Airborne Projection of Burning Embers – Planning and Controls for Los Alamos National Laboratory Facilities

As a result of the Las Conchas Fire, the Department of Energy in correspondence SO:32CK 372899 (DOE 2011) requested that LANS take the following action: Evaluate the Las Conchas fire experience and other data on airborne projection of burning embers and the appropriate planning and controls for Los Alamos National Laboratory (LANL) facilities, including nuclear and high hazard facilities. This paper addresses the DOE action by evaluating 1) the meteorology at the time of the accident and implications for new wild land fires; 2) the ability of LANL facilities to withstand fires as a result of burning embers, and 3) LANL programs in place to mitigate the effects of wild land fires. The spread of fire as a result of burning embers is a known and important mechanism. Both empirical and computational studies have been performed, and it is recognized that these studies should continue (Kim 2009, Koo 2010, Sardoy 2007). Due to the locale and environs of LANL, burning brands or embers from forest fires are a credible risk at LANL. With the exception of the Area G TRU Waste Facility, LANL nuclear facilities have fire resistant exteriors with UL Class A roofs. Waste at Area G is stored in fire resistant containers. The laboratory has comprehensive Emergency Operations and Fire Protection Programs, which includes assessing wildland fire risk and mitigating the spread of fires, for example, by maintaining fire breaks and additional defensible buffer areas free of combustibles around LANL facilities and limits on combustible loading. Vegetation is cut-back to at least national consensus standards on a regular basis around nuclear facilities. Fire Department services are provided by Los Alamos County through an agreement with the Department of Energy. The interface between the Fire Department and LANL during emergencies is the Emergency Operations Division. The ability of LANL facilities to withstand a wildland fire was tested by both the Cerro Grande fire in 2000 as well as the Las Conchas fire. No nuclear or high-hazard facilities were damaged even though the Cerro Grande fire burned around a number of the facilities. Since then, the laboratory has strengthened programs to protect against wildland fires.

99 GENERAL AND MISCELLANEOUS↗

Design of 650 MHz Tuner for PIP-II Project

The Proton Improvement Plan (PIP) II project at Fermilab is a proton driver linac which will use of five different cavity geometries including a 650 MHz 5-cell elliptical cavities that will operate in RF-pulse mode. Detuning of these cavities by Lorentz Forces will be large and strongly depend of the stiffness of the cavity's tuner. First prototype tuner built and tested warm [1,2]. Measured stiffness of the prototype tuner was below 30kN/mm instead of expected from simulation 70kN/mm [2]. Significant effort has been invested into understanding discrepancy between simulation and experimental data that led to newest tuner design. Updated 'dressed cavity-helium vessel-tuner' model provided consistent results between ANSYS simulations and experiment results. Modified tuner design and analysis in limitations for overall 'cavity/tuner system' stiffness will be presented.

43 PARTICLE ACCELERATORS↗

Grimsel Test Site - A Successful International Underground Research Laboratory for Many Decades - 20429

For more than 35 years, Nagra and its partners from around the world have been conducting underground research projects at the Grimsel Test Site (GTS, www.grimsel.com) to contribute to the development and confirmation of safe geological disposal concepts and for the characterization of suitable host rock formations. Over the years, the results of this internationally recognized research program have been, and continue to be, incorporated directly into exploration programs, modelling, safety, and engineering feasibility studies on options for deep geological repositories. Each project of the GTS program involves field-testing, laboratory studies, design and modelling tasks, and integrates all scientific and technical aspects. Each project phase is planned with a duration of three to five years to facilitate practical and administrative aspects and allow flexibility for updating the overall project plans with the latest findings. Scientific and engineering interaction among the different projects is ensured via an international steering committee meeting. Hosting an IAEA level C radiation- controlled zone, which allows use of radionuclides, including actinides such as thorium, uranium, neptunium, plutonium and americium, in in-situ experiments is one of the reasons why GTS also developed as a center of excellence for work with radioactive tracers under realistic in-situ boundary conditions. Last year, a new five-year program (2019 to 2023) started which includes projects with a planning horizon of decades. The new five-year program includes a new phase of in-situ experiments using radionuclides such as migration experiments in the Colloid Formation and Migration project (CFM), the Long-Term Diffusion experiment (LTD) and the newly established C-14 and I-129 Migration in cement project (CIM). The 'High Temperature effects on Bentonite' (HotBENT) project is starting in the current phase and is studying the effects of elevated temperatures (>175 deg. C) on bentonite materials. As a generic underground research laboratory (URL) it is expected that the GTS will provide in the coming years a platform for international collaboration, knowledge development and knowledge transfer for the next generation of scientists and engineers in the area of radioactive waste disposal and geosciences. A key role regarding knowledge transfer and training is provided by the well-established Grimsel Training Center (GTC), which (beside many URL related issues) also covers many general aspects of radioactive waste management. In this paper we provide an overview of the current program at the GTS, focusing on the experiments that study the migration of radionuclides through engineered barrier materials and the geosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PROTOPLASMA - Proton-driven plasma-wakefield experiment at Fermilab: Stages and approach

Generation of TeV-scale electron beams using conventional RF technology appears expensive for building the next generation of colliders. Proton-driven plasma-wakefield acceleration of electrons promises an alternative route to generate TeV-scale electron beams using existing proton machines. PROTOPLASMA is the proposed R and D project at Fermilab that plans to use a proton beam driven plasma-wakefield to accelerate electrons. The project is planned in stages with the project's path guided by simulations. First, a 60-120 GeV proton beam will be injected into 1-2 meters of plasma to observe selfmodulation instability in the proton beam. Next, an injected 5 MeV electron beam will be accelerated by the plasma. In this paper, we report on the basic project plan and outline our staged approach. We report on first simulation results that show self-modulation of a proton bunch and discuss beam optics requirements and other limits.

43 PARTICLE ACCELERATORS↗

Apollo Soyuz Test Project photographic processing control plan

The laboratory controls to be used within the photographic technology division (PTD) for processing original space flight films exposed on the Apollo Soyuz Test Project mission are specified. The sensitometric exposures to be used by PTD for certifying processes, for exposing Houston Controls, and for preflight and postflight exposures on original films as well as procedures for film certification are described. Processing conditions used to achieve each control and processing machine operating parameters are included.

Lockwood, H. E.↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗

The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

Clark, John S.↗

Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulations of space charge in the Fermilab Main Injector

The Fermilab Project X plan for future high intensity operation relies on the Main Injector as the engine for delivering protons in the 60-120 GeV energy range. Project X plans call for increasing the number of protons per Main Injector bunch from the current value of 1.0 x 10{sup 11} to 3.0 x 10{sup 11}. Space charge effects at the injection energy of 8 GeV have the potential to seriously disrupt operations. We report on ongoing simulation efforts with Synergia, MARYLIE/Impact, and IMPACT, which provide comprehensive capabilities for parallel, multi-physics modeling of beam dynamics in the Main Injector including 3D space-charge effects.

43 PARTICLE ACCELERATORS↗

Test Plan Proposal for an International Joint Project for Transient Testing of Fast Reactor Fuels

EXECUTIVE SUMMARY An international joint project for transient testing of fast reactor fuels is proposed. Input from several countries is provided regarding their advanced/fast reactor programs, and the objectives and methods are given based on both historical projects and modern tools and methods. The full package would include irradiation testing using TREAT, use of existing facilities for non destructive exams/evaluations (NDE) and post irradiation exams (PIE), and integration of current state-of-the-art modeling and simulation (M&S) tools to aid in both experiment design, and prediction of experimental results.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ute Mountain Ute Tribe Community-Scale Solar Project (Final Technical Report)

Deployment of Community-Scale solar power has been a goal of the Ute Mountain Ute Tribe (Tribe) for several years. The 1 MW AC photovoltaic power facility was built to power Tribal facilities in a manner that would allow the Tribe to credit residents’ electric bills and Tribal government electric bills with the dollar equivalent of the power generated. Other accomplished project objectives, in addition to learning the intricacies of such an endeavor, included strengthening the relationship with the local electric cooperative and their primary power provider, analysis of the generation and operations and maintenance during a one-year test phase, workforce development and training, and using the project to plan and drive future community scale solar projects. The Tribe’s vision of a net-zero electrical independence for its communities became a clearer reality with this project.

14 SOLAR ENERGY↗

Mod-2 wind turbine project assessment and cluster test plans

An assessment of the Mod-2 Wind Turbine project is presented based on initial goals and present results. Specifically, the Mod-2 background, project flow, and a chronology of events/results leading to Mod-2 acceptance is presented. After checkout/acceptance of the three operating turbines, NASA/LeRC will continue management of a two year test program performed at the DOE Goodnoe Hills test site. This test program is expected to yield data necessary for the continued development and optimization of wind energy systems. These test activities, the implementation of, and the results to date are also presented.

Gordon, L. H.↗

Mobile VLBI deployment plans of the Crustal Dynamics Project for the western United States and Alaska

Current plans for the Mobile VLBI program are addressed. Present mobile stations and their past activities are summarized, and past and future modes of obtaining data are compared, including the 'burst' and 'leap frog' modes. The observational campaign for Mobile VLBI is described, emphasizing the portions in Canada and Alaska. The extent to which the mobile stations are utilized and the ways in which the site visit yield may be increased are discussed.

Trask, D. W.↗

Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

54 ENVIRONMENTAL SCIENCES↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Introduction: Lunabotics provides accredited institutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar surface in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors. The culmination of the Lunabotics virtual challenge will be the design, build and operation of a functional prototype Lunar robot. Teams are required to submit the following: (1) Project Management Plan, (2) Systems Engineering Paper, a (3) STEM Engage-ment Report, and a (4) Proof of Life Video. This is an optional item, but to qualify for the grand prize a team must also submit a: (5) Presentation and Demonstration. Background: The NASA Lunabotics University Competition was first held in 2010 as a follow on to the NASA Regolith Excavation Challenge [1]. The high level of interest and participation from over 50 universities each year has led to a sustained annual competi-ion cadence: it has been held every May for the past 14 years [2,3]. Over 6,000 students have participated and been inspired to pursue Science, Technology, En-gineering and Mathematics careers (STEM). 2024 Competition: The necessary lunar surface tasks are evolving to meet the NASA Artemis Mission requirements. In the past Lunabotics challenges we gathered data to support Lunar mining for consuma-bles in the Lunar regolith. Now, in 2024, the task is to gather data on Lunar site preparation and construction by designing and building a robot that will traverse the chaotic Lunar terrain and construct a regolith-based berm. The goal is to build a berm structure which would be useful to the Artemis Mission for blast and ejecta protection during lunar landings and launches, shading cryogenic propellant tank farms, providing radiation protection around a nuclear power plant and other mission critical uses. Lunabotics will consist of three separate events this year. The first event is NASA’s Lunabotics Project Development Challenge, where teams submit various deliverables to be scored by judges. The second event will be the University of Central Florida (UCF) Lunabotics Qualification challenge, in the Exolith laboratory, where teams will put their de-signs to the test. The top ten scoring teams from the Qualification challenge are then invited to the third and final event, NASA’s Lunabotics On-Site Challenge at Kennedy Space Center in Florida. This presentation will summarize the results and lessons learned from the NASA Lunabotics University Competition held in May 2024.

Lunabotics↗

Computer-aided software development process design

The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

Lin, Chi Y.↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

electricity↗

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)