Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Resource Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Life sciences flight experiments program mission science requirements document. The first life sciences dedicated Spacelab mission, part 1

The Mission Science Requirements Document (MSRD) for the First Dedicated Life Sciences Mission (LS-1) represents the culmination of thousands of hours of experiment selection, and science requirement definition activities. NASA life sciences has never before attempted to integrate, both scientifically and operationally, a single mission dedicated to life sciences research, and the complexity of the planning required for such an endeavor should be apparent. This set of requirements completes the first phase of a continual process which will attempt to optimize (within available programmatic and mission resources) the science accomplished on this mission.

Rummel, J. A.↗

Managing a Safe and Successful Multi-User Spaceport

Encouraged by the creation of the Office of Commercial Space Transportation within the U.S. Federal Aviation Administration (FAA) in 1984 and the Commercial Space Act of 1998, the National Aeronautics and Space Administration (NASA) now relies on an extensive network of support from commercial companies and organizations. At NASA's Kennedy Space Center (KSC), this collaboration opens competitive opportunities for launch providers, including repurposing underutilized Shuttle Program resources, constructing new facilities, and utilizing center services and laboratories. The resulting multi-user spaceport fosters diverse activity, though it engenders risk from hazards associated with various spaceflight processing activities. The KSC Safety & Mission Assurance (S&MA) Directorate, in coordination with the center's Spaceport Integration and Center Planning & Development organizations, has developed a novel approach to protect NASA's workforce, critical assets, and the public from hazardous, space-related activity associated with KSC's multi-user spaceport. For NASA KSC S&MA, the transformation to a multi-user spaceport required implementing methods to foster safe and successful commercial activity while resolving challenges involving: Retirement of the Space Shuttle program; Co-location of multiple NASA programs; Relationships between the NASA programs; Complex relationships between NASA programs and commercial partner operations in exclusive-use facilities; Complex relationships between NASA programs and commercial partner operations in shared-use facilities. NASA KSC S&MA challenges were met with long-term planning and solutions involving cooperation with the Spaceport Integration and Services Directorate. This directorate is responsible for managing active commercial partnerships with customer advocacy and services management, providing a dedicated and consistent level of support to a wide array of commercial operations. This paper explores these solutions, their relevance to the current commercial space industry, and the challenges that continue to drive improvement with a focus on areas of safety management and risk assessment that have been crucial in KSC's evolution into a multi-user spaceport. These solutions may be useful to government entities and private companies looking to partner with the commercial space industry.

Range↗

Resource Allocation Planning Helper (RALPH): Lessons learned

The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

Durham, Ralph↗

PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management

The Phase I feasibility study completed as part of this project has led to a number of innovative technologies being developed and has laid the foundation for a successful Phase II effort to commercialize a platform for managing the integrity of pipelines for the damage mechanisms of the new, hybrid-energy based economy. To ground the development efforts and direction of the project, an extensive market research and customer discovery effort was undertaken early in Phase I. Through this effort, a number of pipeline owners and operators were interviewed, and the following key findings were discovered about the pipeline industry: • Small pipeline operators do not have the central engineering groups necessary to perform their own independent analysis of inspection data, but instead rely on summarized tally sheets provided to them by inspection service providers. • The time it takes to go from an inspection to a completed engineering assessment, even for small segments of pipeline, can take anywhere from 30-120 days. During this delay, critical threats can (and have been known to) cause failures. • Uncertainty is often not accounted for in the assessment of pipeline integrity. The tally sheets provided by third-party service providers are almost always deterministic in nature, identifying threats that present a concern only to the current (not the future) integrity of the pipeline. • It is uncommon to apply the latest technologies to perform advanced assessments of damaged pipelines. There is a desire to use more advanced analysis capabilities to assess threats. Many pipeline operators indicated that they would often excavate a pipeline to perform an inspection and find that the damage was not as bad as they anticipated, thus using limited resources unnecessarily. Companies are not consistent in their use of inspection data to determine corrosion rates, and those that do only calculate deterministic corrosion rates. • The industry has prominently relied on time-based inspections but has recently started to transition to risk-based inspections. However, there appears to be no uniform guidance on how to do so while properly accounting for all sources of uncertainty. • Companies are not storing inspection data in a manner that allows for the ready determination of temporal trends. • Predictive maintenance principles and practices are beginning to be used by early adopters • Some pipelines are being re-purposed to transport different process fluids than they were designed for, e.g., H 2 and CO 2 rich process streams to serve the new hybrid-energy based economy, which are presenting new integrity concerns for the existing pipeline network that crisscrosses the United States. As a result of these discoveries, we were able to target the development efforts in Phase I to best serve the needs of the industry. In Phase I, we developed a way to correlate multiple large-scale scans of the pipeline to determine a probabilistic corrosion rate that accounts for all sources of error and uncertainty in the inspection process. This probabilistic corrosion rate can be used to predict the future thickness distribution of the pipe wall. We demonstrate how this analysis may be performed in an analytical fashion and has been implemented in such a manner that it can be readily distributed using GPU computing through integration of the Kokkos programming model. We also make a very novel extension of the analytical corrosion rate model to Bayesian Networks (an explainable AI technique) that can account for non-parametric distributions of corrosion rates. With the predictions made above for the probabilistic corrosion rate and corresponding future distribution of the pipe wall thickness, we can assess the integrity of the pipeline through the use of a probabilistic engineering assessment. We developed a novel screening data analysis approach that can rapidly identify ‘hotspots’ (local thin areas) where the integrity of the pipeline is a concern. Once more, we implemented this screening approach in C++ to leverage GPU computing via the Kokkos programming model. After the critical hotspots are identified, we developed a program that can automatically generate an advanced finite element model of the damaged regions. Since the number of damaged regions that require advanced analysis can number in the thousands, we integrated an open-source container-native workflow engine for orchestrating parallel jobs on the cloud. Initially, these advanced numerical models were only designed to account for loading due to internal pressure. However, in a slight pivot from the initial Phase I proposal, we developed a complete pipe stress analysis program (called Simflex) which can simulate the complete pipeline and its response to thermal expansion, pressure, thermal bowing, weight, wind, earthquake, support displacement, support friction and external forces. This pipe stress analysis program was written generically, to handle any piping system, but contains the features needed to model long pipelines (i.e., it incorporates a model for soil mechanics and can account for the nonlinear boundary conditions necessary to simulate long underground pipelines). This pipe stress analysis program can simulate any segment of the pipeline (simple or complex) under any set of conditions and loads, to determine the supplemental loads (axial forces and bending moments) at the location of damage. This enables the most accurate state of stress to be accounted for in the pipeline, which can prove critical when evaluating the integrity of a damaged region. In the process of developing the technologies to perform the integrity assessment of the pipeline, we also extended one of the industry standard approaches for performing the assessment of local thin areas that extend more in the circumferential direction than the longitudinal direction of the pipeline. This approach was presented to the API 579-1/AS ME FFS-1 steering committee in November 2021 for consideration in the next edition of the industry standard for Fitness-For-Service (expected to be released in 2023). To help pipeline operators make decisions with the results on any integrity assessment, we developed a new approach to the life-cycle management of pipelines which uses a Bayesian Decision Network. The network is designed to help pipeline operators plan and prioritize inspection activities and ultimately make smarter, more cost-effective decisions. The Bayesian approach accounts for all sources of uncertainty and carries them through to the final optimal decisions, providing a probabilistic framework for optimizing inspection intervals. The proof-of-concept networks developed in the feasibility study are complete, verified, and are focused on a subset of the pipeline. To expand this novel approach to the scale necessary for an entire network of pipelines in Phase II, we will leverage the DOE-funded Bengi solver for industrial-scale decision making with Bayesian Networks [22]. Once implemented, we will be able to provide the pipeline industry with a much-needed tool for optimal inspection planning using truly explainable artificial intelligence (XAI). To handle all of these advanced capabilities into a cloud-based platform, the architecture of the Equity Engineering Cloud (EEC) was extended to include Argo Workflows, a framework capable of distributing and managing a massive number of jobs that consume their own resources, such that thousands of serial finite element simulations can be run in parallel. As part of this substantial undertaking, we also integrated Argo Continuous Delivery (CD) into the EEC, to aid with the rapid prototyping and iterations that will be imperative to the success of the PipeSight platform’s Agile development process in Phase II. As part of the pipe stress analysis program, we also developed a custom visualizer that leverages the DOE-funded VTK visualization library. We added custom contouring capabilities and a means for interacting visually with both the inputs and outputs of the pipe stress analysis program. We also developed routines for automating the post-processing of the finite element simulations to determine if any failure criteria are met and to visualize the deformations, stresses and strains in ParaView using the exodus II file format (a subset of netCDF).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating deliberative planning in a robot architecture

The role of planning and reactive control in an architecture for autonomous agents is discussed. The postulated architecture seperates the general robot intelligence problem into three interacting pieces: (1) robot reactive skills, i.e., grasping, object tracking, etc.; (2) a sequencing capability to differentially ativate the reactive skills; and (3) a delibrative planning capability to reason in depth about goals, preconditions, resources, and timing constraints. Within the sequencing module, caching techniques are used for handling routine activities. The planning system then builds on these cached solutions to routine tasks to build larger grain sized primitives. This eliminates large numbers of essentially linear planning problems. The architecture will be used in the future to incorporate in robots cognitive capabilites normally associated with intelligent behavior.

Elsaesser, Chris↗

Dispatch Optimization Variable Engine

The Dispatch Optimization Variable Engine (DOVE) is software tool written in python, developed at Idaho National Laboratory (INL) that provides an easily accessible application-programming-interface (API) to performing resource dispatch optimization analysis for integrated energy system (IES) configurations. DOVE is an integral part of the Framework for Optimization of Resources and Economics (FORCE) software suite and is leveraged by codes such as the Holistic Energy Resource Optimization Network (HERON) and the Optimization of Real-Time Capacity Allocation (ORCA). The philosophy behind DOVE is to provide a modular software solution to IES planning and operation by utilizing state-of-the-art algorithms and machine learning. The goal is to accurately capture the dispatching behavior of a complex energy system given varying time-dependent signals for demand and commodity pricing.

McDowell, DylanJ. [Idaho National Laboratory (INL)↗

Downscaled Earth System Model Data for Resilient Energy System Planning

The second-generation Sup3rCC dataset provides high-resolution meteorological data generated through the downscaling of multiple earth system models (ESMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). This downscaling is performed through application of a generative machine learning approach called Super-Resolution for Renewable Resource Data (sup3r). This dataset builds on the first-generation Sup3rCC data by applying improved bias correction methods and adding downscaled precipitation to the output variables. In this presentation, we explore the output characteristics of the dataset and various validation analyses. We also present and discuss plans for the integration of this data into power system planning models using a decision-making under deep uncertainty (DMDU) methodology.

97 MATHEMATICS AND COMPUTING↗

Spacelab - A key element in the Space Shuttle Space Transportation System

Spacelab will be a key element in the Space Transportation System (STS) to be initiated with the advent of the first operational flight of Space Shuttle in 1980. Spacelab is an international, cooperative venture between the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA), which is structured to provide the scientific community an earthlike laboratory in space by 1980. The responsibilities of both ESA and NASA are divided into design and development to be accomplished by ESA and the experiment integration and operation with the Space Shuttle by NASA. While the Spacelab is a key element in the STS, it is highly dependent on other elements in the system for its resources and payload support capabilities. This paper presents the relationship of the Spacelab to other elements and the operational planning that NASA is undertaking to make the Spacelab a flexible and efficient laboratory in space.

Lee, T. J.↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Real-Time Science Decisioning During High Tempo-High Intensity Mission Operations and the Role of Analogs

Introduction: NASA’s VIPER mission presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in length. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions directly impact the manner and speed with which the VIPER Science Team (VST) is required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations. The VST shall provide mission enhancing scientific input to guide rover traverse planning and drill site confirmation and selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar in-situ resource utilization (ISRU)and exploration activities. The VST co-located in the Mission Science Center (MSC) will be responsive to the tactical operational cadence of the Mission Operations Center (MOC) and will provide further strategic and Long-Term Planning (LTP) guidance to the mission. The VIPER Science Operations & Integration(SO&I)team has developed an architecture that is focused on the infusion of science-decisioning into the operational framework and execution cadence of VIPER. NASA analog research has played a significant role in the construction of the VIPER science operations systems. As an example, the SO&I team has led analog missions that have focused on bringing together expertise in the sciences (natural, applied and social) and in operations in service of learning how to build and hold together interdisciplinary work environments and what tools are needed to support high tempo, high intensity integrated decisioning. These experiences have provided an essential foundation of knowledge to the VIPER team. Those analogs that specifically influenced the VIPER science operations construct were identified through a process of comparative analysis to prioritize those that offered relevance in whole or in part, and those that did not. The analog research output that provided extensibility to the VIPER science operations architecture included remote teams of humans and robots in cooperation (synchronous and asynchronous) with simulated earthbound systems, engineering and science teams, and the integrated assembly of tools that supported scientific analysis and data synthesis and provided infrastructure for the remote testing framework. Analogs which included real-time data monitoring, synthesis, visualization and access in a democratized and operationalized manner were of particular interest to the development of the VIPER MSC toolset both in terms of the technology and the processes used to develop the supporting infrastructure. We anticipate that each subsequent mission to the lunar south pole, whether with robots or humans, will be able to optimize science and exploration return by evolving strategies to infuse real-time collaborative science-decisioning. Furthermore, these efforts will result in a foundation for science operations development in support of human-robotic exploration of deep space and Mars. NASA analogs can continue to provide the opportunity to prepare, test and iterate on the operational concepts and tools that will support these ever-expanding space exploration efforts. Our presentation will include an overview of the VIPER Science Operations & Integration development process and specifics on what aspects of analog research have had a significant impact on our work systems.

D S S Lim↗

A Stochastic Scheduler for Integrated Arrival, Departure and Surface Operations in Los Angeles

In terminal airspace, integrating arrivals, departures, and surface operations with competing resources provides the potential of improving operational efficiency by removing barriers between different operations. This work develops a centralized stochastic scheduler for operations in a terminal area including airborne and surface operations using Non-dominated sorting genetic algorithm and Monte Carlo simulations. The scheduler handles completing resources between different flows, such as runway allocations, runway crossing, departure fixes, and other interaction way points between arrivals and departures. Meanwhile, the scheduler also takes time-varied uncertainties into account when optimizing schedules. The scheduler is run sequentially to identify the best and robust schedule for the next planning window. Resulting schedules decide the routes, speed or delays, and runway assignments with separation constraints at mergingdiverging waypoints in the air and crossing and separations on runways. The Los Angels terminal area was used as an example. The implementation of this stochastic scheduler for integrated arrival, departure and surface operations is completed. And several preliminary runs are finished for over 1,200 flights in LAX in a typical day. Sensitivity studies on various planning window sizes are presented, which shows that trade-off exits between planning window size and achievable minimum delay. Preliminary results on runway usage are also presented in this abstract. Because arrivals on the outer runways have to be followed by crossings on the inner runways, algorithmic runway allocation prefers inner runways for arrivals and outer runways for departures. More results will be presented in the final paper. And current terminal arrival and departure procedures based on first-come-first-serve procedure will also be set up and used as a baseline for comparison.

integrated scheduler↗

Transmission and Distribution Coordination

This webinar explores planning the future grid and interconnected energy system while examining balancing generation (G), transmission (T), distribution (D), & customer (C) resources all while also increasingly capturing engineering details in planning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NSUF CoMET Project, Implementation Plan FY2019

The Combined Materials and Experiment Toolkit (CoMET) is an NSUF information management resource designed to give users access to the information and tools necessary for designing meaningful experiments and writing clear, structured proposals. NSUF has a milestone to deploy an experiment design expert system to the NSUF website to support applications for the FY2020 CINR, due on August 30, 2019. To meet this milestone, the CoMET project work for FY2019 focuses on three main objectives: 1.) Integrate the three NSUF web applications by linking data fields in one application with the data found in the others. The NSUF web applications are: The Rapid Turnaround Experiment (RTE) Proposal Solicitation system, the Nuclear Fuels and Materials Library (NFML) and the Nuclear Energy Infrastructure Database (NEID) and the researcher and technical staff account and profile management systems. 2.) Build an Experiment Design Wizard (expert system) that will guide users through the process of writing a statement of work for a CINR or RTE experiment. 3.) Build an Irradiation Effects Calculator to help a PI choose the best neutron irradiation facility for their needs, estimate the time needed to achieve their goals, and estimate the resulting radioactivity of their samples, post-irradiation. These objectives are designed to support the mission of the NSUF and optimize the experiment design portion of the proposal processes. The new researcher database will make finding collaborators easier. The wizard will provide the PI with early NSUF expertise so that their proposed experiments, at the “Letter of Intent” and “Pre-Application” stages are better designed to work within the available NSUF facilities. Utilization of these tools should reduce the proportion of proposals that are judged to be infeasible or “not ready” for NSUF access. It should also improve the efficiency of the NSUF technical leads since the PI will be starting with a better statement of work for the project. The tools will also provide resources for NSUF staff to more efficiently screen and score incoming proposals. This implementation plan will layout the work breakdown structure, activities, resources required, and plan for completion of the activities for CoMET in FY2019.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Global 3D Data Visualization and Analysis Platform with Advanced Machine Learning Capabilities in Support of Lunar Exploration

Introduction: The science goals for NASA’s Artemis program include: a) Understanding the character and origin of lunar polar volatiles, b) Conducting experimental science in the lunar environment and c) Investigating and mitigating exploration risks. The permanently shadowed regions (PSRs) on the Lunar south pole are expected to host large quantities of water-ice and volatiles that are important for sustainable Lunar exploration. There are several missions such as onboard Korea Pathfinder Lunar Orbiter (KPLO: Korean name Danuri) with onboard ShadowCam camera, Astrobotic Peregrine Mission One [4], and other efforts underway to obtain high resolution topographic, minerals, volatiles and other information on the moon. We envision a need in immediate future for platforms to integrate these data sets, provide rendering and visualization capabilities in the context of a 3D Lunar globe for easier information access and analysis. NASA's Celestial Mapping System (CMS) is developed to address the need for 3D tools for planetary science investigations, mission planning, in-situ operations, in a 3D-first design constructed around a unified view of a planetary globe. At present CMS provides many critical functionalities that include: 1) equipment planning and optimized placement on Lunar surface 2) line-of-sight (LOS) analysis 3) powerful measurement tools based on 3D terrain with realistic 3D models to represent rovers, astronauts and equipment 4) visualization of derived mapping products (e.g. resource maps), and 5) a data engine for hosting new observations that are not available in other contemporary lunar data tools. Planetary Data Ingestion: CMS can consume and analyze data from locally hosted and external third party sources. It is compatible with Open Geospatial Consortium (OGC) data and file standards and currently integrates datasets from the Astrogeology Science Center of USGS. This includes global and local data acquired from NASA (LRO, Clementine, Lunar Orbiter) and JAXA (SELENE/Kaguya), with capability of integrating more datasets. In addition, users can specify other WMS-hosted data endpoints, which CMS can then query and stream data from automatically. To set-up an automated process for ingestion and accurate rendering, visualization and analysis of external 3rd party planetary datasets within CMS, we initiated the process of ingesting unique dataset of super-enhanced images of the permanently shadowed regions (PSRs) at the lunar poles which were produced by the Hyper-effective nOise Removal U-net Software (HORUS) tool. This tool was developed to enhance the extremely low-light images of the interior of PSRs and provide the ability to see within these regions at and discern surface features (i.e. boulders and craters) down to 3 meters in size. We focused on the Nobile region on the Lunar south pole, selected site for VIPER mission and stitched several images to create a high-resolution map within one of the PSR of Nobile crater. Figure 1 shows the dark PSR zone form the original NAC layer of LRO as the base layer (left image) and the illuminated areas within that crater (center) which was created by ingesting and merging several of HORUS generated images. At present we employ a semi-automated process to ensure spatial accuracy and merger of several overlapping zones. However, we are in the process of completely automating this process by employing AI based techniques that would rank, sort, and stack the images based on their information density. The georectification of the images would employ selected features. Analysis on Ingested Planetary Datasets: Once an external planetary data-set is successfully ingested, georectified and merged seamlessly as a data-layer; CMS’ numerous analysis tools can be used on this data. A Line of Sight (LOS) tool has been developed for CMS which analyzes terrain profiles and obstructions to determine visibility for remote observers. Figure 1 (right image) shows the viewshed analysis on the same PSR in the Nobile region. The yellow pin shows the observer location outside the PSR. The yellow area shows the visible part of PSR. The obstructed area with no visibility for the observer is shown in red. The Measurements tool allows the user to take area and distance measurements of features on the terrain using various shapes. Measurement type can be specified in a number of ways: Line, Path, Polygon, Circle, Ellipse, Square, Rectangle or Freehand. Once the shape is specified, elevation information can then be extracted along each of these shapes. Figure 2 (left) shows the measurements performed on a crater n illuminated PSR in Nobile region. The equipment placement tool allows the user to place a 3D equipment model at a desired location and analyze its coverage area. The equipment placement tool is coupled with LOS to determine the coverage. Figure 2 (right) shows an equipment placed on the Lunar terrain and it’s coverage area. The red rays are blocked sight lines and the green rays are non-obstructed sight lines with the cyan lines showing the point of intersection with the terrain. More details are provided in the video demonstrations in Reference 5. Overcoming Polar Distortions: 3D geospatial applications exhibit significant distortions in polar imagery due to several reasons: 1) distortions in the source imagery, 2) incompatible tessellation algorithms at the poles, and 3) map projections. We are leveraging new tessellation algorithms and reprojecting data using projections that are better suited for Lunar poles. The goal is to seamlessly switch to polar projections while maintaining 3D view and navigation.

Maps↗

Using Electric Vehicles to Mitigate Imbalance Requirements Associated with an Increased Penetration of Wind Generation

The integration of variable renewable generation sources continues to be a significant area of focus for power system planning. Renewable portfolio standards and initiatives to reduce the dependency on foreign energy sources drive much of the deployment. Unfortunately, renewable energy generation sources like wind and solar tend to be highly variable in nature. To counter the energy imbalance caused by this variability, wind generation often requires additional balancing resources to compensate for the variability in the electricity production. With the expected electrification of transportation, electric vehicles may offer a new load resource for meeting all, or part, of the imbalance created by the renewable generation. This paper investigates a regulation-services-based battery charging method on a population of plug-in hybrid electric vehicles to meet the power imbalance requirements associated with the introduction of 11 GW of additional wind generation into the Northwest Power Pool. It quantifies the number of vehicles required to meet the imbalance requirements under various charging assumptions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Visual Impact Assessment of the Energetic Materials Complex Construction Project on Manhattan Project–Era Historic Properties, the TA-06-0037 Concrete Bowl, and the TA-22-0001 Quonset Hut

Concern for potential visual effects to historic Manhattan Project–era properties emerged early in the planning and consultation phase for the upcoming Energetic Materials Complex (EMC) construction project. In initial discussions with project managers and design team members, resource managers became aware of the need to consider potential impacts to the viewsheds of two nearby properties that are eligible for inclusion in the Manhattan Project National Historical Park (MAPR). Resource managers recognized that viewshed characteristics important to the integrity of the Concrete Bowl (Technical Area [TA-]06-0037) and the Quonset Hut (TA-22-0001) conceivably faced the prospect of lasting and irreversible visual impacts. A strategy to gather necessary data soon emerged. The approach presented to the New Mexico State Historic Preservation Officer (SHPO) on April 7, 2021, combined gathering baseline information from field visits with a geographic information system (GIS)-supported viewshed analysis. Accordingly, results from the viewshed analysis would help resource managers determine if a more comprehensive visual impact assessment (VIA) would be needed. If necessitated by the outcome of the GIS viewshed analysis, initial consultation with the SHPO specified the production of a VIA that would explore any potential visual adverse impacts to the Concrete Bowl and the Quonset Hut. Cultural resources and GIS specialists with the Laboratory performed a viewshed analysis shortly after consultation with the SHPO. The analysis indicated a high likelihood that at least one of the two Manhattan Project–era properties would experience at least a minimal level of visual impact and that a VIA would be needed. The resulting analysis provides a description of the undertaking, an account of the properties affected along with an evaluation of historical significance, an examination of potential visual impacts, and a determination of effect to the identified historic properties.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Long-Term Monitoring of Utility-Scale Solar Energy Development and Application of Remote Sensing Technologies: Summary Report

In anticipation of increased utility-scale solar energy development over the next 20 to 50 years, federal agencies and other organizations have identified a need to develop comprehensive long-term monitoring programs specific to solar energy development. Increasingly, stakeholders are requesting that federal agencies, such as the U.S. Department of the Interior Bureau of Land Management (BLM), develop rigorous and comprehensive long-term monitoring programs. Argonne National Laboratory (Argonne) is assisting the BLM in developing an effective long-term monitoring plan as required by the BLM Solar Energy Program to study the environmental effects of solar energy development. The monitoring data can be used to protect land resources from harmful development practices while at the same time reducing restrictions on utility-scale solar energy development that are determined to be unnecessary. The development of a long-term monitoring plan that incorporates regional datasets, prioritizes requirements in the context of landscape-scale conditions and trends, and integrates cost-effective data collection methods (such as remote sensing technologies) will translate into lower monitoring costs and increased certainty for solar developers regarding requirements for developing projects on public lands. This outcome will support U.S. Department of Energy (DOE) Sunshot Program goals. For this reason, the DOE provided funding for the work presented in this report.

14 SOLAR ENERGY↗