabolism impact assessment can, therefore, contribute to the identification of sustainable urban structures with regards, for example, to building types, materials and layout, as well as to location and capacity of transportation and infrastructural developments. In this way, it enables the formulation of planning and policy recommendations to promote efficient use of resources and enhance environmental quality in urban areas. The European FP7 project BRIDGE (sustainaBle uRban plannIng Decision support accountinG for urban mEtabolism) has developed a decision-support system (DSS) that systematically integrates urban metabolism components into impact assessment processes with the aim of accurately quantifying the potential effects of proposed planning interventions. The DSS enables integration of multiple spatial and non-spatial datasets (e.g. physical flows of energy and material with variables of social and economic change) in a systematic manner to obtain spatially defined assessment results and to thus inform planners and decision-makers. This multi-criteria approach also enables incorporation of stakeholders' perceptions in order to prioritise decisive assessment criteria. This paper describes the methodological framework used to develop the DSS and critically examines the results of its practical application in five European cities. - Highlights: Black-Right-Pointing-Pointer Urban metabolism in sustainability assessment of planning alternatives. Black-Right-Pointing-Pointer European FP7 project applied to 5 real life case studies across Europe. Black-Right-Pointing-Pointer Decision support system enables incorporating scientific knowledge into planning. Black-Right-Pointing-Pointer Scale, data availability and stakeholder representativeness limit its application.

54 ENVIRONMENTAL SCIENCES↗