Search NASA⌕ Search

SEARCH · Search NASA

Results for “load estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Experimental investigation of the effect of compliant pores on reservoir rocks under hydrostatic and triaxial compression stress states

The presence of compliant pores in rocks is important for understanding the stress–strain behaviors under different stress conditions. This paper describes findings on the effect of compliant pores on the mechanical behavior of a reservoir sandstone under hydrostatic and triaxial compression. Laboratory experiments were conducted at reservoir temperature on Weber Sandstone samples from the Rock Springs Uplift, Wyoming. Each experiment was conducted at three sequential stages: (stage 1) increase in the confining pressure while maintaining the pore pressure, (stage 2) increase in the pore pressure while maintaining the confining pressure, and (stage 3) application of the deviatoric load to failure. The nonlinear pore pressure – volumetric strain relationship governed by compliant pores under low confining pressure changes to a linear behavior governed by stiff pores under higher confining pressure. The estimated compressibilities of the matrix material in sandstone samples are close to the typical compressibility of quartz. Because of the change in pore structures during stage 1 and stage 2 loadings, the estimated bulk compressibilities of the sandstone sample under the lowest confining pressure decrease with increasing differential pressure. The increase in crack initiation stress is limited with increasing differential pressure because of similar total crack length governed by initial compliant porosity in sandstone samples.

Engineering↗

Elevated Temperature Slow Crack Growth of Silicon Nitride Under Dynamic, Static and Cyclic Flexural Loading

The slow crack growth parameters of a hot-pressed silicon nitride were determined at 1200 and 1300 C in air by statically, dynamically and cyclicly loading bend specimens. The fatigue parameters were estimated using the recently developed CARES/Life computer code. Good agreement exists between the flexural results. However, fatigue susceptibility under static uniaxial tensile loading, reported elsewhere, was greater than in flexure. Cyclic flexural loading resulted in the lowest apparent flexural fatigue susceptibility.

Choi, Sung R.↗

James Webb Space Telescope Integrated Science Instrument Module Thermal Vacuum Thermal Balance Test Campaign at NASA's Goddard Space Flight Center

The James Webb Space Telescope is a large infrared telescope with a 6.5-meter primary mirror, designed as a successor to the Hubble Space Telescope when launched in 2018. Three of the four science instruments contained within the Integrated Science Instrument Module (ISIM) are passively cooled to their operational temperature range of 36K to 40K with radiators, and the fourth instrument is actively cooled to its operational temperature of approximately 6K. Thermal-vacuum testing of the flight science instruments at the ISIM element level has taken place in three separate highly challenging and extremely complex thermal tests within a gaseous helium-cooled shroud inside Goddard Space Flight Centers Space Environment Simulator. Special data acquisition software was developed for these tests to monitor over 1700 flight and test sensor measurements, track over 50 gradients, component rates, and temperature limits in real time against defined constraints and limitations, and guide the complex transition from ambient to final cryogenic temperatures and back. This extremely flexible system has proven highly successful in safeguarding the nearly $2B science payload during the 3.5-month-long thermal tests. Heat flow measurement instrumentation, or Q-meters, were also specially developed for these tests. These devices provide thermal boundaries o the flight hardware while measuring instrument heat loads up to 600 mW with an estimated uncertainty of 2 mW in test, enabling accurate thermal model correlation, hardware design validation, and workmanship verification. The high accuracy heat load measurements provided first evidence of a potentially serious hardware design issue that was subsequently corrected. This paper provides an overview of the ISIM-level thermal-vacuum tests and thermal objectives; explains the thermal test configuration and thermal balances; describes special measurement instrumentation and monitoring and control software; presents key test thermal results; lists problems encountered during testing and lessons learned.

JWST ISIM Thermal↗

Output Current Estimation and Control in Primary Side LCC Secondary Side Series Compensated Wireless Power Transfer System without Secondary Side Sensors

The estimation (and control) of the output variables is often challenging for wireless power transfer (WPT) systems. This paper presents a secondary side sensor-less closed loop estimation technique to estimate the output current in a primary side LCC and secondary side series compensated WPT system. Using information of primary side variables, the proposed estimation can estimate the output current over a wide range of load current variations. Results are presented to verify the efficacy of the proposed estimation.

Mukherjee, Subho [ORNL] (ORCID:0009000672297925)↗

Results of the 2018 Wood Stove Design Challenge

The 2018 Wood Stove Design Challenge was an international design competition which sought to identify top performing residential wood stoves based on automation. To prepare for the event, the Northeast States for Coordinated Air Use Management (NESCAUM) developed a testing protocol that challenged the stoves by testing them in more field-like conditions—capturing emissions from start-up, reloading a stove, and the use of larger piece sizes. Flue gas emissions were measured using a combination of in-stack and novel dilution sampling methods, as the event occurred on the National Mall in Washington D.C. in a non-laboratory setting. Particulate matter (PM), carbon monoxide (CO), carbon dioxide (CO2), and methane (CH4) were measured from three stoves in real-time. A combustion efficiency was also calculated for each stove in real-time. Measured PM emission rates ranged between 1.8 and 8.0 g/hr for all stoves and operating conditions, with the highest emissions being measured during cold start in all cases. The test average PM emission rates were 2.4, 4.0, and 2.4 g/hr for stoves A, B, and C, respectively. Results showed emissions measured during transient operations, which are often excluded in current certification methods, can be significantly higher than steady-state periods—echoing other studies and highlighting the importance of testing in various operational modes for more realistic emission estimates. Additionally, the stoves had overall CO emission rates of 48.8, 284.8, and 100.8 g/hr, for stoves A, B and C, respectively. Calculated PM and CO emission factors overall were low considering the testing protocol sought to follow more challenging yet realistic practices in terms of fuel loading and operating procedures. The overall estimated combustion efficiency for stoves A, B, and C was 85%, 78%, 76%, respectively and in all cases was lowest during the cold start period.This report details the successfully proposed and assembled instrumentation that was relatively portable for field-site testing and the results of the emissions measurements for the 2018 Wood Stove Design Challenge competition. Overall, the repeatability of each stove was favorable with coefficients of variation (COV) ranging from 7 to 15% for measured PM concentrations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

8760-Based Method for Representing Variable Generation Capacity Value in Capacity Expansion Models

Capacity expansion models (CEMs) are widely used to evaluate the least-cost portfolio of electricity generators, transmission, and storage needed to reliably serve load over many years or decades. CEMs can be computationally complex and are often forced to estimate key parameters using simplified methods to achieve acceptable solve times or for other reasons. In this paper, we discuss one of these parameters -- capacity value (CV). We first provide a high-level motivation for and overview of CV. We next describe existing modeling simplifications and an alternate approach for estimating CV that utilizes hourly '8760' data of load and VG resources. We then apply this 8760 method to an established CEM, the National Renewable Energy Laboratory's (NREL's) Regional Energy Deployment System (ReEDS) model (Eurek et al. 2016). While this alternative approach for CV is not itself novel, it contributes to the broader CEM community by (1) demonstrating how a simplified 8760 hourly method, which can be easily implemented in other power sector models when data is available, more accurately captures CV trends than a statistical method within the ReEDS CEM, and (2) providing a flexible modeling framework from which other 8760-based system elements (e.g., demand response, storage, and transmission) can be added to further capture important dynamic interactions, such as curtailment.

14 SOLAR ENERGY↗

How robust are estimates of key parameters in standard viral dynamic models?

Mathematical models of viral infection have been developed, fitted to data, and provide insight into disease pathogenesis for multiple agents that cause chronic infection, including HIV, hepatitis C, and B virus. However, for agents that cause acute infections or during the acute stage of agents that cause chronic infections, viral load data are often collected after symptoms develop, usually around or after the peak viral load. Consequently, we frequently lack data in the initial phase of viral growth, i.e., when pre-symptomatic transmission events occur. Missing data may make estimating the time of infection, the infectious period, and parameters in viral dynamic models, such as the cell infection rate, difficult. However, having extra information, such as the average time to peak viral load, may improve the robustness of the estimation. Here, we evaluated the robustness of estimates of key model parameters when viral load data prior to the viral load peak is missing, when we know the values of some parameters and/or the time from infection to peak viral load. Although estimates of the time of infection are sensitive to the quality and amount of available data, particularly pre-peak, other parameters important in understanding disease pathogenesis, such as the loss rate of infected cells, are less sensitive. Viral infectivity and the viral production rate are key parameters affecting the robustness of data fits. Fixing their values to literature values can help estimate the remaining model parameters when pre-peak data is missing or limited. We find a lack of data in the pre-peak growth phase underestimates the time to peak viral load by several days, leading to a shorter predicted growth phase. On the other hand, knowing the time of infection (e.g., from epidemiological data) and fixing it results in good estimates of dynamical parameters even in the absence of early data. While we provide ways to approximate model parameters in the absence of early viral load data, our results also suggest that these data, when available, are needed to estimate model parameters more precisely.

59 BASIC BIOLOGICAL SCIENCES↗

The application of the statistical theory of extreme values to gust-load problems

An analysis is presented which indicates that the statistical theory of extreme values is applicable to the problems of predicting the frequency of encountering the larger gust loads and gust velocities for both specific test conditions as well as commercial transport operations. The extreme-value theory provides an analytic form for the distributions of maximum values of gust load and velocity. Methods of fitting the distribution are given along with a method of estimating the reliability of the predictions. The theory of extreme values is applied to available load data from commercial transport operations. The results indicate that the estimates of the frequency of encountering the larger loads are more consistent with the data and more reliable than those obtained in previous analyses. (author)

Press, Harry↗

Feasibility Analysis for the Use of Retrofitted Air-Conditioners Using Thermal Energy Storage (TES) for High Ambient Temperature (HAT) Countries

In high ambient temperature (HAT) countries, summer temperatures exceed 35℃, degrading the performance of air-conditioning systems and straining power grids. In this paper, a feasibility analysis was conducted to investigate potential savings during the peak using latent Thermal Energy Storage (TES) at near room phase-change temperatures, replacing condensers, thus, minimizing temperature lifts. Weather data, building loads, and baseline air-conditioning systems data were gathered for Dubai. A transient vapor-compression model in Modelica was used to compare the COP, total power input and cooling capacity of the air-conditioner at peak hours when ambient temperatures range between 35 – 45 ⁰C versus the TES-Phase-Change Material (PCM) melting temperatures from 22 – 28⁰C. The results indicate that the TES-PCM can enhance the system COP at the peak by a factor 1.4 and 2 for during for outdoor temperatures of 35 – 40⁰C, and 40 – 45⁰C, respectively. Lower melting temperature PCMs were able to reduce the required power input by 30-50%, with more savings occurring at higher temperature days. On the other hand, higher temperature PCMs enhancements were minimal especially at outdoor ambient temperatures ranging between 35 – 40⁰C. Improvements to the cooling capacity range from 8 – 18 % for the outdoor temperature range of 35 – 45 ⁰C. An economic analysis was conducted to find the potential saving in utility costs for 30%, 60%, and 90% of the space cooling demands of Dubai, and find the trade-off points between utility savings and cost of PCM-TES implementation. If the peak loads are to be shifted by 6 hours daily, the percentage utility savings for the city is 18%. Using estimated costs of the PCM-TES, ranging from $200-500/kWh, the daily load shifting hours were estimated to range from 4 hours at the lowest cost systems to 2.5 hours at the highest costs.

25 ENERGY STORAGE↗

Analytic analysis of load alignment for coning extreme‐scale rotors

Abstract Extreme‐scale wind turbines (rated powers greater than 10 MW) with large rotor diameters and conventional upwind designs must resist extreme downwind and gravity loads. This can lead to significant structural design challenges and high blade masses that can impede the reduction of levelized cost of wind energy. Herein, the theoretical basis for downwind load alignment is developed. This alignment can be addressed with active downwind coning to reduce/eliminate flapwise bending loads by balancing the transverse components of thrust, centrifugal, and gravitational force. Equations are developed herein that estimates the optimal coning angle that reduces flapwise loads by a specified amount. This analysis is then applied to a 13.2‐MW scale with 100‐m‐level wind turbine blades, where it is found that a load alignment coning schedule can substantially reduce the root flapwise bending moments. This moment reduction in this example can allow the rotor mass to be decreased significantly when compared with a conventional upwind three‐bladed rotor while maintaining structural performance and annual energy output.

Noyes, Carlos↗

SIDSIM (Sub-Interval Distribution-function in Simulation) [SWR-17-22]

Time-series simulation is a technique used to estimate the energy delivery of a power generation system with output that changes under changing conditions. Such variable resources include photovoltaic energy systems that experience different levels of sunlight or wind farms with changing wind patterns. As distributed generation from these variable resources continues to flourish, having improved software tools to accurately measure, model, and estimate phenomena of interest to grid integration, in addition to energy output, will be crucial for safeguarding smooth integration and operation of these energy systems. Currently, time-series simulations assume conditions and power output are constant over the duration of a time-step (steady-state assumption). NREL researchers improve the accuracy with a new simulation software called SIDSIM (Sub-Interval Distribution Simulation) that replaces this steady value (solar or wind resource) with a distribution function that has a maximum value, a minimum value, and a shape to the curve within each time-step. The distribution function used for modeling varying values in the SIDSIM software is a novel equation and presents advantageous new benefits over the conventional methods. The first advantage comes in the ability to determine maximum instantaneous power within a time-step. This enables better protection of a system from overcurrent issues and it also allows for better forecasting and reservation of transmission capacity; such capabilities are essential for energy system integration. Second, a distribution function helps to determine the amount of energy loss due to “clipping” in cases where the photovoltaic direct current (DC) system capacity exceeds the inverter capacity, the AC interconnect capacity, or any other limiting component or threshold value. It improves estimates of battery throughput by allowing both charge and discharge of a battery within the duration of a time-step. Third, it provides a more refined estimate of utility-bill impacts by considering the delivered power may be higher than the site load or lower than the regular average power estimates that are made using a quasi-steady-state assumption. SEE ALSO OSTI ID 1,361,018

Walker, Andy↗

Visual scanning behavior and mental workload in aircraft pilots

This paper describes an experimental paradigm and a set of preliminary results which demonstrate a relationship between the level of performance on a skilled man-machine control task, the skill of the operator, the level of mental difficulty induced by an additional task imposed on the basic control task, and visual scanning performance. During a constant, simulated piloting task, visual scanning of instruments was found to vary as a function of the level of difficulty of a verbal loading task. The average dwell time of each fixation on the pilot's primary instrument increased as a function of the loading. The scanning behavior was also a function of the estimated skill level of the pilots, with novices being affected by the loading task much more than experts. The results suggest that visual scanning of instruments in a controlled task may be an indicator of both workload and skill.

Tole, J. R.↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Centralized and Decentralized Optimal Control of Variable Speed Heat Pumps

Utility service providers are often challenged with the synchronization of thermostatically controlled loads. Load synchronization, as a result of naturally occurring and demand-response events, has the potential to damage power distribution equipment. Because thermostatically controlled loads constitute most of the power consumed by the grid at any given time, the proper control of such devices can lead to significant energy savings and improved grid stability. The contribution of this paper is the development of an optimal control algorithm for commonly used variable speed heat pumps. By means of selective peer-to-peer communication, our control architecture allows for the regulation of home temperatures while simultaneously minimizing aggregate power consumption, and aggregate load volatility. An optimal centralized controller is also explored and compared against its decentralized counterpart.

30 DIRECT ENERGY CONVERSION↗

Geology and Origin of Europa's Mitten Feature (Murias Chaos)

The "Mitten" (provisionally named Murias Chaos by the International Astronomical Union) is a region of elevated chaos-like terrain in the leading hemisphere of Europa. Its origin had been explained under the currently debated theories of melting through a thin lithosphere or convection within a thick one. Galileo observations reveal several characteristics that suggest that the Mitten is distinct from typical chaos terrain and point to a different formational process. Photoclinometric elevation estimates suggest that the Mitten is slightly elevated with respect to the surrounding terrain; geologic relations indicate that it must have raised significantly from the plains in its past, resembling disrupted domes on Europa's trailing hemisphere. Moreover, the Mitten material appears to have extruded onto the plains and flowed for tens of kilometers. The area subsequently subsided as a result of isostatic adjustment, viscous relaxation, and/or plains loading. Using plate flexure models, we estimated the elastic lithosphere in the area to be several kilometers thick. We propose that the Mitten originated by the ascent and extrusion of a large thermal diapir. Thermal-mechanical modeling shows that a Mitten-sized plume would remain sufficiently warm and buoyant to pierce through the crust and flow unconfined on the surface. Such a diapir probably had an initial radius between 5 and 8 km and an initial depth of 20-40 km, consistent with a thick-lithosphere model. In this scenario the Mitten appears to represent the surface expression of the rare ascent of a large diapir, in contrast to lenticulae and chaos terrain, which may form by isolated and clustered small diapirs, respectively.

Figueredo, P. H.↗

Evaluation of Geometrically Nonlinear Reduced Order Models with Nonlinear Normal Modes

Several reduced-order modeling strategies have been developed to create low-order models of geometrically nonlinear structures from detailed finite element models, allowing one to compute the dynamic response of the structure at a dramatically reduced cost. But, the parameters of these reduced-order models are estimated by applying a series of static loads to the finite element model, and the quality of the reduced-order model can be highly sensitive to the amplitudes of the static load cases used and to the type/number of modes used in the basis. Our paper proposes to combine reduced-order modeling and numerical continuation to estimate the nonlinear normal modes of geometrically nonlinear finite element models. Not only does this make it possible to compute the nonlinear normal modes far more quickly than existing approaches, but the nonlinear normal modes are also shown to be an excellent metric by which the quality of the reduced-order model can be assessed. Hence, the second contribution of this work is to demonstrate how nonlinear normal modes can be used as a metric by which nonlinear reduced-order models can be compared. Moreover, various reduced-order models with hardening nonlinearities are compared for two different structures to demonstrate these concepts: a clamped–clamped beam model, and a more complicated finite element model of an exhaust panel cover.

97 MATHEMATICS AND COMPUTING↗

Distribution system model calibration with big data from AMI and PV inverters

Efficient management and coordination of distributed energy resources with advanced automation schemes requires accurate distribution system modeling and monitoring. Big data from smart meters and photovoltaic (PV) micro-inverters can be leveraged to calibrate existing utility models. This paper presents computationally efficient distribution system parameter estimation algorithms to improve the accuracy of existing utility feeder radial secondary circuit model parameters. The method is demonstrated using a real utility feeder model with advanced metering infrastructure (AMI) and PV micro-inverters, along with alternative parameter estimation approaches that can be used to improve secondary circuit models when limited measurement data is available. Lastly, the parameter estimation accuracy is demonstrated for both a three-phase test circuit with typical secondary circuit topologies and single-phase secondary circuits in a real mixed-phase test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗