Search NASA⌕ Search

SEARCH · Search NASA

Results for “(COTS)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Unattended Dual Current Monitor (UDCM)

Researchers at Los Alamos National Laboratory have developed the Unattended Dual Current Monitor (UDCM). The UDCM is an ideal solution for current measurement needs such as ion chamber gamma measurements. This data acquisition system simplifies hardware requirements for current applications, and provides added reliability, flexibility, and compatibility as compared with the legacy Miniature Gamma Ray and Neutron Detector (MiniGRAND) technology. It is lightweight, can be portable or mounted, is manufactured using COTS parts, and features a modern Internet-of-Things (IoT) enabled design.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commercial Electronic Part Class Definitions

Electronic parts used in Nuclear Security Enterprise (NSE) applications have varying pedigrees. Understanding the differences among these "part classes" will better enable Kansas City National Security Campus (KCNSC) and Sandia National Laboratories (SNL, or Sandia) to effectively manage factors such as risk, effort, cost, etc. across all functional areas which have a shared interest in the definition and acquisition process. Regardless of the pedigree and complexity, all parts are expected to meet necessary quality and reliability requirements. This activity has been conducted as part of the COTS Transformation Initiative (CTI).

42 ENGINEERING↗

Brief Update on Advancements by Commercial Vendors/Options for Feeding and Pumping Biomass Slurries for Hydrothermal Liquefaction

In 2011, Pacific Northwest National Laboratory (PNNL), working as a partner in the National Advanced Biofuels Consortium, issued a report assessing the viable industrial feed system and pump options for a 2000 dry metric tons per day production-scale hydrothermal liquefaction (HTL) plant (Berglin et al. 2012). This report was issued as PNNL-21981, Review and Assessment of Commercial Vendors/Options for Feeding and Pumping Biomass Slurries for Hydrothermal Liquefaction, and will be referred to as “Pump Survey” for reference. It had the following scope: • Identify relevant applications and industries operating at comparable scales • Interact with commercial vendors and pursue integration between vendors • Take advantage of commercial off-the-shelf (COTS) technology • Supply and support vendor needs for biomass feedstock rheology characterization • Provide vendors with process requirements to support selection of conceptual design for feedstock handing and pump system • Obtain cost data to the extent possible from equipment vendors to support the technical economic analysis (TEA) • Identify issues associated scale-up. The current document represents an update to the prior report in order to: 1. Identify advancements in vendor-reported technologies 2. List reports of new experience or trials with biomass pumping applications 3. Determine if technology/application gaps identified in the prior report have been filled 4. Capture ideas on future research.

09 BIOMASS FUELS↗

A novel approach to mitigating the potential release of radioisotopes under fire conditions - enhancing fire resiliency of radiological contamination fixatives during deactivation & decommissioning activities

Savannah River National Laboratory (SRNL), in close collaboration with the Florida International University Applied Research Center (FIU ARC), successfully executed a technology development activity on behalf of the Department of Energy, Office of Environmental Management (DOE EM). The purpose of the activity was to improve the capability of fixative technologies in immobilizing residual contamination when exposed to thermal stressors as postulated in accident scenarios in Basis for Interim Operations (BIO) documents across the DOE EM complex. The effort resulted in the test and evaluation of a down-selected, commercial-off-the-shelf (COTS) intumescent technology in a radioactive environment at the Savannah River Site (SRS) Building 235-F Plutonium Fuel Form (PuFF) Facility and highlighted the potential use of this technology as a stand-alone, fire retardant fixative. Furthermore, this activity highlighted significant shortfalls in common fixatives currently used to support decommissioning activities and brought to the forefront the need for a methodical, uniformed approach to certifying fixative technologies for operational use in Deactivation and Decommissioning (D&D) activities. An essential component of this research was to evaluate the state of industry fixatives currently in use and set the foundation for comparison to alternative technological solutions. A baseline of five (5) commonly used fixatives and decontamination gels (hereafter collectively referred to as fixatives) was conducted, and notable shortfalls and deficiencies were revealed, particularly when exposed to thermal, water, and other environmental stressors. At temperatures as low as 300 °F - 400 °F (148.89 °C – 204.44 °C), all commonly used fixatives melted from the substrates within 3-5 minutes of exposure, resulting in contaminant transport. Significant degradation in terms of mass loss, desiccation, and off-gassing occurred, and the chemical breakdown of the polymer was so complete researchers assessed there would likely have been a release of residual contamination. Additional vulnerabilities became evident when exposed to water immersion and high humidity; existing fixatives took up water, swelling and frequently delaminating from the substrate, once again increasing the likelihood of a contaminant release.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Low-Cost, Accessible Vaccine Cooler Options

In response to cold chain management requirements for COVID-19 vaccines, Los Alamos National Laboratory has investigated, built, and demonstrated viability for different cryogenic storage options. With ease-of-access and affordability in mind, these cooler units have been built using commercial off-the-shelf (COTS) components. The team was also able to design a testing method for evaluating the performance of the different vaccine cooler options as part of the Technology Evaluation and Demonstration program. The tested cooler units demonstrated compatibility with either dry ice or liquid nitrogen as the cryogen, along with several commercial solvents. This compatibility demonstration would potentially offer sufficient flexibility for temperature control continuity. Next steps are to investigate industry interest in supporting field testing of the cooler units.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Integration of Next Generation Critical Infrastructure Sensor Technologies

This project is focused on advancing current protective relaying and control through verifying next generation timing systems and sensors with current commercial off the shelf protective relays. This will further research in the field of advanced grid modernization and demonstrate interoperability between nextgeneration protective relays and voltage and current sensors. These commercial off the shelf (COTS) technologies were tested and integrated with next generation sensor technologies, with the results documented below.

47 OTHER INSTRUMENTATION↗

Biocompatible Electrostatic Layered Systems for Viral Elimination in the Nose/Throat

An anti-viral coating for the nose & throat is needed to quickly address the spread of COVID-19 infections and to aid future pandemics. Current nasal delivery systems are typically a 1-spray homogenous solution, which is convenient but may not be as efficient or durable as a multi-spray solution that contains a binding layer to anchor the anti-viral components. Many of the current nasal solutions being investigated to aid in pandemic response have solution-based mechanisms of action and are quickly cleared from the nose/mouth limiting their efficacy lifetime. A multi-spray approach utilizing strong intermolecular forces between polymeric materials and anti-viral agents to provide a robust biocompatible coating is expected to have increased physical and chemical properties to combat viral infection. This work evaluated which tailored biocompatible materials are needed to generate a layered system to combat viral infection. This layered system takes advantage of electrostatic interactions to bind anti-viral components, shown in Figure 1. Proof of concept success was demonstrated through cell toxicity studies and anti-viral assays on both the individual layer components and the complete layered system. Project work began with chemical modifications of Xantham Gum to hydrolyzing xanthan gum to give a negatively charged polymer with varying degrees of ionic character and investigate bonding efficiencies. However, this was abandoned in favor of comparing COTS available materials listed in Table 1 (Results section). Concentration and adhesion studies were performed on layers created using the listed polymeric materials and anti-viral agents. Finally, biocompatibility of materials, layers, and coating system were confirmed through cytotoxicity studies and the efficacy of the anti-viral properties tested with phi6 bacteriophage as a SARS-CoV2 surrogate.

36 MATERIALS SCIENCE↗

SULI Research Report Paper

The Intelligence and Space Research Group 4 (ISR-4) at the Los Alamos National Laboratory focuses on signal processing and developing space electronics for various national security missions. The Space and Atmospheric Burst Reporting System (SABRS) is a sensing payload designed for nuclear detonation detection. As the sensors from previous payloads become obsolete, the requirement for a novel payload design increases. SABRS Prime is the successor to the previous SABRS payloads and is scheduled for delivery in 2028. As part of the SABRS Prompt Gamma Instrument Interface Board, high frequency signals from silicon photomultiplier tubes need to be split and subsequently transmitted to the Analog to Digital Converter. Prior to developing the Space Grade Instrument Interface Board, evaluation modules with Commercial off-the-shelf (COTS) components are evaluated and tested under rigorous conditions. Verification of power levels and gain specifications are some of the important steps taken during the evaluation stage. Working on the Signal Splitting Board has enabled me to work with various schematic software applications and learn more about the processes behind designing space grade electronic components. In addition, I conducted research on efficiency improvements for space-based power systems. Changes in design approaches were found to be the most significant sources of improvement. Being able to interact with researchers and peers across various scientific disciplines has given me a better insight into my future pursuits. Working in a R&D environment has cemented my decision to work on space applications for Quantum Sensing and pursue a PhD in Electrical Engineering. The SULI internship program at the Los Alamos National Laboratory has helped me develop the skillset of a researcher, understand the rigorous processes behind developing space grade hardware, and improve my critical thinking abilities to support the development of reliable instrumentation for deep space missions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

The Impact of Increased Requirements for Verification Measurements of Category III and IV Receipts

As part of the regular nuclear material accounting and control process, sites that have accountable nuclear material regularly perform measurements of the material in their possession. The expectation for the type of measurements and their frequency is set out in Department of Energy (DOE) Order 474.2, and further detailed in each site’s respective material control and accountability (MC&A) plan and associated controlling documents. The measurements of interest in this report are those performed on external (between DOE sites) transfer receipts of Category III or IV accountable materials. In 2020, a revision of DOE Order 474.2 was proposed that would significantly increase the requirement that measurements be performed upon receipt of material, and further, that those measurements be quantitative verification (rather than qualitative confirmatory) measurements. A survey was performed of DOE sites to discuss the impact on their MC&A measurements program if more rigorous verification measurements requirements for Category III and IV receipts were implemented. An assessment of nondestructive assay (NDA) measurement instruments to meet those needs was also performed. Across the board, sites indicated that personnel and budget would cause the largest impact. Sites which are qualified as Category I/II indicated a reduced impact as these sites already have the measurement capabilities and some personnel but would require the acquisition of additional measurement systems. Category III/IV sites indicated a much larger impact as these sites generally have smaller MC&A programs. A few smaller sites stated a measurement program would need to be created to handle the demand. Calorimetry, quantitative gamma spectroscopy and neutron coincidence counting systems were identified as common systems that could meet the verification measurement requirements. The other, and perhaps larger issue is the need for calibration standards for the calorimetry and neutron coincidence counting systems. It is proposed that a comparative study be performed for ISOCS and ISOTOPICS, qualification of a COTS calorimetry system be performed, and development of an AWCC system that uses a neutron generator.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cybersecurity for the Operational Technology Environment (CyOTE) (Final Technical Report)

Electric grids have historically been susceptible to both physical attacks and environmental hazards but the implementation of smart grids, remote management, and self-healing networks, has now made the grid vulnerable to cyber attacks. To address risks introduced by routable connectivity, utilities must establish dynamic solutions to identify, protect, detect, respond to, and recover from cyber security threats and vulnerabilities. In response to the evolving threat landscape U.S. Department of Energy-Office of Cybersecurity, Energy Security, and Emergency Response (DOE CESER) initiated the Cybersecurity for the OT Environment (CyOTE) pilot program, a U.S. Department of Energy (DOE) effort designed to leverage U.S. intelligence capabilities to prevent, detect, or mitigate a cyber attack on utility operational technology (OT) networks. As part of the CyOTE pilot, The Southern Company (Southern Company or Southern) researched, evaluated and deployed emerging Commercial off the Shelf (COTS) technologies and cyber security monitoring architectures to provide previously unrealized network visibility and situational awareness through deep packet inspection and data analytics. This Final Scientific/Technical Report documents the objectives, methodology, lessons learned, and results of Southern Company’s participation in the CyOTE pilot from December 2018 to September 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP): Design Guidelines and Specifications for DC Distribution-Based Charging Hub

Managed under U.S. Department of Energy (DOE)-funded EVs@Scale Consortium, High-Power Electric Vehicle Charging Hub Integration Platform (eCHIP) project aims to design and develop a high-power, interoperable charging experimental platform to research, develop, and demonstrate the integration and control approaches for a DC distribution-based high-power charging (HPC) system. The eCHIP project addresses the crucial need to design and validate efficient, low-cost, reliable, and interoperable solutions for DC-coupled charging hub ('DC hub' for short). This report explains the design, development, and implementation process of the experimental platform for the DC hub. The utilization of DC distribution holds significant potential for enhancing the operation of an HPC station architecture. However, there are challenges establishing the DC hub, including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products as well as novel, in-house designed solutions to evaluate different use cases at rated power and voltage levels.

33 ADVANCED PROPULSION SYSTEMS↗

Testing, Calibration, and UxS Integration of the Kromek GR1 Plus CZT Gamma Spectrometer

Collecting radiation measurements can be a hazardous task, especially in the presence of highly active sources. Various scenarios necessitate source search, classification, and quantification, often with limited or no a priori information. Activities such as disaster mitigation, emergency response, environmental monitoring, and site remediation may involve dangerous radioactive sources. In these situations, there is a pressing need for remote monitoring capabilities that protect human operators from potential harm and enhance adherence to the principle of “As Low as Reasonably Achievable” (ALARA) for radiation doses. The first step toward achieving remote radiation measurement capabilities is the remote operation of a radiation sensor. Once this milestone is reached, the next challenge is to integrate this remote sensing capability into suitable actuation agents, collectively referred to as uncrewed systems (UxS). These systems include familiar platforms such as robotic quadrupeds, aerial multirotor vehicles, and ground vehicles, any of which may be teleoperated, act autonomously, or utilize a combination of both. A critical factor in achieving remote radiation sensing is the availability of data from the appropriate sensor. Many commercially available radiation sensors have closed-source documentation for their communication protocols. Typical end-user products are often self-contained, handheld devices designed for manual measurement scenarios. While there are commercial off-the-shelf (COTS) integrations of radiation sensors with UxS available for purchase, these solutions are typically tailored for specific use cases and may not meet the requirements of different applications. This paper discusses efforts to remotely acquire radiation measurements from a small form-factor CZT gamma spectrometer. Sandia National Laboratories has successfully demonstrated the initial capability to integrate low size, weight, and power (SWaP) gamma spectroscopy into various UxS, alongside co-located GPS data logging and sensor calibration and qualification. With remote gamma spectroscopy achieved, the stage is set for UxS integration of this capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Update on PIP-II beam pattern generator upgrade

The beam pattern generator enables the transfer of beam pulses from the PIP-II linac to the Booster ring, the two RF systems being non-harmonically related. It is synchronized to the timing system to provide beam arrival information to the downstream accelerator subsystems. The design is being upgraded with COTS components and is being developed with a collaboration with SLAC.The pattern generation, digital signal processing and the user interface to an external EPICS server are integrated onto the ARM processor of the SOCFPGA. The progress of the system development is described.

Varghese, P. [Fermilab]↗

Sensos Smart Label Performance Summary as Observed by Oak Ridge National Laboratory

The Oak Ridge National Laboratory (ORNL) team performed an evaluation of the Sensos Smart Label Gen 2.0, as shown in Figure 1, for package tracking. A long-distance round-trip shipment between Oak Ridge, Tennessee, and Seattle, Washington, was completed to assess the device’s performance in location tracking, environment sensing capabilities, alerting features, threshold options, battery life, and real-time and historical data retrieval from the “Sync” data dashboard provided by Sensos. The evaluation was conducted to gain a general understanding of the capabilities of the device. Furthermore, due to time and resource constraints, ORNL did not conduct exhaustive testing to confirm reliability, availability, or effectiveness of alerting and tracking features. On equipment arrangement, Sensos (sensos.ai) graciously agreed to provide a Sensos Smart Label Gen 2.0 device to ORNL, at no cost, for testing and evaluation purposes. ORNL conducted assessments along with other commercial off-the-shelf (COTS) tracking devices. As a courtesy, ORNL will provide Sensos with this report summarizing the observations and findings specific to the Sensos label based on the tests performed.

42 ENGINEERING↗

Gallium Arsenide Semiconductor Opening Switches: Enabling Nanosecond High Powering Pulsed Systems

The goal of this work awas to investigate design manufacturing semiconductor opening switches (SOS) in both silicon and gallium arsenide (GaAs). Solid-state opening switches are critical components for pulsed power systems and applications in directed energy, dielectric wall accelerators, and novel semiconductor manufacturing techniques. Under this funding, we have developed silicon SOS designs that suppresses an unwanted prepulse, increases the peak output voltage by about 10 percent, and reduces the pulse rise time by ~ 4x compared with more conventional profiles. Through this effort we have improved device fabrication and bonding techniques. Additionally, work on this the GaAs opening switch has defined a unique application space that these devices are suited for. GaAs opening switches have short risetimes and pulse widths compared to silicon devices, however the short carrier lifetime of GaAs makes the circuit design more challenging than in silicon. For high PRF operation, the lifetime of the GaAs is an advantage compared to silicon. TCAD simulations of GaAs devices have been used to optimize a GaAs profile. Additionally, we have designed pulsers with sub 50ns reserve pump times and tested GaAs COTs PIN diodes in them.

42 ENGINEERING↗