Search NASA⌕ Search

SEARCH · Search NASA

Results for “lessons”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Hypergolic Propellants: The Handling Hazards and Lessons Learned from Use

Several unintentional hypergolic fluid related spills, fires, and explosions from the Apollo Program, the Space Shuttle Program, the Titan Program, and a few others have occurred over the past several decades. Spill sites include the following government facilities: Kennedy Space Center (KSC), Johnson Space Center (JSC), White Sands Test Facility (WSTF), Vandenberg Air Force Base (VAFB), Cape Canaveral Air Force Station (CCAFS), Edwards Air Force Base (EAFB), Little Rock AFB, and McConnell AFB. Until now, the only method of capturing the lessons learned from these incidents has been "word of mouth" or by studying each individual incident report. Through studying several dozen of these incidents, certain root cause themes are apparent. Scrutinizing these themes could prove to be highly beneficial to future hypergolic system testing, checkout, and operational use.

Nufer, Brian↗

Shuttle Lesson Learned - Toxicology

This is a script for a video about toxicology and the space shuttle. The first segment is deals with dust in the space vehicle. The next segment will be about archival samples. Then we'll look at real time on-board analyzers that give us a lot of capability in terms of monitoring for combustion products and the ability to monitor volatile organics on the station. Finally we will look at other issues that are about setting limits and dealing with ground based lessons that pertain to toxicology.

James, John T.↗

Challenger and Columbia Lessons Learned

The Space Shuttle Challenger and Columbia accidents resulted in tragic loss of life and national assets, and investigations into both accidents produced important lessons to prevent future accidents

Hoffman, William C., III↗

NASA Astronauts on Soyuz: Experience and Lessons for the Future

The U. S., Russia, and, China have each addressed the question of human-rating spacecraft. NASA's operational experience with human-rating primarily resides with Mercury, Gemini, Apollo, Space Shuttle, and International Space Station. NASA s latest developmental experience includes Constellation, X38, X33, and the Orbital Space Plane. If domestic commercial crew vehicles are used to transport astronauts to and from space, Soyuz is another example of methods that could be used to human-rate a spacecraft and to work with commercial spacecraft providers. For Soyuz, NASA's normal assurance practices were adapted. Building on NASA's Soyuz experience, this report contends all past, present, and future vehicles rely on a range of methods and techniques for human-rating assurance, the components of which include: requirements, conceptual development, prototype evaluations, configuration management, formal development reviews (safety, design, operations), component/system ground-testing, integrated flight tests, independent assessments, and launch readiness reviews. When constraints (cost, schedule, international) limit the depth/breadth of one or more preferred assurance means, ways are found to bolster the remaining areas. This report provides information exemplifying the above safety assurance model for consideration with commercial or foreign-government-designed spacecraft. Topics addressed include: U.S./Soviet-Russian government/agency agreements and engineering/safety assessments performed with lessons learned in historic U.S./Russian joint space ventures

Source record↗

Results and Lessons from a Decade of Terra MODIS On-Orbit Spectral Characterization

Since its launch in December 1999, the NASA EOS Terra MODIS has successfully operated for more than a decade. MODIS makes observations in 36 spectral bands from visible (VIS) to longwave infrared (LWIR) and at three nadir spatial resolutions: 250m (2 bands), 500m (5 bands), and 1km (29 bands). In addition to its on-board calibrators designed for the radiometric calibration, MODIS was built with a unique device, called the spectro-radiometric calibration assembly (SRCA). It can be configured in three different modes: radiometric, spatial, and spectral. When it is operated in the spectral modes, the SRCA can monitor changes in Sensor spectral performance for the VIS and near-infrared (NIR) spectral bands. For more than 10 years, the SRCA operation has continued to provide valuable information for MODIS on-orbit spectral performance. This paper briefly describes SRCA on-orbit operation and calibration activities; it presents decade-long spectral characterization results for Terra MODIS VIS and NIR spectral bands in terms of chances in their center wavelengths (CW) and bandwidths (BW). It is shown that the SRCA on-orbit wavelength calibration capability remains satisfactory. For most spectral bands, the changes in CW and BW are less than 0.5 and 1 nm, respectively. Results and lessons from Terra MODIS on-orbit spectral characterization have and will continue to benefit its successor, Aqua MODIS, and other future missions.

Xiong, X.↗

Lessons Learned from Three Recent Sample Return Missions

We share lessons learned from participation on the Science Teams and Recovery/Preliminary Examination/Curation teams for three recent sample return missions: (1) the Long Duration Exposure Facility (LDEF), which returned to Earth with interplanetary dust and spacecraft debris particles in 1990, (2) the Stardust Mission, which returned grains from comet Wild-2 and fresh interstellar dust to Earth in 2006, and (3) the Hayabusa Mission, which returned regolith grains from asteroid Itokawa in 2010.

Zolensky, Michael E.↗

Hayabusa Recovery, Curation and Preliminary Sample Analysis: Lessons Learned from Recent Sample Return Mission

I describe lessons learned from my participation on the Hayabusa Mission, which returned regolith grains from asteroid Itokawa in 2010 [1], comparing this with the recently returned Stardust Spacecraft, which sampled the Jupiter Family comet Wild 2. Spacecraft Recovery Operations: The mission Science and Curation teams must actively participate in planning, testing and implementing spacecraft recovery operations. The crash of the Genesis spacecraft underscored the importance of thinking through multiple contingency scenarios and practicing field recovery for these potential circumstances. Having the contingency supplies on-hand was critical, and at least one full year of planning for Stardust and Hayabusa recovery operations was necessary. Care must be taken to coordinate recovery operations with local organizations and inform relevant government bodies well in advance. Recovery plans for both Stardust and Hayabusa had to be adjusted for unexpectedly wet landing site conditions. Documentation of every step of spacecraft recovery and deintegration was necessary, and collection and analysis of launch and landing site soils was critical. We found the operation of the Woomera Text Range (South Australia) to be excellent in the case of Hayabusa, and in many respects this site is superior to the Utah Test and Training Range (used for Stardust) in the USA. Recovery operations for all recovered spacecraft suffered from the lack of a hermetic seal for the samples. Mission engineers should be pushed to provide hermetic seals for returned samples. Sample Curation Issues: More than two full years were required to prepare curation facilities for Stardust and Hayabusa. Despite this seemingly adequate lead time, major changes to curation procedures were required once the actual state of the returned samples became apparent. Sample databases must be fully implemented before sample return for Stardust we did not adequately think through all of the possible sub sampling and analytical activities before settling on a database design - Hayabusa has done a better job of this. Also, analysis teams must not be permitted to devise their own sample naming schemes. The sample handling and storage facilities for Hayabusa are the finest that exist, and we are now modifying Stardust curation to take advantage of the Hayabusa facilities. Remote storage of a sample subset is desirable. Preliminary Examination (PE) of Samples: There must be some determination of the state and quantity of the returned samples, to provide a necessary guide to persons requesting samples and oversight committees tasked with sample curation oversight. Hayabusa s sample PE, which is called HASPET, was designed so that late additions to the analysis protocols were possible, as new analytical techniques became available. A small but representative number of recovered grains are being subjected to in-depth characterization. The bulk of the recovered samples are being left untouched, to limit contamination. The HASPET plan takes maximum advantage of the unique strengths of sample return missions

Zolensky, Michael E.↗

Constellation Lessons Learned Executive Summary

This slide presentation reviews the lessons learned from the Constellation Program (CxP) and identified several factors that contributed to the inability of the CxP to meet the cost and schedule commitments. The review includes a significant section on the context in which the CxP operated since new programs are likely to experience the same constraints.

Thomas, L. Dale↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

SOFIA Program SE and I Lessons Learned

Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.

Ray, Ronald J.↗

Lessons Learned from CFD Validation Study of Protuberance Heating

The objectives of this presentation are: (1) Share lessons learned from a recent exercise in CFD validation of protuberance heating (2) Impact of experimental data reduction assumptions and techniques on validation activity (3) Advanced data reduction techniques may provide useful data from non-typical test methods (4) Significance of the recovery factor for high-speed flows (5) Show typical results of the Lag turbulence model on protuberances (6) Introduce and inform the listener of a protuberance heating dataset which will soon be available for comparison

Oliver, Brandon↗

The Story Behind the Numbers: Lessons Learned from the Integration of Monitoring Resources in Addressing an ISS Water Quality Anomaly

Beginning in June of 2010 an environmental mystery was unfolding on the International Space Station (ISS). The U.S. Water Processor Assembly (WPA) began to produce water with increasing levels of total organic carbon (TOC). A surprisingly consistent upward TOC trend was observed through weekly in-flight total organic carbon analyzer (TOCA) monitoring. As TOC is a general organics indicator, return of water archive samples was needed to make better-informed crew health decisions and to aid in WPA troubleshooting. TOCA-measured TOC was more than halfway to its health-based screening limit before archive samples could be returned on Soyuz 22 and analyzed. Although TOC was confirmed to be elevated, somewhat surprisingly, none of the typical target compounds were the source. After some solid detective work, it was confirmed that the TOC was associated with a compound known as dimethylsilanediol (DMSD). DMSD is believed to be a breakdown product of silicon-containing compounds present on ISS. A toxicological limit was set for DMSD and a forward plan developed for operations given this new understanding of the source of the TOC. This required extensive coordination with ISS stakeholders and innovative use of available in-flight and archive monitoring resources. Behind the numbers and scientific detail surrounding this anomaly, there exists a compelling story of multi-disciplinary awareness, teamwork, and important environmental lessons learned.

McCoy, Torin↗

Lessons Learned from the Space Shuttle Engine Hydrogen Flow Control Valve Poppet Breakage

The Main Propulsion System (MPS) uses three Flow Control Valves (FCV) to modulate the flow of pressurant hydrogen gas from the Space Shuttle Main Engines (SSME) to the hydrogen External Tank (ET). This maintains pressure in the ullage volume as the liquid level drops, preserving ET structural integrity and assuring the engines receive a sufficient amount of head pressure. On Space Transportation System (STS)-126 (2009), with only a handful of International Space Station (ISS) assembly flights from the end of the Shuttle program, a portion of a single FCV?s poppet head broke off at about a minute and a half after liftoff. The risk of the poppet head failure is that the increased flow area through the FCV could result in excessive gaseous hydrogen flow back to the external tank, which could result in overboard venting of hydrogen ullage pressure. If the hydrogen venting were to occur in first stage (i.e., lower atmosphere), a flammability hazard exists that could lead to catastrophic loss of crew and vehicle. Other failure risks included particle impact damage to MPS downstream hardware. Although the FCV design had been plagued by contamination-related sluggish valve response problems prior to a redesign at STS-80 (1996), contamination was ruled out as the cause of the STS-126 failure. Employing a combination of enhanced hardware inspection and a better understanding of the consequences of a poppet failure, safe flight rationale for subsequent flights (STS-119 and later) was achieved. This paper deals with the technical lessons learned during the investigation and mitigation of this problem at a time when assembly flights were each in the critical path to Space Station success.

Martinez, Hugo E.↗

Constellation Program Lessons Learned in the Quantification and Use of Aerodynamic Uncertainty

The NASA Constellation Program has worked for the past five years to develop a re- placement for the current Space Transportation System. Of the elements that form the Constellation Program, only two require databases that define aerodynamic environments and their respective uncertainty: the Ares launch vehicles and the Orion crew and launch abort vehicles. Teams were established within the Ares and Orion projects to provide repre- sentative aerodynamic models including both baseline values and quantified uncertainties. A technical team was also formed within the Constellation Program to facilitate integra- tion among the project elements. This paper is a summary of the collective experience of the three teams working with the quantification and use of uncertainty in aerodynamic environments: the Ares and Orion project teams as well as the Constellation integration team. Not all of the lessons learned discussed in this paper could be applied during the course of the program, but they are included in the hope of benefiting future projects.

Walker, Eric L.↗

MLAS and LAS: Project Comparison of Lessons Learned

The development of new and safer manned space vehicles is a top priority at NASA. Recently two different approaches of how to accomplish this mission of keeping astronauts safe was successfully demonstrated. With work already underway on an Apollo-like launch abort system for the Orion Crew Exploration Vehicle (CEV), an alternative design concept named the Max Launch Abort System, or MLAS, was developed as a parallel effort. The Orion system, managed by the Constellation office, is based on the design of a single solid launch abort motor in a tower positioned above the capsule. The MLAS design takes a different approach placing the solid launch abort motor underneath the capsule. This effort was led by the NASA Engineering and Safety Center (NESC). Both escape systems were designed with the Ares I Rocket as the launch vehicle and had the same primary requirement to safely propel a crew module away from any emergency event either on the launch pad or during accent. Beyond these two parameters, there was little else in common between the two projects, except that they both concluded in successful launches that will further promote the development of crew launch abort systems. This presentation will compare both projects from the standpoint of technical requirements; program management and flight test objectives and highlight the synergistic lessons learned by two engineers who worked on each program.

Dittemore, Gary↗

SRMS History, Evolution and Lessons Learned

Early in the development of the Space Shuttle, it became clear that NASA needed a method of deploying and retrieving payloads from the payload bay. The Shuttle Remote Manipulator System (SRMS) was developed to fill this need. The 50 foot long robotic arm is an anthropomorphic design consisting of three electromechanical joints, six degrees of freedom, and two boom segments. Its composite boom construction provided a light weight solution needed for space operations. Additionally, a method of capturing payloads with the arm was required and a unique End Effector was developed using an electromechanical snare mechanism. The SRMS is operated using a Displays and Controls Panel and hand controllers located within the aft crew compartment of the shuttle. Although the SRMS was originally conceived to deploy and retrieve payloads, its generic capabilities allowed it to perform many other functions not originally conceived of. Over the years it has been used for deploying and retrieving constrained and free flying payloads, maneuvering and supporting EVA astronauts, satellite repair, International Space Station construction, and as a viewing aid for on-orbit International Space Station operations. After the Columbia accident, a robotically compatible Orbiter Boom Sensor System (OBSS) was developed and used in conjunction with the SRMS to scan the Thermal Protection System (TPS) of the shuttle. These scans ensure there is not a breach of the TPS prior to shuttle re-entry. Ground operations and pre mission simulation, analysis and planning played a major role in the success of the SRMS program. A Systems Engineering Simulator (SES) was developed to provide a utility complimentary to open loop engineering simulations. This system provided a closed-loop real-time pilot-driven simulation giving visual feedback, display and control panel interaction, and integration with other vehicle systems, such as GN&C. It has been useful for many more applications than traditional training. Evolution of the simulations, guided by the Math Model Working Group, showed the utility of input from multiple modeling groups with a structured forum for discussion.There were many unique development challenges in the areas of hardware, software, certification, modeling and simulation. Over the years, upgrades and enhancements were implemented to increase the capability, performance and safety of the SRMS. The history and evolution of the SRMS program provided many lessons learned that can be used for future space robotic systems.

Jorgensen, Glenn↗

Stray Light Lessons Learned from the Mars Reconnaissance Orbiter's Optical Navigation Camera

The Optical Navigation Camera (ONC) is a technical demonstration slated to fly on NASA"s Mars Reconnaissance Orbiter in 2005. Conventional navigation methods have reduced accuracy in the days immediately preceding Mars orbit insertion. The resulting uncertainty in spacecraft location limits rover landing sites to relatively safe areas, away from interesting features that may harbor clues to past life on the planet. The ONC will provide accurate navigation on approach for future missions by measuring the locations of the satellites of Mars relative to background stars. Because Mars will be a bright extended object just outside the camera"s field of view, stray light control at small angles is essential. The ONC optomechanical design was analyzed by stray light experts and appropriate baffles were implemented. However, stray light testing revealed significantly higher levels of light than expected at the most critical angles. The primary error source proved to be the interface between ground glass surfaces (and the paint that had been applied to them) and the polished surfaces of the lenses. This paper will describe troubleshooting and correction of the problem, as well as other lessons learned that affected stray light performance.

stray lights↗