Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

NASA Space Technology Roadmaps and Priorities: Restoring NASA's Technological Edge and Paving the Way for a New Era in Space

Success in executing future NASA space missions will depend on advanced technology developments that should already be underway. It has been years since NASA has had a vigorous, broad-based program in advanced space technology development, and NASA's technology base is largely depleted. As noted in a recent National Research Council report on the U.S. civil space program: Future U.S. leadership in space requires a foundation of sustained technology advances that can enable the development of more capable, reliable, and lower-cost spacecraft and launch vehicles to achieve space program goals. A strong advanced technology development foundation is needed also to enhance technology readiness of new missions, mitigate their technological risks, improve the quality of cost estimates, and thereby contribute to better overall mission cost management. Yet financial support for this technology base has eroded over the years. The United States is now living on the innovation funded in the past and has an obligation to replenish this foundational element. NASA has developed a draft set of technology roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist. The NRC appointed the Steering Committee for NASA Technology Roadmaps and six panels to evaluate the draft roadmaps, recommend improvements, and prioritize the technologies within each and among all of the technology areas as NASA finalizes the roadmaps. The steering committee is encouraged by the initiative NASA has taken through the Office of the Chief Technologist (OCT) to develop technology roadmaps and to seek input from the aerospace technical community with this study.

Source record↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗

Estimating Airline Operating Costs

The factors affecting commercial aircraft operating and delay costs were used to develop an airline operating cost model which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model permits estimates of aircraft related costs, i.e., aircraft service, landing fees, flight attendants, and control fees. A method for estimating the costs of certain types of airline delay is also described.

Maddalon, D. V.↗

Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of satellite servicing cost benefits

Under the auspices of NASA/JSC a methodology was developed to estimate the value of satellite servicing to the user community. Time and funding precluded the development of an exhaustive computer model; instead, the concept of Design Reference Missions was involved. In this approach, three space programs were analyzed for various levels of servicing. The programs selected fall into broad categories which include 80 to 90% of the missions planned between now and the end of the century. Of necessity, the extrapolation of the three program analyses to the user community as a whole depends on an average mission model and equivalency projections. The value of the estimated cost benefits based on this approach depends largely on how well the equivalency assumptions and the mission model match the real world. A careful definition of all assumptions permits the analysis to be extended to conditions beyond the scope of this study.

Builteman, H. O.↗

Developing Analytical Techniques for Modeling Construction/Infrastructure of Energy Systems - ISSST2019

This work was presented at the International Symposium on Sustainable Systems and Transportation (ISSST) 2019 Conference in Portland, OR on June 25, 2019. Using detailed component-level cost estimates for new fossil power plants as documented in Cost and Performance Baseline for Fossil Energy Plants Volume 1a: Bituminous Coal (PC) and Natural Gas to Electricity Revision 3, economic demands for the construction of a power plant and the manufacturing of its components are estimated. The model produces national average construction impact results for the life cycle of a power plant. This output highlights areas of further research that help to define valuable data collection efforts.

Carlson, Derrick R.↗

Demonstration of Mer-Cure Technology for Enhanced Mercury Control

Alstom Power Inc. has completed a DOE/NETL-sponsored program (under DOE Cooperative Agreement No. De-FC26-07NT42776) to demonstrate Mer-Cure{trademark}, one of Alstom's mercury control technologies for coal-fired boilers. The Mer-Cure{trademark}system utilizes a small amount of Mer-Clean{trademark} sorbent that is injected into the flue gas stream for oxidation and adsorption of gaseous mercury. Mer-Clean{trademark} sorbents are carbon-based and prepared with chemical additives that promote oxidation and capture of mercury. The Mer-Cure{trademark} system is unique in that the sorbent is injected into an environment where the mercury capture kinetics is accelerated. The full-scale demonstration program originally included test campaigns at two host sites: LCRA's 480-MW{sub e} Fayette Unit No.3 and Reliant Energy's 190-MW{sub e} Shawville Unit No.3. The only demonstration tests actually done were the short-term tests at LCRA due to budget constraints. This report gives a summary of the demonstration testing at Fayette Unit No.3. The goals for this Mercury Round 3 program, established by DOE/NETL under the original solicitation, were to reduce the uncontrolled mercury emissions by 90% at a cost significantly less than 50% of the previous target of $60,000/lb mercury removed. The results indicated that Mer-Cure{trademark} technology could achieve mercury removal of 90% based on uncontrolled stack emissions. The estimated costs for 90% mercury control, at a sorbent cost of $0.75 to $2.00/lb respectively, were $13,400 to $18,700/lb Hg removed. In summary, the results from demonstration testing show that the goals established by DOE/NETL were met during this test program. The goal of 90% mercury reduction was achieved. Estimated mercury removal costs were 69-78% lower than the benchmark of $60,000/lb mercury removed, significantly less than 50% of the baseline removal cost.

01 COAL, LIGNITE, AND PEAT↗

Parametric Cost Analysis: A Design Function

Parametric cost analysis uses equations to map measurable system attributes into cost. The measures of the system attributes are called metrics. The equations are called cost estimating relationships (CER's), and are obtained by the analysis of cost and technical metric data of products analogous to those to be estimated. Examples of system metrics include mass, power, failure_rate, mean_time_to_repair, energy _consumed, payload_to_orbit, pointing_accuracy, manufacturing_complexity, number_of_fasteners, and percent_of_electronics_weight. The basic assumption is that a measurable relationship exists between system attributes and the cost of the system. If a function exists, the attributes are cost drivers. Candidates for metrics include system requirement metrics and engineering process metrics. Requirements are constraints on the engineering process. From optimization theory we know that any active constraint generates cost by not permitting full optimization of the objective. Thus, requirements are cost drivers. Engineering processes reflect a projection of the requirements onto the corporate culture, engineering technology, and system technology. Engineering processes are an indirect measure of the requirements and, hence, are cost drivers.

Dean, Edwin B.↗

An evaluation of contractor projected and actual costs

GSFC contractors with cost-plus contracts provide cost estimates for each of the next four quarters on a quarterly basis. Actual expenditures over a two-year period were compared to the estimates, and the data were sorted in different ways to answer several questions and give quantification to observations, such as how much does the accuracy of estimates degrade as they are made further into the future? Are estimates made for small dollar amounts more accurate than for large dollar estimates? Other government agencies and private companies with cost-plus contracts may be interested in this analysis as potential methods of contract management for their organizations. It provides them with the different methods one organization is beginning to use to control costs.

Kwiatkowski, K. A.↗

Design considerations for high-altitude, long-endurance, microwave-powered aircraft

The sizing and performance analyses have been conducted in the design of long-endurance, high-altitude airplanes. These airplanes receive power either continuously beamed from a phased array transmitter or intermittently beamed from a dish transmitter. Results are presented for the cases of flight in zero wind speed and nonzero wind speed. Sensitivity studies indicate that the vehicle size is relatively insensitive to changes in the transmitter size. Cost estimates were made using models that excluded the airplane cost. Using a reference payload, results obtained from array and dish configurations were compared. Comparisons showed savings in cost as well as smaller vehicle sizes when an array transmitter was used.

Nguyen, H. Q.↗

Direct broadcast satellite-radio: Portable and mobile reception trade-offs

There has been considerable international effort in the areas of system studies, system development, and regulatory work for a Direct Broadcast Satellite Radio (DBS-R). An important milestone will be the 1992 World Radio Administrative Conference (WARC 1992) consideration of frequency allocation in the 500 - 3000 MHz range for such a service. There is an interagency agreement between Voice of America and the National Aeronautics and Space Administration for a coordinated program in DBS-R. This program includes seven tasks: systems tradeoff studies, propagation measurements, satellite experiment and demonstration, receiver development, market studies, regulatory studies, and WARC preparations. The findings of ongoing work under the first task, systems tradeoff studies, are discussed. Topics covered include digital bit rate and audio quality, propagation considerations and link margin estimates for portable reception, link margin estimates for mobile reception, coverage, and satellite size and cost estimates for a regional DBS-R coverage example.

Golshan, Nasser↗

Parametric Cost Modeling of Space Missions Using the Develop New Projects (DMP) Implementation Process

This paper presents an overview of a parametric cost model that has been built at JPL to estimate costs of future, deep space, robotic science missions. Due to the recent dramatic changes in JPL business practices brought about by an internal reengineering effort known as develop new products (DNP), high-level historic cost data is no longer considered analogous to future missions. Therefore, the historic data is of little value in forecasting costs for projects developed using the DNP process. This has lead to the development of an approach for obtaining expert opinion and also for combining actual data with expert opinion to provide a cost database for future missions. In addition, the DNP cost model has a maximum of objective cost drivers which reduces the likelihood of model input error. Version 2 is now under development which expands the model capabilities, links it more tightly with key design technical parameters, and is grounded in more rigorous statistical techniques. The challenges faced in building this model will be discussed, as well as it's background, development approach, status, validation, and future plans.

Rosenberg, Leigh↗

Launcher Systems Development Cost: Behavior, Uncertainty, Influences, Barriers and Strategies for Reduction

This paper will report on the activities of the IAA Launcher Systems Economics Working Group in preparations for its Launcher Systems Development Cost Behavior Study. The Study goals include: improve launcher system and other space system parametric cost analysis accuracy; improve launcher system and other space system cost analysis credibility; and provide launcher system and technology development program managers and other decisionmakers with useful information on development cost impacts of their decisions. The Working Group plans to explore at least the following five areas in the Study: define and explain development cost behavior terms and concepts for use in the Study; identify and quantify sources of development cost and cost estimating uncertainty; identify and quantify significant influences on development cost behavior; identify common barriers to development cost understanding and reduction; and recommend practical, realistic strategies to accomplish reductions in launcher system development cost.

Shaw, Eric J.↗

An Unmanned Spacecraft Subsystem Cost Model for Advance Mission Planning

This paper reports on the development of a parametric cost model that is being built at JPL to estimate costs of future, deep space, robotic science missions. Because of the changes in the mission implementation process and technology changes, the model is being built in a dramatically different manner than past models which have had access to a data base that drew heavily on the correlation between mass and actual costs.

Parametric↗

Dynamic Analysis of the Next Generation Molten-Salt Breeder Reactor System

The conceptual design of a 1000 MWe two-fluid molten-salt breeder reactor (MSBR) station was performed during 1966-1970 at Oak Ridge National Laboratory (ORNL) with the goal of using the U-233 fuel cycle. This modular design with four reactor modules has an electrical output of 250 MW/module. The abundance of Th-232 was attractive in converting it to U-233 in a thermal breeder reactor. The two-fluid reactor is graphite-moderated 'with a {sup 7}LiF-BeF{sub 2}-UF{sub 4} fuel salt circulated through the core and a {sup 7}LiF-ThF{sub 4}-BeF{sub 2} blanket salt circulated through separate flow channels distributed throughout the core, as well as in a surrounding under-moderated region'. This reactor design has the advantages of not producing Pu isotopes and easy chemical separation of U-233 in the blanket material. The low fuel cost and the graphite replacement cost are attractive for such a design, with an estimated cost of $141/kW at 1968-dollar value. Potential non-proliferation features of MSBR, the low costs of raw materials, and established chemical separation of fission products are important factors in further development of MSBRs as an alternative to current light water reactors. These reactors are often referred to as liquid fluoride thorium reactor (LFTR). The current research on the modeling of the MSBR is based on an earlier work on the preliminary dynamic model of the MSBR concept. Revisions are made to the original model. The physics parameters have been modified for the current modeling effort based on additional information including more recent values of model parameters from and several typographical misprints in equations and values. Details of this effort will be presented in a full follow-up paper. This work presents the detailed nodal models of reactor fluid core, blanket fluid loop, graphite moderator, fuel fluid heat exchanger, and the blanket fluid heat exchanger. A set of simulations has been performed to validate the model using the commercial software MATLAB{sup TM}-Simulink. Simulations were performed for the cases of source perturbation and reactivity perturbation. The model is inherently nonlinear. A description of the MSBR conceptual design, along with a tabulation of relevant system parameters, is presented. The results of simulation demonstrate stable behavior of the MSBR dynamics, temperature feedback effects, and load-following capability of the MSBR system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Techno-Economic Analysis of a Nuclear Reactor System coupled with a Liquid Metal Battery

There is a need for nuclear reactor systems to become more dynamic as defossilization and renewable energy sources continue to reshape the energy grid. One option to meet these changing demands is to pair the reactor with an energy storage system. This work details a technoeconomic analysis and sensitivity analysis of a high temperature gas cooled microreactor, supercritical carbon dioxide power cycle, and liquid metal battery. Dynamic modeling has shown that these three systems compliment each other to provide load following and black-start capabilities to the grid. Current cost estimates for installing the systems yield a competitive levelized cost of electricity and levelized cost of storage, indicating that such a combined system may be economically viable as technological advances lead to them being technically feasible.

25 ENERGY STORAGE↗

Cost models and economical packaging of LSI's

Report discusses mathematical models used to estimate costs of developing and fabricating microcircuits. Second part discusses LSI packaging using tape chip carrier technology.

Himmel, R. P.↗