Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Based Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Unlocking the Value of Deep Energy Retrofits

This publication is based on an extensive study conducted on behalf of the New York State Energy Research and Development Authority (NYSERDA) and the U S Department of Energy (DOE) to explore financial and risk products to accelerate the implementation of deep energy retrofit (DER) solutions to reduce costs These financial products are intended to speed market development via three fundamental themes: reallocating risk from building owners and lenders to insurers, quantifying and monetizing previously unrecognized value associated with DERs, and providing building owners and lenders with confidence in the performance of building systems Findings are based on a comprehensive analysis and characterization of 100+ existing DER case studies, and more than 40 qualitative interviews with industry experts, including insurers, researchers, building owners, and policymakers In addition, a quantitative model of overall project economics with baseline, high, and low cases was developed This data informed the analysis that resulted in three recommended financial product solutions, which were evaluated for their potential to raise projected cash flows and finance DERs: 1) Building System Performance and Energy Savings Guarantee; 2) Trade Credit Insurance; 3) Ancillary Revenue Contracts. This report identifies many value streams associated with DERs and introduces these three potential financial products, which aim to reallocate risks and reduce barriers to the adoption of advanced envelope DERs.

ancillary renenue contracts↗

Computational materials assessment of the D/Li-stripping neutron source as a prototypical facility for fusion materials testing

As the US fusion materials community awaits the selection and design of a fusion prototypical neutron source (FPNS), a risk reduction exercise has been conducted to (i) provide an updated materials performance evaluation using state-of-the-art computational materials modeling, (ii) expand on legacy analysis based on pure Fe to other relevant fusion structural materials types, and (iii) ensure that materials response under FPNS operational conditions is consistent with referential fusion reactor conditions. The current paper describes the efforts undertaken to assemble a comprehensive computational methodology that includes neutronics, primary damage calculations, atomistic simulations of displacement cascades, chemical inventory evolution calculations, and a computational thermodynamic analysis of emerging phases during irradiation. Our work extends existing studies in pure Fe to reduced-activation ferritic/martensitic steels, tungsten, silicon carbide, and vanadium alloys. We focus on the single-beam deuteron/lithium-stripping neutron source behind the IFMIF-DONES concept, which we assess against ITER, two DEMO designs, and an ideal pure 14-MeV flux. Our analysis indicates that, within standard uncertainties inherent to the models employed, the DONES concept adequately captures fusion conditions in the four materials analyzed. Our work is intended as a comprehensive irradiation damage analysis of fusion-representative neutron sources, to be used for further neutron source evaluation and fusion facility operation.

Marian, Jaime [Univ. of California, Los Angeles, C↗

Bioaccumulation Potential Of Air Contaminants: Combining Biological Allometry, Chemical Equilibrium And Mass-Balances To Predict Accumulation Of Air Pollutants In Various Mammals

In the present study we develop and test a uniform model intended for single compartment analysis in the context of human and environmental risk assessment of airborne contaminants. The new aspects of the model are the integration of biological allometry with fugacity-based mass-balance theory to describe exchange of contaminants with air. The developed model is applicable to various mammalian species and a range of chemicals, while requiring few and typically well-known input parameters, such as the adult mass and composition of the species, and the octanol-water and air-water partition coefficient of the chemical. Accumulation of organic chemicals is typically considered to be a function of the chemical affinity forlipid components in tissues. Here, we use a generic description of chemical affinity for neutral and polar lipids and proteins to estimate blood-air partition coefficients (Kba) and tissue-air partition coefficients (Kta) for various mammals. This provides a more accurate prediction of blood-air partition coefficients, as proteins make up a large fraction of total blood components. The results show that 75percent of the modeled inhalation and exhalation rate constants are within a factor of 2 from independent empirical values for humans, rats and mice, and 87percent of the predicted blood-air partition coefficients are within a factor of 5 from empirical data. At steady-state, the bioaccumulation potential of air pollutants is shown to be mainly a function of the tissue-air partition coefficient and the biotransformation capacity of the species and depends weakly on the ventilation rate and the cardiac output of mammals.

54 ENVIRONMENTAL SCIENCES↗

The use of failure mode and effects analysis to construct an effective disposal and prevention mechanism for infectious hospital waste

Highlights: > This study is based on a real case in a regional teaching hospital in Taiwan. > We use Failure mode and effects analysis (FMEA) as the evaluation method. > We successfully identify the risk factors of infectious waste disposal. > We propose plans for the detection of exceptional cases of infectious waste. - Abstract: In recent times, the quality of medical care has been continuously improving in medical institutions wherein patient-centred care has been emphasized. Failure mode and effects analysis (FMEA) has also been promoted as a method of basic risk management and as part of total quality management (TQM) for improving the quality of medical care and preventing mistakes. Therefore, a study was conducted using FMEA to evaluate the potential risk causes in the process of infectious medical waste disposal, devise standard procedures concerning the waste, and propose feasible plans for facilitating the detection of exceptional cases of infectious waste. The analysis revealed the following results regarding medical institutions: (a) FMEA can be used to identify the risk factors of infectious waste disposal. (b) During the infectious waste disposal process, six items were scored over 100 in the assessment of uncontrolled risks: erroneous discarding of infectious waste by patients and their families, erroneous discarding by nursing staff, erroneous discarding by medical staff, cleaning drivers pierced by sharp articles, cleaning staff pierced by sharp articles, and unmarked output units. Therefore, the study concluded that it was necessary to (1) provide education and training about waste classification to the medical staff, patients and their families, nursing staff, and cleaning staff; (2) clarify the signs of caution; and (3) evaluate the failure mode and strengthen the effects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Loss-of-Offsite-Power Events 1998–2012

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses performed loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience from fiscal year 1998 through 2012. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The EDG failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. A statistically significant increase in industry performance was identified for plant-centered and switchyard-centered LOOP frequencies. There is no statistically significant trend in LOOP durations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events 1998–2013

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. Risk analyses suggest that loss of all alternating current power contributes over 70% of the overall risk at some U.S. nuclear plants. LOOP event and subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2013. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. The emergency diesel generator failure modes considered are failure to start, failure to load and run, and failure to run more than 1 hour. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. No statistically significant trends in LOOP frequencies over the 1997–2013 period are identified. There is a possibility that a significant trend in grid-related LOOP frequency exists that is not easily detected by a simple analysis. Statistically significant increases in recovery times after grid- and switchyard-related LOOPs are identified.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of Loss-of-Offsite-Power Events 1997-2015

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1997 through 2015. LOOP events during critical operation that do not result in a reactor trip, are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). There is an adverse trend in LOOP durations. The previously reported adverse trend in LOOP frequency was not statistically significant for 2006-2015. Grid-related LOOPs happen predominantly in the summer. Switchyard-centered LOOPs happen predominantly in winter and spring. Plant-centered and weather-related LOOPs do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986 -1996 time period.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Loss-of-Offsite-Power Events: 1987-2016

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2016. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. Emergency diesel generator reliability is also considered (failure to start, failure to load and run, and failure to run more than 1 hour). An adverse trend in overall LOOP frequency is identified. An adverse trend in LOOP durations is identified. Plant-centered and weather-related LOOP events do not show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1986–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events 1987-2018

Loss of offsite power (LOOP) can have a major negative impact on a power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience during calendar years 1987 through 2018. LOOP events during critical operation that do not result in a reactor trip are not included. Frequencies and durations were determined for four event categories: plant-centered, switchyard-centered, grid-related, and weather-related. No significant trends in critical operation LOOP frequencies over the most recent 10-year period are identified. Adverse trends in LOOP durations are identified for switchyard-centered and grid-related LOOPs, as well as overall LOOPs during critical operation and overall LOOPs during shutdown operation. Both grid-related and weather-related LOOP events are found to show statistically significant seasonality. The engineering analysis of LOOP data shows that human errors have been much less frequent since 1997 than in the 1987–1996 time period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events: Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2020, while the most recent 15-year data (i.e., from 2006–2020) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather related. Highly significant decreasing trends in the LOOP occurrence rates were identified for All-LOOPs during critical operation (p-value = 0.001) and switchyard-centered LOOPs during critical operation (p-value = 0.002) for the most recent 10-year period (2011–2020). Adverse trends in LOOP durations continue for switchyard-centered LOOPs (p-value = 0.005), All-LOOPs (p-value = 0.019), as well as All-LOOPs during shutdown operation (p-value = 0.003). Statistical tests show the LOOP counts are not uniformly distributed across the 12 months, and variation among the months exists for plant-centered LOOPs (p-value = 0.028), grid-related LOOPs (p-value = 0.021), All-LOOPs (p-value = 0.003), and All-LOOPs during critical operation (p-value = 0.008). The engineering analysis of LOOP data showed for the period of 2006–2020, the equipment failure events were dominated by failures of circuits and relay; human errors have been less frequent and occurred primarily in maintenance; and weather events were dominated by tornadoes and lightning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Analysis of Loss-of-Offsite-Power Events: 2021 Update

Loss-of-offsite power (LOOP) can have a negative impact on a nuclear power plant’s ability to achieve and maintain safe shutdown conditions. LOOP event frequencies and times required for subsequent restoration of offsite power are important inputs to plant probabilistic risk assessments. This report presents a statistical and engineering analysis of LOOP frequencies and durations at U.S. commercial nuclear power plants. The data used in this study were based on the operating experience during calendar years 1987–2021, while the most recent 15-year data (i.e., from 2007–2021) were used for most analyses in this report. LOOP events during critical operation that did not result in a reactor trip are not included. Frequencies and durations were determined for four LOOP event categories: plant-centered, switchyard-centered, grid-related, and weather-related. These categories (and the All-LOOPs group which contains all LOOPs without regarding of the four categories) could be further grouped by whether a LOOP event occurred during critical operation, during shutdown operation, or during all operations. The following decreasing trends in the LOOP occurrence rates were identified for the most recent 10-year period (2012–2021): All-LOOPs during critical operation, switchyard-centered LOOPs during critical operation, and grid-related LOOPs during critical operation. Adverse trends in LOOP durations continue for switchyard-centered LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during shutdown operation for the 1997–2021 period. Statistical tests show the LOOP counts for the period of 2007–2021 are not uniformly distributed across the 12 months, and variation among the months exists for grid-related LOOPs during all operations, All-LOOPs during all operations, and All-LOOPs during critical operation. The engineering analysis of LOOP data showed for the period of 2007–2021, the equipment failure events were dominated by failures of relay and other; human errors have been less frequent and occurred primarily in maintenance and switching; and weather were dominated by tornadoes then by lightning and hurricane. Weather was the cause for 45% of LOOPs for the last fifteen years (2007– 2021) but only for 20% of LOOPs for the previous 20 years (1987–2006) .

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feasibility Analyses for the Microgrid of the Mountain in the Cordillera Central Region of Puerto Rico

Distributed energy resource (DER) development can benefit communities through improvement of access to reliable electricity and a resilient energy system. Many place-specific considerations must be accounted for when designing electrical systems with co-located generation and loads. This paper presents an overview of four studies focusing on different aspects for regional DER development in the Cordillera Central region of Puerto Rico, including a grid and load stability study with the introduction of solar energy generation, microgrid design based on the solar resource in the area, resilience considerations during power outage scenarios, and qualitative risk aspects for components in the microgrid. Additionally, a conceptual substation microgrid analysis is conducted using the Microgrid Design Toolkit (MDT) to evaluate trade-offs between cost and energy availability, providing insights into optimal design strategies. A microgrid resilience assessment is performed using the Resilient Nodal Cluster Analysis Tool (ReNCAT) to identify critical loads and evaluates their accessibility during outages, emphasizing the importance of community needs. Finally, a qualitative risk assessment utilizing Hazard and Operability Analysis (HAZOP) methods highlights potential hazards and mitigations for microgrid components, ensuring robust system design and operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparison of AEO 2009 Natural Gas Price Forecast to NYMEX Futures Prices

On December 17, 2008, the reference-case projections from Annual Energy Outlook 2009 (AEO 2009) were posted on the Energy Information Administration's (EIA) web site. We at LBNL have, in the past, compared the EIA's reference-case long-term natural gas price forecasts from the AEO series to contemporaneous natural gas prices that can be locked in through the forward market, with the goal of better understanding fuel price risk and the role that renewables can play in mitigating such risk. As such, we were curious to see how the latest AEO reference-case gas price forecast compares to the NYMEX natural gas futures strip. This brief memo presents our findings. Note that this memo pertains only to natural gas fuel price risk (i.e., the risk that natural gas prices might differ over the life of a gas-fired generation asset from what was expected when the decision to build the gas-fired unit was made). We do not take into consideration any of the other distinct attributes of gas-fired and renewable generation, such as dispatchability (or lack thereof), differences in capital costs and O&M expenses, or environmental externalities. A comprehensive comparison of different resource types--which is well beyond the scope of this memo--would need to account for differences in all such attributes, including fuel price risk. Furthermore, our analysis focuses solely on natural-gas-fired generation (as opposed to coal-fired or nuclear generation, for example), for several reasons: (1) price volatility has been more of a concern for natural gas than for other fuels used to generate power; (2) for environmental and other reasons, natural gas has, in recent years, been the fuel of choice among power plant developers; and (3) natural gas-fired generators often set the market clearing price in competitive wholesale power markets throughout the United States. That said, a more-complete analysis of how renewables mitigate fuel price risk would also need to consider coal, uranium, and other fuel prices. Finally, we caution readers about drawing inferences or conclusions based solely on this memo in isolation: to place the information contained herein within its proper context, we strongly encourage readers interested in this issue to read through our previous, more-detailed studies, available at http://eetd.lbl.gov/ea/EMS/reports/53587.pdf or http://eetd.lbl.gov/ea/ems/reports/54751.pdf.

03 NATURAL GAS↗

Analysis of Geologic CO 2 Migration Pathways in Farnsworth Field, NW Anadarko Basin

This study reports on analyses of natural, geologic CO 2 migration paths in Farnsworth Oil Field, northern Texas, where CO 2 was injected into the Pennsylvanian Morrow B reservoir as part of enhanced oil recovery and carbon sequestration efforts. We interpret 2D and 3D seismic reflection datasets of the study site, which is located on the western flank of the Anadarko basin, and compare our seismic interpretations with results from a tracer study. Petroleum system models are developed to understand the petroleum system and petroleum- and CO 2 -migration pathways. We find no evidence of seismically resolvable faults in Farnsworth Field, but interpret a karst structure, erosional structures, and incised valleys. These interpretations are compared with results of a Morrow B well-to-well tracer study that suggests that inter-well flow is up-dip or lateral. Southeastward fluid flow is inhibited by dip direction, thinning, and draping of the Morrow B reservoir over a deeper, eroded formation. Petroleum system models predict a deep basin-ward increase in temperature and maturation of the source rocks. In the northwestern Anadarko Basin, petroleum migration was generally up-dip with local exceptions; the Morrow B sandstone was likely charged by formations both below and overlying the reservoir rock. Based on this analysis, we conclude that CO 2 escape in Farnsworth Field via geologic pathways such as tectonic faults is unlikely. Abandoned or aged wellbores remain a risk for CO 2 escape from the reservoir formation and deserve further monitoring and research.

58 GEOSCIENCES↗

The analysis of rapidly developing fog at the Kennedy Space Center

This report documents fog precursors and fog climatology at Kennedy Space Center (KSC) Florida from 1986 to 1990. The major emphasis of this report focuses on rapidly developing fog events that would affect the less than 7-statute mile visibility rule for End-Of-Mission (EOM) Shuttle landing at KSC (Rule 4-64(A)). The Applied Meteorology Unit's (AMU's) work is to: develop a data base for study of fog associated weather conditions relating to violations of this landing constraint; develop forecast techniques or rules-of-thumb to determine whether or not current conditions are likely to result in an acceptable condition at landing; validate the forecast techniques; and transition techniques to operational use. As part of the analysis the fog events were categorized as either advection, pre-frontal or radiation. As a result of these analyses, the AMU developed a fog climatological data base, identified fog precursors and developed forecaster tools and decision trees. The fog climatological analysis indicates that during the fog season (October to April) there is a higher risk for a visibility violation at KSC during the early morning hours (0700 to 1200 UTC), while 95 percent of all fog events have dissipated by 1600 UTC. A high number of fog events are characterized by a westerly component to the surface wind at KSC (92 percent) and 83 percent of the fog events had fog develop west of KSC first (up to 2 hours). The AMU developed fog decision trees and forecaster tools that would help the forecaster identify fog precursors up to 12 hours in advance. Using the decision trees as process tools ensures the important meteorological data are not overlooked in the forecast process. With these tools and a better understanding of fog formation in the local KSC area, the Shuttle weather support forecaster should be able to give the Launch and Flight Directors a better KSC fog forecast with more confidence.

Wheeler, Mark M.↗

The TPS Advanced Development Project for CEV

The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

Reuther, James↗

The economic viability of pursuing a space power system concept

The development of a space power system requires no fundamental technological breakthroughs. There are, however, uncertainties regarding the degree to which necessary developments can be achieved or exceeded. An analysis is conducted concerning the implementation of a 5000 MW space-based solar power system based on photovoltaic conversion of solar energy to electrical energy. The solar array is about 13 km long and 5 km wide. Placed in geosynchronous orbit, it provides power to the earth for 30 years. Attention is given to the economic feasibility of a space power system, a risk analysis for space power systems, and the use of the presented methodology for comparing alternative technology development programs.

Hazelrigg, G. A., Jr.↗

POTENTIAL DROUGHT IMPACTS ON ELECTRICITY GENERATION IN TEXAS

Many power plants in the Electric Reliability Council of Texas (ERCOT) region require a large amount of water for system cooling. To improve the understanding of potential risks of electricity generation curtailment due to drought, an assessment of water availability and its potential impacts on generation during drought was performed. For this impact analysis, we identified three drought scenarios based on historical drought records and projected climate data from the Geophysical Fluid Dynamics Laboratory global climate model, for greenhouse gas emission scenario A2 defined by the Intergovernmental Panel on Climate Change . The three drought scenarios are (1) 2011 drought conditions (the worst drought in history), with the current level of water use; (2) a single-year drought (2022) projected for the period of 2020-2030, with the assumed projected water use level for 2030; and (3) a multiple-year drought constructed with climate data for 1950-1957 and water demand projected for 2030. The projected drought scenario in 2022 and the historical droughts in 2011 and 1950-1957 represent two different precipitation patterns in the Texas-Gulf river basin. The hydrologic model constructed for the Texas-Gulf river basin covers most of the ERCOT region. The model incorporates climate and water use data that correspond to three drought scenarios, respectively, to estimate evapotranspiration, water yield from watersheds, stream flow and water storage in reservoirs. Using criteria based on observed (< 50% storage) and predicted (< 55% storage) reservoir data, we identified 15 low-storage reservoirs in 2011, 10 in 2022, and 20 in 1956 (the last year of the multiple-year drought). The power plants that are supported by these reservoirs would be potentially at risk of being derated for thermoelectric cooling because of a lack of water supply. These power plants are located mainly in watersheds near and between Houston and Austin, as well as surrounding Dallas.

Yan, Y. Eugene↗