Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEMONSTRATION PROGRAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2017. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2017 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstration of a new unstructured mesh IMC x-ray transport capability in LAP codes

In this document, the Advanced Simulation and Computing (ASC) Transport Project’s Jayenne team presents evidence that the Los Alamos National Laboratory (LANL) Level 2 milestone statement, Demonstrate a new unstructured mesh IMC x-ray transport capability in LAP codes, due Q4 FY20, has been satisfied with the release and integration of the Jayenne team’s Implicit Monte Carlo (IMC) solver libraries into the lumos multiphysics solver. The Jayenne project’s software includes the algorithms and features prescribed by the milestone description. The lumos software is maintained by the Lagrangian Applications Project (LAP) along with the hydrodynamics code flag and operates under the same ASC program as Jayenne. A set of demonstration problems has been specified, executed, and analyzed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2018

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2018. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2018 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Thermal & Mechanical Properties of Additively Manufactured Monolithic SiC for Solar Receiver Applications

Increasing the operating temperatures of solar receivers is paramount to the efficiency of concentrated solar thermal (CST) and solar power (CSP) systems. Owing to its high temperature stability combined with excellent thermal and optical properties, SiC has been the material of choice for application in high-temperature solar receivers. State-of-the-art SiC volumetric concentrating solar air receivers such as the honeycomb design have successfully demonstrated in field exit air temperatures approaching 800oC. However, a successful application of CST systems for the decarbonization of heat reliant industrial sectors requires significant increases in the temperature capability of SiC receiver technology. Supported by an award from the Solar Technology Office (SETO), US Department of Energy (DOE), GE Research in collaboration with Heliogen Holdings Inc, is engaged in the development of an ultra-High Operating Temperature SiC-matrix Solar Thermal Air Receiver (HOTSSTAR) enabled by additive manufacturing. The program objective is to design and demonstrate a techno-economically viable SiC air receiver technology that can achieve exit air temperatures up to 1100oC for CST applications. We report and discuss the results of our testing and evaluation of thermal and mechanical properties of reaction-bonded SiC fabricated via binder jet printing to support the receiver component design, development, and analyses.

14 SOLAR ENERGY↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-material Preforming of Structural Composites

Fiber-reinforced composites offer significant weight reduction potential, with glass fiber composites already widely adopted. Carbon fiber composites deliver the greatest performance benefits, but their high cost has inhibited widespread adoption. This project demonstrates that hybrid carbon-glass solutions can realize most of the benefits of carbon fiber composites at much lower cost. ORNL and Owens Corning Reinforcements along with program participants at the ORISE collaborated to demonstrate methods for produce hybrid composites along with techniques to predict performance and economic tradeoffs. These predictions were then verified in testing coupons and more complex demonstration articles.

36 MATERIALS SCIENCE↗

Combined Heat and Power Systems Technology Development and Demonstration 370 kW High Efficiency Microturbine

The C370 Program was awarded in October 2010 with the ambitious goal of designing and testing the most electrically efficient recuperated microturbine engine at a rated power of less than 500 kW. The aggressive targets for electrical efficiency, emission regulatory compliance, and the estimated price point make the system state-of-the-art for microturbine engine systems. These goals will be met by designing a two stage microturbine engine identified as the low pressure spool and high pressure spool that are based on derivative hardware of Capstone’s current commercially available engines. The development and testing of the engine occurred in two phases. Phase I focused on developing a higher power and more efficient engine, that would become the low pressure spool which is based on Capstone’s C200 (200kW) engine architecture. Phase II integrated the low pressure spool created in Phase I with the high pressure spool, which is based on Capstone’s C65 (65 kW) commercially available engine. Integration of the engines, based on preliminary research, would allow the dual spool engine to provide electrical power in excess of 370 kW, with electrical efficiency approaching 42%. If both of these targets were met coupled with the overall CHP target of 85% total combined heating and electrical efficiency California Air Resources Board (CARB) level emissions, and a price target of $600 per kW, the system would represent a step change in the currently available commercial generation technology. Phase I of the C370 program required the development of the C370 low pressure spool. The goal was to increase the C200 engine power by a minimum of 25% — 250 kW — and efficiency from 32% to 37%. These increases in the C200 engine output were imperative to meet the power requirements of the engine when both spools were integrated. An additional benefit of designing and testing the C370 low pressure spool was the possibility of developing a stand-alone product for possible commercialization. The low pressure spool design activity focused on an aeropath derivative of the current C200 engine. The aeropath derivative included changes to the compressor section —compressor and inducer — and to the turbine nozzle. The increased power also necessitated a larger, more powerful generator and generator controller to support the increased power requirements. These two major design changes were completed by utilizing both advanced 3D modeling and computational fluid dynamics modelling. After design, modeling, and analysis, the decision was made to acquire and integrate the components for testing. The second task of Phase I was to integrate and test the components of the low pressure spool to validate power and efficiency. Acquisition of the components for the low pressure spool was completed utilizing Capstone’s current supplier base. Utilization of Capstone’s supply base for integration of the test article would allow — if the decision was made —expedited commercialization of the product. After integration of the engine components, the engine was tested and evaluated for performance and emissions. Test data analysis confirmed that the engine met all power and efficiency requirements and did so while maintaining CARB level emissions. The emissions were met without the use of any post processing or catalyst. After testing was completed, the DOE authorized — via a milestone review — proceeding to Phase II: the development of the integrated C370 engine. The C370 high pressure spool design activity required significant changes to the C65 engine architecture. The engine required a high power density generator, completely redesigned compressor stage, turbine section, recuperator, controls architecture, and intercooler stage asThe two most critical design challenges were the turbine section (the nozzle and turbine) and the controls architecture. The design and analysis of all of the components was completed and integrated into a system model. The system model — after numerous iterations — indicated that, once integrated, the engine will meet or exceed all system requirements. Unfortunately, the turbine section’s life requirements remain a technical challenge and will require continued refinement of the bi-metallic turbine wheel design and manufacturing approach to meet the life requirement at theses high temperatures. The current controls architecture requires substantial effort to develop a system capable of handling the high-speed, near real-time controls requirement, but it was determined not to be a technical roadblock for the project. The C370 Program has been a significant effort with state-of-the-art technical targets. The targets have pushed Capstone’s designers to the limits of current technology. The program has been fortunate to see many successes: the successful testing of the low pressure spool (C250), the development of new material processes, and the implementation of new design practices. The technology and practices learned during the program will be utilized in Capstone’s current product lines and future products. The C370 Program has been a resounding success on many fronts for the DOE and for Capstone.

none↗

Optimal Adsorbents for Low-Cost Storage of Natural Gas and Hyd: Computational Identification, Experimental Demonstration, and System-Level Projection

This research program will develop best-in-class natural gas (NG) and hydrogen adsorbents based on metal-organic frameworks (MOFs). More specifically, high-throughput computational screening coupled to machine learning will be used to identify MOFs that simultaneously achieve high usable gravimetric and volumetric capacities for methane and hydrogen. The most promising materials pinpointed by computation will be synthesized and characterized experimentally. In addition, the final stage of the project will critically evaluate the use of methane as a model for NG and consider which structural features are most important in making a viable NG storage system.

03 NATURAL GAS↗

PMDT: AI-Enabled Predictive Maintenance Digital Twins for Advanced Nuclear Reactors

Our team made substantial technical progress on various fronts during the course of the program. Multiple milestones were geared towards demonstrating the feasibility of machine learning based predictive maintenance digital twins towards reducing O&M costs, whereas some other milestones actually focused on identifying technical gaps and developing technologies such as humble AI to provide necessary robustness to the ML-based models. We were able to demonstrate in many cases that Machine learning-based methods can be successfully adapted for Nuclear plant environments especially for remote monitoring applications. Detailed analyses were carried out with plant and full scope simulation data along with capabilities of enhanced analytics to assess and set realistic expectations on cost reductions in O&M. These assessments are paving the way for investments towards reactor design improvements as well project planning for SMR projects as they develop and mature in the next few years. Technology developed under this program got direct visibility to GE Hitachi and their utility customers and resulted in positive intents to deploy some of the elements from design phase. The project additionally resulted in several reports, publications, software and data generation that will be useful in deployment and O&M services for BWRX300 fleets.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

West Valley Demonstration Project Annual Site Environmental Report (CY2019)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2019. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2019 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AO13. High energy, low methane syngas from low-rank coals for coal-to-liquids production

An experimental program was undertaken to develop and demonstrate novel steam reforming catalysts for converting tars, C2+ hydrocarbons, and methane under high temperature and sulfur environments at lab scale. Several catalysts were developed and synthesized along with some catalysts based on recipes found in the literature. Of these, two had good resistance at 90 ppm H 2 S with one almost not affected at all. Higher concentrations of H 2 S did affect methane conversion across the catalyst, but performance was fairly stable for up to 200 hours. Based on the results of the experimental program, a techno-economic analysis was developed for IGCC and CTL applications and compared to DOE reference cases to examine the effects of the new technology. In the IGCC cases, the reformer/POX system produces nearly the same amount of electricity for nearly the same cost, however, the reformers/POX case sequesters a higher percentage of the carbon when compared to IGCC alone. For the CTL case the economics of the new process were nearly identical to the CTL case, but due to improved yields, the greenhouse gas emissions for a given production of fuels was approximately 50% less than the baseline case.

36 MATERIALS SCIENCE↗

Grupe Homes Enters the Whole-House Retrofit Market

This article for HomeEnergy Magazine, a trade magazine on energy efficient home construction, retrofitting, remodeling, and research, describes retrofit projects by Grupe Homes of Sacramento, California, a production builder who has worked with DOE's Building America program on energy-efficient home demonstration projects. In this project, The article is a case study of Grupe's decision to enter the energy efficient remodeling market when new home sales lagged due to the economic slowdown starting in late 2007. The article also describes an energy-efficient retrofit of of a 22-year-old, 3-bedroom home in California’s Central Valley done in 2009 by Grupe. The home is Grupe's first retrofit and was done according to the criteria of Home Performance with ENERGY STAR, a national program from the EPA and DOE that promotes a comprehensive, whole-house approach to making energy-efficiency improvements. Grupe's staff were trained through the California Building Performance Contractors Association and passed the Building Performance Institute test to learn how to conduct extensive energy audits of existing houses as well to perform the energy efficient retrofits. In the retrofit home, they did extensive air sealing, replaced and added insulation, and replaced inefficient HVAC equipment and leaky can lights. They cut air leakage from 2478 to 1115 cfm 50, a 55% reduction. A Building America case study on this project was distributed at the EEBA (Energy and Environmental Building Alliance) Annual Conference in Denver, Colorado, Sept 28-30, 2009. The Home Energy article was published in the March/April 2010 issue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗