At least 703 records · Page 39

INFORMATION: Management Alert on the Department's Monitoring of the Weatherization Assistance Program in the State of Illinois

Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of Energy's Weatherization Assistance Program received $5 billion to improve the energy efficiency of homes owned or occupied by low income persons, reduce their total residential expenditures, and improve their health and safety. Since the Recovery Act was enacted in February 2009, the Department has awarded weatherization grants to every state, the District of Columbia and five territories. Because of the unprecedented level of funding and the risks associated with spending vast amounts of money in a relatively short period of time, the Office of Inspector General (OIG) initiated a series of audits designed to evaluate the Program's internal control structures at both the Federal and state levels. As part of our work, we are in the process of reviewing Weatherization Program internal controls for the State of Illinois. We are also currently performing identical audits in the States of North Carolina, Pennsylvania and Virginia. Under the Recovery Act and the Department's Program, the State of Illinois received $242 million to weatherize 26,933 homes. The State of Illinois awarded these funds to 35 local agencies responsible for determining recipients' eligibility, contracting for the installation of the weatherization work, and conducting final inspections to ensure that work on homes was done in accordance with requirements. Inspectors working for the local agencies are required to evaluate the quality of mechanical and architectural improvements, such as furnace installations and window caulking, and certify that the work performed meets established standards. Under a Department approved plan in place at the time of our review, state officials were required to evaluate the sufficiency of local agency monitoring controls and to inspect the work performed on at least five percent of the units weatherized with Department funds during the program year for each local agency. We identified significant internal control deficiencies in the management of the Weatherization Program in Illinois which require immediate attention. Specifically, our audit testing revealed significant problems with on-site monitoring and inspection of the Illinois Home Weatherization Assistance Program (Illinois). We noted that the Department had not fulfilled its requirement to perform monitoring visits at the State level. In addition, Illinois officials had not complied with the Department's requirements for inspecting weatherization work conducted by local agencies. Finally, we found that a weatherization inspection for one of the local agencies failed to detect substandard installation of energy saving materials. This case involved a furnace gas leak that could have resulted in serious injury to the occupants and material damage to the structure. This is an interim report and our audit work remains in progress.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Report 2007

The purposes of the 'Lawrence Livermore National Laboratory Environmental Report 2007' are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites--the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2007: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses Systeme International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Environmental Report 2010

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2010 are to record Lawrence Livermore National Laboratory's (LLNL's) compliance with environmental standards and requirements, describe LLNL's environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites - the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL's Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.llnl.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL's compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL's compliance with environmental regulations; and Chapter 3 is a description of LLNL's environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL's environmental monitoring programs and monitoring data for 2010: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL's groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9). The report uses System International units, consistent with the federal Metric Conversion Act of 1975 and Executive Order 12770, Metric Usage in Federal Government Programs (1991). For ease of comparison to environmental reports issued prior to 1991, dose values and many radiological measurements are given in both metric and U.S. customary units. A conversion table is provided in the glossary.

54 ENVIRONMENTAL SCIENCES↗

Environmental Report 2009

The purposes of the Lawrence Livermore National Laboratory Environmental Report 2009 are to record Lawrence Livermore National Laboratory’s (LLNL’s) compliance with environmental standards and requirements, describe LLNL’s environmental protection and remediation programs, and present the results of environmental monitoring at the two LLNL sites—the Livermore site and Site 300. The report is prepared for the U.S. Department of Energy (DOE) by LLNL’s Environmental Protection Department. Submittal of the report satisfies requirements under DOE Order 231.1A, Environmental Safety and Health Reporting, and DOE Order 5400.5, Radiation Protection of the Public and Environment. The report is distributed electronically and is available at https://saer.lln.gov/, the website for the LLNL annual environmental report. Previous LLNL annual environmental reports beginning in 1994 are also on the website. Some references in the electronic report text are underlined, which indicates that they are clickable links. Clicking on one of these links will open the related document, data workbook, or website that it refers to. The report begins with an executive summary, which provides the purpose of the report and an overview of LLNL’s compliance and monitoring results. The first three chapters provide background information: Chapter 1 is an overview of the location, meteorology, and hydrogeology of the two LLNL sites; Chapter 2 is a summary of LLNL’s compliance with environmental regulations; and Chapter 3 is a description of LLNL’s environmental programs with an emphasis on the Environmental Management System including pollution prevention. The majority of the report covers LLNL’s environmental monitoring programs and monitoring data for 2009: effluent and ambient air (Chapter 4); waters, including wastewater, storm water runoff, surface water, rain, and groundwater (Chapter 5); and terrestrial, including soil, sediment, vegetation, foodstuff, ambient radiation, and special status wildlife and plants (Chapter 6). Complete monitoring data, which are summarized in the body of the report, are provided in Appendix A. The remaining three chapters discuss the radiological impact on the public from LLNL operations (Chapter 7), LLNL’s groundwater remediation program (Chapter 8), and quality assurance for the environmental monitoring programs (Chapter 9).

61 RADIATION PROTECTION AND DOSIMETRY↗

PACE and the Federal Housing Finance Agency (FHFA)

The FHFA regulates Fannie Mae, Freddie Mac, and the 12 Federal Home Loan Banks (the government-sponsored enterprises - GSEs). On June 18, 2009, James B. Lockhart III, then Director of FHFA, released a letter expressing concern about the negative impact of energy loan tax assessment programs (ELTAPs) - also known as Property Assessed Clean Energy (PACE) programs - on both the housing finance system and homeowner program participants. Subsequently, a number of PACE proponents responded to the concerns laid out in the FHFA letter. In early Fall 2009, word circulated that FHFA was planning to follow its June letter with guidance to other agencies, possibly including Fannie Mae and Freddie Mac, discouraging them from buying loans on properties subject to PACE-type assessment liens. This triggered a second round of stakeholder letters, several of which were addressed to President Obama. On October 18, 2009, the White House, in what some believe was an attempt to obviate the need for FHFA guidance, released a Policy Framework for PACE Financing Programs that outlined best practices guidance for homeowner and lender protection. As of February 2010, FHFA and the GSEs have agreed to monitor PACE programs and work with stakeholders and the Administration to consider additional guidance beyond the Policy Framework and to collect more information on PACE program efficacy and risks. A summary of the communications timeline and highlights of the communications are provided.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Calendar Year 2008 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2008 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2008 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2008 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0).

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Site Environmental Monitoring Plan

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

54 ENVIRONMENTAL SCIENCES↗

INL Environmental Monitoring Plan (DOE/ID-11088 Rev. 5)

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

54 ENVIRONMENTAL SCIENCES↗

A Structural engineering Graduate Degree Program with specialization in structural health monitoring & non-destructive evaluation [Slides]

The promotional presentation discusses the graduate degree program at the University of California, San Diego, Jacobs School of Engineering, related to structural engineering. Structural Health Monitoring (SHM) encompasses the integration of a broad range of technologies from sensing/actuating, data interrogation, and statistical modeling to enable system-level or component-level health assessment and predictive modeling. The course is available via distance learning to Los Alamos National Laboratory engineers.

42 ENGINEERING↗

Environmental Compliance Audit& Assessment Program Manual

This document describes the elements, schedule, roles, and responsibilities of the Lawrence Berkeley National Laboratory (LBNL) Environmental Compliance Audit & Assessment Program (ECAAP). The ECAAP has been developed to meet the requirements of DOE Order 450.1A,1 and Executive Order 13423.2 These referenced Orders stipulate that government agencies must develop environmental compliance audit programs to monitor and improve compliance with environmental regulations. As stated specifically in the DOE Order, as a part of a DOE facility's Environmental Management System (EMS), 'An environmental compliance audit and review program that identifies compliance deficiencies and root causes of non-compliance' shall be developed and implemented. The ECAAP has also been developed to satisfy LBNL's institutional technical assurance assessment requirements promulgated in the Environment, Safety and Health (ES&H) Self-Assessment Program (LBNL/PUB-5344) and described by the ES&H Technical Assurance Program (TAP) Manual (LBNL/PUB-913E). The ES&H TAP Manual provides the framework for systematic reviews of ES&H programs with the intent to provide assurance that these programs comply with their guiding regulations, are effective, and are properly implemented. As required by the DOE and Executive Orders and by LBNL's TAP, the goal of the ECAAP is to identify environmental regulatory compliance deficiencies and to determine their respective causes. The ECAAP then provides a means of correcting any deficiencies identified, and leads to continually improving environmental compliance performance.

99 GENERAL AND MISCELLANEOUS↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Assay Systems for Radionuclide Contamination in Soils

Through the support of the Department of Energy (DOE) Office of Environmental Management (EM) Technical Assistance Program, the Idaho National Laboratory (INL) has developed and deployed a suite of systems that rapidly scan, characterize, and analyze surface soil contamination. The INL systems integrate detector systems with data acquisition and synthesis software and with global positioning technology to provide a real-time, user-friendly field deployable turn-key system. INL real-time systems are designed to characterize surface soil contamination using methodologies set forth in the Multi-Agency Radiation Surveys and Site Investigation Manual (MARSSIM). MARSSIM provides guidance for planning, implementing, and evaluating environmental and facility radiological surveys conducted to demonstrate compliance with a dose or risk-based regulation and provides real-time information that is immediately available to field technicians and project management personnel. This paper discusses the history of the development of these systems and describes some of the more recent examples and their applications. In summary: INL mobile real-time systems have been successfully used as pre-certification devices for contaminated soils under specific conditions, and accepted by regulators as an approved method to replace or significantly reduce physical sampling and laboratory analysis. These systems coupled with advanced data collection and analysis software developed at the INL to perform production pre-screening soil surveys are also used to determine final analytical sample locations for final validation of sites. The success of the real-time soil characterization program at DOE-Ohio field office sites at Mound and Fernald provided the driver for use of some of these systems at the current INL ICP. Additionally, the use of INL real-time advanced assay systems at Fernald resulted in overall cost savings to the soil remediation project totaling $34 M by the end of the project in 2006. Although the genesis of these systems occurred in the DOE Environmental Management program, other agencies have examined the use of real-time mobile spectrometry in cross-cutting applications such as National Homeland Security; where modified versions of these systems could be applied to monitoring, and surveillance of facilities and events as well as event-response to terrorist attacks using radioactive materials. (authors)

54 ENVIRONMENTAL SCIENCES↗

The Lake Charles CCS Project

The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.

01 COAL, LIGNITE, AND PEAT↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

INTERFEROMETRIC MONITORING OF GAMMA-RAY BRIGHT AGNs. I. THE RESULTS OF SINGLE-EPOCH MULTIFREQUENCY OBSERVATIONS

We present results of single-epoch very long baseline interferometry (VLBI) observations of gamma-ray bright active galactic nuclei (AGNs) using the Korean VLBI Network (KVN) at the 22, 43, 86, and 129 GHz bands, which are part of a KVN key science program, Interferometric Monitoring of Gamma-Ray Bright AGNs. We selected a total of 34 radio-loud AGNs of which 30 sources are gamma-ray bright AGNs with flux densities of >6 × 10{sup −10} ph cm{sup −2} s{sup −1}. Single-epoch multifrequency VLBI observations of the target sources were conducted during a 24 hr session on 2013 November 19 and 20. All observed sources were detected and imaged at all frequency bands, with or without a frequency phase transfer technique, which enabled the imaging of 12 faint sources at 129 GHz, except for one source. Many of the target sources are resolved on milliarcsecond scales, yielding a core-jet structure, with the VLBI core dominating the synchrotron emission on a milliarcsecond scale. CLEAN flux densities of the target sources are 0.43–28 Jy, 0.32–21 Jy, 0.18–11 Jy, and 0.35–8.0 Jy in the 22, 43, 86, and 129 GHz bands, respectively. Spectra of the target sources become steeper at higher frequency, with spectral index means of −0.40, −0.62, and −1.00 in the 22–43 GHz, 43–86 GHz and 86–129 GHz bands, respectively, implying that the target sources become optically thin at higher frequencies (e.g., 86–129 GHz).

79 ASTRONOMY AND ASTROPHYSICS↗

The Mississippi CCS Project

The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO 2 storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO 2 capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO 2 for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO 2 from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO 2 capture and compression equipment, the Mississippi CO 2 Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

02 PETROLEUM↗

Lightweight runtime checking of C programs with RTC

The C Programming Language is known for being an efficient language that can be compiled on almost any architecture and operating system. However the absence of dynamic safety checks and a relatively weak type system allows programmer oversights that are hard to spot. In this paper, we present RTC, a runtime monitoring tool that instruments unsafe code and monitors the program execution. RTC is built on top of the ROSE compiler infrastructure. RTC finds memory bugs and arithmetic overflows and underflows, and run-time type violations. Most of the instrumentations are directly added to the source file and only require a minimal runtime system. As a result, the instrumented code remains portable. In tests against known error detection benchmarks, RTC found 98% of all memory related bugs and had zero false positives. Finally, in performance tests conducted with well known algorithms, such as binary search and MD5, we determined that our tool has an average run-time overhead rate of 9.7× and memory overhead rate of 3.5×.

97 MATHEMATICS AND COMPUTING↗

A simplified approach for creep damage and remaining life calculation for materials surveillance in advanced reactors

High temperature reactor materials will experience a combination of mechanical degradation caused by creep and fatigue and environmental degradation caused by neutron irradiation and, in some cases, exposure to corrosive coolants. A materials surveillance program is one option for ensuring the safe, reliable operation of key reactor components under these conditions. Such a program would monitor the degradation in key material properties over time, using this data to predict how changes in the material properties affect components performance. This could then be used to make plant operational decisions and support eventual plant license extensions. Past work de-scribes such a material surveillance program based on passively actuated mechanical test articles that impose creep-fatigue type loading on test materials driven only by changes in temperature, for example those experienced by components under standard operating cycles. This report focuses on two aspects of the proposed material surveillance program: how to design the test articles to mimic the mechanical response of the corresponding component and how to use ex-situ test data to deter-mine the amount of damaged experienced by the test article (and hence the corresponding compo-nent) in service. Specifically, this report derives and validated simplified methods for both tasks, replacing earlier, more complicated approaches based on simulating the test article response and finding the best specimen design or current damage via complex numerical optimization. The sim-plified methods for each task developed here can be implemented in spreadsheet software and are simple enough for practical use in future operating plants. This report derives the methods (one for sizing and two options for damage inference), verifies the simplified approaches versus more so-phisticated methods, and compares the results of applying the simplified methods to previous re-sults using the complex numerical optimization approach. The report also provides a worked sam-pled problem applying the simplified techniques to a realistic high temperature reactor component.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗