Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launching”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Space Logistics: Launch Capabilities

The current maximum launch capability for the United States are shown. The predicted Earth-to-orbit requirements for the United States are presented. Contrasting the two indicates the strong National need for a major increase in Earth-to-orbit lift capability. Approximate weights for planned payloads are shown. NASA is studying the following options to meet the need for a new heavy-lift capability by mid to late 1990's: (1) Shuttle-C for near term (include growth versions); and (2) the Advanced Lauching System (ALS) for the long term. The current baseline two-engine Shuttle-C has a 15 x 82 ft payload bay and an expected lift capability of 82,000 lb to Low Earth Orbit. Several options are being considered which have expanded diameter payload bays. A three-engine Shuttle-C with an expected lift of 145,000 lb to LEO is being evaluated as well. The Advanced Launch System (ALS) is a potential joint development between the Air Force and NASA. This program is focused toward long-term launch requirements, specifically beyond the year 2000. The basic approach is to develop a family of vehicles with the same high reliability as the Shuttle system, yet offering a much greater lift capability at a greatly reduced cost (per pound of payload). The ALS unmanned family of vehicles will provide a low end lift capability equivalent to Titan IV, and a high end lift capability greater than the Soviet Energia if requirements for such a high-end vehicle are defined.In conclusion, the planning of the next generation space telescope should not be constrained to the current launch vehicles. New vehicle designs will be driven by the needs of anticipated heavy users.

Furnas, Randall B.↗

Effectiveness of Loan Guarantees versus Tax Incentives for Space Launch Ventures

Over the course of the past few years, several new and innovative fully or partiailly reusable launch vehicle designs have been initiated with the objective of reducing the cost of space transportation. These new designs are in various stages hardware development for technology and system demonstrators. The larger vehicles include the Lockheed Martin X-33 technology demonstrator for VentureStar and the Space Access launcher. The smaller launcher ventures include Kelly Space and Technology and Rotary Rocket Company. A common denominator between the new large and small commercial launch systems is the ability to obtain project financing and at an affordable cost. Both are having or will have great difficulty in obtaining financing in the capital markets because of the dollar amounts and the risk involved. The large established companies are pursuing multi-billion dollar developments which are a major challenge to finance because of the size and risk of the projects. The smaller start-up companies require less capital for their smaller systems, however, their lack of corporate financial muscle and launch vehicle track record results in a major challenge to obtain financing also because of high risk. On Wall Street, new launch system financing is a question of market, technical, organizational, legal/regulatory and financial risk. The current limit of acceptable financial risk for Space businesses on Wall Street are the telecommunications and broadcast satellite projects, of which many in number are projected for the future. Tbc recent problems with Iridium market and financial performance are casting a long shadow over new satellite project financing, making it increasingly difficult for the new satellite projects to obtain needed financing.

Scottoline, S.↗

Design of a Low Cost Avionics System for Launch Vehicles

Marshall Space Flight Center has long been one of the leaders in development of propulsion systems. Due to current launch vehicle costs, Marshall Space Flight Centers (MSFC) Advanced Space Transportation Program (ASTP) office has emphasized the development of low cost launch vehicles. The Bantam launch vehicle is one of the primary programs that has low cost as a requirement. One of the driving factors for a low cost launch vehicle is a low cost avionics system. This paper will summarize MSFC's Astrionics Laboratories efforts in designing a low cost avionics system. MSFC has done Phase A avionics system design and has been working with various contractors on a Phase B preliminary avionics design. Deriving the major requirements, trade studies and cost drivers are some of the topics to be discussed.

Crawford, Kevin↗

Launch Conditions Might Affect the Formation of Blood Vessel in the Quail Chorioallantoic Membrane

AS 2 part of the first joint USA-Russian MIR/Shuttle program, fertilized quail eggs were flown on the MIR 18 mission. Post-flight examination indicated impaired survival of both the embryos in space and also of control embryos exposed to vibrational and g-forces simulating the conditions experienced during the launch of Progress 227. We hypothesized that excess mechanical forces and/or other conditions during the launch might cause abnormal development of the blood supply in the chorioallantoic membrane (CAM) leading to the impaired survival of the embryos. The CAM, a highly vascularized extraembryonic organ, provides for the oxygen exchange across the egg shell and is thus pivotal for proper embryonic development. To test our hypothesis, we compared angiogenesis In CAMS of eggs which were either exposed to the vibration and g-force profile simulating the conditions at launch of Progress 227 (synchronous controls), or kept under routine conditions in a laboratory Incubator (laboratory controls). At various time points during Incubation, the eggs were fixed in paraformaldehyde for subsequent dissection. At the time of dissection, the CAM was carefully lifted from the egg shell and examined as whole mounts by bright-field and fluorescent microscopy. The development or the vasculature (angiogenesis) was assessed from the density of blood vessels per viewing field and evaluated by computer aided image analysis. We observed a significant decrease In blood-vessel density in the synchronous controls versus "normal" laboratory controls beginning from day 10 of Incubation. The decrease in vascular density was restricted to the smallest vessels only, suggesting that conditions during the launch and/or during the subsequent Incubation of the eggs may affect the normal progress of angiogenesis in the CAM. Abnormal angiogenesis In the CAM might contribute to the impaired survival of the embryos observed in synchronous controls as well as in space.

Henry, M. K.↗

STS-37 Breakfast / Ingress / Launch & ISO Camera Views

The primary objective of the STS-37 mission was to deploy the Gamma Ray Observatory. The mission was launched at 9:22:44 am on April 5, 1991, onboard the space shuttle Atlantis. The mission was led by Commander Steven Nagel. The crew was Pilot Kenneth Cameron and Mission Specialists Jerry Ross, Jay Apt, and Linda Godwing. This videotape shows the crew having breakfast on the launch day, with the narrator introducing them. It then shows the crew's final preparations and the entry into the shuttle, while the narrator gives information about each of the crew members. The countdown and launch is shown including the shuttle separation from the solid rocket boosters. The launch is reshown from 17 different camera views. Some of the other camera views were in black and white.

Source record↗

Human Mars Mission: Launch Window from Earth Orbit

The determination of orbital window characteristics is of major importance in the analysis of human interplanetary missions and systems. The orbital launch window characteristics are directly involved in the selection of mission trajectories, the development of orbit operational concepts, and the design of orbital launch systems. The orbital launch window problem arises because of the dynamic nature of the relative geometry between outgoing (departure) asymptote of the hyperbolic escape trajectory and the earth parking orbit. The orientation of the escape hyperbola asymptotic relative to earth is a function of time. The required hyperbola energy level also varies with time. In addition, the inertial orientation of the parking orbit is a function of time because of the perturbations caused by the Earth's oblateness. Thus, a coplanar injection onto the escape hyperbola can be made only at a point in time when the outgoing escape asymptote is contained by the plane of parking orbit. Even though this condition may be planned as a nominal situation, it will not generally represent the more probable injection geometry. The general case of an escape injection maneuver performed at a time other than the coplanar time will involve both a path angle and plane change and, therefore, a DELTA V penalty. Usually, because of the DELTA V penalty the actual departure injection window is smaller in duration than that determined by energy requirement alone. This report contains the formulation, characteristics, and test cases for five different launch window modes for Earth orbit. These modes are: (1) One impulsive maneuver from a Highly Elliptical Orbit (HEO) (2) Two impulsive maneuvers from a Highly Elliptical Orbit (HEO) (3) One impulsive maneuver from a Low Earth Orbit (LEO) (4) Two impulsive maneuvers from LEO (5) Three impulsive maneuvers from LEO.

Young, Archie↗

STS-31: Hubble Space Telescope Post Launch Press Conference from Kennedy Space Center

This video presents a post-launch press conference on the STS-31 Hubble Space Telescope. Dick Young, Kennedy Space Center Public Affairs, introduces the panel. The panel consists of Robert Sieck, Kennedy Space Center Launch Director, and George T. Sassen, Director Shuttle Engineer. The STS-31 launch was accomplished with very few problems. Terminal count was started and then stopped at 31 seconds because the software sensed that a valve was not positioned correctly. The valve was positioned correctly, the count was resumed, and the launch was carried out safely and successfully. George T. Sassen explains, in detail, how the problem was corrected.

Source record↗

TITAN III Launch Replays

Footage shows several views of the launching of the Mars Observer Titan III satellite. Scenes include different angle and camera views of the launch. Also shown are panoramic views of the launch vehicle on the launch pad.

Source record↗

Starfire 1 Consort III Launch

The Consort 3 is a commercial suborbital rocket that carried 12 microgravity experiments. It was launched on a Starfire rocket on May 16, 1990, from the Naval Ordnance Missile Test Station facilities at the U.S. Army's White Sands Missile Range (WSMR), NM. The videotape opens with approximately 2 minutes of a man speaking into a microphone but there is no sound. This is followed by a brief summary of the payload, and the expected trajectory, a view of the launch vehicle, the countdown and the launch. The videotape then shows a film clip from the University of Alabama, with Dr. Francis Wessling, project manager for the Consort 3 project, speaking about the mission goals in the materials sciences experimentation. The video shows footage of the payload being assembled. The next section is a discussion by Dr. Roy Hammustedt, of Pennsylvania State University, who reviews the Penn State Bio Module,and the goal of learning about the effects of gravity on physiology. This is followed by George Maybee, from McDonald Douglas, who spoke about the payload integration process while the video shows some of the construction. The last section of the videotape shows a press conference at the launch site. Ana Villamil answers questions from the press about the flight.

Source record↗

Reusable Launch Vehicle Control In Multiple Time Scale Sliding Modes

A reusable launch vehicle control problem during ascent is addressed via multiple-time scaled continuous sliding mode control. The proposed sliding mode controller utilizes a two-loop structure and provides robust, de-coupled tracking of both orientation angle command profiles and angular rate command profiles in the presence of bounded external disturbances and plant uncertainties. Sliding mode control causes the angular rate and orientation angle tracking error dynamics to be constrained to linear, de-coupled, homogeneous, and vector valued differential equations with desired eigenvalues placement. Overall stability of a two-loop control system is addressed. An optimal control allocation algorithm is designed that allocates torque commands into end-effector deflection commands, which are executed by the actuators. The dual-time scale sliding mode controller was designed for the X-33 technology demonstration sub-orbital launch vehicle in the launch mode. Simulation results show that the designed controller provides robust, accurate, de-coupled tracking of the orientation angle command profiles in presence of external disturbances and vehicle inertia uncertainties. This is a significant advancement in performance over that achieved with linear, gain scheduled control systems currently being used for launch vehicles.

Shtessel, Yuri↗

TOPEX/POSEIDON Launch from Guiana Space Center Aboard an Ariane 42P

Footage shows the Launch Control Center (LCC) as they prepare for launch. During preparation Charles Bigot, Chairman and C.E.O. of Arianespace, and Jean-Daniel Levi, Director of CNES spoke briefly about the join effort between National Aeronautics and Space Administration (NASA) and the European Space Agency (ESA). The NASA administrator, Don Golding also made a brief speech via telephone before the launching. Live footage also shows the launching of the TOPEX/POSEIDON satellite.

Source record↗

INTELSAT V-A (F-10) Launch

Footage shows panoramic views of the Atlas launch vehicle on the launch complex. Also shown are ignition, liftoff, several different launch replays from different cameras, and views of the complex after launch.

Source record↗

Venus and Beyond Using the Ariane ASAP Launch Capability

The cost of executing planetary missions in the next ten years is expected to decrease significantly. The principle reason is that new technology is reducing spacecraft mass while increasing capability. Another reason is that launch costs are expected to decrease. A move in this direction is to permit important planetary missions to fly as secondary payloads, and this opportunity is now provided by the French on the Ariane 5 using the Ariane Structure for Auxiliary Payloads (ASAP). The ASAP will fly on GEO missions, and can boost up to eight 100 kg (or 200 kg, if paired) payloads into the elliptical geosynchronous transfer orbit (GTO), which delivers large communication satellites to GEO. An efficient multi-burn method has been developed by this author to deliver these small spacecraft from GTO to Mars and other destinations. This method, referred to here as Moon-Earth Gravity Assist (MEGA), requires 3 or more major maneuvers together with close flybys of the earth and moon. An example for a Mars 2003 mission (not to scale) is shown in Figure 1, where, once in GTO, the first burn sends the spacecraft beyond the Moon to a distance of 1.2 million kilometers. At apogee, the second burn targets to an encounter with the Moon such that a swingby returns the spacecraft to the Earth with a 300 km perigee, and with an inclination such that a perigee burn will send the spacecraft off to Mars with the required escape velocity vector. Details of this method, specifically for Mars missions, can be found in Reference 3. A similar strategy works for Venus, with some caveats. This method is required to work for any Ariane 5 launch date over a three month period, to ensure a high probability of getting off the ground. The launch period is provided by fixing the Earth escape date (3rd burn), but allowing the high ellipse (beyond the Moon) period to vary by one or two months, and also allowing a one to two month wait time in GTO (or other orbit) before the first burn is performed. Figure 2 shows the trajectory profiles for the early and late GTO launch dates for a Mars 2003 mission. Venus. which is an inner planet, poses special problems for the MEGA process. The escape direction is reverse that of Earth's motion, and the GTO apogee arrival

Penzo, Paul A.↗

Closed End Launch Tube (CELT)

As an alternative to magnetic propulsion for launch assist, the authors propose a pneumatic launch assist system. Using off the shelf components, coupled with familiar steel and concrete construction, a launch assist system can be brought from the initial feasibility stage, through a flight capable 5000 kg. demonstrator to a deployed full size launch assist system in 10 years. The final system would be capable of accelerating a 450,000 kg. vehicle to 270 meters per second. The CELT system uses commercially available compressors and valves to build a fail-safe system in less than half the time of a full Mag-Lev (magnetic levitation) system, and at a small fraction of the development cost. The resulting system could be ready in time to support some Gen 2 (generation 2) vehicles, as well as the proposed Gen 3 vehicle.

Lueck, Dale E.↗

A Space Based Internet Protocol System for Launch Vehicle Tracking and Control

Personnel from the Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF) in Virginia are responsible for the overall management of the NASA Sounding Rocket and Scientific Balloon Programs. Payloads are generally in support of NASA's Space Science Enterprise's missions and return a variety of scientific data as well as providing a reasonably economical means of conducting engineering tests for instruments and devices used on satellites and other spacecraft. Sounding rockets used by NASA can carry payloads of various weights to altitudes from 50 km to more than 1,300 km. Scientific balloons can carry a payload weighing as much as 3,630 Kg to an altitude of 42 km. Launch activities for both are conducted not only from established ranges, but also from remote locations worldwide requiring mobile tracking and command equipment to be transported and set up at considerable expense. The advent of low earth orbit (LEO) commercial communications satellites provides an opportunity to dramatically reduce tracking and control costs of these launch vehicles and Unpiloted Aerial Vehicles (UAVs) by reducing or eliminating this ground infrastructure. Additionally, since data transmission is by packetized Internet Protocol (IP), data can be received and commands initiated from practically any location. A low cost Commercial Off The Shelf (COTS) system is currently under development for sounding rockets that also has application to UAVs and scientific balloons. Due to relatively low data rate (9600 baud) currently available, the system will first be used to provide GPS data for tracking and vehicle recovery. Range safety requirements for launch vehicles usually stipulate at least two independent tracking sources. Most sounding rockets flown by NASA now carry GP~ receivers that output position data via the payload telemetry system to the ground station. The Flight Modem can be configured as a completely separate link thereby eliminating the requirement for tracking radar. The system architecture that integrates antennas, GPS receiver, commercial satellite packet data modem, and a single board computer with custom software is described along with the technical challenges and the plan for their resolution. These include antenna development, high Doppler rates, reliability, environmental ruggedness, hand over between satellites, and data security. An aggressive test plan is included which, in addition to environmental testing, measures bit error rate, latency and antenna patterns. Actual launches on a sounding rocket and various aircraft flights have taken place. Flight tests are planned for the near future on aircraft, long duration balloons and sounding rockets. These results, as well as the current status of the project, are reported.

Bull, Barton↗

STS-104 Pre-Launch Press Conference

George Diller, NASA Public Affairs, introduces Jim Halsell, Shuttle Program Launch Integration Manager, Dave King, NASA Director of Shuttle Processing, Michael Hawes, Deputy Associate Administrator for ISS, and John Weems, Launch Weather Officer, in this STS-104 press conference. An overview is given of the launch and mission activities, International Space Station activities during the mission, and the weather forecast for the launch. The men then answer questions from the press.

Source record↗

STS-104 Post-Launch News Conference

George Diller, NASA Public Affairs, introduces Jim Halsell, Director of Shuttle Launch Integration, and Mike Leinbach, Shuttle Launch Director, in this STS-104 post-launch press conference. The men give an overview of the successful launch of Atlantis and answer questions from the press.

Source record↗

NASA Headquarters/Kennedy Space Center: Organization and Small Spacecraft Launch Services

The objectives of the Kennedy Space Center's (KSC) Expendable Launch Vehicles (ELV) Program are to provide safe, reliable, cost effective ELV launches, maximize customer satisfaction, and perform advanced payload processing capability development. Details are given on the ELV program organization, products and services, foreign launch vehicle policy, how to get a NASA launch service, and some of the recent NASA payloads.

Sierra, Albert↗