Physical Security Model Development of an Electrochemical Facility

Nuclear facilities in the U.S. and around the world face increasing challenges in meeting evolving physical security requirements while keeping costs reasonable. The addition of security features after a facility has been designed and without attention to optimization (the approach of the past) can easily lead to cost overruns. Instead, security should be considered at the beginning of the design process in order to provide robust, yet efficient physical security designs. The purpose of this work is to demonstrate how modeling and simulation can be used to optimize the design of physical protection systems. A suite of tools, including Scribe3D and Blender, were used to model a generic electrochemical reprocessing facility. Physical protection elements such as sensors, portal monitors, barriers, and guard forces were added to the model based on best practices for physical security. Two theft scenarios (an outsider attack and insider diversion) as well as a sabotage scenario were examined in order to optimize the security design. Security metrics are presented. This work fits into a larger Virtual Facility Distributed Test Bed 2020 Milestone in the Material Protection, Accounting, and Control Technologies (MPACT) program through the Department of Energy (DOE). The purpose of the milestone is to demonstrate how a series of experimental and modeling capabilities across the DOE complex provide the capabilities to demonstrate complete Safeguards and Security by Design (SSBD) for nuclear facilities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Insulation Coordination Design for Grid-Connected Solid-State Transformers

The deployment of solid-state transformers (SSTs) in medium-voltage (MV) distribution systems is facing various challenges, especially the challenge of insulation coordination design against grid-originated lightning impulses. In this article, two challenges in existing insulation coordination designs for grid-connected SSTs are identified. One challenge is the mismatch between metal-oxide varistor (MOV) protective levels and SST insulation strength, the other challenge is the incompatibility of standard impulse test on SST protective structures. To address the MOV selection challenge, a novel lightning protection scheme is designed to protect a single-stage SST where the semiconductor modules are directly exposed to external lightning impulses. Here, the in-lab lightning impulse tests are performed to verify the overvoltage attenuation performance of the prototyped lightning protection scheme. To address the impulse test challenge, the surge withstand capability of the protected SST is comprehensively evaluated with a complete set of insulation coordination design procedures beyond the basic insulation level (BIL) test. After these two challenges are addressed, a discussion is presented on substituting conventional transformers with the protected SSTs into insulation-coordinated distribution systems to facilitate the field deployment of SSTs.

solid-state transformer (SST)↗

Resilience Design Patterns: A Structured Approach to Resilience at Extreme Scale

Reliability is a serious concern for future extreme-scale high-performance computing (HPC) systems. Projections based on the current generation of HPC systems and technology roadmaps suggest the prevalence of very high fault rates in future systems. While the HPC community has developed various resilience solutions, application-level techniques as well as system-based solutions, the solution space remains fragmented. There are no formal methods and metrics to integrate the various HPC resilience techniques into composite solutions, nor are there methods to holistically evaluate the adequacy and efficacy of such solutions in terms of their protection coverage, and their performance \& power efficiency characteristics. Additionally, few of the current approaches are portable to newer architectures and software environments that will be deployed on future systems. In this paper, we develop a structured approach to the design, evaluation and optimization of HPC resilience using the concept of design patterns. A design pattern is a general repeatable solution to a commonly occurring problem. We identify the problems caused by various types of faults, errors and failures in HPC systems and the techniques used to deal with these events. Each well-known solution that addresses a specific HPC resilience challenge is described in the form of a pattern. We develop a complete catalog of such resilience design patterns, which may be used by system architects, system software and tools developers, application programmers, as well as users and operators as essential building blocks when designing and deploying resilience solutions. We also develop a design framework that enhances a designer's understanding the opportunities for integrating multiple patterns across layers of the system stack and the important constraints during implementation of the individual patterns. It is also useful for defining mechanisms and interfaces to coordinate flexible fault management across hardware and software components. The resilience patterns and the design framework also enable exploration and evaluation of design alternatives and support optimization of the cost-benefit trade-offs among performance, protection coverage, and power consumption of resilience solutions. Here, the overall goal of this work is to establish a systematic methodology for the design and evaluation of resilience technologies in extreme-scale HPC systems that keep scientific applications running to a correct solution in a timely and cost-efficient manner despite frequent faults, errors, and failures of various types.

97 MATHEMATICS AND COMPUTING↗

Gen 3 Particle Pilot Plant (G3P3) -- High-Temperature Particle System for Concentrating Solar Power (Phases 1 and 2)

The U.S. Department of Energy Solar Energy Technologies Office initiated the Generation 3 Concentrating Solar Power (CSP) program to achieve higher operating temperatures (>700 °C) to enable next-generation CSP high-temperature power cycles such as the supercritical CO 2 (sCO2) Brayton Cycle. Three teams were selected to pursue high-temperature gas, liquid, and solid pathways for the heat-transfer media. Phases 1 and 2, which lasted from 2018 – 2020, consisted of design, modeling, and testing activities to further de-risk each of the technologies and develop a design for construction, commissioning, and operation of a pilot-scale facility in Phase 3 (2021 – 2024). This report summarizes the activities in Phases 1 and 2 for the solid-particle pathway led by Sandia National Laboratories. In Phases 1 and 2, Sandia successfully de-risked key elements of the proposed Gen 3 Particle Pilot Plant (G3P3) by improving the design, operation, and performance of key particle component technologies including the receiver, storage bins, particle-to-sCO2 heat exchanger, particle lift, and data acquisition and controls. Modeling and testing of critical components have led to optimized designs that meet desired performance metrics. Detailed drawings, piping and instrumentation diagrams, and process flow diagrams were generated for the integrated system, and structural analyses of the assembled tower structure were performed to demonstrate compliance with relevant codes and standards. Instrumentation and control systems of key subsystems were also demonstrated. Together with Bridgers & Paxton, Bohannan Huston, and Sandia Facilities, we have completed a 100% G3P3 tower design package with stamped engineering drawings suitable for construction bid in Phase 3.

14 SOLAR ENERGY↗

Lake Charles CCS Project (Final Technical Report, Phase 2)

In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CHL1 2K COLD BOX REPLACEMENT

There is growing evidence showing that the cold compressors in the Modified Sub-atmospheric Cold Box (SC1/SCM) of the JLab Central Helium Liquefier (CHL) are approaching the end of their life. Their replacement parts are no longer available due to obsolescence, thus placing the Physics program at serious risk. A new sub-atmospheric cold box (SC1R), which hosts five technologically superior, water-cooled cold compressors and a similar 4K-2K refrigeration recovery heat exchanger, was funded in July 2017, to replace the existing 2K cold box. The design of the new 2K cold box and the external support system have been completed allowing the project to enter the fabrication and assembly phase, which will be completed here at JLab. We present the design, fabrication, installation and commissioning schedule of the new 2K cold box.

Yang, Shirley↗

Reassessing Double-Ended Guillotine Break Requirements: Evidence-Based Analysis of Regulatory Assumptions After Five Decades of Nuclear Operation

After five decades of nuclear power operation encompassing more than 20,000 reactor-years across 35 countries and 647 reactors, zero double-ended guillotine breaks (DEGBs) have been documented in commercial reactor coolant systems—despite DEGB being the fundamental design-basis assumption driving Emergency Core Cooling System (ECCS) sizing, structural protection requirements, and containment design specifications. This report examines the basis for DEGB requirements in nuclear power plant design. The DEGB postulate assumes the instantaneous, complete circumferential severance of the largest diameter pipes in reactor coolant systems, driving major design requirements under 10 Code of Federal Regulations 50.46, General Design Criterion 4 and containment design specifications. The United States (4,880 reactor-years) and France (2,505 reactor-years) contribute the largest operational datasets. Probabilistic assessments estimate direct DEGB occurrence probabilities with extremely low event frequencies, far below the 10-5/reactor-year thresholds typically used to define non-credible events in nuclear-safety analyses; i.e., events with probability this low fall into beyond-design-basis events. Current material-science knowledge demonstrates that the ductile steel materials used in nuclear piping systems exhibit stable crack-growth behavior fundamentally incompatible with instantaneous severance. International regulatory experience, particularly Germany’s comprehensive break-preclusion implementation, and successful leak-before-break (LBB) applications in almost all of U.S. pressurized water reactor units validate that alternatives can maintain safety performance while reducing economic burden. Current DEGB protection systems impose estimated lifetime costs of hundreds of millions of dollars per unit, over the life of a plant across the nuclear industry (including ongoing costs), representing substantial resource allocation toward scenarios with extremely low probability. Although this report acknowledges uncertainties regarding long-term aging effects, potential synergistic degradation mechanisms, and site-specific seismic considerations that warrant continued evaluation as regulatory policy evolves, there remains no documented evidence that a DEGB has occurred as a consequence of the conditions or mechanisms described in this report. This report acknowledges the Nuclear Regulatory Commission’s (NRC’s) recent efforts—outlined in the draft Interim Staff Guidance (ISG) NRC-DSS-ISG-2025-XX (“Treatment of Certain Loss-of-Coolant Accident Locations as Beyond-Design-Basis Accidents Draft Interim Staff Guidance”)—to reduce overly conservative requirements for large-break loss of coolant accidents through technical justifications and exemptions. However, extensive operating experience and validated methodologies—such as LBB and in-service inspection programs—demonstrate that the probability of a DEGB in reactor coolant-loop piping is extremely low, even under seismic conditions. The authors and reviewers of this report recommend that DEGB be removed as a design-basis event through formal rulemaking, rather than case-by-case exemptions, to better reflect credible failure modes, align with current data, and align with modern, risk-informed safety analysis.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PVMapper: Report on the Second Public Opinion Survey

This report has been developed as an integral part of the PVMapper project, funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy’s SunShot program. The objective of the SunShot program is to reduce the total costs of solar energy systems. The scope of PVMapper is to develop a geographic information system (GIS) based project planning tool to identify optimal utility-scale solar facility sites. The specific objectives of the project are to 1) develop the software on an open-source platform; 2) integrate the appropriate data sets and GIS layers; 3) include a measure of social risk and public acceptance; 4) enable customization of variable weights; 5) provide a free and accessible platform for software download; and 6) provide a sustainability plan to ensure future relevance of the software. When completed, PVMapper is intended to be used by solar developers, Authorities Having Jurisdiction (AHJs), and other interested parties. This project supports SunShot’s objective by reducing the non-hardware balance of system costs (“soft costs”) for utility-scale solar project development. In order to accomplish the third project objective – including a measure of social risk and public acceptance within PVMapper – the project team has developed a time-series public opinion survey, administered yearly over the course of the three-year project. This report highlights the results and preliminary analyses from the second survey in this series. While the results of this survey are valuable to both PVMapper and future utility-scale solar development, the time-series design is extremely important. The completion of the series enables the extension of the dataset to much richer information. For example, the research team altered this iteration to sharpen the focus on specific topics (those posing potentially higher risks) and target specific locations in the oversample (such as communities near existing facilities). Using similar approaches for each iteration leads to an increasingly greater amount of detail regarding siting risks. The need for this extended dataset to aid in siting utility-scale solar projects is evident, as developers continue to scale back initial plans due to unidentified or incorrectly quantified social risks. It should be noted that this report provides the complete dataset from the survey, encompassing the wide-ranging responses from all of the survey questions. Although the methods used to integrate these data into PVMapper’s siting algorithms is not the purpose of this report, allusions to integration can be found in the discussions surrounding the design of questions and types of data to be used.

14 SOLAR ENERGY↗

Technology Development: From Idea to Implementation - 12131

There are good ideas and new technologies proposed every day to solve problems within the DOE complex. A process to transition a new technology from inception to the decision to launch a project with baselines is described. Examples from active technology development projects within Savannah River Remediation (SRR) will be used to illustrate the points. The process includes decision points at key junctures leading to preliminary design. At that point, normal project management tools can be employed. The technology development steps include proof-of-principle testing, scaled testing and analysis, and conceptual design. Tools are used that define the scope necessary for each step of technology development. The tools include use of the DOE technology readiness guide, Consolidated Hazards Analysis (CHA) and internal checklists developed by Savannah River Remediation. Integration with operating or planned facilities is also included. The result is a roadmap and spreadsheet that identifies each open question and how it may be answered. Performance criteria are developed that enable simple decisions to be made after the completion of each step. Conceptual design tasks should begin as the technology development continues. The most important conceptual design tasks at this point in the process include process flow diagrams (PFDs), high level Process and Instrumentation Drawings (P and IDs), and general layout drawings. These should influence the design of the scaled simulant testing. Mechanical and electrical drawings that support cost and schedule development should also be developed. An early safety control strategy developed from the CHA will also influence the cost. The combination of test results, calculations and early design output with rough order of magnitude cost and schedule information provide input into the decisions to proceed with a project and data to establish the baseline. This process can be used to mature any new technology, especially those that must be integrated into complicated flow sheets. Then fully informed decisions can be made to usher technology development ideas through project implementation. Examples from active technology development projects, Tank 48 Treatment and Enhanced Chemical Cleaning, are presented. This model for technology development integrates several tools and activities to provide a logical method for maturing new ideas and technologies. It provides a framework to develop a good idea into a full up design/build project. This model defines a set of integrated tasks to mature the technology and define scope, cost and schedule necessary to make business decisions for implementing technology development. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report on ITER Task Agreement 81-10

An International Thermonuclear Experimental Reactor (ITER) Implementing Task Agreement (ITA) on Magnet Safety was established between the ITER International Organization (IO) and the Idaho National Laboratory (INL) Fusion Safety Program (FSP) during calendar year 2004. The objectives of this ITA were to add new capabilities to the MAGARC code and to use this updated version of MAGARC to analyze unmitigated superconductor quench events for both poloidal field (PF) and toroidal field (TF) coils of the ITER design. This report documents the completion of the work scope for this ITA. Based on the results obtained for this ITA, an unmitigated quench event in an ITER larger PF coil does not appear to be as severe an accident as in an ITER TF coil.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗

Searching for a dark photon with DarkLight

Here, we describe the current status of the DarkLight experiment at Jefferson Laboratory. DarkLight is motivated by the possibility that a dark photon in the mass range 10 to 100 MeV/c 2 could couple the dark sector to the Standard Model. DarkLight will precisely measure electron proton scattering using the 100 MeV electron beam of intensity 5 mA at the Jefferson Laboratory energy recovering linac incident on a windowless gas target of molecular hydrogen. We will detect the complete final state including scattered electron, recoil proton, and e + e - pair. A phase-I experiment has been funded and is expected to take data in the next eighteen months. The complete phase-II experiment is under final design and could run within two years after phase-I is completed. The DarkLight experiment drives development of new technology for beam, target, and detector and provides a new means to carry out electron scattering experiments at low momentum transfers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Designing polar textures with ultrafast neuromorphic features from atomistic simulations

This review summarizes recent works, all using a specific atomistic approach, that predict and explain the occurrence of key features for neuromorphic computing in three archetypical dipolar materials, when they are subject to THz excitations. The main ideas behind such atomistic approach are provided, and illustration of model relaxor ferroelectrics, antiferroelectrics, and normal ferroelectrics are given, highlighting the important potential of polar materials as candidates for neuromorphic computing. Some peculiar emphases are made in this Review, such as the connection between neuromorphic features and percolation theory, local minima in energy path, topological transitions and/or anharmonic oscillator model, depending on the material under investigation. By considering three different and main polar material families, this work provides a complete and innovative toolbox for designing polar-based neuromorphic systems.

THz pulses↗

Completion of IER 305: Molybdenum Sleeve Experiments and Preparations for Performing IER 441: Epithermal Tantalum Experiments [Slides]

This presentation includes a look into Sandia critical experiments including the 7uPCX, BUCCX, and assembly design. This presentation touches on the completion of IER 305 with CED-3b, CED-4a, and CED-4b. Finally, there are preparations to perform IER 441 including new hardware, critical configurations, and next steps.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Scaling Studies for Advanced High Temperature Reactor Concepts, Final Technical Report: October 2014—December 2017

Computer simulations of nuclear reactor thermal-hydraulic phenomena are often used in the design and licensing of nuclear reactor systems. In order to assess the accuracy of these computer simulations, computer codes and methods are often validated against experimental data. This experimental data must be of sufficiently high quality in order to conduct a robust validation exercise. In addition, this experimental data is generally collected at experimental facilities that are of a smaller scale than the reactor systems that are being simulated due to cost considerations. Therefore, smaller scale test facilities must be designed and constructed in such a fashion to ensure that the prototypical behavior of a particular nuclear reactor system is preserved. The work completed through this project has resulted in scaling analyses and conceptual design development for a test facility capable of collecting code validation data for the following high temperature gas reactor systems and events— 1. Passive natural circulation core cooling system, 2. pebble bed gas reactor concept, 3. General Atomics Energy Multiplier Module reactor, and 4. prismatic block design steam-water ingress event. In the event that code validation data for these systems or events is needed in the future, significant progress in the design of an appropriate integral-type test facility has already been completed as a result of this project. Where applicable, the next step would be to begin the detailed design development and material procurement. As part of this project applicable scaling analyses were completed and test facility design requirements developed. Conceptual designs were developed for the implementation of these design requirements at the Oregon State University (OSU) High Temperature Test Facility (HTTF). The original HTTF is based on a ¼-scale model of a high temperature gas reactor concept with the capability for both forced and natural circulation flow through a prismatic core with an electrical heat source. The peak core region temperature capability is 1400°C. As part of this project, an inventory of test facilities that could be used for these experimental programs was completed. Several of these facilities showed some promise, however, upon further investigation it became clear that only the OSU HTTF had the power and/or peak temperature limits that would allow for the experimental programs envisioned herein. Thus the conceptual design and feasibility study development focused on examining the feasibility of configuring the current HTTF to collect validation data for these experimental programs. In addition to the scaling analyses and conceptual design development, a test plan was developed for the envisioned modified test facility. This test plan included a discussion on an appropriate shakedown test program as well as the specific matrix tests. Finally, a feasibility study was completed to determine the cost and schedule considerations that would be important to any test program developed to investigate these designs and events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

MAN-004 Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.

42 ENGINEERING↗

Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.

42 ENGINEERING↗