Search NASA⌕ Search

SEARCH · Search NASA

Results for “component testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Bioregenerative Planetary Life Support Systems Test Complex (BIO-Plex): NASA's Next Human-Rated Testing Facility

As a key component in its ground test bed capability, NASA's Advanced Life Support Program has been developing a large-scale advanced life support test facility capable of supporting long-duration evaluations of integrated bioregenerative life support systems with human test crews. This facility-targeted for evaluation of hypogravity compatible life support systems to be developed for use on planetary surfaces such as Mars or the Moon-is called the Bioregenerative Planetary Life Support Systems Test Complex (BIO-Plex) and is currently under development at the Johnson Space Center. This test bed is comprised of a set of interconnected chambers with a sealed internal environment which are outfitted with systems capable of supporting test crews of four individuals for periods exceeding one year. The advanced technology systems to be tested will consist of both biological and physicochemical components and will perform all required crew life support functions. This presentation provides a description of the proposed test "missions" to be supported by the BIO-Plex and the planned development strategy for the facility.

Tri, Terry O.↗

Measurement of Centaur/Orbiter multiple reaction forces in a full-scale test rig

A multiple component load cell for measuring load is described, and its capability and reliability are evaluated by utilizing it to measure the reaction forces between the Centaur and Centaur Support Structure. The system employs 11 six-component balances in a single test rig to react a combination of loads. The vehicle and balance loads, procedures for fabricating each balance, and the assembly of the balances are discussed. The calibration and testing of the balances are examined. It is noted that the multiple component load cell system is a cost-effective method for obtaining an accurate measurement of friction effects and primary loads.

Mole, Philip J.↗

Split-cross-bridge resistor for testing for proper fabrication of integrated circuits

An electrical testing structure and method is described whereby a test structure is fabricated on a large scale integrated circuit wafer along with the circuit components and has a van der Pauw cross resistor in conjunction with a bridge resistor and a split bridge resistor, the latter having two channels each a line width wide, corresponding to the line width of the wafer circuit components, and with the two channels separated by a space equal to the line spacing of the wafer circuit components. The testing structure has associated voltage and current contact pads arranged in a two by four array for conveniently passing currents through the test structure and measuring voltages at appropriate points to calculate the sheet resistance, line width, line spacing, and line pitch of the circuit components on the wafer electrically.

Buehler, M. G.↗

Development and demonstration of manufacturing processes for fabricating graphite/LARC 160 polyimide structural elements

The development and demonstration of manufacturing technologies for the structural application of Celion graphite/LARC-160 polyimide composite material is discussed. Process development and fabrication of demonstration components are discussed. Process development included establishing quality assurance of the basic composite material and processing, nondestructive inspection of fabricated components, developing processes for specific structural forms, and qualification of processes through mechanical testing. Demonstration components were fabricated. The demonstration components consisted of flat laminates, skin/stringer panels, honeycomb panels, chopped fiber compression moldings, and a technology demonstrator segment (TDS) representative of the space shuttle aft body flap.

Frost, R. K.↗

Baseline tests of an autonomous telerobotic system for assembly of space truss structures

Several proposed space missions include precision reflectors that are larger in diameter than any current or proposed launch vehicle. Most of these reflectors will require a truss structure to accurately position the reflector panels and these reflectors will likely require assembly in orbit. A research program has been conducted at the NASA Langley Research Center to develop the technology required for the robotic assembly of truss structures. The focus of this research has been on hardware concepts, computer software control systems, and operator interfaces necessary to perform supervised autonomous assembly. A special facility was developed and four assembly and disassembly tests of a 102-strut tetrahedral truss have been conducted. The test procedures were developed around traditional 'pick-and-place' robotic techniques that rely on positioning repeatability for successful operation. The data from two of the four tests were evaluated and are presented in this report. All operations in the tests were controlled by predefined sequences stored in a command file, and the operator intervened only when the system paused because of the failure of an actuator command. The tests were successful in identifying potential pitfalls in a telerobotic system, many of which would not have been readily anticipated or incurred through simulation studies. Addressing the total integrated task, instead of bench testing the component parts, forced all aspects of the task to be evaluated. Although the test results indicate that additional developments should be pursued, no problems were encountered that would preclude automated assembly in space as a viable construction method.

Rhodes, Marvin D.↗

Program For Evaluation Of Reliability Of Ceramic Parts

CARES/LIFE predicts probability of failure of monolithic ceramic component as function of service time. Assesses risk that component fractures prematurely as result of subcritical crack growth (SCG). Effect of proof testing of components prior to service also considered. Coupled to such commercially available finite-element programs as ANSYS, ABAQUS, MARC, MSC/NASTRAN, and COSMOS/M. Also retains all capabilities of previous CARES code, which includes estimation of fast-fracture component reliability and Weibull parameters from inert strength (without SCG contributing to failure) specimen data. Estimates parameters that characterize SCG from specimen data as well. Written in ANSI FORTRAN 77 to be machine-independent. Program runs on any computer in which sufficient addressable memory (at least 8MB) and FORTRAN 77 compiler available. For IBM-compatible personal computer with minimum 640K memory, limited program available (CARES/PC, COSMIC number LEW-15248).

Nemeth, N.↗

Modal Survey of ETM-3, A 5-Segment Derivative of the Space Shuttle Solid Rocket Booster

The complex interactions between internal motor generated pressure oscillations and motor structural vibration modes associated with the static test configuration of a Reusable Solid Rocket Motor have potential to generate significant dynamic thrust loads in the 5-segment configuration (Engineering Test Motor 3). Finite element model load predictions for worst-case conditions were generated based on extrapolation of a previously correlated 4-segment motor model. A modal survey was performed on the largest rocket motor to date, Engineering Test Motor #3 (ETM-3), to provide data for finite element model correlation and validation of model generated design loads. The modal survey preparation included pretest analyses to determine an efficient analysis set selection using the Effective Independence Method and test simulations to assure critical test stand component loads did not exceed design limits. Historical Reusable Solid Rocket Motor modal testing, ETM-3 test analysis model development and pre-test loads analyses, as well as test execution, and a comparison of results to pre-test predictions are discussed.

Nielsen, D.↗

Thermal testing of the Ranger Block III SPACECRAFT in the JPL 25 ft. space simulator

In January, 1964, a test program was begun on the thermal design of the Ranger Block III Spacecraft. The tests were performed i n the newly operational JPL 25' Space Simulator over a period of 6 months . The objectives of these tests were two-fold: A. To evaluate the 25' Space Simulator as a facility for proving the thermal design of spacecrafts, and B. To verify .the thermal design of the Ranger Block III spacecraft. These two objectives are complimentary in the test series performed and are difficult to separate into distinct categories. An important part of the first objective was to learn what type of test preparation, instrumentation, and analysis was required for the meaningful evaluation of test data from the 25' Space Simulator tests. Although some experience had been gained in testing of components and incomplete spacecrafts in smaller solar simulation chambers during the early part of the Ranger program, we knew little about testing of a complete spacecraft in the 25' Space Simulator when this test program began. Test analysis requires that the energy absorbed by various spacecraft components be known. This requires a knowledge of the area of solar absorption or sunlit area, the solar energy flux density on the area, and the effective absorptance of that area. Most of the problems encountered were associated with the determination of the last two quantities since the sunlit area may be obtained directly by inspection of spacecraft surfaces. This paper will present a discussion of our experiences during the Ranger Block III thermal test series on the Thermal Test Model (TCM). The TCM was thermally equivalent to the flight type Ranger spacecraft except for the lack of an antenna dish and solar panels. Flight type structural hardware was used with surface finishes equivalent to those of the flight spacecraft. Aluminum blocks simulated the spacecraft electronics thermal masses with resistance heaters simulating the electronic power dissipation. The discussion will be presented in a semi-chronological order and will be divided into the following areas: 1. Determination of solar simulation flux density on spacecraft surfaces. 2. Problems related to decollimation of the solar simulation source. 3. Determination of effective absorptance in the solar simulation spectrum.

SPACE SIMULATOR↗

The development of sine vibration test requirements for Viking lander capsule components

In connection with the Viking project for exploring the planet Mars, two identical spacecraft, each consisting of an orbiter and a lander, will be launched in the third quarter of 1975. Upon arrival at the planet, the Viking lander will separate from the Viking orbiter and descend to a soft landing at a selected site on the Mars surface. It was decided to perform a sine vibration test on the Viking spacecraft, in its launch configuration, to qualify it for the booster-induced transient-dynamic environment. It is shown that component-level testing is a cost- and schedule-effective prerequisite to the system-level, sine-vibration test sequences.

Barrett, S.↗

Separator for alkaline batteries

Separator compositions have been tested as components of three-plate silver-zinc oxide cells in a standard cycling test. Six materials meet imposed requirements, giving cycling performance superior to cellophane.

Hoyt, H. W.↗

A Focus on Cryogenic Engineering for the Primordial Inflation Polarization Explorer (PIPER) Mission

Cryogenic engineering involves design and modification of equipment that is used under boiling point of nitrogen which is 77 K. The focus of this paper will be on the design of hardware for cryogenic use and a retrofit that was done to the main laboratory cryostat used to test flight components for the Primordial Inflation Polarization Explorer balloon-borne mission. Data from prior tests showed that there was a superfluid helium leak and a total disassemble of the cryostat was conducted in order to localize and fix the leak. To improve efficiency new fill tubes and clamps with modifications were added to the helium tank. Upon removal of the tank, corrosion was found on the flange face that connects to the helium cold plate and therefore had to be fully replaced and copper plated to prevent future corrosion. Indium seals were also replaced for the four fill tubes, a helium level sensor, and the nitrogen and helium tanks. Four additional shielded twisted pairs of cryogenic wire and a wire harness for the Superconducting Quantum Interference Devices (SQUIDs) were added. Finally, there was also design work done for multiple pieces that went inside the cryostat and a separate probe used to test the SQUIDs. Upon successful completion of the cryostat upgrade, tests were run to check the effectiveness and stability of the upgrades. The post-retrofit tests showed minor leaks were still present and due to this, superfluidity has still not been attained. As such there could still be a possibility of a superfluid leak appearing in the future. Regardless, the copper plating on the helium tank has elongated the need to service it by three to five years.

Rosas, Rogelio↗

Return to Mercury: A Comparison of Solar Simulation and Flight Data for the MESSENGER Spacecraft

The MErcury, Surface, Space, ENvironment GEochemistry and Ranging (MESSENGER) spacecraft is a NASA Discovery Mission spacecraft developed and operated by the Johns Hopkins University Applied Physics Laboratory. It was launched on August 3, 2004 and is currently on a course for Mercury orbit insertion in March 2011. To date the mission trajectory has taken the spacecraft to minimum solar distances of 0.332 and 0.313 AU and on January 14, 2008 the first flyby of Mercury in 33 years. From launch through the latest perihelion passage temperature performance data has been collected for the sun facing Digital Sun Sensors (DSS), the sun facing phased array and low gain (omni) antennas, the solar arrays, the sunshade and the two sun facing attitude control 4.4 N thrusters. Prior to launch, extensive solar simulation testing was conducted at the Glenn Research Center, Tank 6 solar simulation facility in Cleveland Ohio. Flight hardware qualification units representing these Sun exposed components were tested in solar environments that represented near mission minimum solar distance as to verify the thermal designs and the material used in fabrication. The paper will review the thermal designs of these components and their thermal performance to date as compared to the solar simulation testing.

Ercol, Carl J.↗

Single shaft automotive gas turbine engine characterization test

An automotive gas turbine incorporating a single stage centrifugal compressor and a single stage radial inflow turbine is described. Among the engine's features is the use of wide range variable geometry at the inlet guide vanes, the compressor diffuser vanes, and the turbine inlet vanes to achieve improved part load fuel economy. The engine was tested to determine its performance in both the variable geometry and equivalent fixed geometry modes. Testing was conducted without the originally designed recuperator. Test results were compared with the predicted performance of the nonrecuperative engine based on existing component rig test maps. Agreement between test results and the computer model was achieved.

Johnson, R. A.↗

AWT Circuit Aerothermodynamics Discussion

The aerothermodynamic performance of the Altitude Wind Tunnel is assessed in order to define the proper component and system configurations to insure desired tunnel flow. This is accomplished through experimental model testing of components, coupled components, complete circuit and research models. Viewgraphs show what types of computer codes were used on the various sections of the tunnel as well as how and where experimental data was acquired.

Povinelli, Louis A.↗

The Use of Environmental Test Facilities for Purposes Beyond Their Original Design

Increasing demands from space flight project offices are requiring environmental testing facilities to become more versatile with increased capabilities. At the same time, maintaining a cost-effective approach to test operations has driven efforts to use these facilities for purposes beyond their original design. This paper presents an overview of the Jet Propulsion Laboratory's efforts to provide JPL's space flight projects with test facilities to meet unique test requirements and to serve the needs of selected outside customers. The large number of recent Mars Missions, including the Mars Pathfinder project, have required testing of components and systems in a Martian surface environment in facilities originally designed for deep space testing. The unique problems associated with performing these tests are discussed, along with practical solutions. Other unique test requirements are discussed including the use of space simulation chambers for testing high altitude balloon gondolas and the use of vacuum chambers for system level test firing of an ion propulsion engine.

Fisher, Terry C.↗

System Level Aerothermal Testing for the Adaptive Deployable Entry and Placement Technology (ADEPT)

The Adaptive Deployable Entry and Placement Technology (ADEPT), a mechanically deployable entry vehicle technology, has been under development at NASA since 2011. As part of the technical maturation of ADEPT, designs capable of delivering small payloads (10 kg) are being considered to rapidly mature sub 1 m deployed diameter designs. The unique capability of ADEPT for small payloads comes from its ability to stow within a slender volume and deploy to achieve a mass efficient drag surface with a high heat rate capability. The low ballistic coefficient results in entry heating and mechanical loads that can be met by a revolutionary three-dimensionally woven carbon fabric supported by a deployable skeleton structure. This carbon fabric has test proven capability as both primary structure and payload thermal protection system. In order to rapidly advance ADEPTs technical maturation, the project is developing test methods that enable thermostructural design requirement verification of ADEPT designs at the system level using ground test facilities. Results from these tests are also relevant to larger class missions and help us define areas of focused component level testing in order to mature material and thermal response design codes. The ability to ground test sub 1 m diameter ADEPT configurations at or near full-scale provides significant value to the rapid maturation of this class of deployable entry vehicles. This paper will summarize arc jet test results, highlight design challenges, provide a summary of lessons learned and discuss future test approaches based upon this methodology.

Hypersonic↗

Developing Reliable Life Support for Mars

A human mission to Mars will require highly reliable life support systems. Mars life support systems may recycle water and oxygen using systems similar to those on the International Space Station (ISS). However, achieving sufficient reliability is less difficult for ISS than it will be for Mars. If an ISS system has a serious failure, it is possible to provide spare parts, or directly supply water or oxygen, or if necessary bring the crew back to Earth. Life support for Mars must be designed, tested, and improved as needed to achieve high demonstrated reliability. A quantitative reliability goal should be established and used to guide development t. The designers should select reliable components and minimize interface and integration problems. In theory a system can achieve the component-limited reliability, but testing often reveal unexpected failures due to design mistakes or flawed components. Testing should extend long enough to detect any unexpected failure modes and to verify the expected reliability. Iterated redesign and retest may be required to achieve the reliability goal. If the reliability is less than required, it may be improved by providing spare components or redundant systems. The number of spares required to achieve a given reliability goal depends on the component failure rate. If the failure rate is under estimated, the number of spares will be insufficient and the system may fail. If the design is likely to have undiscovered design or component problems, it is advisable to use dissimilar redundancy, even though this multiplies the design and development cost. In the ideal case, a human tended closed system operational test should be conducted to gain confidence in operations, maintenance, and repair. The difficulty in achieving high reliability in unproven complex systems may require the use of simpler, more mature, intrinsically higher reliability systems. The limitations of budget, schedule, and technology may suggest accepting lower and less certain expected reliability. A plan to develop reliable life support is needed to achieve the best possible reliability.

life support↗