Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 703 records · Page 39

Evaluation of Trenchless Installation Technology for Radioactive Wastewater Piping Applications

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) cleanup mission at Oak Ridge National Laboratory (ORNL) includes dispositioning facilities, contaminated legacy materials/waste, and contamination sources and remediation of soil under facilities, groundwater, and surface water to support final Records of Decision (RODs). The Integrated Facilities Disposition Project (IFDP) is a roughly $15B project for completion of the EM mission at Oak Ridge, with a project duration of up to 35 years. The IFDP Mission Need Statement - Critical Decision-0 (CD-0) - was approved by DOE in July 2007, and the IFDP Alternative Selection and Cost Range - Critical Decision-1 (CD-1) - was approved in November 2008. The IFDP scope includes reconfiguration of waste collection and treatment systems as needed to complete the IFDP remediation and decontamination and decommissioning (D&D) missions in a safe and cost-effective manner while maintaining compliance with all governing regulations and bodies and preserving the support of continuing operations at ORNL. A step in the CD-1 approval process included an external technical review (ETR) of technical approaches proposed in the CD-1 document related to the facility reconfiguration for the ORNL radioactive waste and liquid low-level waste management systems. The ETR team recommended that the IFDP team consider the use of trenchless technologies for installing pipelines underground in and around contaminated sites as part of the alternatives evaluations required in support of the CD-2 process. The team specifically recommended evaluating trenchless technologies for installing new pipes in existing underground pipelines as an alternative to conventional open trench installation methods. Potential benefits could include reduction in project costs, less costly underground piping, fewer disruptions of ongoing and surface activities, and lower risk for workers. While trenchless technologies have been used extensively in the sanitary sewer and natural gas pipeline industries, they have been used far less in contaminated environments. Although trenchless technologies have been used at ORNL in limited applications to install new potable water and gas lines, the technologies have not been used in radioactive applications. This study evaluates the technical risks, benefits, and economics for installing gravity drained and pressurized piping using trenchless technologies compared to conventional installation methods for radioactive applications under ORNL geological conditions. A range of trenchless installation technologies was reviewed for this report for general applicability for replacing existing contaminated piping and/or installing new pipelines in potentially contaminated areas. Installation methods that were determined to have potential for use in typical ORNL contaminated environments were then evaluated in more detail for three specific ORNL applications. Each feasible alternative was evaluated against the baseline conventional open trench installation method using weighted criteria in the areas of environment, safety, and health (ES&H); project cost and schedule; and technical operability. The formulation of alternatives for evaluation, the development of selection criteria, and the scoring of alternatives were performed by ORNL staff with input from vendors and consultants. A description of the evaluation methodology and the evaluation results are documented in the following sections of this report.

03 NATURAL GAS↗

Real-Sim Interface: Enabling Multi-resolution Simulation and X-in-the-Loop Development for Connected and Automated Vehicles

We report connected and automated vehicles (CAVs) can bring safety, mobility, and energy benefits to transportation systems. Ideally, CAV applications would be fully evaluated and validated prior to real-world implementation. However, many technical challenges in both software and hardware hinder the process. To comprehensively evaluate all aspects of CAV applications, an integrated evaluation environment is needed with various simulation tools from different domains. In the current literature, there lacks a well-developed interface to enable multi-resolution simulation of vehicle, traffic, virtual environment, and hardware-in-the-loop (HIL) simulation. In this work, a modular and flexible interface is developed to enable multi-resolution vehicle and traffic co-simulation for CAV applications. This interface is built upon Oak Ridge National Laboratory’s (ORNL’s) Real-Sim approach, can support various simulation tools and real-time X-in-the-loop (XIL) simulations, and is based on network communication protocols. The network communication delays are analyzed for simultaneous connection of up to 20 simulators. Then, two example applications are studied to demonstrate the potential usage of the Real-Sim interface: (1) a centralized merging scenario where the dynamics of two ego vehicles are emulated with detailed vehicle and powertrain dynamics models and (2) a signal-controller-in-the-loop (SCIL) evaluation where one intersection of the simulated traffic scenario is controlled by a physical signal controller. This Real-Sim interface is a tool that allows researchers to bring real, tangible hardware and software into simulated environments to comprehensively evaluate and support a wide variety of CAV applications.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluation of Current Knowledge for Building the Dutch Salt Safety Case - 16024

This paper provides an overview of an evaluation for building the Safety Case of geological disposal of radioactive waste in rock salt in the Netherlands. The evaluation comprises the present knowledge about the safety and feasibility of geological disposal designs considered in the past, thereby classifying the information taking into account the methodology and structure of a Safety Case. The evaluation is performed as part of the Dutch research programme OPERA (OnderzoeksProgramma Eindberging Radioactief Afval - Dutch acronym for Research Programme into Geological Disposal of Radioactive Waste) by a consortium consisting of GRS from Germany, and TNO and NRG from the Netherlands. Basis of the evaluation is the available Dutch and international scientific-technical information about geological disposal in rock salt, especially from the German and US programmes. The evaluations have shown that although much knowledge on the topic exists, the available information need to be integrated in order to develop a Dutch Safety Case on rock salt. For example, the characteristics of the Dutch radioactive waste investigated for disposal have changed considerably since the last Dutch research programme ended in 2000. This implies that the previously considered Dutch facility concepts for geological disposal in rock salt need to be adapted to the newly regarded waste types such as spent fuel from research reactors and large amounts of LLW, including depleted uranium. Introducing these aspects into the iteration towards a salt Safety Case would also require an update of the post-closure safety assessment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Percutaneous Lung Tumor Biopsy Under CBCT Guidance with PET-CT Fusion Imaging: Preliminary Experience

Purpose: The aim of this study is to evaluate the feasibility of percutaneous lung tumor biopsy under cone beam-computed tomography (CBCT) with PET-CT imaging fusion. Materials and Methods: Eleven patients (four women and seven men) underwent C-arm CBCT lung biopsy with PET-CT fusion imaging. A preprocedural PET-CT scan was manually fused with procedural CBCT based on anatomical landmarks; using real-time fluoroscopy, the coregistered PET-CT and CBCT images were overlaid to guide the needle trajectory. Technical success, accuracy, sensibility and specificity were evaluated. Mean total procedure time and time required for image elaboration were recorded. Results: Technical success, diagnostic accuracy, sensitivity and specificity were 100%. The mean procedure time was 38 min. The average time of PET-CT/CBCT image fusion elaboration was 3.53 min for planning and 3.42 min for needle positioning check. Conclusion: CBCT-guided percutaneous lung biopsy with PET-CT fusion imaging is a feasible and effective procedure, with the potential to further improve diagnostic yield by targeting the most metabolically active portion of a lesion, whether it is morphologically altered or normal.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Thermal Neutron Scattering Law for Beryllium Hydride and Critical Mass Calculations [Slides]

TSLs for H(BeH 2 ) and Be(BeH 2 ) were evaluated in the incoherent approximation using FLASSH. Minimum critical mass estimates were performed using MC21 continuous energy Monte Carlo calculations with the BeH 2 TSLs. Researchers confirmed very low estimated critical mass for BeH 2 -moderated and Be- reflected spheres. These were the lowest critical masses NNL has studied to date. Future work includes relaxation of the incoherent approximation for Be(BeH 2 ). A small increase in critical mass is expected due to increased neutron transmission at sub-Bragg cutoff energies.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A Handbook for Designing, Implementing, and Evaluating Successful Electric Utility Pilots

Since at least the late 1970s, electric utilities and their regulators have recognized the value of experimentation to motivate innovation. The industry has a long history of using pilots to help inform future decision making about electric utility rates, customer technology adoption and integration, and even changes to the utility’s regulatory or business model. Although utility pilots have become almost ubiquitous proving grounds for new rates, technologies, and alterations to the traditional utility regulatory and business model, some regulators are beginning to raise questions about what constitutes a “good” pilot. Much has been written about utility pilots over the years; however, what is missing from the literature is the identification of a comprehensive process for not only designing and evaluating a pilot, but also implementing, successful utility pilots that provide actionable outcomes upon which more informed decisions can be made. This report provides a step-by-step process that regulators, policymakers, and utilities can follow to help promote a more successful pilot, even if whatever is being tested fails to produce the intended or expected result(s). It is worth noting that this report is not intended to serve as a technical resource for those designing, implementing, and evaluating pilots. However, there are myriad references provided for those wishing to delve deeper into the technical details.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges for Deep Vadose Zone Remediation at the Hanford Site

The “deep vadose zone” is defined as the region below the practical depth of surface remedy influence (e.g., excavation or barrier). At the Hanford Site, this region of the Central Plateau poses unique challenges for characterization and remediation. The contaminants in this region also pose a potentially significant continuing or future threat to groundwater. Currently, deep vadose zone characterization efforts and remedy selection are spread over multiple waste site Operable Units and tank farm Waste Management Areas. A particular challenge for this effort is the situation in which past leaks from single-shell tanks have become commingled with discharges from nearby liquid disposal sites. The Hanford Site is working with all affected parties, including the Washington State Department of Ecology, the Environmental Protection Agency, DOE-RL, DOE-ORP, and multiple contractor organizations to develop a unified approach to conducting work and reaching remediation decisions. This effort addresses the complex and challenging technical and regulatory issues within this environment. A true inter-Agency effort is evaluating the best strategy or combination of strategies for focusing technical investigations, including treatability studies, and for attaining remedy decisions on the Hanford Site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transcatheter Arterial Embolization of Intramuscular Active Hemorrhage with N-Butyl Cyanoacrylate

Purpose: This study was designed to evaluate the clinical efficacy and safety of transcatheter arterial embolization (TAE) with n-butyl cyanoacrylate (NBCA) for intramuscular active hemorrhage of varied etiologies and anatomic sites. Methods: Eighteen patients who demonstrated hematoma with pseudoaneurysm and/or active extravasation of contrast media underwent TAE with NBCA. Etiologies of hematoma included trauma, postoperative complication, and coagulopathy (due to underlying disease or anticoagulation therapy). Sites of embolization included chest wall, abdomen wall, retroperitoneum, and extremity. TAE was performed by using 1:3 to 1:5 mixtures of NBCA and iodized oil, either solely (n = 15) or in combination with microcoil (n = 3). The technical and clinical success rate, procedure-related complications, and clinical outcomes were evaluated. Results: The technical and clinical success rates were 100% and 83% (15/18), respectively. Two patients expired while admitted due to other comorbidities. One patient expired due to recurrent bleeding at another site. There were no serious complications relating to the embolization procedure. Conclusions: TAE with NBCA is effective and safe treatment modality for intramuscular active hemorrhage.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

IRSN working program status on tools for evaluation of SFR cores static neutronics safety parameters

As technical support of the French Nuclear Safety Authority, IRSN will be in charge of safety assessment of any future project of Sodium Fast Reactor (SFR) that could be built in France. One of the main safety topics will deal with reactivity control. Since the design and safety assessment of the last two SFR plants in France (Phenix and Superphenix, more than thirty years ago), methods, codes and safety objectives have evolved. That is why a working program on core neutronic simulations has been launched in order to be able to evaluate accuracy of future core characteristics computations. The first step consists in getting experienced with the ERANOS well-known deterministic code used in the past for Phenix and Superphenix. Then Monte-Carlo codes have been tested to help in the interpretation of ERANOS results and to define what place this kind of codes can have in a new SFR safety demonstration. This experience is based on open benchmark computations. Different cases are chosen to cover a wide range of configurations. The paper shows, as an example, criticality results obtained with ERANOS, SCALE and MORET, and the first conclusions based on these results. In the future, this work will be extended to other safety parameters such as sodium void and Doppler effects, kinetic parameters or flux distributions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Industry Application Emergency Core Cooling System Cladding Acceptance Criteria Early Demonstration

The U. S. NRC is currently proposing rulemaking designated as “10 CFR 50.46c” to revise the loss-of-coolant-accident (LOCA)/emergency core cooling system (ECCS) acceptance criteria to include the effects of higher burnup on cladding performance as well as to address other technical issues. The NRC is also currently resolving the public comments with the final rule expected to be issued in April 2016. The impact of the final 50.46c rule on the industry may involve updating of fuel vendor LOCA evaluation models, NRC review and approval, and licensee submittal of new LOCA evaluations or re-analyses and associated technical specification revisions for NRC review and approval. The rule implementation process, both industry and NRC activities, is expected to take 4-6 years following the rule effective date. As motivated by the new rule, the need to use advanced cladding designs may be a result. A loss of operational margin may result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee cost as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. Consequently, there will be an increased focus on licensee decision making related to LOCA analysis to minimize cost and impact, and to manage margin. The proposed rule would apply to a light water reactor and to all cladding types.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Scoping assessments of ATF impact on late–stage accident progression including molten core-concrete interaction

Simple scoping models that can be used to evaluate ATF performance under severe accident conditions have been developed. The methodology provides a fundamental technical basis (a.k.a. metric) based on the thermodynamic boundary for evaluating performance relative to that of traditional Zr-based claddings. The initial focus in this study was on UO 2 fuel with the advanced claddings 310 SS, D9, FeCrAl, and SiC. The evaluation considered only energy release with concurrent combustible gas production from fuel–cladding–coolant interactions and, separately, molten core–concrete interactions at high temperatures. Other important phenomenological effects that can influence the rate and extent of cladding decomposition (e.g., eutectic interactions, degradation of other core constituents) were not addressed. For the cladding types addressed, potential combustible gas production under both in-vessel and ex-vessel conditions was similar to that for Zr. However, exothermic energy release from cladding oxidation was substantially less for iron-based alloys (by at least a factor of 4), and modestly less (by ~20%) for SiC. Data on SiC-clad UO 2 fuel performance under severe accident conditions are sparse in the literature; thus, assumptions on the nature of the cladding decomposition process were made in order to perform this initial screening evaluation. Furthermore, experimental data for this system under severe accident conditions is needed for a proper evaluation and comparison to iron-based claddings.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A genomic data archive from the Network for Pancreatic Organ donors with Diabetes

The Network for Pancreatic Organ donors with Diabetes (nPOD) is the largest biorepository of human pancreata and associated immune organs from donors with type 1 diabetes (T1D), maturity-onset diabetes of the young (MODY), cystic fibrosis-related diabetes (CFRD), type 2 diabetes (T2D), gestational diabetes, islet autoantibody positivity (AAb+), and without diabetes. nPOD recovers, processes, analyzes, and distributes high-quality biospecimens, collected using optimized standard operating procedures, and associated de-identified data/metadata to researchers around the world. Herein describes the release of high-parameter genotyping data from this collection. 372 donors were genotyped using a custom precision medicine single nucleotide polymorphism (SNP) microarray. Data were technically validated using published algorithms to evaluate donor relatedness, ancestry, imputed HLA, and T1D genetic risk score. Additionally, 207 donors were assessed for rare known and novel coding region variants via whole exome sequencing (WES). These data are publicly-available to enable genotype-specific sample requests and the study of novel genotype:phenotype associations, aiding in the mission of nPOD to enhance understanding of diabetes pathogenesis to promote the development of novel therapies.

59 BASIC BIOLOGICAL SCIENCES↗

ATHENA detector proposal—a totally hermetic electron nucleus apparatus proposed for IP6 at the Electron-Ion Collider

ATHENA has been designed as a general purpose detector capable of delivering the full scientific scope of the Electron-Ion Collider. Careful technology choices provide fine tracking and momentum resolution, high performance electromagnetic and hadronic calorimetry, hadron identification over a wide kinematic range, and near-complete hermeticity. This article describes the detector design and its expected performance in the most relevant physics channels. It includes an evaluation of detector technology choices, the technical challenges to realizing the detector and the R&D required to meet those challenges.

47 OTHER INSTRUMENTATION↗

Evaluating the coherence and time-domain profile of quantum cascade laser frequency combs

Recently, much attention has been focused on the generation of optical frequency combs from quantum cascade lasers. We discuss how fast detectors can be used to demonstrate the mutual coherence of such combs, and present an inequality that can be used to quantitatively evaluate their performance. We discuss several technical issues related to shifted wave interference Fourier Transform spectroscopy (SWIFTS), and show how such measurements can be used to elucidate the time-domain properties of such combs, showing that they can possess signatures of both frequency-modulation and amplitude-modulation.

42 ENGINEERING↗

Imaging for dismantlement verification: information management and analysis algorithms

The level of detail discernible in imaging techniques has generally excluded them from consideration as verification tools in inspection regimes. An image will almost certainly contain highly sensitive information, and storing a comparison image will almost certainly violate a cardinal principle of information barriers: that no sensitive information be stored in the system. To overcome this problem, some features of the image might be reduced to a few parameters suitable for definition as an attribute. However, this process must be performed with care. Computing the perimeter, area, and intensity of an object, for example, might reveal sensitive information relating to shape, size, and material composition. This paper presents three analysis algorithms that reduce full image information to non-sensitive feature information. Ultimately, the algorithms are intended to provide only a yes/no response verifying the presence of features in the image. We evaluate the algorithms on both their technical performance in image analysis, and their application with and without an explicitly constructed information barrier. The underlying images can be highly detailed, since they are dynamically generated behind the information barrier. We consider the use of active (conventional) radiography alone and in tandem with passive (auto) radiography.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Bench-Scale Development of a Hot Carbonate Absorption Process with Crystallization-Enabled High Pressure Stripping for Post-Combustion CO 2 Capture

This report summarizes the methodology and preliminary results of a techno-economic analysis on a hot carbonate absorption process (Hot-CAP) with crystallization-enabled high pressure stripping for post-combustion CO 2 capture (PCC). This analysis was based on the Hot-CAP that is fully integrated with a sub-critical steam cycle, pulverized coal-fired power plant adopted in Case 10 of the DOE/NETL’s Cost and Performance Baseline for Fossil Energy Plants. The techno-economic analysis addressed several important aspects of the Hot-CAP for PCC application, including process design and simulation, equipment sizing, technical risk and mitigation strategy, performance evaluation, and cost analysis. Results show that the net power produced in the subcritical power plant equipped with Hot-CAP is 611 MWe, greater than that with Econoamine (550 MWe). The total capital cost for the Hot-CAP, including CO 2 compression, is $\$ $399 million, less than that for the Econoamine PCC ($\$ $493 million). O&M costs for the power plant with Hot-CAP is $\$ $175 million annually, less than that with Econoamine ($\$ $178 million). The 20-year levelized cost of electricity (LCOE) for the power plant with Hot-CAP, including CO 2 transportation and storage, is 119.4 mills/kWh, a 59% increase over that for the plant without CO 2 capture. The LCOE increase caused by CO 2 capture for the Hot-CAP is 31% lower than that for its Econoamine counterpart.

20 FOSSIL-FUELED POWER PLANTS↗