Search NASA⌕ Search

SEARCH · Search NASA

Results for “Communication costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Deployable Propulsion and Power Systems for Solar System Exploration

NASA is developing thin-film based, deployable propulsion, power and communication systems for small spacecraft that could provide a revolutionary new capability allowing small spacecraft exploration of the solar system. The Near Earth Asteroid (NEA) Scout reconnaissance mission will demonstrate solar sail propulsion on a 6U CubeSat interplanetary spacecraft and lay the groundwork for their future use in deep space science and exploration missions. Solar sails use sunlight to propel vehicles through space by reflecting solar photons from a large, mirror-like sail made of a lightweight, highly reflective material. This continuous photon pressure provides propellantless thrust, allowing for very high delta V maneuvers on long-duration, deep space exploration. Since reflected light produces thrust, solar sails require no onboard propellant. The Lightweight Integrated Solar Array and Transceiver (LISA-T) is a launch stowed, orbit deployed array on which thin-film photovoltaic and antenna elements are embedded. Inherently, small satellites are limited in surface area, volume, and mass allocation; driving competition between power, communications, and GN&C (guidance navigation and control) subsystems. This restricts payload capability and limits the value of these low-cost satellites. LISA-T is addressing this issue, deploying large-area arrays from a reduced volume and mass envelope - greatly enhancing power generation and communications capabilities of small spacecraft. The NEA Scout mission, funded by NASA's Advanced Exploration Systems Program and managed by NASA MSFC, will use the solar sail as its primary propulsion system, allowing it to survey and image one or more NEA's of interest for possible future human exploration. NEA Scout uses a 6U cubesat (to be provided by NASA's Jet Propulsion Laboratory), an 86 sq m solar sail and will weigh less than 12 kilograms. NEA Scout will be launched on the first flight of the Space Launch System in 2018. Similar in concept to the NEA Scout solar sail, the LISA-T array is designed to fit into a very small volume and provide abundant power and omnidirectional communications in just about any deployment configuration. The technology is being proposed for flight validation as early as 2019 in a low earth orbit demonstration using a 3U cubesat, of which less than 1U will be devoted to the LISA-T power and propulsion system. By leveraging recent advancements in thin films, photovoltaics and miniaturized electronics, new mission-level capabilities will be enabled aboard lower-cost small spacecraft instead of their more expensive, traditional counterparts, enabling a new generation of frequent, inexpensive deep space missions.

Johnson, Les↗

Micro Electric Propulsion Feasibility

Miniature, 50 kg class, strategic satellites intended for extended deployment in space require an on-board propulsion capability to perform needed attitude control adjustments and drag compensation maneuvers. Even on such very small spacecraft, these orbit maintenance functions can be significant and result in a substantial propellant mass requirement. Development of advanced propulsion technology could reduce this propellant mass significantly, and thereby maximize the payload capability of these spacecraft. In addition, spacecraft maneuverability could be enhanced and/or multi-year mission lifetimes realized. These benefits cut spacecraft replacement costs, and reduce services needed to maintain the launch vehicles. For SDIO brilliant pebble spacecraft, a miniaturized hydrazine propulsion system provides both boost and divert thrust control. This type of propulsion system is highly integrated and is capable of delivering large thrust levels for short time periods. However, orbit maintenance functions such as drag make-up require only very small velocity corrections. Using the boost and/or divert thrusters for these small corrections exposes this highly integrated propulsion system to continuous on/off cycling and thereby increases the risk of system failure. Furthermore, since drag compensation velocity corrections would be orders of magnitude less than these thrusters were designed to deliver, their effective specific impulse would be expected to be lower when operated at very short pulse lengths. The net result of these effects would be a significant depletion of the on-board hydrazine propellant supply throughout the mission, and a reduced propulsion system reliability, both of which would degrade the interceptors usefulness. In addition to SDIO brilliant pebble spacecraft, comparably small spacecraft can be anticipated for other future strategic defense applications such as surveillance and communication. For such spacecraft, high capability and reliability, minimal detectability and low cost are requirements. All these miniature spacecraft share a common characteristic: because of their on-board electronic equipment they have, by design, solar order 50-100 W. In a relative sense, such spacecraft are power rich when compared to other larger spacecraft. This power rich situation is offset by very tight mass budgets, which make reductions in propellant mass requirements a key issue in meeting overall spacecraft minimum mass goals. In principle, power rich and propellant poor brilliant pebbles class spacecraft can benefit from using high specific impulse electric propulsion to reduce chemical propellant mass requirements. However, at power levels of order 50 W, arcjets cannot be made to function, ion thrusters are too complex and heavy and resistojets have too low a specific impulse. Recognizing these capability limitations in existing electric propulsion technology, the SDIO/IST sponsored the Phase I SBIR Micro Electric Propulsion (MEP) thruster study described in this report. The objective of this study was to examine the feasibility of developing a very simple, low mass and small volume, electric thruster for operation on hydrazine at less than 100 W of input power. The feasibility of developing such a MEP thruster was successfully demonstrated by EPL by the discovery of a novel plasma acceleration process. The sections in this report summarize the approach, test results and major accomplishments of this proof-of-concept program.

Aston, Graeme↗

Improving Life-Cycle Cost Management of Spacecraft Missions

This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

Clardy, Dennon↗

Communicating Medical Needs to Non-Medical Managers

Differences in communication styles and languages between groups often lead to miscommunication, confusion, and/or frustration. Engineers, computer specialists, clinicians, and managers often utilize the English language in very different ways, with different groups using the same words to represent different concepts ("complaint" is a typical example). In addition, medical issues are often perceived as "off-nominal" and not "primary mission tasks" by managers, which can cause them to assign lower priorities to medical training time and resources. Knowledge bases differ due to variations in training and skill sets, and the goals (both immediate and long-term) of the communicators may also vary, with managers being primarily concerned with overall mission objectives, while clinicians focus on individual or group health issues. Furthermore, true communication is only possible when clinicians possess a deep understanding of mission requirements as well as the ability to communicate medical requirements on a priority basis using risk assessment, added value, and cost benefit analysis. These understandable differences may contribute to difficulties in expressing concerns and ideas in an efficient manner, particularly in projects, such as the space program or many military operations, where these varied groups must collaborate, and where the final decisions must be made by fully informed mission commanders. Methods: Three scenario-based approaches were developed utilizing decision trees and problem based learning, to help define and integrate these concepts. Results: Use of these techniques by NASA and military personnel will be presented. Discussion: To enhance communication, particularly of medical needs, one must identify the concerns and motivating factors for the other groups; for example, members of management may focus on financial concerns, a desire for risk mitigation, public perceptions, mission objectives, etc. Training clinicians to frame issues in these terms may lead to better understanding of the medical concerns by other groups.

Bacal, Kira↗

The cost benefits of the Spacelab system to scientific investigations and space applications

Cost advantages of the Spacelab system to scientific experiments in space and space operations are presented. The payload integration concepts developed for Spacelab are examined, and it is shown that Spacelab and Shuttle integration, communications and data processing, launch support requirements and flight operations will provide a considerable savings in the costs of space research relative to previous space systems. Spacelab modular design, incorporating features such as standard payload interfaces, optional mission dependent equipment and standard services, such as the Experiment Computer Operating System, is shown to offer the user a wider range of services than previous programs, also at significantly lower costs. It is concluded that the Spacelab system will greatly reduce the costs and broaden the opportunities for scientific investigation in space.

Jean, O. C.↗

Bridging the Divide between Safety and Risk Management for your Project or Program

This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

Lutomski, Mike↗

Integrated Network Architecture for NASA's Orion Missions

NASA is planning a series of short and long duration human and robotic missions to explore the Moon and then Mars. The series of missions will begin with a new crew exploration vehicle (called Orion) that will initially provide crew exchange and cargo supply support to the International Space Station (ISS) and then become a human conveyance for travel to the Moon. The Orion vehicle will be mounted atop the Ares I launch vehicle for a series of pre-launch tests and then launched and inserted into low Earth orbit (LEO) for crew exchange missions to the ISS. The Orion and Ares I comprise the initial vehicles in the Constellation system of systems that later includes Ares V, Earth departure stage, lunar lander, and other lunar surface systems for the lunar exploration missions. These key systems will enable the lunar surface exploration missions to be initiated in 2018. The complexity of the Constellation system of systems and missions will require a communication and navigation infrastructure to provide low and high rate forward and return communication services, tracking services, and ground network services. The infrastructure must provide robust, reliable, safe, sustainable, and autonomous operations at minimum cost while maximizing the exploration capabilities and science return. The infrastructure will be based on a network of networks architecture that will integrate NASA legacy communication, modified elements, and navigation systems. New networks will be added to extend communication, navigation, and timing services for the Moon missions. Internet protocol (IP) and network management systems within the networks will enable interoperability throughout the Constellation system of systems. An integrated network architecture has developed based on the emerging Constellation requirements for Orion missions. The architecture, as presented in this paper, addresses the early Orion missions to the ISS with communication, navigation, and network services over five phases of a mission: pre-launch, launch from T0 to T+6.5 min, launch from T+6.5 min to 12 min, in LEO for rendezvous and docking with ISS, and return to Earth. The network of networks that supports the mission during each of these phases and the concepts of operations during those phases are developed as a high level operational concepts graphic called OV-1, an architecture diagram type described in the Department of Defense Architecture Framework (DoDAF). Additional operational views on organizational relationships (OV-4), operational activities (OV-5), and operational node connectivity (OV-2) are also discussed. The system interfaces view (SV-1) that provides the communication and navigation services to Orion is also included and described. The challenges of architecting integrated network architecture for the NASA Orion missions are highlighted.

Bhasin, Kul B.↗

Low cost manned Mars mission based on indigenous propellant production

The paper describes a low-cost approach to the manned exploration of Mars (which involves an unmanned mission followed two years later by a manned mission) based on near-term technologies and in situ propellant production. Particular attention is given to the basic mission architecture and its major components, including the orbital analysis, the unmanned segment, the Earth Return Vehicle, the aerobrake design, life sciences, guidance, communications, power, propellant production, the surface rovers, and Mars science. Also discussed are the cost per mission over an assumed 8-yr initiative.

Bruckner, A. P.↗

How Improved Forecasting Can Increase the Bulk Power System Value of Price-Responsive Electric Vehicle Managed Charging

Personal light-duty vehicle (LDV) electric vehicle managed charging (EVMC) can reduce power system costs by better aligning electric vehicle (EV) charging with locations and times of low energy cost or infrastructure use. The need to coordinate charging demand across thousands to millions of vehicles while preserving mobility service is a barrier to realizing the value of EVMC. Price-responsive dispatch mechanisms like time-of-use rates (TOU) and hourly real-time prices (RTP) are attractive compared to direct load control (DLC) because they only require one-way communications and local controls. However, increasing participation in price responsive mechanisms can induce costly-to-serve spikes in load and otherwise increase, rather than decrease, production costs. We quantify the ability of improved EVMC forecasting to sustain savings from price responsive mechanisms beyond the limit of 14% of LDVs actively participating observed in previous work. Perfect forecasting of price-responsive EV load makes TOU and RTP value-competitive with a low-error DLC formulation with up to 27% (within-week flexibility) to 45% or more (within-session flexibility) of LDVs participating in EVMC in an envisioned New England power system with 84% clean energy. Additional costs of implementing DLC should be no more than tens of dollars per vehicle-year if DLC is to be value-competitive with accurately forecast price-responsive EVMC for double-digit percentage shares of LDVs participating.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Results from ACTS Development and On-Orbit Operations

The Advanced Communications Technology Satellite (ACTS) was sponsored by NASA to develop the technology for 30/20 Ghz, spot beam communications satellites with on-board baseband and microwave matrix switching. The spot beams allow the use of very small aperture, low cost terminals as well as provide a large degree of frequency reuse. These technologies also significantly reduce the on-orbit weight per unit communication capacity. The ACTS system provides, for the most part, on-demand, integrated digital satellite /terrestrial networks with service data rates from 64 Kbps to 622 Mbps. This paper discusses the results obtained from the ACTS development and its first two years of on-orbit operations for fixed and mobile services.

Gedney, Richard T.↗

Manufacturing Large Membrane Mirrors at Low Cost

Relatively inexpensive processes have been developed for manufacturing lightweight, wide-aperture mirrors that consist mainly of reflectively coated, edge-supported polyimide membranes. The polyimide and other materials in these mirrors can withstand the environment of outer space, and the mirrors have other characteristics that make them attractive for use on Earth as well as in outer space: With respect to the smoothness of their surfaces and the accuracy with which they retain their shapes, these mirrors approach the optical quality of heavier, more expensive conventional mirrors. Unlike conventional mirrors, these mirrors can be stowed compactly and later deployed to their full sizes. In typical cases, deployment would be effected by inflation. Potential terrestrial and outer-space applications for these mirrors include large astronomical telescopes, solar concentrators for generating electric power and thermal power, and microwave reflectors for communication, radar, and short-distance transmission of electric power. The relatively low cost of manufacturing these mirrors stems, in part, from the use of inexpensive tooling. Unlike in the manufacture of conventional mirrors, there is no need for mandrels or molds that have highly precise surface figures and highly polished surfaces. The surface smoothness is an inherent property of a polyimide film. The shaped area of the film is never placed in contact with a mold or mandrel surface: Instead the shape of a mirror is determined by a combination of (1) the shape of a fixture that holds the film around its edge and (2) control of manufacturing- process parameters. In a demonstration of this manufacturing concept, spherical mirrors having aperture diameters of 0.5 and 1.0 m were fabricated from polyimide films having thicknesses ranging from <20 m to 150 m. These mirrors have been found to maintain their preformed shapes following deployment.

FROM↗

Lazy checkpoint coordination for bounding rollback propagation

Independent checkpointing allows maximum process autonomy but suffers from potential domino effects. Coordinated checkpointing eliminates the domino effect by sacrificing a certain degree of process autonomy. In this paper, we propose the technique of lazy checkpoint coordination which preserves process autonomy while employing communication-induced checkpoint coordination for bounding rollback propagation. The introduction of the notion of laziness allows a flexible trade-off between the cost for checkpoint coordination and the average rollback distance. Worst-case overhead analysis provides a means for estimating the extra checkpoint overhead. Communication trace-driven simulation for several parallel programs is used to evaluate the benefits of the proposed scheme for real applications.

Wang, Yi-Min↗

Lazy checkpoint coordination for bounding rollback propagation

Independent checkpointing allows maximum process autonomy but suffers from potential domino effects. Coordinated checkpointing eliminates the domino effect by sacrificing a certain degree of process autonomy. In this paper, we propose the technique of lazy checkpoint coordination which preserves process autonomy while employing communication-induced checkpoint coordination for bounding rollback propagation. The introduction of the notion of laziness allows a flexible trade-off between the cost for checkpoint coordination and the average rollback distance. Worst-case overhead analysis provides a means for estimating the extra checkpoint overhead. Communication trace-driven simulation for several parallel programs is used to evaluate the benefits of the proposed scheme for real applications.

Wang, Yi-Min↗

Improvements to Integrated Tradespace Analysis of Communications Architectures (ITACA) Network Loading Analysis Tool

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by replicating the analysis capabilities of commercially licensed software which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. SCENIC differs from current tools that perform similar analyses in that it 1) does not require any licensing fees, 2) will provide an all-in-one package for various analysis capabilities that normally requires add-ons or multiple tools to complete. As part of SCENIC's capabilities, the ITACA network loading analysis tool will be responsible for assessing the loading on a given network architecture and generating a network service schedule. ITACA will allow users to evaluate the quality of service of a given network architecture and determine whether or not the architecture will satisfy the mission's requirements. ITACA is currently under development, and the following improvements were made during the fall of 2017: optimization of runtime, augmentation of network asset pre-service configuration time, augmentation of Brent's method of root finding, augmentation of network asset FOV restrictions, augmentation of mission lifetimes, and the integration of a SCaN link budget calculation tool. The improvements resulted in (a) 25% reduction in runtime, (b) more accurate contact window predictions when compared to STK(Registered Trademark) contact window predictions, and (c) increased fidelity through the use of specific SCaN asset parameters.

analysis↗

Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

Overruns↗

Engineering planetary lasers for interstellar communication

Transmitting large amounts of data efficiently among neighboring stars will vitally support any eventual contact with extrasolar intelligence, whether alien or human. Laser carriers are particularly suitable for high-quality, targeted links. Space laser transmitter systems designed by this work, based on both demonstrated and imminent advanced space technology, could achieve reliable data transfer rates as high as 1 kb/s to matched receivers as far away as 25 pc, a distance including over 700 approximately solar-type stars. The centerpiece of this demonstration study is a fleet of automated spacecraft incorporating adaptive neural-net optical processing active structures, nuclear electric power plants, annular momentum control devices, and ion propulsion. Together the craft sustain, condition, modulate, and direct to stellar targets an infrared laser beam extracted from the natural mesospheric, solar-pumped, stimulated CO2 emission recently discovered at Venus. For a culture already supported by mature interplanetary industry, the cost of building planetary or high-power space laser systems for interstellar communication would be marginal, making such projects relevant for the next human century. Links using high-power lasers might support data transfer rates as high as optical frequencies could ever allow. A nanotechnological society such as we might become would inevitably use 10 to the 20th power b/yr transmission to promote its own evolutionary expansion out of the galaxy.

Sherwood, Brent↗

Unique Concept for a Low Cost, Light Weight Space Deployable Antenna Structure

Large space deployable antennas are needed for a variety of applications that include Mobile Communications, Radiometry, Active Microwave Sensing, Very Long Baseline Interferometry and DoD Space Based Radar. These user requirements identify the need for structures up to tens of meters in size for operation from 1 to 90 GHz, based on different aperture configurations. However, the one thing the users have in common is a concept selection criteria for low cost, light weight and highly reliable deployable structures. Fortunately, a unique class of space structures has recently emerged that have tremendous potential for satisfying these criteria. They are referred to as inflatable deployable structures.

Freeland, Robert E.↗