Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Remote-Handled TRU Storage Challenges at Sandia National Laboratories/ New Mexico - 16071

The events at the Waste Isolation Pilot Plant (WIPP) in February 2014 had a significant impact on the packaging, storage, and disposal options at Sandia National Laboratories/New Mexico (Sandia) as with other transuranic generator sites. In 2012, Sandia had identified accountable material for disposal, fresh and irradiated mixed oxide (MOX) and uranium oxide (UO{sub 2}), which had been used in experiments conducted in the 1970's and 1980's. During the 2012/2013 timeframe, discussions with WIPP determined the samples and experimental vessels qualified as remote-handled (RH) transuranic (TRU) waste for disposal at WIPP. Sandia began discussions with WIPP to determine the process to repackage and characterize the material for disposal at WIPP in addition to obtain funding to complete the project. By January 2014, Sandia had contracted with Nuclear Waste Partnerships, LLC (NWP) to provide Central Characterization Program (CCP) certified visual examination (VE) and dose-to-curie (DTC) support to package and certify the accountable material/waste. Work began on February 3, 2014 with the arrival of two VE operators. On February 5, 2014, a salt truck caught fire in the underground and on February 14, 2014, the radiological release occurred at WIPP initiating a suspension of shipments. The length of the suspension was not known at the time. Sandia was only a couple of days into this long-term project, had signed a contract with NWP for support, and was still responsible for meeting earlier negotiated milestones. There were 37 parent containers which included experimental vessels from 3 to 10 feet long and unused material pieces. The original plan was to package each of the 37 parent containers separately, but several issues, including the suspension of shipments, made it imperative that a new path forward be developed. Because space is limited in the Auxiliary Hot Cell Facility (AHCF), the storage configuration for criticality safety and material-at-risk was of the highest importance. Therefore, packaging in the fewest number of containers without exceeding WIPP limits, keeping the accountable items together, and not violating any safety basis requirements was Sandia's goal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-J-190: Development of Abdominal Compression & Respiratory Guiding System Using Gas Pressure Sensor

Purpose: Abdominal compression is known to be effective but, often makes external-marker-based monitoring of breathing motion not feasible. In this study, we developed and evaluated a system that enables both abdominal compression and monitoring of residual abdominal motion simultaneously. The system can also provide visual-biofeedback capability. Methods: The system developed consists of a compression belt, an abdominal motion monitoring sensor (gas pressure sensor) and a visual biofeedback device. The compression belt was designed to be able to compress the frontal side of the abdomen. The pressure level of the belt is controlled by air volume and monitored in real time using the gas pressure sensor. The system displays not only the real-time monitoring curve but also a guiding respiration model (e.g., a breath hold or shallow breathing curve) simultaneously on the head mounted display to help patients keep their breathing pattern as consistent as possible. Three healthy volunteers were enrolled in this pilot study and respiratory signals (pressure variations) were obtained both with and without effective abdominal compression to investigate the feasibility of the developed system. Two guidance patterns, breath hold and shallow breathing, were tested. Results: All volunteers showed smaller abdominal motion with compression (about 40% amplitude reduction compared to without compression). However, the system was able to monitor residual abdominal motion for all volunteers. Even under abdominal compression, in addition, it was possible to make the subjects successfully follow the guide patterns using the visual biofeedback system. Conclusion: The developed abdominal compression & respiratory guiding system was feasible for residual abdominal motion management. It is considered that the system can be used for a respiratory motion involved radiation therapy while maintaining the merit of abdominal compression. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the Ministry of Science, ICT&Future Planning.

60 APPLIED LIFE SCIENCES↗

Low-temperature Stirling Engine for Geothermal Electricity Generation

Up to 2700 terawatt-hours per year of geothermal electricity generation capacity has been shown to be available within North America, typically with wells drilled into geologically active regions of the earth's crust where this energy is concentrated (Huttrer, 2001). Of this potential, about half is considered to have temperatures high enough for conventional (steam-based) power production, while the other half requires unconventional power conversion approaches, such as organic Rankine cycle systems or Stirling engines. If captured and converted effectively, geothermal power generation could replace up to 100GW of fossil fuel electric power generation, leading to a significant reduction of US power sector emissions. In addition, with the rapid growth of hydro-fracking in oil and gas production, there are smaller-scale distributed power generation opportunities in heated liquids that are co-produced with the main products. Since 2006, Cool Energy, Inc. (CEI) has designed, fabricated and tested four generations of low-temperature (100°C to 300°C) Stirling engine power conversion equipment. The electric power output of these engines has been demonstrated at over 2kWe and over 16% thermal conversion efficiency for an input temperature of 215°C and a rejection temperature of 15°C. Initial pilot units have been shipped to development partners for further testing and validation, and significantly larger engines (20+ kWe) have been shown to be feasible and conceptually designed. Originally intended for waste heat recovery (WHR) applications, these engines are easily adaptable to geothermal heat sources, as the heat supply temperatures are similar. Both the current and the 20+ kWe designs use novel approaches of self-lubricating, low-wear-rate bearing surfaces, non-metallic regenerators, and high-effectiveness heat exchangers. By extending CEI's current 3 kWe SolarHeart® Engine into the tens of kWe range, many additional applications are possible, as one 20 kWe design produces nearly seven times the power output of the 3 kWe unit but at only 2.5 times the estimated fabrication cost. Phase I of the proposed SBIR program will therefore study the feasibility of generating electricity with one or more 20 kWe or larger Stirling engines, powered by geothermal heat produced by current and possibly some forward-looking borehole extraction methods, and from producing oil and gas wells. The feasibility study will include full analysis of the thermodynamic and heat transfer processes within the engine (necessary to produce optimum theoretical designs and performance maps), the cost of pumping the geothermal heat recovery fluid, and how the system tradeoffs impact the overall system economics. The goal is a geothermal system design that could be demonstrated during a Phase II follow-on program at a field test site.

15 GEOTHERMAL ENERGY↗

Design and Assessments of Liquid Metal Systems for a Fusion Power Reactor

This three-year research program at UCLA builds on the Fusion Engineering System Study (FESS) and has the major goal of identifying and accessing the most critical MHD/Mass & Heat Transfer phenomena associated with LM MHD flows in fusion breeding/cooling applications. The computed results and their analyses provide a strong basis to overcome present design limitations and will eventually lead to feasible, more effective solutions for LM systems of a fusion power reactor, such as breeding blankets and LM plasma facing components (PFCs). The project focuses on three research thrusts: Identification and characterization of the most important generic issues common to LM breeders (hereinafter called “Blanket”: ~47% of the resources); Design, implementation and assessments of two LM breeding-blanket concepts, DCLL and HCLL, for particular fusion devices, such as the US Fusion Nuclear Science Facility (FNSF) or the Fusion Pilot Plant (FPP) (hereinafter called “System Studies”: ~40% of the resources); Design and analysis of LM (Li) divertor concepts for FNSF or FPP, including scoping and detailed 2D and 3D computations (hereinafter called “LM PFC”: ~13% of the resources).

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling of Reactor Design and Optimization for Scale-Up of the Catalyxx Process for Ethanol Conversion to Higher Alcohol Biofuels

This report summarizes the results of a collaborative efforts between Oak Ridge National Laboratory (ORNL) and Catalyxx Inc. to investigate scale-up of Catalyxx’s Ethanol upgrading to higher alcohols process. The study was funded by the U.S. Department of Energy (DOE) Bioenergy Technologies Office (BETO) under CRADA (Cooperative Research and Development Agreement) No: NFE-20-08396. The project is part of the Direct Funding Opportunity (DFO) for Computational Science to Enable Bioenergy program which utilized computational toolsets developed by the Consortium for Computational Physics and Chemistry, a multi-laboratory consortium in BETO. The report here summarizes a packed-bed reactor modeling effort spanning the range from lab to industrial scale (from 4 gram to 5-ton catalyst beds), and examining reactor design, process optimization strategies, and suggested design and operating conditions for Catalyxx’s ethanol upgrading plants. The results in this report have been shared in monthly steering meetings and presentations are available in the shared data house owned by Catalyxx. The modeling effort helped to define optimum operation conditions for maximum alcohol selectivity and yield: i.e., temperature control scenarios ranging from adiabatic to isothermal, feed rate, pressure, and inlet H 2 /Ethanol ratio. The modeling results were verified at lab-(4 gram) and pre-pilot (4 kg) scales and has been used to evaluate a 5-ton packed-bed reactor and identify operating conditions to maximize the butanol yield. Special focus was given to understanding mass-transfer effects in the pre-pilot and pilot-scale reactors, over the domain of flow rate, pressure, feed composition, pellet size, shape, porosity, bed voidage, and reactor dimensions (i.e., length/diameter). Modeling was also used to evaluate innovative reactor design concepts such as water removal to improve alcohol selectivity and yield, and a reactor with an additional side inlet to facilitate quenching. These concepts were thoroughly explored, and potential benefits were disclosed. The results in this report are summarized and described qualitatively to protect the IP rights of Catalyxx. The details have been shared with the Catalyxx team in the regular steering meetings. At the end of the project, Catalyxx Inc. announced a successful demonstration of pilot scale operation in Seville, Spain.

02 PETROLEUM↗

CyTRICS Impact-Based Prioritization Process

Cyber Testing for Resilient Industrial Control Systems™ (CyTRICS™) is the Department of Energy’s (DOE’s) program for cybersecurity vulnerability testing, digital subcomponent enumeration, and forensic assessment. CyTRICS leverages best-in-class test facilities and analytic capabilities at six DOE National Laboratories and strategic partnerships with key stakeholders including technology developers, manufacturers, asset owners and operators, and interagency partners. During the program’s development, CyTRICS established a unique methodology for prioritizing digital components within operational technology (OT) and industrial control systems (ICS) in the Energy Sector Industrial Base (ESIB) for cyber vulnerability testing. The CyTRICS prioritization process leverages multiple characteristics of systems, components, and their contextual deployment to calculate a quantification of individual digital components for CyTRICS testing. The initial version of the CyTRICS prioritization process was premised largely upon the impact which could result to an energy sector industrial control system if the digital component under testing was compromised, either through malicious means, faulty engineering, or other modes. CyTRICS has termed this process the “CyTRICS Impact-based Prioritization Process.” This paper describes the factors identified for use in the Impact-based Prioritization process and identifies the rationale for inclusion. During development, three National Laboratories piloted this prioritization process and generated prioritization scores for seven systems. Following the piloting of the process, laboratory subject matter experts (SME) validated that the numerical scores generated by the prioritization process were consistent with their knowledge of the impact that may occur should any of these systems be disrupted. The following document explains how to perform the prioritization process to generate prioritization scores for energy sector systems. After outlining assumptions required to conduct the process, it describes how to identify and elicit data which can be leveraged to evaluate a system and assign numerical values for each factor. The prioritization process uses different weights on different factors; rationale for each weight is included within the paper. Additionally, the paper includes some recommendations for future enhancements to prioritization, including lessons learned from developing and piloting the process. Finally, a comprehensive appendix includes example documents to be leveraged by those looking to execute the prioritization process.

99 GENERAL AND MISCELLANEOUS↗

FY16 Summary Report: Participation in the KOSINA Project

Salt formations represent a promising host for disposal of nuclear waste in the United States and Germany. Together, these countries provided fully developed safety cases for bedded salt and domal salt, respectively. Today, Germany and the United States find themselves in similar positions with respect to salt formations serving as repositories for heat-generating nuclear waste. German research centers are evaluating bedded and pillow salt formations to contrast with their previous safety case made for the Gorleben dome. Sandia National Laboratories is collaborating on this effort as an Associate Partner, and this report summarizes that teamwork. Sandia and German research groups have a long-standing cooperative approach to repository science, engineering, operations, safety assessment, testing, modeling and other elements comprising the basis for salt disposal. Germany and the United States hold annual bilateral workshops, which cover a spectrum of issues surrounding the viability of salt formations. Notably, recent efforts include development of a database for features, events, and processes applying broadly and generically to bedded and domal salt. Another international teaming activity evaluates salt constitutive models, including hundreds of new experiments conducted on bedded salt from the Waste Isolation Pilot Plant. These extensive collaborations continue to build the scientific basis for salt disposal. Repository deliberations in the United States are revisiting bedded and domal salt for housing a nuclear waste repository. By agreeing to collaborate with German peers, our nation stands to benefit by assurance of scientific position, exchange of operational concepts, and approach to elements of the safety case, all reflecting cost and time efficiency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Patient Room Lighting System with Integrated Spectrally Adaptive Control

In December of 2013, the U.S. Department of Energy’s SSL R&D Program released a Funding Opportunity Announcement (FOA), that for the first time, contained opportunities for comprehensive application-specific system development. The FOA included opportunities for two applications, one of which was a Patient Room. Philips Lighting Research North America, submitted a proposal for the Patient Room application, and was selected for the complete project award. The award amount was for $497,127, with a Philips Research co-funding commitment 165,709 dollars. The total project value was 662,836 dollars. This project sought to redefine lighting for the patient room application. The goal was to deliver an innovative LED patient suite (patient room and bathroom) lighting system solution that was 40% more energy-efficient than traditional fluorescent incumbent technologies, and would meet all the visual and non-visual needs of patients, caregivers and visitors, and improve the patient experience. State-of-the-art multichannel LED platforms and control technologies that would provide spectral tuning and become part of an intelligent, connected lighting system drove the solution. The project was scoped into four main task areas that included a) System Concept Creation, b) Identification of the Luminaire Portfolio, c) Development of the Connected Lighting Infrastructure, and d) System Performance Validation. Each of the four main tasks were completed and validated extensively over the course the 2 ½ year project. The system concept was created by first developing a lighting design that demonstrated best practices for patient room lighting – illuminance and uniformity for task performance, reduced glare, and convenient controls, in addition to giving patients control over the lighting in their environment. A framework was defined to deliver circadian support via software behaviors. Through that process luminaires were identified from the Philips portfolio that were adaptable – by their form, dimensions, and optical materials – to mix multicolor LED platforms uniformly and deliver target design lumen levels. The Blue Sky luminaire was selected for the patient bed area to give the illusion of skylight while providing white light on the patient bed. Luminaires used existing 2-channel tunable white LED boards, and newly developed 4-channel LED boards. Red-Orange, Blue, Green, and Blue-shifted Yellow LED chips were selected based on spectral characteristics and their ability to produce high quality white light. 4-channel Power over Ethernet (PoE) drivers were developed and firmware written so they would communicate with both 2- and 4-channel boards. These components formed the backbone of the connected lighting infrastructure. Software, flexible and nuanced in its complexity, was written to set behaviors for myriad lighting scenes in the room throughout the 24 hour day – and all could be overridden by manual controls. This included a dynamic tunable white program, three color changing automatic programs that simulated degrees of sunrise to sunset palettes, and an amber night lighting system that offered visual cues for postural stability to minimize the risk of falls. All programs were carefully designed to provide visual comfort for all occupants, support critical task performance for staff, and to support the patient’s 24hr rhythms. A full scale mockup room was constructed in the Philips Cambridge Lab. The lighting system was installed, tested and functionality demonstrated to ensure smooth operation of system components – luminaires, drivers, PoE switches, wall controls, patient remote, and daylight and occupancy sensors. How did the system perform? It met visual criteria, confirmed by calculations, simulations and measurements in the field. It met non-visual criteria, confirmed by setting circadian stimulus (CS) targets and performing calculations using the calculator developed by the Lighting Research Center. Finally, human factors validation studies were conducted to gain insight from real end users in the healthcare profession; surveys were administered, data analyzed, and audio comments captured. The general consensus was positive, with requests to pilot the system in their hospitals. The importance of the research completed under this grant is that it allowed the exploration and development of a unique lighting system, one that would deliver a blend of visual and non-visual criteria in patient room design for today’s healthcare environment. The research investigated the area of multichannel LED technology, multichannel Power over Ethernet (PoE) drivers and their integration with automatic and manual controls as a system – uncovering and meeting challenges along the way. It married visual needs of patients and staff with support for 24 hour rhythms, placing value on the wellbeing of the patient – while successfully saving energy over incumbent technologies. Indications are that the market is ready and willing to invest – multiple healthcare facilities are in line to pilot this system, recognizing its value beyond energy to patient and staff well-being. Its value to the public can best be expressed by a patient support coordinator who, after spending several hours in the room being immersed in the lighting, analyzing all its features, commented: “This re-writes lighting for healthcare”.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Acquired experience resulting from transforming a chemical installation into a nuclear one

ICIT-Valcea has developed an experimental pilot-scale installation for tritium and deuterium separation. The main objective of this pilot was to demonstrate the water detritiation technology and to transfer this technology to the CANDU reactors of the Cernavoda nuclear power plant. The pilot-scale installation was initiated in 1992. The initial design and construction were performed similarly to chemical plants as the separation of isotopes was focused on only hydrogen and deuterium to assess feasibility. In a second phase we have begun to transform it into a nuclear facility with the aim of separating tritium. Moving to tritium separation has imposed a lot of changes. Changes consisted mainly of: -) re-design of the technological systems for nuclear material processing, applying specific codes and standards (ASME, Romanian nuclear specific pressure boundary prescriptions for code classification); -) design and implementation of new systems, classified as safety systems; -) re-design and implementation of command and control systems, complying with the requirements of reliability and maintenance required for the project promoted; -) revaluation of auxiliary systems (utilities, power supply); -) implementing radiation protection systems, including secondary barriers; -) implementing and maintaining environment operational program specific to the new nuclear plant; -) developing and conducting safety analyzes; and -) the production of specific documentation to obtain the necessary permits for construction, commissioning and operation of the plant.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CO2 Capture from Biofuels Production and Storage into the Mt Simon Sandstone

Advanced carbon capture and storage (CCS) technologies offer significant potential for reducing anthropogenic carbon dioxide (CO2) emissions, while minimizing the cost of employing these technologies. Under the Industrial Carbon Capture and Storage (ICCS) Program, the U.S. Department of Energy (DOE) collaborated with industry in cost-sharing arrangements to demonstrate technologies that captured CO2 emissions from industrial sources and either stored or beneficially re-use them. The technologies included in the ICCS program progressed beyond the research and development stage to a scale that can be deployed into commercial practice within the industry. The Illinois Industrial Carbon Capture and Storage (IL-ICCS) project sought to demonstrate the ability of the Mt. Simon Sandstone to accept and retain industrial-scale volumes of carbon dioxide (CO2) from an anthropogenic source for permanent geologic sequestration. The project was a collaboration of Archer Daniels Midland (ADM) Company, the Illinois State Geological Survey (ISGS), Schlumberger Carbon Services (SCS), and Richland Community College (RCC), and had average annual injection rate of between 1,500 and 2,400 metric tons per day (MTPD) or 0.5 to 0.7 million metric tons (MMT) annually. The project site is in Decatur, Illinois on the property of ADM and RCC (Fig 1) and is directly adjacent to the Illinois Basin – Decatur Project (IBDP), a large scale pilot project of the Midwest Geological Sequestration Consortium (MGSC), which collected and injected CO2 from the ADM fuel ethanol production unit, where high purity biogenic CO2 is produced during the anaerobic fermentation of sugars to alcohol. The IL-ICCS project had an operational period of approximately six (6) years, in which 3.5 MMT of CO2 was captured, compressed, injected, and permanently stored in the Mt Simon Sandstone.

01 COAL, LIGNITE, AND PEAT↗

Fusion Energy Research at Idaho National Laboratory: Experimentation and Simulation to Support Safety and Rapid Technology Development

Research into fusion energy is growing rapidly, responding to a call for sustainable sources of energy to replace fossil fuels and mitigate climate change. Within the United States, at least, researchers are also responding to the “Bold Decadal Vision” proposed by the White House, seeking to have a commercially relevant fusion pilot plant deployed within a decade. Before this can become a reality, many Fusion Science & Technology (FS&T) gaps remain. For over 45 years, Idaho National Laboratory has been at the forefront of addressing these FS&T gaps in the context of fusion safety and technology via the operation of world-leading experimental facilities within the Safety and Tritium Applied Research (STAR) Facility. Here, INL focuses on the tritium fuel cycle, conceptual system design studies, risk assessment, waste management, and materials safety. Modeling and Simulation (M&S) has also been a component of this portfolio of research, but, early on, focused on individual systems. Since 2019, active development and research on integrated whole device modeling tools based on the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework has been undertaken. This has culminated in a MOOSE-based version of the Tritium Migration and Analysis Program (TMAP), an INL code historically focused on tritium permeation and trapping within fusion systems. More recently, INL Laboratory Directed Research and Development funds have been used to create the Fusion ENergy Integrated multiphys-X (FENIX) code focused on scrape-off layer plasma physics and the first wall of a magnetically confined fusion device. This talk will focus on an overview of INL activities in the FS&T research area, with a particular focus on recent M&S activities and results.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Fast Responding Voltage Regulator and Dynamic VAR Compensator

The objectives of this project were to develop a dynamic VAR compensator (DVC) for voltage regulation through VAR support to demonstrate the ability to achieve greater levels of voltage control on electricity distribution networks, and faster response compared to existing grid technology. The goal of the project was to develop a prototype Fast Dynamic VAR Compensator (Fast DVC) hardware device, and this was achieved. In addition to developing the dynamic VAR compensator device, Varentec in partnership with researchers at North Carolina State University (NCSU) successfully met the objectives to model the potential positive impact of such DVCs on representative power networks. This modeling activity validated the ability of distributed dynamic VAR compensators to provide fast voltage regulation and reactive power control required to respond to grid disturbances under high penetration of fluctuating and intermittent distributed energy resources (DERs) through extensive simulation studies. Specifically the following tasks were set to be accomplished: 1) Development of dynamic VAR compensator to support dynamic voltage variations on the grid through VAR control 2) Extensive testing of the DVC in the lab environment 3) Present the operational DVC device to the DOE at Varentec’s lab 4) Formulation of a detailed specification sheet, unit assembly document, test setup document, unit bring-up plan, and test plan 5) Extensive simulations of the DVC in a system with high PV penetration. Understanding the operation with many DVC on a single distribution system 6) Creation and submittal of quarterly and final reports conveying the design documents, unit performance data, modeling simulation charts and diagrams, and summary explanations of the satisfaction of program goals. This report details the various efforts that led to the development of the Fast DVC as well as the modeling & simulation results. The report begins with the introduction in Section II which outlines the problems associated with increasing penetration of renewable resources on the grid and what are the challenges in solving these issues. Section III provides a brief summary of the initial concepts that were explored before the final Fast DVC prototype was developed. Section IV and V present the hardware, controls, communication, and mechanical architecture and features of the Fast DVC. Section VI presents the procedure for assembling the Fast DVC. The test plan and lab setup are expounded in Section VII and VIII. Section IX presents the results from testing the Fast DVC in the lab, several results are presented along with some pictures of the developed unit. Section X details the pilot demonstration activities. Finally, section XI showcases the efforts associated with the simulation and modeling of the Fast DVC in various scenarios with DERs and its impact in all these scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AGR-5/6/7 Irradiation Disassembly and Metrology First Look

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform research and development on tristructural isotropic (TRISO)-coated particle fuel to support deployment of high-temperature gas-cooled reactors (HTGRs), which are graphite-moderated nuclear reactors cooled with helium. This work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel Program. The overarching program goal is to provide a baseline fuel qualification data set to support licensing, deployment, and operation of HTGRs in the United States. To achieve these goals, the program includes fuel fabrication, irradiations of TRISO fuels and high-temperature materials (e.g., graphite), safety testing and post-irradiation examination (PIE), fuel performance modeling, and fission product transport and source term determination. The ART AGR program has conducted four distinct fuel irradiation experiments in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The first of these irradiation tests, designated AGR-1, began in ATR in December of 2006 and ended in November 2009. This experiment was primarily to act as a shakedown test of the multi-capsule test train design and to provide early data on fuel performance that would be used in fuel fabrication process development. AGR-1 fuel kernels were produced on an engineering scale, but the TRISO coatings and cylindrical fuel compacts were fabricated on a laboratory scale. The AGR-1 PIE was completed and the final report was published in 2015. The second irradiation test, AGR-2, started in ATR in June 2010 and ended in October 2013. The AGR-2 irradiation test was designed to provide fuel performance data for coated particles fabricated on an engineering-scale pilot line using a coater with an internal chamber diameter of 150 mm (6 in.). The final PIE report was published in 2021. AGR-3/4, a single irradiation that combined what were originally conceived as the third and fourth tests, was to support the refinement of fission product transport models and to assess the effects of sweep gas impurities on fuel performance and fission product transport. PIE of the AGR-3/4 experiment is still in progress as of this writing. The subject of this report is AGR-5/6/7, the final qualification test of AGR TRISO fuel made entirely at the engineering scale.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Need for an Independent Monitoring of Nuclear Waste Repository: Lessons from WIPP Experience - 18130

The Waste Isolation Pilot Plant (WIPP) is the only operating deep geological repository for the permanent disposal of defense transuranic (TRU) waste in the world. The facility recently resumed waste disposal operations after recovering from a February 2014 accident involving a radiological release from a waste container in the WIPP underground. WIPP had been a DOE success story, operating nearly 15 years with no significant incidents or accidents. Many factors contributed to this success, one of the most important being the overwhelming support exhibited by the local community and the local elected officials. One component of the broad public acceptance by the citizens of Southeast New Mexico has been the concept of independent, third party monitoring of environmental effluents at the site. Independent environmental monitoring ensures a role for the local community in ongoing evaluation of the safety and performance of the site. At WIPP this has been achieved through an independent environmental monitoring program operated by the Carlsbad Environmental Monitoring and Research Center (CEMRC). The CEMRC has been conducting independent environmental monitoring activities on and around the WIPP site since 1991 and makes the results of monitoring activities available and easily accessible to members the general public. The public's free and open access to this data and their direct participation in the CEMRC's whole body counting program provides transparency, which is key to maintaining public trust and confidence. The circumstances following the 2014 radiological release event at WIPP reinforced the value of independent environmental monitoring in order to maintain the high level of transparency necessary for long term local acceptance and support for nuclear facilities. Following what was a minor radiological release event, there were understandably fearful reactions from a number of citizens residing in Carlsbad and the nearby communities of Hobbs, Loving, and Artesia. CEMRC's independent environmental monitoring program and their early public engagement proved invaluable in providing timely and accurate environmental data to local community leaders and members of the general public. The data, and open communication from CEMRC, helped reassure citizens in Carlsbad and the surrounding area that the release was extremely low and the extent was very limited. CEMRC further communicated that the probability of any environmental or health impacts from the release was extremely low. It is unlikely the local community would have placed the same level of trust in similar assurances of safety coming from DOE or other State and Federal regulators. The CEMRC's performance in the days following the release meant the local community had access to independent monitoring data and an independent voice in the dialogue with DOE and state officials that shaped the recovery and eventual re-opening of the WIPP facility. The WIPP radiological release event yielded a plethora of lessons learned that will frame the next phase of operational, oversight, and emergency planning surrounding the facility. In this presentation we will be discussing the value and viability of federally-funded, university-housed independent monitoring programs in maintaining trust of state officials and the local communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GROWdb US River Systems - Samples

GROW Overview We developed the Genome Resolved Open Watersheds database (GROWdb), which aims to increase genomic sampling and understanding of global river microbiomes. An emphasis of GROWdb is to create a publicly available and ever-expanding microbial genome database that is focused on rivers while being interoperable with databases from other ecosystems. GROWdb is based on a network-of-networks approach to move beyond a small collection of well-studied rivers, towards a spatially distributed, global network of systematic observations. GROWdb represents the first microbial, river-focused resource parsed at various scales from genes to MAGs to community level including expression and potential based measurements that will be of interest to microbiologists, ecologists, geochemists, hydrologists, and modelers. Dataset Acknowledgement GROWdb contains data from various research campaigns, please acknowledge the following data generators, as appropriate: WHONDRS derived genomes or samples - include this statement in your acknowledgements: “This study used data from the Worldwide Hydrobiogeochemistry Observation Network for Dynamic River Systems (WHONDRS) under the River Corridor Science Focus Area (SFA) at the Pacific Northwest National Laboratory (PNNL) that was generated at the U.S. Department of Energy (DOE) Joint Genome Institute User Facility. PNNL is operated by Battelle Memorial Institute for the U.S. DOE under Contract No. DE-AC05-76RL01830. The SFA is supported by the U.S. DOE, Office of Biological and Environmental Research (BER), Environmental System Science (ESS) Program.” Total Samples loaded onto this Narrative: 178 Note: Not all GROW samples may be loaded into KBase Data Availability The data underlying GROWdb are accessible across various platforms to ensure all levels of data structure are widely available. First, all reads and MAGs are publicly hosted on National Center for Biotechnology (NCBI) under Bioproject PRJNA946291. Second, all data related data presented here including MAG annotations, extended data tables, phylogenetic tree files, antibiotic resistance gene database files, and MAG abundance tables are available in Zenodo (link). Beyond the flat database files listed above, our aim for GROWdb was to maximize data use by making the data available in searchable and interactive platforms including the National Microbiome Data Collaborative (NMDC) data portal, the Department of Energy’s Systems Biology Knowledgebase (KBase), and a GROW specific user interface released here, GROWdb Explorer. Each platform provides different ways to interact with GROWdb: NMDC GROWdb formed a pilot project for the NMDC. Specifically, individual GROWdb datasets (metagenomes, metatranscriptomes, etc) are easily accessible and searchable through the NMDC data portal, where they are systematically connected to each other and to a rich suite of sample information and standard analysis results, following Findable, Accessible, Interoperable, and Reusable (FAIR) data practices. KBase GROWdb is publicly available within KBase, including samples (this Narrative), MAGs, and corresponding genome scale metabolic models. Access within KBase allows for immediate access and reuse of data, including comparison to private data using KBase’s 500+ analysis tools. Other linked narratives in KBase: GROW Metagenome Assembled Genomes (MAGs) GROW Metabolic Models GROWdb Explorer GROWdb data is also explorable through a graphical user interface built through the Colorado State University Geospatial Centroid (https://geocentroid.shinyapps.io/GROWdatabase/), allowing users to search and graph microbial and spatial data simultaneously. In summary, this microbial genome resource represents the first publicly available genome collection from rivers and offers data that can be leveraged across microbiome studies. GROWdb is an expanding repository to incorporate and unify global river multi-omic data for the future.

59 BASIC BIOLOGICAL SCIENCES↗

Development and implementation of energy efficiency standards and labeling programs in China: Progress and challenges

Over the last twenty years, with growing policy emphasis on improving energy efficiency and reducing environmental pollution and carbon emissions, China has implemented a series of new minimum energy performance standards (MEPS) and mandatory and voluntary energy labels to improve appliance energy efficiency. As China begins planning for the next phase of standards and labeling (S&L) program development under the 12th Five Year Plan, an evaluation of recent program developments and future directions is needed to identify gaps that still exist when compared with international best practices. The review of China’s S&L program development and implementation in comparison with major findings from international experiences reveal that there are still areas of improvement, particularly when compared to success factors observed across leading international S&L program. China currently lacks a formalized regulatory process for standard-setting and do not have any legal or regulatory guidance on elements of S&L development such as stakeholder participation or the issue of legal precedence between conflicting national, industrial and local standards. Consequently, China’s laws regarding standard-setting and management of the mandatory energy label program could be updated, as they have not been amended or revised recently and no longer reflects the current situation. While China uses similar principles for choosing target products as the U.S., Australia, EU and Japan, including high energy-consumption, mature industry and testing procedure and stakeholder support, recent MEPS revisions have generally aimed at only eliminating the bottom 20% efficiency of the market. Setting a firm principle based on maximizing energy savings that are technically feasible and economically justified may help improve the stringency of China’s MEPS program and reduce the need for frequent revisions. China also lacks robust survey data and relies primarily on market research data in relatively simple techno-economic analyses used to determine its efficiency standards levels rather than the specific sets of analyses and tools used internationally. Based on international experiences, inclusion of more detailed energy consumption surveys in the Chinese national census surveys and statistical reporting systems could help provide the necessary data for more comprehensive standard-setting analyses. In terms of stakeholder participation in the standards development process, stakeholder participation in China is limited to membership on technical committees responsible for developing or revising standards and generally do not include environmental groups, consumer associations, utilities and other NGOs. Increasing stakeholder involvement to broader interest groups could help garner more support and feedback in the S&L implementation process. China has emerged as a leader in a national verification testing scheme with complementary pilot checktesting projects, but it still faces challenges with insufficient funding, low local awareness amongst some regulatory agencies and resistance to check-testing by some manufacturers, limited product sampling scope, and testing inconsistency and incomparability of results. Thus, further financial and staff resources and capacity building will be needed to overcome these remaining challenges and to expand impacts evaluations to assess the actual effectiveness of implementation and enforcement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Procurement of 100 kg of Enriched Xenon for the EXO Prototype and for its Installation at WIPP

This grant supported the enriched xenon procurement, detector construction and initial operation of the EXO-200 double beta decay experiment at the Waste Isolation Pilot Plant (WIPP). The period of performance was Aug 15, 2002 to Dec 31, 2014. The primary goal of the experiment is to search for the very rare (and to date not observed) neutrino-less double beta decay. Such decay, if observed, would shed the light of the quantum-mechanical structure of neutrinos, and the origins of elementary particle masses. Another goal of the detector is to serve as prototype of a larger neutrino-less double beta decay experiment, currently being considered by DOE-OS. EXO-200 has already been extremely successful in both areas and is, in fact, leading the way world-wide in this area of fundamental physics. In the initial part of the grant the EXO-200 collaboration acquired 200kg of xenon enriched to 80% in the isotope 136 that is a candidate for double beta decay. At the time this was the largest isotope separation program carried out for fundamental science. The enrichment was done in Russia, providing a rare and valuable opportunity for US scientists to work alongside Russian colleagues, in some cases from the former closed cities of their military complex. By now the EXO-200 collaboration include institutions from the US, Canada, South Korea, China, Germany, Switzerland and Russia. Many collaborating scientists from these countries have taken shifts at WIPP or at the various remote monitoring sites world-wide. EXO-200 detector construction was completed in early 2010, with the time projection chamber (TPC) installation in the cleanrooms already placed in NeXA. Detector commissioning at WIPP followed, with the last phase, the filling of the TPC with liquid Xenon, occurring in the spring 2011. EXO-200 is described in [1]. Low background data taking started on Jun 1, 2011 and within the first month of data the 2-neutrino double beta decay of 136Xe was discovered, as reported in [2]. More data provided the best half-life measurement of any 2-neutrino double-beta decay modes [3]. Until Feb 2014 the detector ran continuously producing some of the world leading results in the field and, in particular, two of the most sensitive searches for neutrinoless double beta decay [4,5]. These measurements show that the half life of this decay is longer than 1015 times the age of the universe. This is one of the leading results in this field world-wide and succeeded to put the DOE-funded research on the world stage in a very cost-effective way. Other results from EXO-200 include a search for exotic double-beta decay modes [6], a detailed report on the state of the art background levels achieved in the detector [7], the study of rare ion and neutral atom motion and neutralization rates in liquid Xenon [8], a study of the cosmogenic backgrounds in the detector at WIPP’s depth [9], a search for Lorentz and CPT symmetries violation [10] and a search for double-beta decay to excited states [11]. In Feb 2014 the EXO-200 detector was severely disrupted by the accidents in the WIPP underground (unrelated to EXO-200). The EXO-200 operations team was able to recover the unique stockpile of enriched Xenon to high pressure cylinders and warm-up the detector to room temperature without damaging the very delicate equipment. This was a very impressive achievement as no plan had been made to complete these operations entirely from remote. This validates the robustness of well-designed liquid xenon detectors for this and other measurements in particle and nuclear astrophysics. The operations team re-gained almost regular access to the WIPP underground and the EXO-200 detector in Jan 2015 and spent calendar 2015 cleaning up the soot from the WIPP fire, assessing the damage to the EXO-200 infrastructure, correcting such damage and restarting the detector. This process was successfully carried out and culminated in the re-filling of the detector with liquid xenon, in Jan 2016. As of late Jan 2016 EXO-200 is taking data again. The collaboration is in the process of upgrading the readout electronics and restarting a radon abatement system that had been commissioned just before the Feb 2014 events. The upgraded electronics will provide lower readout noise and, in turn, better signal to background discrimination. The radon abatement system will further reduce the radon in a small air-gap between the EXO-200 cryostat and the lead shielding. In a review in Jun 2015 DOE-OS approved EXO-200 for 2.5 more years of running at the end of which we expect to improve the sensitivity to the neutrino-less double-beta decay by a factor two or three. For the last 5 years the EXO-200 detector, located in the WIPP underground, has been at the center of the hunt for new physics beyond the Standard Model of particle physics!

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗