Search NASA⌕ Search

SEARCH · Search NASA

Results for “Advanced Distribution Management System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications: Preprint

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900 MHz LTE network↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Improving the Performance of Integrated Power-Hardware-in-the-Loop and Quasi-Static Time-Series Simulations

This paper introduces a novel multirate cosimulation architecture that overcomes previous challenges integrating faster real-time, microseconds-scale, power-hardware-in-the-loop (PHIL) with larger scale but slower, real-time, seconds-scale, quasi-static time-series (QSTS) simulation. Specifically, an intermediate reduced-equivalent electromagnetic transient (EMT) model duplicates the key power system topology to capture high-speed dynamics and converge hardware-power system interactions between QSTS updates. Exchanging multidimensional parameter vectors (loads, control status, etc.) between the QSTS and EMT models enables capturing the interactions of the rich, high-node-count (thousands of electrical nodes) QSTS model with the hardware. This architecture offers full spatial resolution from QSTS, including individual load dynamics, actual distribution management system controls, and nodal voltages. Simultaneously, the intermediate EMT model provides more detailed high-speed transients of key distributed energy resource hardware interactions. In addition, we use careful PHIL interface design and the exchange of complex power data, rather than current, to further improve performance. This cosimulation architecture is demonstrated by testing a simulated distribution system with an interconnected 500-kVA advanced photovoltaic (PV) inverter in PHIL. In conclusion, the architecture successfully captured PV local volt-volt ampere reactive (volt-VAR) control interactions with the larger network under time-varying electrical and weather conditions.

42 ENGINEERING↗

Optimization-Based Deconfliction of Distribution System Applications

Power distribution systems are transitioning towards a future with large numbers of controllable grid-edge devices and distributed generation, as well as more complex operational objectives. This evolution requires a new distribution management approach, and modular applications can play a significant role. Thus, new strategies to coordinate independent applications with diverging operational goals are necessary. In this paper, we propose a novel optimization-based deconflictor to facilitate coordination in future advanced distribution management systems.

application deconfliction, power system optimizati↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 14: Model Verification/Validation Test Plan (Deliverable D10))

This report summarizes the technical progress and validation plan for each of AGGREGATE project modules, and integrated modules. The overall validation plan can be divided into two major parts. Firstly, it provides offline validation results of each module using the IEEE-123 node distribution system with certain modifications to support individual module results verification. The offline validation plan tentatively validated the usability and practicability of developed AGGREGATE tools. Secondly, the realworld test system - Seattle City Light (SCL) test feeder for verifying each module and the integrated modules using GE advanced distribution management system (ADMS) software.

42 ENGINEERING↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS-based on real-time optimal power flow-controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

An Application for Validation of Power Distribution System Models in an ADMS Environment

An accurate model of a power distribution system is the foundation for model-based applications that ensure efficient and reliable grid operation in an advanced distribution management system (ADMS) environment. However, these models are error-prone and comprehensive model validation is challenging due to lack of standards-based systems, data originating from disparate databases and other sources, and the constantly evolving nature of modern power distribution systems. In this paper, a novel framework for comprehensive model validation is described. The proposed application, the Model Validator, ensures that a model is both consistent and feasible by validating the derivative static and operational network model. A modular architecture for the application has been implemented and integrated with an open-source standards-based platform for ADMS application development, GridAPPS-D, allowing new validation capability to be added with minimal time and effort. The Model Validator application is demonstrated on the IEEE 13-bus, 123-bus, and 8500-node test cases over three validation scenarios.

Poudel, Shiva↗

Volt/VAR Optimization (VVO) Application on GridAPPS-D Platform

There is a large increment in the distributed energy resources (DERs) installation and deployments of smart sensing devices and communication infrastructure; hence, the power distribution network is swiftly evolving from a passive network to an active network. This motivates the development of advanced applications to operate power distribution systems for higher efficiency and reliability. These advanced applications are model-based and data-driven. This requires an advanced distribution management system (ADMS) to provide required data for the optimal operation of the distribution systems by coordinating various grid controllable devices. In this paper a Volt-VAR optimization (VVO) application to coordinate the grid’s legacy and new voltage control devices for conservation voltage reduction (CVR) is deployed on the GridAPPS-D platform (an open-source platform ) for ADMS application development. The VVO application is validated for various operating conditions on using modified IEEE 8500-node distribution test feeders. Further, the application is successfully deployed on the GridAPPS-D platform.

Jha, Rahul↗

DINGO: Digital assistant to grid operators for resilience management of power distribution system

With increasing adverse weather events and disasters, enabling resiliency of the power distribution system (PDS) is becoming increasingly important. Here in this work, resiliency is defined as the systems ability to keep supplying critical loads even with multiple contingencies. Resiliency may depend on: (a) advanced tools to assist operators in situational awareness and decision making with the increasing volume of data generated by the PDS, (b) visualization and ease of interaction with system resources and information, especially during extreme events and resulting human operator stress, and (c) flexible resources and autonomous control. Operators and support engineers need to interact with the system for key information and take action under stress, given the requirement for decisions in a short time. Integrated technological solutions are prevailing steps to support the most appropriate decision during critical times to serve essential loads. In order to meet the required goals, a Real-time Resiliency Monitoring and Operational Decision Support (RT-RMOD) tool have been developed. It supports various functionalities, including real-time monitoring, resilience assessment, and proactive decision support. However, this work makes advanced feature additions to the tool by developing data-enabled resilience management algorithms for (i) outage detection and localization, (ii) Resiliency-metric driven restoration and reconfiguration, and (iii) NLP based digital assistant for operators called DINGO (DIgital assistaNt to Grid Operators) to interact with Advanced Distribution Management System (ADMS) and RT-RMOD. The developed algorithm was validated for multiple cases of weather events using a real-world, off-grid microgrid system modeled in a real-time simulator, sensor data, and software tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Maximizing the Benefits of Volt/VAR Optimization in the Presence of Community Energy Storage

This paper reports on the need for coordinating smart grid volt/volt-ampere reactive (VAR) control (VVC) and community energy storage (CES) to maximize the benefits of both approaches. It addresses a key application of volt/VAR optimization (VVO): the conservation of voltage reduction (CVR). The lack of coordination among network controls, such as VVO, and asset controls at the community battery storage system can lead to detrimental effects on grid operation. A smart grid-enabled VVC uses the VVO to perform the CVR operation. VVO can perform numerous tasks for advanced distribution management systems with coordination of the system operator. To achieve the optimal VVC solution, we use a particle swarm optimization driven VVO method. The test system has been simulated for two scenarios-during light loading and high loading condition-with and without the CES system. In both scenarios, the operation of CVR and CES have been performed considering different case studies. The outcomes of the simulated results demonstrate that significant improvement in peak load-demand reduction is achieved by the proposed VVC and CES system with reduced system losses.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Master Services Agreement - Flexible Feeder/Distribution System Support: Cooperative Research and Development (Final Report)

PGE will engage NREL on a broad range of projects related to the integration of distributed energy resources (DERs) into the utility's operations. This portfolio of work could include projects focused on DER adoption models, advanced distribution management system (ADMS) and distributed energy management system (DERMS) design, DER dispatch strategy development, and DER valuation framework development. Additional topics could include long-term energy planning, renewable energy, energy efficiency and demand-side management. As well as technology evaluations and design guidance for building retrofits and new construction projects, energy and energy infrastructure planning, policies, and markets (and their analysis), energy storage, energy security and resilience (including energy system-related cybersecurity), transportation and mobility, technology integration analysis. Additionally, other assistance as requested by PGE consistent with NREL’s expertise.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of System and Interoperability Impact from Securing Communications for Distributed Energy Resources

As the power grid incorporates increasing amounts of distributed energy resources (DER) that provide new generation sources, new opportunities are created for improving operation of the grid while large challenges also arise for preserving grid reliability and security. To improve grid performance, DERs can be utilized to provide important support functionality, such as supporting frequency and voltage levels, especially if they are assisted by communication schemes as part of an advanced distribution management system (ADMS). Unfortunately, such connectivity and grid support functionality also creates additional cyber security risk with the potential for degradation of grid services, especially under conditions with high amounts of distributed generation. This paper will first discuss the communications needed by DERs to support system and interoperability objectives, as well as the security requirements and impact of securing these communications. Some common security mechanisms are discussed in relation to DERs, and a simulated 15-bus model of a distribution feeder is used to demonstrate aspects of the DER communications and impact to grid performance. These results help to advance understanding of the benefits, requirements, and mechanisms for securely implementing DER communications while ensuring that grid reliability is maintained.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Operations: The Evolution of Distributed Energy Resources [Guest Editorial]

Utilities around the world are experiencing change with the increasing digitalization of their systems and those of their customers. Efforts to decarbonize the electric power system have led to growth in renewable energy resources, particularly distributed energy resources (DERs), such as generation, storage, and flexible load, both in front of and behind the meter. As this change occurs in any given utility service area, new tools, such as advanced distribution management systems (ADMSs), are needed to manage utility operations, planning, and business issues, some of which are discussed here.

distributed energy resources, DER, decarbonize, re↗

Model Improvement for ADMS Deployment

The objective of this research is to evaluate the performance of the advanced distribution management system (ADMS) Volt/VAR Optimization (VVO) application for different levels of model quality and different levels of measurement density -- using 4 different load days VVO optimized for conservative voltage regulation (CVR) and six feeders from Xcel Energy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation of Power Distribution Models using Load Flow Analysis in an ADMS Environment

Electric utilities are facing the need for better monitoring, analysis, and control of their distribution systems. An accurate mathematical model is a key to both the development of cutting-edge, scalable model-based algorithms and the assessment of emerging technologies such as distributed energy resources (DER) for grid planning and operation. However, the constantly evolving nature of power distribution systems poses challenges to maintaining accurate models. In this paper, we propose a novel load flow based approach to validate power distribution models. Networked equipment models described according to the Common Information Model (CIM) standard and a measurement model are used to formulate the distribution load flow problem. First, a system admittance matrix (Ybus) is derived from device-level CIM parameters. Next, the operational parameters (dynamic Ybus and nodal injections) are extracted from the measurement model using sensor configuration and equipment state. An iterative power flow method is then used to compute nodal voltages and branch flows that are compared against the measurement data to find any inconsistencies in the networked equipment model. This approach is implemented within GridAPPS-D, an open-source standards-based platform for advanced distribution management system (ADMS) application development, and demonstrated on the IEEE 13-bus, 123-bus, and 8500-node test feeders.

Common information model, model validation, power ↗