Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design Technology, and Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LANSCE Accelerator Update and Future Plans

Several multi-year accelerator system upgrades have recently been completed at LANSCE that will ensure the long-term future of beam operations to its users and to prepare for a planned next-generation signature facility (MaRIE) based on multi-probe capabilities. Present LANSCE accelerator operations will be discussed. As a result, a summary of the recent upgrades completed and future plans will also be presented.

43 PARTICLE ACCELERATORS↗

805 Stepped Plan Project Description

The 805 MHz system utilizes 1.25 MW class klystron amplifiers. The Solid-State Amplifier (SSA) technology has been utilized in the SC accelerator technology, but more powerful sources are needed for use in the NC accelerator facilities such as LASNCE. The SSA topologies that are widely used need to be scaled and tested for reliability and operation in a high impact accelerator facility, such as the 805 MHz SCCL in Los Alamos. Operational experience with high power SSA needs to be assessed prior to installation of an SSA unit at LANSCE. The RFE group at LANSCE is looking for collaboration in the development of the Solid-State Amplifier.

43 PARTICLE ACCELERATORS↗

Mitigation of Beam Losses in LANSCE Linear Accelerator

Suppression of beam losses is essential for successful operation of high-intensity accelerator facility. The LANSCE accelerator started routine operation in 1972 as a 0.8 MW average proton beam power facility for meson physics research, and delivered highpower beam for a quarter century. The accelerator currently delivers 100 MeV proton beam to Isotope Production Facility (IPF) and 800 MeV H- beams to various experimental areas. The accelerator is equipped with two independent injectors for H + and H - beams, merging at the entrance of a 201.25 MHz Drift Tube Linac (DTL). The DTL performs acceleration up to the energy of 100 MeV. After the DTL, the Transition Region beamline directs a 100 MeV proton beam to the Isotope Production Facility, while the H - beam is accelerated up to the final energy of 800 MeV in an 805- MHz Coupled Cavity Linac. The H - beams, created with different time structure by a lowenergy chopper, are distributed in the Switch Yard (SY) to four experimental areas: the Lujan Neutron Scattering Center equipped with a Proton Storage Ring (PSR), the Weapons Neutron Research facility (WNR), the Proton Radiography facility (pRad), and the Ultra-Cold Neutron facility (UCN). Multi-beam operation requires careful control of accelerator tune to minimize beam losses. In this paper we review main effects affecting beam losses in LANSCE linear accelerator and discuss methods to reduce them.

43 PARTICLE ACCELERATORS↗

Delivery of H - / H + Beams to Area A

We explore the relative merits of transporting the beam from the H + ion source and from the H - ion source to Area-A for low current applications. Transporting the H - beam to Area-A using the laser neutralization approach has some risk associated with it and will require some development. Alternative method of delivering H - beam to Area-A includes replacing LDBM00 bending magnet with kicker for sharing beam between Line D and modified Line A. Transporting the H + beam to Area-A will have significant impact on the operation the IPF facility and maintaining high pulse rate to IPF will require major modifications to the transition region of the accelerator and Drift Tube Linac.

43 PARTICLE ACCELERATORS↗

High-Brightness Beam Technology Development for a Future Dynamic Mesoscale Materials Science Capability

A future capability in dynamic mesoscale materials science is needed to study the limitations of materials under irreversible and extreme conditions, where these limitations are caused by nonuniformities and defects in the mesoscale. This capability gap could potentially be closed with an X-ray free-electron laser (XFEL), producing 5 × 10 10 photons with an energy of 42 keV, known as the Matter–Radiation Interactions in Extremes (MaRIE) XFEL. Over the last few years, researchers at the Los Alamos National Laboratory have developed a preconceptual design for a MaRIE-class XFEL based on existing high-brightness beam technologies, including superconducting L-band cryomodules. However, the performance of a MaRIE-class XFEL can be improved and the risk of its operation reduced by investing in emerging high-brightness beam technologies, such as the development of high-gradient normal conducting radio frequency (RF) structures. Additionally, an alternative XFEL architecture, which generates a series of high-current microbunches instead of a single bunch with uniformly high current along it, may suppress the most important emittance degradation effects in the accelerator and in the XFEL undulator. In this paper, we describe the needed dynamic mesoscale materials science capability, a MaRIE-class XFEL, and the proposed microbunched XFEL accelerator architecture in detail.

47 OTHER INSTRUMENTATION↗

LANSCE Accelerator Modernization Project (LAMP) Overview [Slides]

LANSCE is based on a high-current 800 MeV proton accelerator capable of delivering 1 MW of beam power to the central target area. The LANSCE accelerator provides beam simultaneously to 5 separate experimental areas. LANSCE operates with 650 µs RF macro pulses at 120 Hz. Within this macro pulse several different beam timing patterns are utilized. LANSCE also accelerates H + and H – simultaneously. LANSCE celebrated 50 years of beam delivery in 2022.

43 PARTICLE ACCELERATORS↗

Initial Conditioning of the Rod-style RFQ

The RFQ test stand will allow new sources to be tested and will provide information on the performance of our RFQ designs. The RFQ must sustain the high peak power that will be necessary for bunching and accelerating beam, and that peak power must be sustained at a duty factor that is higher than other facilities that use similar rod-style RFQs. The conditioning of the RFQ allows both requirements to be tested, and in addition the intricacies of its operation are discovered and can be corrected for future work. In addition, the conditioning procedure was able to be done concurrently with the source development.

43 PARTICLE ACCELERATORS↗

Preliminary Look at the LBEG & MPEG Beam Transmissions between HPSim and Operation Data

This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.

43 PARTICLE ACCELERATORS↗

NorthStar Facility Target Fab and Flow Testing - FY 21

The facility target fabrication and flow testing activity will consist of flow tests using the blower system at LANL to test the disk holder and target, both redesigned by the NorthStar prime contractor. The housing and transition system delivering helium cooling to the disc holder and target will be fabricated and tested at LANL facilities. The tests will include pressure drop versus flow measurements through the target and housing, optical flow diagnostics and fiber optic imaging of the disc stack. The pressure drop measurements will be compared to CFD simulations to verify the latter, the optical flow diagnostics will be used to determine whether modifications made to the housing and target holder allow sufficient flow through the bottom of the housing to adequately cool it and the fiber optics will be used to image the discs during operation as a proof of concept of the diagnostic, to be used at NorthStar facilities during preproduction testing. The work is a Partial Fulfillment of the Deliverable Requirement for NorthStar Facility Target Fab and Flow Testing and Production Target Testing Support by LANL

42 ENGINEERING↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

LEBT Buncher / Feed Forward / Frequency Generation: System Design Document (SDD)

The LAMP Low Energy Beam Transport (LEBT) transfers a continuous beam at 100 keV from the ion source to RFQ in LEBT. A LEBT buncher imposes an energy tilt to initiate velocy bunching in the chopped beam pulse about 25 ns long to form a short MPEG bunch. One possible option for the LEBT buncher based on a two-gap LC-circuit driven structure was considered, which is similar to the existing LANSCE low-frequncy buncher (LFB). Another possible option is a non-resonant element driven by a pulse-forming-network that provides a single pulse at the repetition frequency of MPEG beam, with a period of 1.8 µs. The LEBT operation is synchronized with the accelerator timing system.

43 PARTICLE ACCELERATORS↗

MEBT Bunchers: System Design Document (SDD)

The LAMP Medium Energy Beam Transport (MEBT) transfers bunched beam at the energy 3 MeV from RFQ to the Drift-Tube Linac (DTL) entrance. The beam particles (protons or H- ) in the LAMP MEBT have velocity β = v/c = 0.08, where v is the beam velocity, c is the speed of light. The MEBT bunchers keep beam bunches from spreading longitudinally as they propagate through the MEBT, where some unwanted bunches are removed by a chopper to create a required beam pattern. The MEBT bunchers are RF cavities operating at the frequency 201.25 MHz; possible design options were considered in.

43 PARTICLE ACCELERATORS↗

High-Intensity Linear Accelerator with Ribbon Beam

We propose a solution of the fundamental problem in accelerator physics: significant increase of peak beam power in linear accelerator with conservation of beam brightness. It is of primary importance for operation of existing high-power accelerators (LANSCE, Spallation Neutron Source), for development of the next generation of high-power accelerators for basic scientific research and Accelerator-Driven Systems applications (Transmutation of Waste, Nuclear Reactor-Driver), and national security applications, which are all $1B-class facilities. The concept utilizes acceleration of beam with ribbon geometry instead of traditional circular beam. High value of beam current is reached using large width of the beam. Acceleration and focusing is achieved using alternative-focusing principle, which does not require traditional focusing elements (quadrupoles, solenoids). The concept utilizes advantage of 2D plane geometry which excludes beam distortion along beam width and results in conservation of high-value of beam brightness.

43 PARTICLE ACCELERATORS↗

Development of an accelerator-based neutron source to prototype Mo-99 production, Part II: A liquid LBE loop under a high vacuum

To provide US domestic supply of Mo-99 without using high-enriched uranium (HEU), a subcritical uranium target assembly (UTA) is irradiated by an accelerator-based neutron source to create Mo-99 through fission. Part I of this work discusses the design of a liquid lead–bismuth eutectic (LBE) windowless target for an accelerator-based neutron source development. Part II discusses how to couple this windowless target to an accelerator operating at an ultra-high vacuum and the subcritical UTA cooled by water at room temperature. Due to the windowless design of the target, the liquid LBE flow shares an ultra-high vacuum (<1.3 × 10 -7 Pa or 10 -9 Torr) space with the accelerator. As a result of this shared vacuum space, the LBE system must operate at a high vacuum (10 -3 ~10 -6 Pa or 10 -5 ~10 -8 Torr). A magnetic rotary motion feedthrough unit utilizes magnetic fluid to allow rotation of the pump while maintaining a high vacuum environment. Prior to testing the LBE system under vacuum, a pump curve measurement is performed to estimate flowrate in the system. This measurement also generates data on orifice loss coefficients, which are compared to correlations in literature. The second experiment investigates vacuum level in the LBE system during operation. High vacuum is maintained (10 -3 ~10 -5 Pa or 10 -5 ~10 -7 Torr) during system operation, and a residual gas analyzer (RGA) scan shows that partial pressures of residual gases in the LBE system lower over the duration of LBE system operations. The third experiment investigates the gravity driven liquid LBE flowing out of the target chamber in the return line, which is partially full. If the liquid LBE is not drained quickly enough, flooding in the target chamber could occur. The coefficient n in the Manning equation is found to be around 0.008 s/m 1/3 . The last experiment performed is a demonstration that a vacuum jacket could provide sufficient thermal insulation to allow coupling between 300 °C LBE loop and a water tank at room temperature. In conclusion, the results from these experiments have influenced the development of the neutron source for the future commercial scale Mo-99 production system.

43 PARTICLE ACCELERATORS↗

Design and Analysis of a Double Wall, Water Cooled Window for Accelerator Based Mo-99 Production

The electron accelerator based Mo-99 production technique requires the use of Rhodotrons to generate 38 MeV, 6.32 mA pulsed electron beams. The introduction of the pulsed beam structure has introduced fatigue concerns in the vacuum-helium windows that did not exist previously for electron beam production via linear accelerators. Previous analysis has shown that temperature fluctuations of approximately 100°C above and below the steady state operating temperature of ~500°C will occur within the windows. A water cooled window will eliminate this concern by reducing the primary mechanical stress due to the 300-psig helium pressure load as well as the secondary thermally induced stress. Although a water cooled window was considered years ago, the complexities of adding an additional water line was unattractive until now. A double wall, water cooled window has been designed and analyzed for this reason. The water cooled window design is shown to decrease the helium-side window temperature to as low as 125°C, while the vacuum-side window is maintained at 161°C at a water flow rate of 3.2 GPM. These low steady state temperatures reduce the thermal stress of the helium-side window significantly. Also, the primary mechanical stress has been reduced by roughly 50% due to the reduced pressure gradient across the helium-side window (150-psig water and 300-psig helium). Considering a Mo-99 production loss of roughly 1%, the water cooled window is a drastic improvement over the previous helium cooled designs and should be greatly considered for future upgrades and redesign.

43 PARTICLE ACCELERATORS↗

Northstar Mo100 Target Beam Spot Size Sensitivity Study

Northstar Mo100 target for production of the medical isotope Mo99 is particularly sensitive to beam over focusing because of the intended high power density. At 38 MeV and 6.32 mA (240 kW beam power, nominally 160 kW th in the target), small deviation from the nominal 12 mm FWHM beam can significantly increase the target disk temperatures and more importantly the load bearing target window temperature. A rhodotron will be the source of the electron beam to be used in the isotope production. This machine operates in a pulsed beam mode, currently expected to be at 50 Hz, which results in a 100 C temperature oscillation above and below the steady state temperature that is the focus of this study. This must be considered in the determination of minimum beam spot size that can be accepted by the target without risk of failure. In addition to the nominal beam spot size of 12 mm, the analysis of 10, 11 and 14.5 mm beam spot sizes are analyzed. The primary conclusion is that an over focused beam to just 11 mm FWHM is the minimum beam spot allowable, based on window temperature and the Ultimate Tensile Stress (UTS) of the window material Inconel 718 as a function of temperature. In contrast an under focused beam of 14.5 mm FWHM has much reduced target and window temperatures, but there is a resulting 6% drop in isotope production, all other factor staying the same. These results are presented herein.

07 ISOTOPE AND RADIATION SOURCES↗