Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE DISPOSAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Spent Nuclear Fuel Disposition

One interdisciplinary field devoted to achieving the end-state of used nuclear fuel (UNF) through reuse and/or permanent disposal. The reuse option aims to make use of the remaining energy content in UNF and reduce the amount of long-lived radioactive materials that require permanent disposal. The planned approach in the U.S., as well as in many other countries worldwide, is direct permanent disposal in a deep geologic repository. Used nuclear fuel is fuel that has been irradiated in a nuclear reactor to the point where it is no longer capable of sustaining operational objectives. The vast majority (by mass) of UNF is from electricity generation in commercial nuclear power reactors. Furthermore, the other main source of UNF in the U.S. is the Department of Energy’s (DOE) and other federal agencies’ operation of reactors in support of federal government missions, such as materials production, nuclear propulsion, research, testing, and training. Upon discharge from a reactor, UNF emits considerable heat from radioactive decay. Some period of active on-site cooling (e.g., 2 or more years) is typically required to facilitate efficient packaging and transportation to a disposition facility. Hence, the field of UNF disposition broadly includes storage, transportation and ultimate disposition. See also: Nuclear Fission (content/nuclear-fission/458400), Nuclear Fuels (/content/nuclear-fuels/458600), Nuclear Fuel Cycle (/content/nuclear-fuel-cycle/458500), Nuclear Fuels Reprocessing (/content/nuclear-fuels-reprocessing/458700), Nuclear Power (/content/nuclear-power/459600), Nuclear Reactor (/content/nuclear-reactor/460100), Radiation (/content/radiation/566300), and Radioactive Waste Management (/content/radioactive-waste-management/568900).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site (Rev.3)

U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, requires that performance assessments (PAs) and composite analyses (CAs) for low-level radioactive waste (LLW) disposal facilities be maintained by the responsible field office. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). The plan is based on DOE Order 435.1 Radioactive Waste Management (DOE 2007), DOE Manual 435.1-1, Radioactive Waste Management Manual (DOE 2011), and DOE Standard DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation (DOE 2017). The facility’s Disposal Authorization Statement (DAS) specifies conditions for the continuing operation of a LLW facility. The DAS is issued based on a review of the facility's PA, CA, the maintenance plan, preliminary closure plan, and preliminary monitoring plan. The DAS specifies the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. The Maintenance Plan uses an Unreviewed Disposal Question (UDQ)/Unreviewed Composite Analysis Question (UCAQ) change control process to identify, evaluate, and control planned or discovered changes affecting the PA, CA, DAS, or other documents composing the Radioactive Waste Management Basis (RWMB). The UDQ/UCAQ process uses the PA and CA GoldSim models to calculate updated results, assess the significance of changes, and to assess the need to revise the PA, CA, or DAS. In addition to the change control process, the Maintenance Plan requires an annual review of all changes and an annual assessment of the need to revise RWMB documents, plans, and programs. The cumulative effect of all changes is assessed annually by preparing a revised PA and CA baseline model that is used to update PA and CA results. The updated results are used to assess compliance with the PA performance objectives and the CA dose constraint, and to assess the need to revise the PAs, CAs, and other documents, plans, and programs supporting the RWMB. An Annual Summary Report documenting the results and conclusions of the annual review is prepared and submitted to DOE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Aeolian Transport of Contaminated Sediments at Los Alamos National Laboratory, Technical Area 54, Area G: Sensitivities to Succession, Disturbance, and Future Climate

The Technical Area 54 (TA-54) Area G disposal facility is used for the disposal of radioactive waste at Los Alamos National Laboratory (LANL). U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety and the environment. In compliance with that requirement, DOE field sites must prepare and maintain site-specific radiological performance assessments for facilities that receive waste after September 26, 1988. Sites are also required to conduct composite analyses for facilities that receive waste after this date; these analyses account for the cumulative impacts of all waste that has been (and will be) disposed of at the facilities and other sources of radioactive material that may interact with these facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Fuel Reprocessing Development and Usage of Fission Products as Starting Precursor for Ceramic Waste-Forms - 16498

The principal purpose of spent fuel reprocessing consists in the recovery of the uranium and plutonium and the separation of fission products so as to allow re-use of fissile isotopes and waste preparing for disposal. Reprocessing is a series of chemical operations that separates plutonium and uranium from other constituents in nuclear waste. Indeed, the plutonium separated can be used to fuel reactors, but also to make nuclear weapons. Since reprocessing operations are far more expensive than using uranium fuel and disposing of the spent fuel directly, this process is not readily considered. Without doubts the reprocessing price of $1000 per kilogram of heavy metal (kgHM), like uranium must be less by at least 2-3 times compared to directly deposing the spent fuel. And some more simple technology (in comparison with PUREX process) must be developed, for example, technology based on precipitation processes. One of the options to change reprocessing technology is the idea to use certain fission products occurring in spent fuel in considerable amount and capable to form insoluble substances as suitable materials for long-term storage or final disposal of radioactive wastes. The development of new materials for HLW immobilization are intended to reduce disposal cost. The present work was aimed at the search for the simple engineering decisions that would provide opportunity of fission products usage as starting precursor for ceramic waste-forms. The results of experiments on synthesis of Pd-based metallo-ceramic compositions are presented in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Low Level Waste Management Practices and Technical Bases for Very Low Level Waste Classification - 19415

Different countries around the globe use varying schemes for the classification of radioactive waste. Many countries use adaptations of the International Atomic Energy Agency (IAEA) waste classification scheme. The United States uses the Class A, B, and C waste classification scheme that is loosely based on the IAEA concepts. Classification may be based on concentration limits or dose rate limits or a combination of concentration and dose rate limits. In some countries the existence of very low-level waste categories allows nuclear power plant waste to be disposed of in hazardous waste or shallow land burial sites separate from low and intermediate level waste disposal facilities. In the United States, the very low-level waste (VLLW) classification does not exist. Nuclear power plants use alternative disposal procedures under 10CFR20.2002 and other licensed processes in agreement states in order to dispose of very low activity waste in hazardous waste disposal sites. [1] Disposal of VLLW in hazardous waste or separate VLLW facilities is generally more cost effective than disposing of waste in radioactive waste sites and is protective of the health and safety of the public. This can become an important factor when large volumes of very low activity waste are generated during decommissioning of nuclear power plants. The Electric Power Research Institute (EPRI) Radiation Safety (RS) Program has developed technical bases for the establishment of a very low-level waste category. EPRI studied how VLLW waste is defined, managed, and disposed of in various countries. This included the study of disposal site design, characteristics, and how these sites protect the health and safety of the environment and the public from low levels of radioactivity. EPRI conducted a cost benefit analysis to understand the economic impact of disposing VLLW in hazardous waste disposal sites versus low-level waste disposal sites. Finally, EPRI calculated potential radionuclide limits that may be used to define very low-level waste. The purpose of this work was to provide an example of how one might approach defining limits for VLLW. The same or similar approaches could be applied to derive radionuclide limits for different dose limit objectives. This paper presents the results of research that explored the waste management and disposal practices at six countries around the world with additional focus and details on the implementation of the very low-level waste category. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transport and Treatment of Chapelcross Gas Ducts for Clearance and Recycling - 19662

In the summer of 2018, Cyclife, the EDF group's specialist radioactive waste management and decommissioning company, transported sixteen gas ducts and associated equipment from the shutdown Chapelcross nuclear power plant to treatment facilities in the UK and Sweden. The client requested a full removal, treatment and disposal service for approximately 820 te of low level metallic waste comprising Upper Gas Duct Assemblies (including bellows), Upper Gas Duct elbows, Filter Pots and Convoluted pipework. The complex scope involved heavy lifting, transport by road and sea, processing and recycling on a large scale, thereby necessitating involvement of a wide range of suppliers at different tiers all managed by Cyclife. The purpose of the entire project was to safely handle and treat all of the components for clearance and recycling into the public domain for the manufacture of new steel products. Most of the treatment took place in Cyclife's nuclear licensed metal treatment facility in Sweden. Cyclife has a long and unique experience of arranging safe transport of large contaminated components on road and sea. The metal treatment facility in Sweden can, without special arrangements, receive components up to 30 meters long with a weight of up to 400 tonnes for decontamination, size reduction and melting. The actual treatment of the components consisted of the following steps: a) Separation of a gas duct from the gantry, b) size reduction, radiological verification measurements and clearance of the gantry, c) stepwise segmentation of the gas duct and elbow including removal of asbestos, d) decontamination, e) melting, f) radiological assessment and clearance of the metal ingots, g) management of the secondary waste for return to UK. The result of the project, upon completed treatment of all the material, demonstrates a high recycling rate of the material. 5-10% of the original mass of material will have to disposed as radioactive waste. This number include all residues, untreatable material (asbestos, mineral wool, filters etc.) and two melt batches with a too high activity content for clearance. The paper takes the reader through the entire project from the initial planning to the clearance of the metal and the return of the secondary waste to UK for disposal. It will also present and discuss pros and cons for alternative management approaches in several perspectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing the interfaces for successful waste treatment operations at the river protection project - 15347

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize(vitrify) approximately 432 million liters (114 million gallons) of high level radioactive waste (after all single-shell retrievals are accomplished). The tank operating contractor (TOC) is charged with delivering feed, with preconditioning if required. Other Hanford contractors are charged with providing utilities and other services and waste disposal facilities. In all, four DOE contractors, two DOE offices along with DOE headquarters, and two Washington state regulators play essential roles in enabling successful treatment operations eliminate the radioactive and hazardous waste threats to the public and the environment. DOE has decided that the appropriate approach is to proceed with operations at the WTP's Low-Activity Waste (LAW) vitrification facility ahead of completing the WTP Pretreatment and High Level Waste (HLW) waste vitrification facilities, This paper outlines the approach that is being taken to ensure that all the functions, reviews, and approvals needed for radioactive operations are achieved to allow successful feed delivery, startup, and operations of the WTP in a direct feed to LAW mode. A massive effort is needed to be successful and a One System organization, jointly managed and staffed by WTP and TOC personnel is tasked with achieving the integration, coordination, tracking, and reporting necessary for the endeavor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation Guide for the Revised Branch Technical Position on Concentration Averaging and Encapsulation - 16021

As a result of the research begun in 2007 to better understand the bases of the Branch Technical Position (BTP) on 'Concentration Averaging and Encapsulation' and 10 CFR 61 'Licensing Requirements for Land Disposal of Radioactive Waste', EPRI identified three regulatory initiatives that could be pursued to enhance disposal options for the industry. These initiatives directly follow the NRC strategic assessment. The first was to revise the BTP to allow broader blending of compatible waste types. The second was to examine how 10 CFR 61.58 'Alternative requirements for waste classification and characteristics' could be used to allow for an alternative disposal criterion based on site-specific hydro-geological characteristics and end land use scenarios. And, the third is to develop a technical basis for risk informed disposal regulations in anticipation of a 10CFR 61 rulemaking. By the summer of 2015 these initiatives had been broadly addressed and resulted in the NRC issuing Revision 1 to the BTP in February of 2015. Revision 1 of the BTP (BTP 2015) is a significant re-write of the draft issued in May 2012 and a significant improvement over the 1995 BTP (BTP 1995). The NRC has altered many of the positions in the interest of clarification. The development of an Implementation Guide for applying BTP 2015 to industry-specific waste streams that is vetted and supported by a EPRI sponsored working group consisting of industry participants (including utilities, disposal sites, NRC and Agreement State representatives and industry experts) will ensure compliant and consistent application during waste generation, packaging, processing and disposal activities. The Implementation Guide will provide for a comparison to previous BTP guidance and provide clarification and common understanding of the key concepts contained within the revised BTP. These include averaging constraints, hot spots, waste streams, waste types, discrete items, blending, solidification, encapsulation and alternative approaches. EPRI plans to publish the BTP Implementation Guide in the second quarter of 2016 and it will be available to the public. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Inventory for Near Surface Repository (NSR) - 13482

The main characteristics, physical, chemical as well as radiological of the waste intended to be disposed of in the planned NSR are described. This description is mainly based on the waste inventory investigations performed by the Ignalina Nuclear Power Plant (INPP). The four different waste streams to be disposed of in the NSR are described and investigated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Cigeo Pilot Phase - 19024

Within the incremental development of the Cigeo deep geological repository, the Pilot Phase (PP) concept emerged during the 2013 public debate on Cigeo. The PP is a period of time that covers the beginning of the project, after its construction license is granted. It mainly aims at acquiring and / or confirming in situ, in a representative environment and in the operating conditions of Cigeo, the data selected for the design and safety demonstration. In parallel, it will emphasize the gradual and cautious approach for starting a complex industrial installation such as Cigeo. The Pilot Phase which is scheduled for a total duration of at least a decade will include 'inactive' tests (without radioactive waste) and then radioactive waste package disposal operations. The PP should be considered as a phase during which additional knowledge will be obtained and demonstration that cannot be fully acquired within the Underground Research Laboratory will be completed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Generation Waste Tracking: Linking Legacy Systems with Modern Networking Technologies

This report describes results from a preliminary analysis to satisfy the Department of Energy (DOE) objective to ensure the safe, secure, efficient packaging and transportation of materials both hazardous and non hazardous [1, 2]. The DOE Office of Environmental Management (OEM) through Oak Ridge National Laboratory (ORNL) has embarked on a project to further this objective. OEM and ORNL have agreed to develop, demonstrate and make available modern day cost effective technologies for characterization, identification, tracking, monitoring and disposal of radioactive waste when transported by, or between, motor, air, rail, and water modes. During the past 8 years ORNL has investigated and deployed Web 2.0 compliant sensors into the transportation segment of the supply chain. ORNL has recently demonstrated operational experience with DOE Oak Ridge Operations Office (ORO) and others in national test beds and applications within this domain of the supply chain. Furthermore, in addition to DOE, these hazardous materials supply chain partners included Federal and State enforcement agencies, international ports, and commercial sector shipping operations in a hazardous/radioactive materials tracking and monitoring program called IntelligentFreight. IntelligentFreight is an ORNL initiative encompassing 5 years of research effort associated with the supply chain. The ongoing ORNL SmartFreight programs include RadSTraM [3], GRadSTraM , Trusted Corridors, SensorPedia [4], SensorNet, Southeastern Transportation Corridor Pilot (SETCP) and Trade Data Exchange [5]. The integration of multiple technologies aimed at safer more secure conveyance has been investigated with the core research question being focused on testing distinctly different distributed supply chain information sharing systems. ORNL with support from ORO have demonstrated capabilities when transporting Environmental Management (EM) waste materials for disposal over an onsite haul road. ORNL has unified the operations of existing legacy hazardous, radioactive and related informational databases and systems using emerging Web 2.0 technologies. These capabilities were used to interoperate ORNL s waste generating, packaging, transportation and disposal with other DOE ORO waste management contractors. Importantly, the DOE EM objectives were accomplished in a cost effective manner without altering existing information systems. A path forward is to demonstrate and share these technologies with DOE EM, contractors and stakeholders. This approach will not alter existing DOE assets, i.e. Automated Traffic Management Systems (ATMS), Transportation Tracking and Communications System (TRANSCOM), the Argonne National Laboratory (ANL) demonstrated package tracking system, etc

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Future German R and D on HLW Disposal - 16519

In 2009, after the General elections, the new German Government showed a relatively positive attitude towards a prolonged use of nuclear power. Power plant shutdown was planned for the year 2032. Nuclear power was considered as a sort of transition energy technology until the energy supply would take place by the use of renewable energy sources. This was in line with the legal framework and the political strategy of the energy turnaround. Then, 17 nuclear power plants (NPP) were operational. The Fukushima incident heralded the sound of drastic changes in the German energy policy: Besides an intermediate stop of operation of reactors until a so-called stress test was accomplished, the general political decision was to phase-out nuclear earlier than planned and to implement faster the decisions regarding the energy transition policy. The shut-down of the last German nuclear power plant will occur in 2022. Accordingly, all the necessary legal changes were made. A consensus about the appropriate waste management strategy for heat generating waste (spent nuclear fuel (SNF) and vitrified waste (HLW)) was still pending at this time. Public and political discussions on this subject continued as in the years before. In July 2013, after intensive discussions, most of the parties represented in the German parliament agreed to eventually tackle the challenge of finding a repository by a consensual, transparent and science-based approach. This was to be codified in a law. In July 2013, the Site Selection Act passed the parliament. This law should pave the way for a new holistic process that addresses social, political, and scientific aspects of siting and the site selection process. The basics for this process should be provided by the 'Commission Storage of Radioactive Waste Materials' which was established according this law. Against this background discussions showed that scientific-technical R and D activities should be mirrored accordingly and R and D has to deal both with the future challenges of radioactive waste HLW disposal and related aspects. Considering this the Federal Ministry for Economic Affairs and Energy (BMWi), which is responsible for non-site specific R and D, created the new Research Concept 'Research for the management of radioactive waste', being fundamental and the frame for non-site specific R and D projects funded by BMWi. Key changes - mirroring the new requirements and different aspects - touch the issues: host rock research, i.e. all potential host rocks available in Germany are equally addressed and there is no prioritization, consideration of consequences of prolonged storage at NPP sites, alternative waste management strategies compared to direct disposal in a mined repository, and involvement of socio-technical aspects.This paper intends to highlight the key changes, its consequences, and will give a brief overview on first initiated R and D activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simplifying the Tracking of Waste Disposal Inventories: Process Improvement for Rapid Data Interpretation and Reduced Errors - 16143

Tracking the inventory of low-level radioactive waste at an operating disposal facility offers unique challenges. At the Savannah River Site's Saltstone Disposal Facility (SDF) the inventory used in Performance Assessment modeling is determined based on radionuclide concentrations from the aqueous waste in a feed tank and the volume of the waste that is transferred from the feed tank to the Saltstone Production Facility (SPF). These inputs are reported quarterly. As such, the disposal inventories are also updated quarterly; however, due to decay and ingrowth, the inventory values for some radionuclides can be misrepresented if the data is not tracked appropriately. Additionally, it is not feasible to analyze the feed tank samples for every possible radionuclide; therefore, a series of adjustments are necessary to estimate the concentrations of radionuclides that are not explicitly measured but still pose a potential dose risk. Prior to 2015, the SDF disposal inventories were updated using a series of spreadsheets that required users to perform a significant number of steps (including manually transferring data back and forth between a separate decay and ingrowth calculation software). Despite this labor intensive approach, the process only provided single point-in-time results. With multiple steps, minimal automation, and limited result data, this approach to inventory tracking was not ideal and minor mistakes were often identified during the equally cumbersome review process. As a process improvement, the simplified SDF Waste Inventory Disposed Estimator (SDF-WIDE) Model was developed using GoldSim software. The software allows users to identify specific dates to define the duration of the simulation, from the beginning of operations until the time of future facility closure, and provides graphical interfaces for displaying data over time. Further, GoldSim's Contaminant Transport Module is used to perform the decay and ingrowth calculations, making the model completely self-contained (i.e., there is no need to transfer intermediate data back and forth between different programs). GoldSim also includes model 'versioning' features that significantly reduce the time needed to perform the appropriate quality assurance reviews as required for each quarterly inventory update. By transitioning from the complex spreadsheets to the simplified SDFWIDE model, the time needed to perform updates to the SDF inventory has been reduced from days to hours, the risk of making human errors has been greatly mitigated, and users are able to quickly observe trends in the data over time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning, Decontamination, and Disposal of LLW-LL, and ILW-LL at a Former Rare Earths Processing Facility in Malaysia - 19087

Geosyntec Consultants, Inc. (Geosyntec) was the design-build Contractor for a project involving the remediation and disposal of low level (LLW-LL and ILW-LL) NORM and TENORM wastes at a former rare earth processing facility in Malaysia. These sites were associated with a plant that extracted rare earth elements from local tin ores. Because of the naturally occurring radioactivity contained in the raw materials, these productions resulted in by-products and residues containing LLW-LL and ILW-LL thorium hydroxide and uranium hydroxide. The total mass of uranium (∼120 tons) and thorium (∼1,200 tons) managed in a single repository required the project design incorporate requirements related to inventory, security and safeguards around nuclear precursor materials. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility as this disposal facility was purposely designed and permitted as a final disposal for the LLW-LL and ILW-LL. The first phase of the project was the decommissioning, decontamination, and demolition of the 14- acre former rare earth processing plant and excavation of contaminated soils, construction of an engineered cell at the repository for waste disposal, and transportation and disposal of the waste materials into the cell. Final status surveys were carried out to allow the site to be successfully released by the Malaysian regulatory authorities as a clean site for re-development as common industrial use. Over 11,000 loads of material, including approximately 75,000 cubic meters of excavated soils and plant debris, were transported in specially designed steel transport boxes on public roads for disposal in the engineered cell. The second phase of the project included the design and construction of a second engineered cell, enhanced with protective barrier systems and a final cover system constructed of natural materials. Ancillary facilities such as substations, offices, processing buildings, and wastewater treatment plants were constructed to support retrieval and processing of the materials from more than 87,000 individual drums using a semi-automated process. The drums, waste packages, and other materials in the storage facility were systematically extracted, sorted, inventoried, solidified using Portland cement, transported, and disposed in the cell. All temporary facilities were decontaminated, demolished, and disposed in the cell. Radiological inventory and radiation safety programs were implemented to quantify the waste activity and to control exposure to workers and the public during the project. The total mass of radioactive contaminated waste disposed in the two projects is nearly 200,000 tons. The projects were carried out under a high level of scrutiny from Malaysian and international regulatory bodies. Between 2014 and 2017, performance monitoring and modeling activities were carried out to demonstrate that the disposal facility was performing in accordance with design requirements established by regulatory agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Performance and Processing Property Acceptance Region for Cementitious Low-Level Waste Forms at Savannah River Site - 13174

The Saltstone Production and Disposal Facilities (SPF and SDF) at the Savannah River Site (SRS) have been treating decontaminated salt solution, a low-level aqueous waste stream (LLW) since facility commissioning in 1990. In 2012, the Saltstone Facilities implemented a new Performance Assessment (PA) that incorporates an alternate design for the disposal facility to ensure that the performance objectives of DOE Order 435.1 and the National Defense Authorization Act (NDAA) of Fiscal Year 2005 Section 3116 are met. The PA performs long term modeling of the waste form, disposal facility, and disposal site hydrogeology to determine the transport history of radionuclides disposed in the LLW. Saltstone has been successfully used to dispose of LLW in a grout waste form for 15 years. Numerous waste form property assumptions directly impact the fate and transport modeling performed in the PA. The extent of process variability and consequence on performance properties are critical to meeting the assumptions of the PA. The SPF has ensured performance property acceptability by way of implementing control strategies that ensure the process operates within the analyzed limits of variability, but efforts continue to improve the understanding of facility performance in relation to the PA analysis. A similar understanding of the impact of variability on processing parameters is important from the standpoint of the operability of the production facility. The fresh grout slurry properties (particularly slurry rheology and the rate of hydration and structure formation) of the waste form directly impact the pressure and flow rates that can be reliably processed. It is thus equally important to quantify the impact of variability on processing parameters to ensure that the design basis assumptions for the production facility are maintained. Savannah River Remediation (SRR) has been pursuing a process that will ultimately establish a property acceptance region (PAR) to incorporate elements important to both processability and long-term performance properties. This process involves characterization of both emplaced product samples from the disposal facility and laboratory-simulated samples to demonstrate the effectiveness of the lab simulation. With that basis confirmed, a comprehensive variability study using non-radioactive simulants will define the acceptable PAR, or 'operating window' for Saltstone production and disposal. This same process will be used in the future to evaluate new waste streams for disposal or changes to the existing process flowsheet. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transport of French PWR steam generators to very low level waste disposal - 15203

When considering the complexity of IAEA nuclear transport regulations, the transport of a Steam Generator (SG) in one un-packaged block from a dismantling plant to a nuclear waste disposal is a challenge. The choices made, the difficulties encountered and the feedback that has been learnt from it are described. The disposal of decommissioning waste requires taking into account not only the constraints of acceptance of the repository but also the specific constraints of transportation from the dismantling plant to the final disposal site. In France, these criteria and regulations are respectively under the supervision of the French National Radioactive Waste Management Agency (ANDRA) and the French Nuclear Safety Authority (ASN). In the course of the dismantling of the EDF PWR plant Chooz A, the four decontaminated SGs were shipped to the ANDRA Very Low Level Waste (VLLW) repository. After removal, the SGs were decontaminated, allowing them to attain the criteria of VLLW and thus be accepted by the ANDRA. However, to transport these decontaminated SGs as single un-packaged blocks, it was necessary to ensure compliance with the Surface Contaminated Object SCO-I regulation criteria. For this, transport safety files were written and surface contamination and radiation criteria checked. One of the four SGs had to be decontaminated again and another one had to be transported under special arrangement. Due to the exceptional nature of the transportation, specialized means of transport and stowage were also studied. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermodynamic assessment of the hollandite high‐level radioactive waste form

Abstract Hollandite has been studied as a candidate ceramic waste form for the disposal of high‐level radioactive waste due to its inherent leach resistance and ability to immobilize alkaline‐earth metals such as Cs and Ba at defined lattice sites in the crystallographic structure. The chemical and structural complexity of hollandite‐type phases developed for high‐level waste immobilization limits the systematic experimental research that is required to understand phase development due to the large number of potential additives and compositional ranges that must be evaluated. Modeling the equilibrium behavior of the complex hollandite‐forming oxide waste system would aid in the design and processing of hollandite waste forms by predicting their thermodynamic stability. Thus, a BaO–Cs 2 O–TiO 2 –Cr 2 O 3 –Al 2 O 3 –Fe 2 O 3 –FeO–Ga 2 O 3 thermodynamic database was developed in this work according to the CALPHAD methodology. The compound energy formalism was used to model solid solution phases such as hollandite while the two‐sublattice partially ionic liquid model characterized the oxide melt. Results of model optimizations are presented and discussed including a 1473 K isothermal BaO–Cs 2 O–TiO 2 pseudo‐ternary diagram that extrapolates phase equilibrium behavior to regions not experimentally explored.

Utlak, Stephen A.↗

Nuclear waste: distant and expensive mirage

The situation in the U.S. regarding the disposal of nuclear waste is briefly summarized. Current estimates are that the site will not begin operation before 2020, and that the cost will be $96 billion, which includes construction, waste transport, operation through 2133, and closure of the facility. The Department of Energy is also considering whether more disposal sites might be needed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗