Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Designing systems to satisfy their users - The coming changes in aviation weather and the development of a central weather processor

Attention is given to the development history of the Central Weather Processor (CWP) program of the Federal Aviation Administration. The CWP will interface with high speed digital communications links, accept data and information products from new sources, generate data processing products, and provide meteorologists with the capability to automate data retrieval and dissemination. The CWP's users are operational (air traffic controllers, meteorologists and pilots), institutional (logistics, maintenance, testing and evaluation personnel), and administrative.

Bush, M. W.↗

Orbit on demand - Will cost determine best design?

Eleven design concepts for vertical (V) and horizontal (H) take-off launch-on-demand manned orbital vehicles are discussed. Attention is given to up to three stages, Mach numbers (sub-, 2, or 3), expendable boosters, drop tanks (DT), and storable (S) or cryogenic fuels. All the concepts feature lifting bodies with circular cross-section and most have a 7 ft diam, 15 ft long payload bay as well as a crew compartment. Expendable elements impose higher costs and in some cases reduce all-azimuth launch capabilities. Single-stage vehicles simplify the logistics whether in H or V configuration. A two-stage H vehicle offers launch offset for the desired orbital plane before firing the rocket engines after take-off and subsonic acceleration. A two-stage fully reusable V form has the second lowest weight of the vehicles studied and an all-azimuth launch capability. Better definition of the prospective mission requirements is needed before choosing among the alternatives.

Macconochie, J. O.↗

A home away from home

The role of the NASA-Marshall center in the development of the Space Station is discussed. The tasks of the center include the development of the life-support system; the design of the common module, which will form the basis for all pressurized Space Station modules; the design and outfit of a common module for the Material and Technology Laboratory (MTL) and logistics use; accommodations for operations of the Orbit Maneuvering Vehicle (OMV) and the Orbit Transfer Vehicle (OTV); and the Space Station propulsion system. A description of functions and design is given for each system, with particular emphasis on the goals of safety, efficiency, automation, and cost effectiveness.

Powell, L. E.↗

Human factors in space station architecture 1: Space station program implications for human factors research

The space station program is based on a set of premises on mission requirements and the operational capabilities of the space shuttle. These premises will influence the human behavioral factors and conditions on board the space station. These include: launch in the STS Orbiter payload bay, orbital characteristics, power supply, microgravity environment, autonomy from the ground, crew make-up and organization, distributed command control, safety, and logistics resupply. The most immediate design impacts of these premises will be upon the architectural organization and internal environment of the space station.

Cohen, M. M.↗

Management: A bibliography for NASA Managers

This bibliography lists 707 reports, articles and other documents introduced into the NASA scientific and technology information system in 1985. Items are selected and grouped according to their usefulness to the manager as manager. Citations are grouped into ten subject categories: human factors and personnel issues; management theory and techniques; industrial management and manufacturing; robotics and expert systems; computers and information management; research and development; economics, costs, and markets; logistics and operations management; reliability and quality control; and legality, legislation, and policy.

Source record↗

Tether applications for space station

A wide variety of space station applications for tethers were reviewed. Many will affect the operation of the station itself while others are in the category of research or scientific platforms. One of the most expensive aspects of operating the space station will be the continuing shuttle traffic to transport logistic supplies and payloads to the space station. If a means can be found to use tethers to improve the efficiency of that transportation operation, it will increase the operating efficiency of the system and reduce the overall cost of the space station. The concept studied consists of using a tether to lower the shuttle from the space station. This results in a transfer of angular momentum and energy from the orbiter to the space station. The consequences of this transfer is studied and how beneficial use can be made of it.

Nobles, W.↗

Study of onboard expert systems to augment space shuttle and space station autonomy

The feasibility of onboard crew activity planning was examined. The use of expert systems technology to aid crewmembers in locating stowed equipment was also investigated. The crew activity planning problem, along with a summary of past and current research efforts, was discussed in detail. The requirements and specifications used to develop the crew activity planning system was also defined. The guidelines used to create, develop, and operate the MFIVE Crew Scheduler and Logistics Clerk were discussed. Also discussed is the mathematical algorithm, used by the MFIVE Scheduler, which was developed to aid in optimal crew activity planning.

Kurtzman, C. R.↗

Space station

The Space Station is being defined as a multi-purpose facility with emphasis in the following areas: scientific and technology research laboratory; permanent observatory; spacecraft servicing facility; construction and assembly facility; manufacturing facility; transportation node; and staging base for future space endeavors. The Station complex, in its initial operating capability configuration, includes a continuously habitable manned element, a polar orbiting unmanned platform, and a second unmanned platform co-orbiting with the manned element. All elements are dependent on the Space Transportation System (STS) for initial placement on-orbit and for subsequent logistical services. The manned element will be designed for long duration operations with systems maintainable on-orbit and operationally autonomous from ground control. A major feature of the Station will be its adaptability to evolutionary technology upgrades; and the Space Station, as a system, is to be designed for maximum ease of use by its users.

Thompson, D. R.↗

Basic research for future electric propulsion

It is pointed out that the evolution of electric propulsion over the past two and a half decades has been constrained by the interaction of three broad factors, including the physics and dynamics of the propellants, the dynamical and logistical requirements of the mission, and the technological realities of materials, power sources, and thermal management. A projection of the future of electric propulsion requires, therefore, a simultaneous reassessment of all three factors. Aspects of mission specification and power systems are discussed, and basic research needed for future electric propulsion applications is considered. Attention is given to electrostatic propulsion, electrothermal propulsion, electromagnetic propulsion, electrothermal/electromagnetic hybrids, novel concepts, and ancillary concerns.

Jahn, R. G.↗

Space station program operations - Making it work

The Space Station Program (SSP) will consist, in part, of a permanently orbiting facility composed of a mix of manned and unmanned elements. To insure that such a facility will be an operationally viable and productive one, capable of performing a myriad of assigned missions, special attention must be given to the following operational disciplines during the design and development of the SSP systems and subsystems: (1) Automation/Autonomy, (2) Customer Interfaces/Operations, (3) Habitability/Crew Productivity, (4) Maintainability, and (5) Logistics. In order to properly address these disciplines, from an operations point of view, the Director of the Space Station Task Force (SSTF) formed the Operations Working Group (OWG) in July 1982, and chartered this group to develop the top level operational technical and management-approach philosophies and requirements for the SSP. This paper attempts to summarize the results and conclusions reached by the OWG after an 18 month intensive study effort.

Parker, G. R.↗

The role of scientists in developing Hubble Space Telescope

The objective of the Hubble Space Telescope Program is to build and operate a high-performance, fully-instrumented and long-lived optical observatory in earth orbit. Key Program elements are (1) a logistic strategy of Shuttle launch/maintenance and TDRSS communications, (2) overall responsibility at the MSFC Project for developing both the flight and ground systems, and (3) scientific participation in ST development and responsibility after launch for conducting the observing program. The ST Project is a management structure with a budget and schedule for delivering an ST system capable of achieving its established scientific objectives. The Project distributes through contracts the responsibility for supplying particular components, but retains the responsibility for system-level integrity. Scientists have set the performance objectives and now support the Project during the development stage by providing (1) PI management of the five Science Instruments, (2) continuing translations of scientific requirements into engineering specifications, (3) oversight of designs and performance tests, and (4) specific expertise on technical concerns.

Brown, R. A.↗

Antarctica - Lessons for a Mars exploration program

The history of exploration and the international system of control of Antarctica has often been cited as a paradigm for the exploration of space. The small isolated research stations have been used to model the psychological stresses of future space missions. In addition, the programmatic structure of the U.S. Antarctic Research Program provides several possible analogs to future Mars Programs presently under discussion. These are: (1) Continued presence; (2) Civilian, military and private sector involvement; (3) Scientific activities; (4) Risk assessment and logistical support; (5) Accessibility for non-specialists; (6) Political and strategic motivations; (7) International cooperation/competition. Survival in Antarctica is contingent on advanced technology and the active transport of supplies. The scientific exploration of this remote and barren expanse without, of course, the aid and guidance of indigenous people certainly provides one of the closest analogs available to future science activities on the Martian surface.

Mckay, C. P.↗

Advanced geologic exploration supported by a lunar base - A traverse across the Imbrium-Procellarum region of the moon

An example of extended traverse of a lunar region, the Imbrium-Procellarum, for the purpose of geological exploration is described. The necessary field support is discussed, including transportation and logistical support, analytical instrumentation, and field equipment. The various sites of special geological interest in the region are mentioned individually in the order in which they would be visited, indicating what questions are of particular scientific interest at each site.

Cintala, M. J.↗

The case for a centralized repair depot for Space Shuttle

The first priority of the NSTS program is to make the Space Shuttle system fully operational and cost effective in providing routine access to space. In support of this priority an integrated logistics support system was planned, structured and is being implemented to support a launch-on-time goal of 95 percent. In achieving a 95 percent spares 'fill rate' in an environment of small fleet size, highly unique and high cost assets, significant spares cost can be incurred. A major portion of these costs are for the additional spares required when repair or acquisition times are lengthy. This paper provides a fundamental analysis of the costs and other factors involved in the spare and repair process and provides an optimized cost and process solution for the Space Shuttle program - a centralized repair depot located at KSC.

Enlow, R. D.↗

Space Station benefits from ECLS - Propulsion system synergism

Benefits of integrating the Space Station Environmental Control and Life Support (ECLS) system with the propulsion system are addressed in this paper for various levels of ECLS closure. Effluents generated by the ECLS system are used to augment or even supplement the propulsion system. Potential benefits include reductions in logistic weights and volumes, fixed weights and volumes, power requirements, and in total station systems cost.

Brennan, S. M.↗

International Symposium on Remote Sensing of Environment, Fourth Thematic Conference: Remote Sensing for Exploration Geology, San Francisco, CA, April 1-4, 1985, Proceedings. Volumes 1 & 2

State of the art applications of remote sensing in geological exploration programs are discussed along with research and development activities aimed at increasing the future capabilities of this technology for exploration geology. The topics considered include: technical issues in the state of the art; regional exploration models; remote sensing applications for hydrocarbon exploration; commercialization of remote sensing satellites; and data integration. Also addressed are: remote sensing applications for mineral exploration; geobotanical and environmental remote sensing; image processing techniques and applications; advanced sensors, radar, and airborne systems; and engineering, logistics, and marine applications.

Source record↗

Space Station and technology experiments

The space technology experiments to be performed on the Space Station are discussed. The characteristics of the dual keel Station, which contains modules for habitation, logistics, and laboratories, applicable to technology experiments are described. Experiments utilizing the initial Space Station design include: (1) assessing the instrumented Space Station, (2) the testing of spacecraft materials and coatings, and (3) a microelectronics data system experiment; the objectives and procedures for these studies are examined. With increases in the number of modules, and electrical power and OTV capabilities, the evaluation of teleoperated techniques, the development and testing of a diversified antenna near- and far-field measurement facility, the study of cryogenic propellant transfer, and storage, and the implementation of a large concentrator in space are possible; descriptions of these proposed experiments are provided.

Breckenridge, R. A.↗

Space Station overall management approach for operations

An Operations Management Concept developed by NASA for its Space Station Program is discussed. The operational goals, themes, and design principles established during program development are summarized. The major operations functions are described, including: space systems operations, user support operations, prelaunch/postlanding operations, logistics support operations, market research, and cost/financial management. Strategic, tactical, and execution levels of operational decision-making are defined.

Paules, G.↗