Search NASA⌕ Search

SEARCH · Search NASA

Results for “2003 Mars Exploration Rover (MER)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

61 records · Page 4

Mars Exploration Rovers navigation results

The twin Mars Exploration Rovers, Spirit and Opportunity, were launched on June 10, 2003(dagger), and July 8, 2003, from Cape Canaveral, Florida. Spirit and Opportunity were targeted for landings at Gusev Crater (arrival on January 4, 2004) and Meridiani Planum (arrival on January 25, 2004). The primary navigation challenge was to deliver each spacecraft to the desired atmospheric entry interface point with sufficient accuracy such that each lander would touch down within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. In order to achieve landing within the target ellipse, precise control of the inertial entry flight path angle (FPA) at atmospheric entry was required. The maximum allowable errors in FPA following TCM-5 (trajectory correction maneuver #5) at Entry (E) - 2 days were +/-0.12(deg) (3(sigma)) for Spirit and +/-0.14(deg) (3(sigma)) for Opportunity. Achieving these entry delivery accuracies necessitated significant improvements to the interplanetary avigation system used for MER. These improvements included new processes and software for orbit determination, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly exceeded the requirements. At the navigation data cutoff for the TCM-5 final design, the orbit determination FPA knowledge error was +/-0.028(deg) (3(sigma) ) for Spirit and +/-0.035(deg) (3(sigma)) for Opportunity. Because of exceptionally accurate navigation performance, TCM-5 (E - 2 days) and TCM-6 (E - 4 hours) were canceled for both Spirit and Opportunity. The actual landing locations (determined from in-situ Doppler tracking between the MER rovers and the Mars Odyssey orbiter) differed from the target landing points by 10.1 km (downtrack) for Spirit and 24.6 km (downtrack) for Opportunity. The majority of the landing position offsets for both landers was primarily caused by variations in atmosphere and spacecraft aerodynamic modeling from what was predicted. The amount of the landing position offset caused by navigation-only errors was only 3.3 km (uptrack) for Spirit and 9.7 km (downtrack) for Opportunity.

Mars Exploration Rover (MER)↗

Mass properties testing of the Mars Exploration Rover missions

Lockheed Martin Space Systems Company (LMSSC) Denver, under contract to the Jet Propulsion Laboratory (JPL) performed the mass properties testing of the Mars Exploration Rover (MER) missions. This testing occurred over a ten-month period at bath the Jet Propulsion Laboratory and Kennedy Space Center (KSC). The tests at JPL were performed to verify model accuracy and determine arty issues that may affect the final mass properties measurements at the KSC launch site. Testing at KSC was performed on the Entry Vehicles and [he fully fueled spacecraft configurations for both the Spirit and Opportunity missions. All tests were completed successfully contributing to both mission's successful launch and subsequent landing on the surface of Mars in January of 2003.

Greene, Jason↗

In-flight propulsion system characterization for both Mars Exploration Rover Spacecraft

Two Mars Exploration Rover spacecraft were dispensed to red planet in 2003, culminating in a phenomenally successful prime science mission. Twin cruise stage propulsion systems were developed in record time, largely through heritage with Mars Pathfinder. As expected, consumable usage was minimal during the short seven-month cruise for both spacecraft. Propellant usage models based on pressure and temperature agreed with throughput models with in a few percent. Trajectory correction maneuver performance was nominal, allowing the cancellation of near-Mars maneuvers. Spin thruster delivered impulse was 10-12% high vs. ground based models for the intial spin-down maneuvers, while turn performance was XX-XX% high/low vs. expectations. No clear indications for pressure transducer drift were noted during the brief MER missions.

maneuvers↗

Selection of the Final Four Landing Sites for the Mars Exploration Rovers

Engineering constraints developed for the Mars Exploration Rovers (MER), their translation into ~185 potential landing sites and their downselection to 6 high priority science sites have been described [1, 2]. These 6 sites (Meridiani-previously referred to as Hematite, Gusev, Isidis, Melas, Eos, and Athabasca) were evaluated in detail as to their science potential and safety, relative to specific engineering constraints, at the 3rd MER Landing Site Workshop held March 26-28, 2002 in Pasadena, CA. This abstract describes: (1) the evaluation of these 6 sites, (2) the removal and reprioritization of sites following this workshop, (3) the identification of a low-wind site in Elysium, (4) the final 4 sites being considered for landing the 2 MER and (5) their evaluation at the 4th MER Landing Site Workshop held January 8-10, 2003 in Pasadena, CA [3].

Golombek, M.↗

Characterization of Layered Deposits inside Valles Marineris

This report represents the final progress report on our study of the Melas Chasma region on Mars that was proposed as a landing site for the Mars Exploration Rover mission (MER). During this two-year proposal (which was extended over three years by a no-cost extension), we conducted a thorough study of the layered deposits in western Melas Chasma that had been the location of a high priority MER mission landing ellipse within Valles Marineris. All available data sets from orbiter missions, including MOC, MOLA, THEMIS visible and infrared images were all used to analyze this site. The major outcome of this work was a published paper in the Journal of Geophysics and Research Planets [Weitz et al., 2004]. Our geologic mapping and interpretation of the MOC images suggest the landing ellipse contains three main geomorphologic units: (1) a blocky deposit consisting of bright blocks in a darker matrix (BD); (2) sand sheets composed of dark dunes; and (3) landslide deposits emanating from the wallrock to the west [Weitz et al., 2003]. Furthermore, we propose that the morphology of the BD unit in western Melas is a mass wasting deposit composed of blocks of Interior Layered Deposits (ILDs) mixed in with wallrock material. However, more recent MOC images indicate that in the eastern portion of the ellipse and adjacent to a large hill, there are blocks of material resembling those seen in BD. Hence, we cannot rule out the source of BD was this hill. Unfortunately, sand dunes obscure much of the deposit around this hill, making it impossible to precisely determine the connection between the hill and BD, whereas BD can be traced directly to the southern Melas wallrock. If BD resulted from a mass wasting event in the southern wallrock, then we would expect the material to be concentrated further to the north, as now appears to be the case. In summary, the exact source location for BD continues to remain a mystery, but we favor an origin from either the southern wallrock [Weitz et el., 2002] or the eastern hill.

Weitz, Catherine↗

Mars Exploration Rover: Launch, Cruise, Entry, Descent, and Landing

The Mars Exploration Rover Project was an ambitious effort to land two highly capable rovers on Mars and concurrently explore the Martian surface for three months each. Launched in June and July of 2003, cruise operations were conducted through January 4, 2004 with the first landing, followed by the second landing on January 25. The prime mission for the second rover ended on April 27, 2004. This paper will provide an overview of the launch, cruise, and landing phases of the mission, including the engineering and science objectives and challenges involved in the selection and targeting of the landing sites, as well as the excitement and challenges of atmospheric entry, descent and landing execution.

Entry, Descent, Landing, (EDL)↗

An Update of the Ground Testing of the Li-ion Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration (>9 months), both Rovers are equipped with rechargeable Lithium-ion batteries, which have enabled operation for over 854 and 834 Sols of operation, respectively, to date. Given that the batteries were required to support the mission for 90 Sols of operation by design, it is significant that the batteries have demonstrated over a nine fold increase in life over mission objectives. In addition to supporting the surface operations in conjunction with a triple-junction deployable solar arrays, the batteries were designed to aid in the launch and the EDL pyros, and allow for anomalies during cruise. In summary, the requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +30 C), withstand long storage periods (e.g., cruise period), operate in an inverted orientation, and support high current pulses (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 10 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory correction maneuvers), (d) simulating the entry, decent, and landing (EDL) pulse load profile (required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing capacity loss and impedance characteristics as a function of temperature and life. This paper provides further detail to previously reported results1 of the RBAU testing program, especially with regard to the life characteristics. To date, the lithium-ion batteries (fabricated by Lithion/Yardney, Inc.) have been demonstrated to far exceed the requirements defined by the mission, both on Mars and on the ground, and are projected to support an extended mission (> 4 years).

Mars Exploration Rovers (MER) Mission↗