Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

A Vision for Co-optimized T&D System Interaction with Renewables and Demand Response

The evolution of the power system to the reliable, effi- cient and sustainable system of the future will involve development of both demand- and supply-side technology and operations. The use of demand response to counterbalance the intermittency of re- newable generation brings the consumer into the spotlight. Though individual consumers are interconnected at the low-voltage distri- bution system, these resources are typically modeled as variables at the transmission network level. In this paper, a vision for co- optimized interaction of distribution systems, or microgrids, with the high-voltage transmission system is described. In this frame- work, microgrids encompass consumers, distributed renewables and storage. The energy management system of the microgrid can also sell (buy) excess (necessary) energy from the transmission system. Preliminary work explores price mechanisms to manage the microgrid and its interactions with the transmission system. Wholesale market operations are addressed through the devel- opment of scalable stochastic optimization methods that provide the ability to co-optimize interactions between the transmission and distribution systems. Modeling challenges of the co-optimization are addressed via solution methods for large-scale stochastic op- timization, including decomposition and stochastic dual dynamic programming.

14 SOLAR ENERGY↗

Accelerated Assessment of Critical Infrastructure in Aiding Recovery Efforts During Natural and Human-made Disaster

Relief and recovery from disasters (both natural and human-made) require a coordinated approach across several federal and state government agencies. In order to achieve optimal resource allocation and deployment of first responders, accurate and timely assessment of the impact and extent of destruction are the cornerstones to any recovery effort. Ideally, this knowledge should be gathered and shared within the first 0-24 hours (termed as "Acute Phase" by the U.S. CDC guideline) for informed decision-making. But achieving this poses significant challenges for the data collection and data harmonization processes, particularly when voluminous data are being generated from diverse and distributed sources during the disaster responses. To this end, this work developed a scalable and efficient workflow to dynamically collect and harmonize crowd-sourced geographic multi-modal data, and then assess critical infrastructure (CI) damaged during disaster events. We demonstrate the application of our framework with two real-world experiences in addressing post-disaster recovery efforts - for the Bahamas (Natural - due to Hurricane Dorian, 2019) and Beirut (Human-made - due to explosion caused by the ammonium nitrate stored in a warehouse, 2020). We have illustrated that a coordinated effort is needed for planning as well as for execution to achieve informed decision making.

Thakur, Gautam Malviya↗

REPORT OF ON-SITE INSPECTION WORKSHOP-16

The central issue addressed by this workshop was the task of making the on-site inspection (OSI) part of the Comprehensive Nuclear-Test-Ban Treaty verification system operationally ready at entry into force of the Treaty. It is recognized, and this was emphasized by the 2008 OSI Integrated Field Exercise (IFE), that it is not possible to develop every part of the OSI regime simultaneously. Therefore, it is necessary to prioritize the approach to OSI readiness. The reviews of the IFE have pointed to many elements of OSI readiness that still need development. The objective of this workshop was to provide priorities for the path forward for Working Group B to consider. Several critical areas have been identified that are related to the development of OSI readiness: (1) Technology development: Priorities are radionuclide and noble gas sampling and analysis, visual observation, multispectral/infrared imaging methods, active seismic methods and the recognition of the importance of signatures. (2) Organizational development: Priorities are health and safety, the Operations Support Centre, the Equipment Storage and Maintenance Facility, information technology data flow and communications. (3) Resources: The expertise to develop key parts of the OSI regime is not available within the current OSI Division staff. To develop these aspects of the regime will require more staff or supplements to the staff with cost-free experts or other means. Aspects of the system that could benefit from more staff include radionuclide and noble gas detection methods, data flow and communications, visual observation, multispectral/infrared methods and health and safety. As the path forward, participants of this workshop recognized a need to optimize the development of OSI priorities. The outcome of this workshop is to suggest for consideration an operational approach to OSI readiness that utilizes results of an evaluation of the relative effectiveness of OSI elements versus their relative maturity. By integrating such an assessment with considerations of integrated operational capabilities and the anticipated level of inspection team self-sufficiency and measurable milestone criteria, a set of priorities for OSI development can be developed. Once these priorities have been established, the Policy Making Organs can decide upon the milestones, strategic plan and action plan to serve as guidance for implementation by the Provisional Technical Secretariat. The suggested operational approach is as follows: (1) Assess the relative effectiveness (importance) of OSI elements versus their relative maturity; (2) Determine the anticipated level of self-sufficiency; (3) Define measurable milestone criteria; and (4) Result: Milestones for OSI readiness.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Fast Ray Tracing of Lunar Digital Elevation Models

Ray-tracing (RT) of Lunar Digital Elevation Models (DEM)'s is performed to virtually derive the degree of radiation incident to terrain as a function of time, orbital and ephemeris constraints [I- 4]. This process is an integral modeling process in lunar polar research and exploration due to the present paucity of terrain information at the poles and mission planning activities for the anticipated spring 2009 launch of the Lunar Reconnaissance Orbiter (LRO). As part of the Lunar Exploration Neutron Detector (LEND) and Lunar Crater Observation and Sensing Satellite (LCROSS) preparations RI methods are used to estimate the critical conditions presented by the combined effects of high latitude, terrain and the moons low obliquity [5-7]. These factors yield low incident solar illumination and subsequently extreme thermal, and radiation conditions. The presented research uses RT methods both for radiation transport modeling in space and regolith related research as well as to derive permanently shadowed regions (PSR)'s in high latitude topographic minima, e.g craters. These regions are of scientific and human exploration interest due to the near constant low temperatures in PSRs, inferred to be < 100 K. Hydrogen is thought to have accumulated in PSR's through the combined effects of periodic cometary bombardment and/or solar wind processes, and the extreme cold which minimizes hydrogen sublimation [8-9]. RT methods are also of use in surface position optimization for future illumination dependent on surface resources e.g. power and communications equipment.

McClanahan, Timothy P.↗

Opportunities and Challenges for Nuclear-Renewable Hybrid Energy Systems

Tightly coupled nuclear-renewable hybrid energy systems (N-R HESs) are systems that link subsystems to generate dispatchable electricity and produce at least one industrial product from two or more energy resources. Because N-R HESs are designed to produce different products based on the value of those products in markets, their optimal designs and operations can be complex. This paper summarizes some key conclusions from a set of economic analyses of N-R HESs. Each N-R HES use case analyzed includes a nuclear reactor, a thermal power cycle to convert nuclear energy into electricity, either a wind or photovoltaic solar subsystem producing electricity, and an industrial process producing an energy or an industrial product. The analyses focused on identifying the optimal configuration and hours of operations for each N-R HES within ranges of hypothetical future electricity price profiles and industrial product prices. Four important insights are drawn from the results of those analyses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of a Machine-Learning Algorithm for Treatment Planning in Prostate Low-Dose-Rate Brachytherapy

Purpose: This work presents the application of a machine learning (ML) algorithm to automatically generate high-quality, prostate low-dose-rate (LDR) brachytherapy treatment plans. The ML algorithm can mimic characteristics of preoperative treatment plans deemed clinically acceptable by brachytherapists. The planning efficiency, dosimetry, and quality (as assessed by experts) of preoperative plans generated with an ML planning approach was retrospectively evaluated in this study. Methods and Materials: Preimplantation and postimplantation treatment plans were extracted from 100 high-quality LDR treatments and stored within a training database. The ML training algorithm matches similar features from a new LDR case to those within the training database to rapidly obtain an initial seed distribution; plans were then further fine-tuned using stochastic optimization. Preimplantation treatment plans generated by the ML algorithm were compared with brachytherapist (BT) treatment plans in terms of planning time (Wilcoxon rank sum, α = 0.05) and dosimetry (1-way analysis of variance, α = 0.05). Qualitative preimplantation plan quality was evaluated by expert LDR radiation oncologists using a Likert scale questionnaire. Results: The average planning time for the ML approach was 0.84 ± 0.57 minutes, compared with 17.88 ± 8.76 minutes for the expert planner (P=.020). Preimplantation plans were dosimetrically equivalent to the BT plans; the average prostate V150% was 4% lower for ML plans (P=.002), although the difference was not clinically significant. Respondents ranked the ML-generated plans as equivalent to expert BT treatment plans in terms of target coverage, normal tissue avoidance, implant confidence, and the need for plan modifications. Respondents had difficulty differentiating between plans generated by a human or those generated by the ML algorithm. Conclusions: Prostate LDR preimplantation treatment plans that have equivalent quality to plans created by brachytherapists can be rapidly generated using ML. The adoption of ML in the brachytherapy workflow is expected to improve LDR treatment plan uniformity while reducing planning time and resources.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Photovoltaic and Cost Analysis for Winston-Salem, North Carolina

This study assesses the feasibility of solar installations at various sites in Winston-Salem, focusing on factors such as solar resource availability, electricity costs, and rooftop area for photovoltaic systems. The analysis begins by estimating daily energy requirements based on annual electricity use, followed by adjusting for seasonal and operational fluctuations. Using regional solar data from the National Solar Radiation Database (NSRDB), we calculate average peak sun hours to determine effective system sizing. A parametric approach using the System Advisor Model (SAM) refines this sizing process, incorporating a safety margin of 1.2 to address demand peaks. Each PV system is designed to fit available rooftop space, and a coverage threshold of 70% is identified as optimal for maximizing cost savings and sustainability. This threshold allows installations to meet substantial energy demands, supporting energy resilience and enhancing economic returns.

14 SOLAR ENERGY↗

Evaluation of the Oxygen Concentrator Prototypes: Pressure Swing Adsorption Prototype and Electrochemical Prototype

An oxygen concentrator is needed to provide enriched oxygen in support of medical contingency operations for future exploration human spaceflight programs. It would provide continuous oxygen to an ill or injured crew member in a closed cabin environment. Oxygen concentration technology is being pursued to concentrate oxygen from the ambient environment so oxygen as a consumable resource can be reduced. Because oxygen is a critical resource in manned spaceflight, using an oxygen concentrator to pull oxygen out of the ambient environment instead of using compressed oxygen can provide better optimization of resources. The overall goal of this project is to develop an oxygen concentrator module that minimizes the hardware mass, volume, and power footprint while still performing at the required clinical capabilities. Should a medical event occur that requires patient oxygenation, the release of 100 percent oxygen into a small closed cabin environment can rapidly raise oxygen levels to the vehicles fire limit. The use of an oxygen concentrator to enrich oxygen from the ambient air and concentrate it to the point where it can be used for medical purposes means no oxygen is needed from the ultra-high purity (99.5+% O2) oxygen reserve tanks. By not adding oxygen from compressed tanks to the cabin environment, oxygen levels can be kept below the vehicle fire limit thereby extending the duration of care provided to an oxygenated patient without environmental control system intervention to keep the cabin oxygen levels below the fire limits. The oxygen concentrator will be a Food and Drug Administration (FDA) clearable device. A demonstration unit for the International Space Station (ISS) is planned to verify the technology and provide oxygen capability. For the ISS, the demonstration unit should not exceed 10 kg (approximately 22 lb), which is the soft stowage mass limit for launch on resupply vehicles for the ISS. The unit's size should allow for transport within the spacecraft to an ill crewmember. The user interface needs to be designed for ease of use by the local care provider and with consideration to the limited amount of training available to the astronaut corps for medical equipment and procedures.

Gilkey, Kelly M.↗

Fast Dynamic Simulation-Based Small Signal Stability Assessment and Control

Power grid planning and operation decisions are made based on simulation of the dynamic behavior of the system. Enabling substantial energy savings while increasing the reliability of the aging North American power grid through improved utilization of existing transmission assets hinges on the adoption of wide-area measurement systems (WAMS) for power system stabilization. However, adoption of WAMS alone will not suffice if the power system is to reach its full entitlement in stability and reliability. It is necessary to enhance predictability with "faster than real-time" dynamic simulations that will enable the dynamic stability margins, proactive real-time control, and improve grid resiliency to fast time-scale phenomena such as cascading network failures. Present-day dynamic simulations are performed only during offline planning studies, considering only worst case conditions such as summer peak, winter peak days, etc. With widespread deployment of renewable generation, controllable loads, energy storage devices and plug-in hybrid electric vehicles expected in the near future and greater integration of cyber infrastructure (communications, computation and control), monitoring and controlling the dynamic performance of the grid in real-time would become increasingly important. The state-of-the-art dynamic simulation tools have limited computational speed and are not suitable for real-time applications, given the large set of contingency conditions to be evaluated. These tools are optimized for best performance of single-processor computers, but the simulation is still several times slower than real-time due to its computational complexity. With recent significant advances in numerical methods and computational hardware, the expectations have been rising towards more efficient and faster techniques to be implemented in power system simulators. This is a natural expectation, given that the core solution algorithms of most commercial simulators were developed decades ago, when High Performance Computing (HPC) resources were not commonly available.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Green Prison: Santa Rita Jail Creeps Towards Zero Net Energy (ZNE)

A large project is underway at Alameda County's twenty-year old 45 ha 4,000-inmate Santa Rita Jail, about 70 km east of San Francisco. Often described as a green prison, it has a considerable installed base of distributed energy resources including a seven-year old 1.2 MW PV array, a four-year old 1 MW fuel cell with heat recovery, and efficiency investments. A current US$14 M expansion will add approximately 2 MW of NaS batteries, and undetermined wind capacity and a concentrating solar thermal system. This ongoing effort by a progressive local government with considerable Federal and State support provides some excellent lessons for the struggle to lower building carbon footprint. The Distributed Energy Resources Customer Adoption Model (DER-CAM) finds true optimal combinations of equipment and operating schedules for microgrids that minimize energy bills and/or carbon emissions without 2 of 12 significant searching or rules-of-thumb prioritization, such as"efficiency first then on-site generation." The results often recommend complex systems, and sensitivities show how policy changes will affect choices. This paper reports an analysis of the historic performance of the PV system and fuel cell, describes the complex optimization applied to the battery scheduling, and shows how results will affect the jail's operational costs, energy consumption, and carbon footprint. DER-CAM is used to assess the existing and proposed DER equipment in its ability to reduce tariff charges.

25 ENERGY STORAGE↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Climate and water resource change impacts and adaptation potential for US power supply

Power plants that require cooling currently (2015) provide 85% of electricity generation in the United States. These facilities need large volumes of water and sufficiently cool temperatures for optimal operations, and projected climate conditions may lower their potential power output and affect reliability. We evaluate the performance of 1,080 thermoelectric plants across the contiguous US under future climates (2035-2064) and their collective performance at 19 North American Electric Reliability Corporation (NERC) sub-regions. Joint consideration of engineering interactions with climate, hydrology and environmental regulations reveals the region-specific performance of energy systems and the need for regional energy security and climate-water adaptation strategies. Despite climate-water constraints on individual plants, the current power supply infrastructure shows potential for adaptation to future climates by capitalizing on the size of regional power systems, grid configuration and improvements in thermal efficiencies. Without placing climate-water impacts on individual plants in a broader power systems context, vulnerability assessments that aim to support adaptation and resilience strategies misgauge the extent to which regional energy systems are vulnerable. As a result, climate-water impacts can lower thermoelectric reserve margins, a measure of systems-level reliability, highlighting the need to integrate climate-water constraints on thermoelectric power supply into energy planning, risk assessments, and system reliability management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Renewable Energy Cost Modeling: A Toolkit for Establishing Cost-Based Incentives in the United States

This report serves as a resource for policymakers who wish to learn more about levelized cost of energy (LCOE) calculations, including cost-based incentives. The report identifies key renewable energy cost modeling options, highlights the policy implications of choosing one approach over the other, and presents recommendations on the optimal characteristics of a model to calculate rates for cost-based incentives, FITs, or similar policies. These recommendations shaped the design of NREL's Cost of Renewable Energy Spreadsheet Tool (CREST), which is used by state policymakers, regulators, utilities, developers, and other stakeholders to assist with analyses of policy and renewable energy incentive payment structures. Authored by Jason S. Gifford and Robert C. Grace of Sustainable Energy Advantage LLC and Wilson H. Rickerson of Meister Consultants Group, Inc.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Financial-technical co-design for capital-intensive, resource-responsive energy systems

Because of their capital-intensive operation, wind energy systems that are competitive in terms of the cost of the energy that they produce lead to risk-reward trade-offs that make their business cases less favorable than those of conventional energy generation technologies. However, wind energy systems tend to be designed to maximize energy production or minimize cost of energy rather than to maximize their business cases. In this work, we attempt to exploit designs specifically tailored to business cases. We develop a novel framework for analyzing energy systems that ties their design variables to monthly operating incomes using simple models and historical hourly market and resource data. Using this approach, we demonstrate that for a wind site with abundant wind resource in the California Independent System Operator market, we can control the trade-off between mean and 5th percentile monthly returns by choosing the specific power of the turbine at a fixed modeled initial capital cost. Our framework gives a measure of the risk-reward spectrum of energy generation assets that could be built at a given site with respect to the sub-annual resource/market variation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ADMS State of the Industry and Gap Analysis

An Advanced distribution management system (ADMS) is a platform for optimized distribution system operational management. This platform comprises of distribution management system (DMS) applications, supervisory control and data acquisition (SCADA), outage management system (OMS), and distributed energy resource management system (DERMS). One of the primary objectives of this work is to study and analyze several ADMS component and auxiliary systems. All the important component and auxiliary systems, SCADA, GISs, DMSs, AMRs/AMIs, OMSs, and DERMS, are discussed in this report. Their current generation technologies are analyzed, and their integration (or evolution) with an ADMS technology is discussed. An ADMS technology state of the art and gap analysis is also presented. There are two technical gaps observed. The integration challenge between the component operational systems is the single largest challenge for ADMS design and deployment. Another significant challenge noted is concerning essential ADMS applications, for instance, fault location, isolation, and service restoration (FLISR), volt-var optimization (VVO), etc. There are a relatively small number of ADMS application developers as ADMS software platform is not open source. There is another critical gap and while not being technical in nature (when compared the two above) is still important to consider. The data models currently residing in utility GIS systems are either incomplete or inaccurate or both. This data is essential for planning and operations because it is typically one of the primary sources from which power system model are created. To achieve the full potential of ADMS, the ability to execute acute Power Flow solution is an important pre-requisite. These critical gaps are hindering wider Utility adoption of an ADMS technology. The development of an open architecture platform can eliminate many of these barriers and also aid seamless integration of distribution Utility legacy systems with an ADMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Additional Capability Being Developed from UNF-ST&DARDS Unified Database: System Analysis and Fuel Cycle Option Analysis

The Used Nuclear Fuel Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) is being developed for the U.S. Department of Energy’s Office of Nuclear Energy by the national laboratories. An important part of UNF-ST&DARDS is the Unified Database (UDB), which contains information that can support a variety of activities including fuel storage, fuel transportation, and disposal-related system analysis. Currently, the main application of the UDB is to support evaluation of the characteristics of discharged spent nuclear fuel (SNF) from the U.S. commercial reactors. However, because of the extensive amount of data that has been collected and analyzed for UNF-ST&DARDS, there are many more applications that can utilize the UDB including system analysis with the Next-Generation System Analysis Model (NGSAM) and fuel cycle analysis with fuel cycle simulation codes such as ORION. Going forward, NGSAM and fuel cycle transition analysis with ORION integrate UDB data wherever possible in the UDB’s development plan. Finally, these advances in NGSAM and fuel cycle analysis can be used in conjunction with the UDB to help answer more complex questions about the optimization, utilization, storage, and eventual disposal of SNF.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Defining weather scenarios for simulation-based assessment of thermal resilience of buildings under current and future climates: A case study in Brazil

In response to increasingly severe weather conditions, optimization of building performance and investment provides an opportunity to consider co-benefits of thermal resilience during energy efficiency retrofits. This work aims to assess thermal resilience of buildings using building performance simulation to evaluate the indoor overheating risk under nine weather scenarios, considering historical (2010s), mid-term future (2050s), and long-term future (2090s) typical meteorological years, and heat wave years. Such an analysis is based on resilience profiles that combine six integrated indicators. A case study with a district of 92 buildings in Brazil was conducted, and a combination of strategies to improve thermal resilience was identified. Results reflect the necessity of planning for resilience in the context of climate change. This is because strategies recommended under current conditions might not be ideal in the future. Therefore, an adaptable design should be prioritized. Cooling energy consumption could increase by 48 % by the 2050s, while excessive overheating issues could reach 37 % of the buildings. Simple passive strategies can significantly reduce the heat stress. A comprehensive thermal resilience analysis should ultimately be accompanied by a thorough reflection on the stakeholders’ objectives, available resources, and planning horizon, as well as the risks assumed for not being resilient.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗