Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

MSRR Rack Materials Science Research Rack

The Materials Science Research Rack (MSRR) is a research facility developed under a cooperative research agreement between NASA and the European Space Agency (ESA) for materials science investigations on the International Space Station (ISS). The MSRR is managed at the Marshall Space Flight Center (MSFC) in Huntsville, AL. The MSRR facility subsystems were manufactured by Teledyne Brown Engineering (TBE) and integrated with the ESA/EADS-Astrium developed Materials Science Laboratory (MSL) at the MSFC Space Station Integration and Test Facility (SSITF) as part of the Systems Development Operations Support (SDOS) contract. MSRR was launched on STS-128 in August 2009, and is currently installed in the U. S. Destiny Laboratory Module on the ISS. Materials science is an integral part of developing new, safer, stronger, more durable materials for use throughout everyday life. The goal of studying materials processing in space is to develop a better understanding of the chemical and physical mechanisms involved, and how they differ in the microgravity environment of space. To that end, the MSRR accommodates advanced investigations in the microgravity environment of the ISS for basic materials science research in areas such as solidification of metals and alloys. MSRR allows for the study of a variety of materials including metals, ceramics, semiconductor crystals, and glasses. Materials science research benefits from the microgravity environment of space, where the researcher can better isolate chemical and thermal properties of materials from the effects of gravity. With this knowledge, reliable predictions can be made about the conditions required on Earth to achieve improved materials. MSRR is a highly automated facility with a modular design capable of supporting multiple types of investigations. Currently the NASA-provided Rack Support Subsystem provides services (power, thermal control, vacuum access, and command and data handling) to the ESA developed Materials Science Laboratory (MSL) which accommodates interchangeable Furnace Inserts (FI). Two ESA-developed FIs are presently available on the ISS: the Low Gradient Furnace (LGF) and the Solidification and Quenching Furnace (SQF). Sample-Cartridge Assemblies (SCAs), each containing one or more material samples, are installed in the FI by the crew and can be processed at temperatures up to 1400 C. Once an SCA is installed, the experiment can be run by automatic command or science conducted via telemetry commands from the ground. This facility is available to support materials science investigations through programs such as the US National Laboratory, Technology Development, NASA Research Announcements, and others. TBE and MSFC are currently developing NASA Sample Cartridge Assemblies (SCA's) with a planned availability for launch in 2017.

Reagan, Shawn↗

Evaluation of a CFD Method for Aerodynamic Database Development using the Hyper-X Stack Configuration

A computational fluid dynamic (CFD) study is performed on the Hyper-X (X-43A) Launch Vehicle stack configuration in support of the aerodynamic database generation in the transonic to hypersonic flow regime. The main aim of the study is the evaluation of a CFD method that can be used to support aerodynamic database development for similar future configurations. The CFD method uses the NASA Langley Research Center developed TetrUSS software, which is based on tetrahedral, unstructured grids. The Navier-Stokes computational method is first evaluated against a set of wind tunnel test data to gain confidence in the code s application to hypersonic Mach number flows. The evaluation includes comparison of the longitudinal stability derivatives on the complete stack configuration (which includes the X-43A/Hyper-X Research Vehicle, the launch vehicle and an adapter connecting the two), detailed surface pressure distributions at selected locations on the stack body and component (rudder, elevons) forces and moments. The CFD method is further used to predict the stack aerodynamic performance at flow conditions where no experimental data is available as well as for component loads for mechanical design and aero-elastic analyses. An excellent match between the computed and the test data over a range of flow conditions provides a computational tool that may be used for future similar hypersonic configurations with confidence.

Parikh, Paresh↗

Spaceport Command and Control System Software Development

The control system for the Space Launch System (SLS) and Orion capsule contains a multitude of displays for use in displaying information like vehicle health, sensor information, life support, etc. Currently users in the Launch Control Center (LCC) are using a list-based selection Graphical User Interface (GUI) to open various displays. However the display names are not intuitive as to what the display looks like nor what data is presented in a display. My project involves adding additional functionality to the current display selection GUI utilizing thumbnail images of each display for easy browsing. This new GUI allows users to find their desired display much faster without needing to memorize the layout of every display based only on the display's name.

Chapa, Nicholas↗

Logistics support economy and efficiency through consolidation and automation

An integrated logistics support system, which would provide routine access to space and be cost-competitive as an operational space transportation system, was planned and implemented to support the NSTS program launch-on-time goal of 95 percent. A decision was made to centralize the Shuttle logistics functions in a modern facility that would provide office and training space and an efficient warehouse area. In this warehouse, the emphasis is on automation of the storage and retrieval function, while utilizing state-of-the-art warehousing and inventory management technology. This consolidation, together with the automation capabilities being provided, will allow for more effective utilization of personnel and improved responsiveness. In addition, this facility will be the prime support for the fully integrated logistics support of the operations era NSTS and reduce the program's management, procurement, transportation, and supply costs in the operations era.

Savage, G. R.↗

Space Resources and Mining: Current Objectives, Plans, and Missions

Why are Space Resources and Their Use Important? There are many reasons why people and nations want to explore space, and there are many different ways in which space can be explored. A critical interface linking both the ‘why’ and the ‘how’ of space exploration is the identification, extraction, and use of resources in space. In both NASA’s Journey to Mars: Pioneering Next Steps in Space Exploration released in October of 2015 and the Global Exploration Roadmap released in August 2013, the ability to find, quantify, extract, process, and use space resources was identified as a critical objective by NASA and over 14 other space agencies for achieving affordable and sustainable human exploration beyond Earth’s orbit, encouraging and creating new commercial entities and markets based on space activities, and increasing the terrestrial economy and quality-of-life benefits for all humankind. Robotic and especially human space exploration up to this point in time can be considered to be ‘Earth reliant’ in that everything needed to support and enable the mission is launched from Earth. The past Apollo missions to the Moon and the International Space Station currently in orbit above the Earth all rely on hardware, habitats, power, transportation, and life support consumables sent from Earth to keep the crew alive and working. As the distance from Earth increases, the cost of transportation and the risks due to failures and logistics disruptions also increases. By using resources found at the site of exploration to make mission critical consumables (such as propellants, fuel cell reactants and life support commodities), spare parts, and infrastructure needed to support surface activities (such as landing pads, roads, habitats/shelters, and power/thermal systems) commonly referred to as In Situ Resource Utilization, a significant amount of launch mass and cost can be saved and risk reduced. The ability to do these things also changes how exploration is performed from Earth Reliant to NASA’s goal of ‘Earth Independent’ exploration. After the US Apollo program was over, people began to recognize that it had been an inspiration for a generation of young students to go into Science, Technology, Engineering and Math (STEM) fields, and that the US industry and economy had significantly grown and lived off these students and the technological advances made to achieve these missions for decades. Space exploration should no longer be focused solely on scientific advancement or national pride, but for economic growth and population standard of living advancement. Considering the economic value of human exploration and how it could expand the economy of the US was brought to full light in a speech by John Marburger, the director of US Office of Science and Technology Policy under George W Bush at the Goddard Symposium in 2006. In his speech he highlighted that the ultimate goal was not to just Explore space but to Use space for the benefit of mankind. He further stated that the use of off-planet resources, in this case from the Moon, should be a critical architectural consideration for human space exploration to make it more affordable and sustainable. This could be achieved in two ways. The first is to start by encouraging and commercializing the extraction and production of transportation and life support related products from space resources, which could than lead to other resource uses once an affordable transportation architecture is established. The second is to encourage the spin-in of terrestrial technologies into space applications and spin-off of space technologies into terrestrial applications to increase the efficiency and profitability of terrestrial industries.

Sanders, Gerald B.↗

International Space Station Passive Thermal Control System Analysis, Top Ten Lessons-Learned

The International Space Station (ISS) has been on-orbit for over 10 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The analysis lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

Iovine, John↗

International Space Station Passive Thermal Control System Top Ten Lessons-Learned

Final document not an Abstract attached. The International Space Station (ISS) has been on-orbit for nearly 20 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The PTCS lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

Iovine, John V.↗

International Space Station Passive Thermal Control System Top Ten Lessons-Learned

Final document not an Abstract attached. The International Space Station (ISS) has been on-orbit for nearly 20 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The PTCS lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

Iovine, John V.↗

Optimal selection of space transportation fleet to meet multi-mission space program needs

A space program that spans several decades will be comprised of a collection of missions such as low earth orbital space station, a polar platform, geosynchronous space station, lunar base, Mars astronaut mission, and Mars base. The optimal selection of a fleet of several recoverable and expendable launch vehicles, upper stages, and interplanetary spacecraft necessary to logistically establish and support these space missions can be examined by means of a linear integer programming optimization model. Such a selection must be made because the economies of scale which comes from producing large quantities of a few standard vehicle types, rather than many, will be needed to provide learning curve effects to reduce the overall cost of space transportation if these future missions are to be affordable. Optimization model inputs come from data and from vehicle designs. Each launch vehicle currently in existence has a launch history, giving rise to statistical estimates of launch reliability. For future, not-yet-developed launch vehicles, theoretical reliabilities corresponding to the maturity of the launch vehicles' technology and the degree of design redundancy must be estimated. Also, each such launch vehicle has a certain historical or estimated development cost, tooling cost, and a variable cost. The cost of a launch used in this paper includes the variable cost plus an amortized portion of the fixed and development costs. The integer linear programming model will have several constraint equations based on assumptions of mission mass requirements, volume requirements, and number of astronauts needed. The model will minimize launch vehicle logistic support cost and will select the most desirable launch vehicle fleet.

Morgenthaler, George W.↗

Cassini Attitude Control Fault Protection Design: Launch to End of Prime Mission Performance

The Cassini Attitude and Articulation Control Subsystem (AACS) Fault Protection (FP) has been successfully supporting operations for over 10 years from launch through the end of the prime mission. Cassini's AACS FP is complex, containing hundreds of error monitors and thousands of tunable parameters. Since launch there have been environmental, hardware, personnel and mission event driven changes which have required AACS FP to adapt and be robust to a variety of scenarios. This paper will discuss the process of monitoring, maintaining and updating the AACS FP during Cassini's lengthy prime mission as well as provide some insight into lessons learned during tour operations.

Meakin, Peter C.↗

Simple, Robust Cryogenic Propellant Depot for Near Term Applications

The ability to refuel cryogenic propulsion stages on-orbit provides an innovative paradigm shift for space transportation supporting National Aeronautics and Space Administration s (NASA) Exploration program as well as deep space robotic, national security and commercial missions. Refueling enables large beyond low Earth orbit (LEO) missions without requiring super heavy lift vehicles that must continuously grow to support increasing mission demands as America s exploration transitions from early Lagrange point missions to near Earth objects (NEO), the lunar surface and eventually Mars. Earth-to-orbit launch can be optimized to provide competitive, cost-effective solutions that allow sustained exploration. This paper describes an experimental platform developed to demonstrate the major technologies required for fuel depot technology. This test bed is capable of transferring residual liquid hydrogen (LH2) or liquid oxygen (LO2) from a Centaur upper stage, and storage in a secondary tank for up to one year on-orbit. A dedicated, flight heritage spacecraft bus is attached to an Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA) ring supporting experiments and data collection. This platform can be deployed as early as Q1 2013. The propellant depot design described in this paper can be deployed affordably this decade supporting missions to Earth-Moon Lagrange points and lunar fly by. The same depot concept can be scaled up to support more demanding missions and launch capabilities. The enabling depot design features, technologies and concept of operations are described.

McLean, Christopher↗

A logistics and potential hazard study of propellant systems for a Saturn 5 derived heavy lift (three-stage core) launch vehicle

The Bush Administration has directed NASA to prepare for a return to the Moon and on to Mars - the Space Exploration Initiative. To meet this directive, powerful rocket boosters will be required in order to lift payloads that may reach the half-million pound range into low earth orbit. In this report an analysis is presented on logistics and potential hazards of the propellant systems envisioned for future Saturn 5 derived heavy lift launch vehicles. In discussing propellant logistics, particular attention has been given to possible problems associated with procurement, transportation, and storage of RP-1, HL2, and LOX, the heavy lift launch vehicle propellants. Current LOX producing facilities will need to be expanded and propellant storage and some support facilities will require relocation if current Launch Pads 39A and/or 39B are to be used for future heavy noise-abatement measures. Included in the report is a discussion of suggested additional studies, primarily economic and environmental, which should be undertaken in support of the goals of the Space Exploration Initiative.

Whitney, E. Dow↗

Launch-Off-Need Shuttle Hubble Rescue Mission: Medical Issues

The Space Shuttle Hubble repair mission (STS-125) is unique in that a rescue mission (STS-400) has to be ready to launch before STS-125 life support runs out should the vehicle become stranded. The shuttle uses electrical power derived from fuel cells that use cryogenic oxygen and hydrogen (CRYO) to run all subsystems including the Environmental Control System. If the STS-125 crew cannot return to Earth due to failure of a critical subsystem, they must power down all nonessential systems and wait to be rescued by STS-400. This power down will cause the cabin temperature to be 60 F or less and freeze the rest of the vehicle, preventing it from attempting a reentry. After an emergency has been declared, STS-125 must wait at least 7 days to power down since that is the earliest that STS-400 can be launched. Problem The delayed power down of STS-125 causes CYRO to be consumed at high rates and limits the survival time after STS-400 launches to 10 days or less. CRYO will run out sooner every day that the STS-400 launch is delayed (weather at launch, technical issues etc.). To preserve CRYO and lithium hydroxide (LiOH - carbon dioxide removal) the crew will perform no exercise to reduce their metabolic rates, yet each deconditioned STS-125 crewmember must perform an EVA to rescue himself. The cabin may be cold for 10 days, which may cause shivering, increasing the metabolic rate of the STS-125 crew. Solution To preserve LiOH, the STS-125 manifest includes nutrition bars with low carbohydrate content to maintain crew respiratory quotient (RQ) below 0.85 as opposed to the usual shuttle galley food which is rich in carbohydrates and keeps the RQ at approximately 0.95. To keep the crew more comfortable in the cold vehicle warm clothing also has been included. However, with no exercise and limited diet, the deconditioned STS-125 crew returning on STS-400 may not be able to egress the vehicle autonomously requiring a supplemented crash-and-rescue capability.

Hamilton, Douglas↗

A two stage launch vehicle for use as an advanced space transportation system for logistics support of the space station

This report describes the preliminary design specifications for an Advanced Space Transportation System consisting of a fully reusable flyback booster, an intermediate-orbit cargo vehicle, and a shuttle-type orbiter with an enlarged cargo bay. It provides a comprehensive overview of mission profile, aerodynamics, structural design, and cost analyses. These areas are related to the overall feasibility and usefullness of the proposed system.

Source record↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC E2 heater head assembly. These mechanical tests were collectively referred to as lateral load tests since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC-E2 heater head assembly. These mechanical tests were collectively referred to as "lateral load tests" since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗

Lateral Load Testing of the Advanced Stirling Convertor (ASC-E2) Heater Head

Free-piston Stirling convertors are fundamental to the development of NASA s next generation of radioisotope power system, the Advanced Stirling Radioisotope Generator (ASRG). The ASRG will use General Purpose Heat Source (GPHS) modules as the energy source and Advanced Stirling Convertors (ASCs) to convert heat into electrical energy, and is being developed by Lockheed Martin under contract to the Department of Energy. Achieving flight status mandates that the ASCs satisfy design as well as flight requirements to ensure reliable operation during launch. To meet these launch requirements, GRC performed a series of quasi-static mechanical tests simulating the pressure, thermal, and external loading conditions that will be experienced by an ASC-E2 heater head assembly. These mechanical tests were collectively referred to as "lateral load tests" since a primary external load lateral to the heater head longitudinal axis was applied in combination with the other loading conditions. The heater head was subjected to the operational pressure, axial mounting force, thermal conditions, and axial and lateral launch vehicle acceleration loadings. To permit reliable prediction of the heater head s structural performance, GRC completed Finite Element Analysis (FEA) computer modeling for the stress, strain, and deformation that will result during launch. The heater head lateral load test directly supported evaluation of the analysis and validation of the design to meet launch requirements. This paper provides an overview of each element within the test and presents assessment of the modeling as well as experimental results of this task.

Cornell, Peggy A.↗