NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.↗

Surface Hardness Testing of Mobile Launcher 1 (ML-1) Vehicle Support Posts (VSP) Following Artemis I Launch Exposure

Following the successful launch of Artemis I on November 16th, 2022 (Fig 1), a surface hardness assessment was performed on the eight primary VSPs (Figs. 2, 3) located on the Zero Deck of the ML. This assessment was performed as part of an instrument investigation for strain gauges installed on VSP interior surfaces that had a “strange reaction”. This report does not address the VSP strain gauge investigation, but rather VSP structural integrity for future service (Artemis II, III, …). Surface hardness measurements were taken to assess the strength of the ASTM A148 steel castings to confirm thermal exposure from launch had not reannealed the VSPs. However unlikely, it is possible high temperature may have heated and tempered (reannealed) the VSPs, resulting in a change of built-in stresses. This loss in built-in stress may explain the change in off-set measured by the strain gauges. Initial hardness measurements were made at two interior surfaces of VSPs near the strain gauges and the corresponding exterior surfaces (engine hole-facing). Field hardness measurements on the exterior, engine hole surface-facing surfaces for all eight VSPs ranged from 175 to 226 HB/P, well below the minimum hardness of 302 Brinell (HB). Opposing interior surface hardness measurements near strain gauges ranged from 264 to 358 HB/P. In all cases for flight VSPs, a drop in interior-to-exterior hardness ranging from 70 to 132 HB/P was measured. Surface hardness measurements were then made on the two spare VSPs not exposed to launch temperatures for baseline comparison. These two spare VSPs had a drop in Brinell hardness from interior to exterior surfaces ranging from 3 to 17 HB/P. The large interior-to-exterior delta hardness for eight flight VSPs but not for the two spare VSPs suggests launch exposure temperatures softened the exterior surfaces, raising two questions: 1) Are the VSPs compromised for future use, and 2) How deep is the exterior surface softening effect? To address concerns of low surface hardness values at non-critical exterior surfaces, additional field surface hardness measurements were taken at high-stress locations on VSP3: Both door jams, back radius, and internal left and right radius near the base. These values came in well above the required minimum hardness (317 to 365 HB/P). For a more representative pre-launch versus post-launch surface hardness comparison, VSP Acceptance Data Packages (ADPs) were reviewed, and hardness measurements were made at the same eight original locations on VSP3 where hardness measurements were made at the foundry. To determine the degree of softening, 1/8” of material was machined away at three exterior surfaces of engine hole-facing side (Fig. 4). A significant increase in surface hardness was measured ranging from 50 to 86 HB/P. Values at these three locations were still slightly below the required minimum hardness, so an additional 1/8” material was machined away, and hardness values were retaken. At the ¼” depth, hardness values increased to 321 to 324 HB/P. These values fall above the required minimum, concluding surface hardness testing. Rationale for VSP continued use was reached with no restrictions during a Chief Engineering Review based on hardness values exceeding minimum at critical locations and subsurface locations for VSP #3.

Artemis I↗

Space Launch System Artemis I CubeSats: SmallSat Vanguards of Exploration, Science and Technology

When NASA’s Space Launch System (SLS) rocket launches in 2021 with the Orion crew vehicle, it will lay the foundation for NASA’s goal of landing the first woman and the next man on the Moon as part of the Artemis program. This first flight—Artemis I—will also mark a milestone for smallsats. Thirteen6U CubeSats are manifested on the Artemis I flight, the first fleet of CubeSats carried as a ride share opportunity to deep space.(NASA’s first CubeSats to deep space, the twin Mars Cube One [MarCO] spacecraft, were an integral part of the InSight Mars lander mission). The Artemis I CubeSat manifest represents a diverse collection of smallsats performing an array of science missions and technology demonstrations. Payloads from NASA, international partners, academia and industry will execute a variety of experiments. Several smallsats will perform lunar-focused missions that may return data that addresses Strategic Knowledge Gaps (SKGs) in the agency’s lunar exploration program. Indeed, the Artemis I CubeSats will be in the vanguard of the agency’s 21st-century lunar program. The Artemis I missions will produce data to support space radiation awareness,crewed landings and in-situ resource utilization, helping to support a sustained human lunar presence. Several of the Artemis I CubeSats are demonstrating new technologies, including propulsion capabilities. Among the Artemis I CubeSats are three selected through NASA’s Cube Quest Challenge, part of the Centennial Challenges program. These three missions will compete for prize money while meeting specific technical development goals. Payloads from the Japanese and Italian space agencies provide an early opportunity for international involvement in the Artemis program. Student involvement in almost half of the payloads allow STEM engagement with NASA’s Artemis program. The SLS Block 1 vehicle for the Artemis I flight is manufactured with several elements delivered to Kennedy Space Center (KSC) and being prepared for stacking and integration. The new-development of the program, the 212-footcore stage with its four RS-25 engines installed is currently at Stennis Space Center (SSC) for “green run” testing. Following the green run test campaign, the stage will ship to KSC, where it will be integrated with the rest of the vehicle, including the upper stage adapter, where the Artemis I smallsats will be housed.

Kimberly F Robinson↗

Validation of Artemis I Aerothermal Design Models Using Developmental Flight Instrumentation

The inaugural flight of the Space Launch System (SLS) Block 1 launch vehicle, Artemis I, occurred on November 16, 2022, and featured a full suite of Developmental Flight Instrumentation (DFI) that provided aerothermodynamic measurements to assess thermal design and substantiate aerothermodynamic models. The Block 1 launch vehicle aerothermal instrumentation consisted of approximately 277 aerothermal gauges mounted throughout the Orion Multi-Purpose Crew Vehicle (MPCV), Integrated Spacecraft and Payload Element (ISPE), Core Stage (CS) and Solid Rocket Boosters (SRB) and an additional 179 thermal gauges on the Orion Crew Module (CM). Instrumentation included calorimeters, radiometers, pressure transducers, gas temperature probes, and thermocouples. Data was collected from lift-off through CS Main Engine Cut-Off (MECO). The flight data was invaluable for determining aerothermal model performance and developing flight-derived aerothermal environments for flight reconstruction thermal analysis and future SLS aerothermal models. The data offered critical insights into the aerothermodynamic conditions experienced during the launch and ascent of the SLS vehicle. This study compares the flight derived environments to pre-existing design models. The aerothermal models were constructed using MINIVER, the aerothermal engineering code which predicts aerodynamic heating and acts as an integration tool for incorporating databases from computational fluid dynamics (CFD) simulations and wind tunnel test data. The comparisons reveal the fidelity of the design models, highlighting areas where the design models accurately predicted flight conditions and instances where deviations were observed. Preliminary results suggest that while the design models largely aligned with the observed flight data, there were unique observations that reflected needed areas of model refinement. Aerothermal flight data from Artemis I for the SLS Block 1 vehicle will be further utilized to enhance the accuracy of Block 1B and Block 2 aerothermal models, ensuring improved safety and performance for subsequent Artemis missions.

aerothermodynamics↗

Validation of Artemis I Aerothermal Design Models Using Developmental Flight Instrumentation

The inaugural flight of the Space Launch System (SLS) Block 1 launch vehicle, Artemis I, occurred on November 16, 2022, and featured a full suite of Developmental Flight Instrumentation (DFI) that provided aerothermodynamic measurements to assess thermal design and substantiate aerothermodynamic models. The Block 1 launch vehicle aerothermal instrumentation consisted of approximately 277 aerothermal gauges mounted throughout the Orion Multi-Purpose Crew Vehicle (MPCV), Integrated Spacecraft and Payload Element (ISPE), Core Stage (CS) and Solid Rocket Boosters (SRB) and an additional 179 thermal gauges on the Orion Crew Module (CM). Instrumentation included calorimeters, radiometers, pressure transducers, gas temperature probes, and thermocouples. Data was collected from lift-off through CS Main Engine Cut-Off (MECO). The flight data was invaluable for determining aerothermal model performance and developing flight-derived aerothermal environments for flight reconstruction thermal analysis and future SLS aerothermal models. The data offered critical insights into the aerothermodynamic conditions experienced during the launch and ascent of the SLS vehicle. This study compares the flight derived environments to pre-existing design models. The aerothermal models were constructed using MINIVER, the aerothermal engineering code which predicts aerodynamic heating and acts as an integration tool for incorporating databases from computational fluid dynamics (CFD) simulations and wind tunnel test data. The comparisons reveal the fidelity of the design models, highlighting areas where the design models accurately predicted flight conditions and instances where deviations were observed. Preliminary results suggest that while the design models largely aligned with the observed flight data, there were unique observations that reflected needed areas of model refinement. Aerothermal flight data from Artemis I for the SLS Block 1 vehicle will be further utilized to enhance the accuracy of Block 1B and Block 2 aerothermal models, ensuring improved safety and performance for subsequent Artemis missions.

aerothermodynamics↗

Artemis Internal Science Team Update: Deployed Payloads

Artemis will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis effort includes a collaboration of space agencies and companies from around the world [1]. In support of Artemis, a cross-disciplinary effort of science, engineering, operations, and human factors personnel is currently developing the best methods, facilities, and field locations to test hardware, train astronauts, and evaluate concepts of operations. This abstract, as part of the Artemis Internal Science Team (AIST) [2], provides an update to NASA’s plans for the solicitation, development, and operations of deployed surface payloads. In calendar year 2023, NASA’s Science Mission Directorate will solicit proposals for instruments to be deployed by crew on the surface of the Moon (Fig. 1), beginning with Artemis III [3]. The Artemis III mission will land in the south polar region of the Moon, within 6º of latitude from the south pole, in the vicinity of both persistently illuminated and permanently shadowed areas of the Moon, with potential access to surface-accessible volatile deposits [4]. Several of the proposed landing regions are located among some of the oldest parts of the Moon, and together with the permanently shadowed regions, provide the opportunity to learn about the history of the Moon through previously unexplored lunar regions [5]. Deployed payloads will be a critical part of a notional program that captures the highest-priority science for Artemis III and provides the greatest feedforward to follow-on missions and the build-up to the Artemis Base Camp

R. C. Weber↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

Russell Lane↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

David Hitt↗

An Intern Experience with NASA’s Artemis Program

“3...2...1...Go For Launch”. Nasa’s Kennedy Space Center is projected to launch the first mission of theArtemis Program by the end of this year, 2021. I have had the opportunity to contribute directly to this mission through my internship with their Engineering organization from January to August of 2021.Within their Engineering organization, I am an intern for the Avionics branch. Throughout this experience I have completed two projects with one project still in progress. These projects allowed me to work directly with the Orion vehicle’s software and hardware power ups, checkouts, and tests. I became familiarized with the engineering concepts that allowed this advanced technology to perform as intended.In addition, I became acquainted with the operations and tasks that are completed during a LaunchCountdown, both at a detailed level as well as a higher managerial level. Lastly, I worked directly with the software algorithm that detects and responds to onboard faults and failures. I have analyzed and made conclusions based on data and documentation, allowing my team to benefit from a condensed, centralized informational file. In addition to my technical experience, I have learned a significant amount about how the Kennedy Space Center operates, it’s history, and the history of the agency. The education I received from the Engineering department at Texas A&M University not only allowed me to obtain this internship, but provided me with the required background in computer and electrical engineering principles to be successful in this organization.

Sarah Bianco↗

Artemis Internal Science Team Update: Deployed Payloads

Artemis will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis effort includes a collaboration of space agencies and companies from around the world. In support of Artemis, a cross-disciplinary effort of science, engineering, operations, and human factors personnel is currently developing the best methods, facilities, and field locations to test hardware, train astronauts, and evaluate concepts of operations. This poster, as part of the Artemis Internal Science Team (AIST), provides an update to NASA’s plans for the solicitation, development, and operations of deployed surface payloads. In calendar year 2023, NASA’s Science Mission Directorate will solicit proposals for instruments to be deployed by crew on the surface of the Moon (Fig. 1), beginning with Artemis III. The Artemis III mission will land in the south polar region of the Moon, within 6º of latitude from the south pole, in the vicinity of both persistently illuminated and permanently shadowed areas of the Moon, with potential access to surface-accessible volatile deposits. Several of the proposed landing regions are located among some of the oldest parts of the Moon, and together with the permanently shadowed regions, provide the opportunity to learn about the history of the Moon through previously unexplored lunar regions. Deployed payloads will be a critical part of a notional program that captures the highest-priority science for Artemis III and provides the greatest feed-forward to follow-on missions and the build-up to the Artemis Base Camp.

R. C. Weber↗

NASA's Habitation Development Status: Current Concepts and ISRU Opportunities

Introduction: The National Aeronautics and Space Administration (NASA) is embarking on a bold journey to return humankind to the Moon and onward to Mars with innovative commercial, international, and academic partnerships [1]. Under the Artemis series of missions, NASA seeks to establish sustained human exploration of deep space through an objectives-based approach [2]. This approach drives the identification of needed system functionality and the current and future capabilities which will eventually allow humanity to sustainably live beyond Earth. Providing evolvable and scalable habitation is a cornerstone function that calls for the collection and integration of current, developmental, and future technologies that can meet near-term exploration needs while growing into long-term sustained presence. NASA is advancing in-space habitation through its Next Space Technologies for Exploration Partnerships (NextSTEP) model while designing lunar, Mars transit, and Mars surface habitat government reference concepts for Artemis missions. These efforts have unveiled possible near-term opportunities for the in-space resource utilization community if human habitation is considered a future customer of space resources. NextSTEP Habitation Development: NASA is closely working with commercial partners under its NextSTEP Appendix A model to advance habitation systems in the arena of inflatable and composite habitation structures. Such efforts promise efficiencies in volumetric packaging and overall spacecraft mass respectively. Recent testing by commercial partners have helped to quantify possible failure mechanisms for inflatable structures while advancing their technology towards eventual flight certification. The advancement of such Class II habitation structures, in which the habitat is only fully deployed once in-space or on a planetary surface [3], is critical to providing increased habitable volume for long-duration missions with no additional mass penalties. The progression of such technology is infused into NASA’s government reference concepts for notional deep space habitation concepts. Current Government Reference Concepts: To best inform the formulation of future collaborative solicitations, NASA employs the practice of internally developing reference concepts for future exploration elements. These concepts aid in identifying the functions and capabilities needed to complete NASA missions as well as feasible solutions within the timeframe needed. Government reference concepts for a lunar Surface Habitat, Mars Transit Habitat, and Mars Sur-face Habitat are continuously being developed and updated to better guide the Agency’s overall exploration architecture. Lunar Surface Habitat. As NASA returns to the Moon, it is evaluating possible lunar surface habitation concepts. The Surface Habitat (SH) reference concept entails a hybrid metallic-inflatable structure capable of initially housing two crew for surface stays of up to 30 days in duration [4]. While initial missions may span ~7 days in duration, consideration is being given to expanding SH’s capability to support a crew of four for up to 60 days over its 15-year design life [5]. Functionally, the SH serves as a ‘hub’ for all Artemis crewed surface operations, providing internal volume for maintenance, medical, logistics, science utilization, and extravehicular activity (EVA) support in addition to core habitation functionality such as environmental control and life support (ECLS) and power generation and distribution among many others. Additionally, NASA has entered a study agreement with the Italian Space Agency (Agenzia Spaziale Italiana – ASI) to investigation a possible Multi-Purpose Habitat (MPH) as an additional or augmenting habit-able element for the lunar surface [6]. Mars Transit Habitat. NASA’s current architectural concept for initial human missions to Mars entails the utilization of a transit habitat (TH) to transport a four-person crew to and from Mars orbit, departing from and returning to a lunar near-rectilinear halo orbit (NRHO), over the course of a ~1,200-day mission [5]. While holding a similar 15-year design lifetime, TH will also support a series of analog mission activities in NRHO to gradually test the systems and interaction with lunar surface elements, some of which may be adapted for Mars surface exploration. Holding similar functional capabilities as SH, TH is sized to support much longer durations in space and greater logistical independence. Mars Surface Habitat. NASA is still exploring the concept of operations for initial crewed missions to Mars. As such, the Mars Surface Habitat (MSH) concept is still in its infancy as options for mobile, pressurized habitation and stationary habitats are being explored. It is expected MSH will leverage heavily from the lunar SH and possible lunar pressurized rover, however the very different Martian environment will likely necessitate modifications. ISRU Opportunities: Despite the advancements under NASA’s NextSTEP habitation work and continually optimized reference concepts, NASA is facing near-term mass and power challenges that may create opportunities to the ISRU community by providing yet another possible customer for space resources. While NASA desires to use regenerative ECLS systems (ECLSS) for all habitation concepts, their operation comes with initial mass penalties and maintenance overheads when compared to simpler open-loop architectures. Because of this, NASA is currently pro-posing an open-loop, consumables-based architecture for its surface habitats to achieve initial launch and delivery lander mass targets while scarring for the in-corporation of regenerative ECLSS to meet longer mission durations and sustained presence. With such an architecture, oxygen and potable water are needed consumables, which initial ISRU systems may be able to provide in a pilot capacity. Although the TH is expecting to utilize regenerative ECLSS, advancements in lunar surface-based ISRU and possible re-supply of spacecraft in lunar or Mars orbit could significantly reduce the logistical need for ECLSS related spares on TH and possibly allow a similar open-loop and consumables-based architecture. Table 1 Notional ECLSS consumables per mission use for SH and TH [5]. SH (28-day) Open Loop: Water (kg) 288 | Oxygen (kg) 30 TH (1110-day) Closed-Loop: Water (kg) 182 | Oxygen (kg) 123 In addition to ECLSS mass concerns, the SH is facing challenges with energy storage to support operations over periods of darkness exceeding 100 hours. Both battery and fuel cell-based power architectures are being traded, opening options for external power generation and energy storage. One possibility is ISRU-produced H2 and O2 feeding external primary fuel cell systems which could supplement habitation power generation while reducing initial mass and volume until much more powerful fission power systems might be deployed. Conclusion: Significant advancements are being made in evolvable habitation concepts that span from near-term technologies, such as inflatable structures under NextSTEP, to potentially revolutionary capabilities like the lunar surface construction as funded through the Moon-to-Mars Planetary Autonomous Construction Technologies (MMPACT) project [7]. As NASA investigates both heritage capabilities and rap-idly advancing, disruptive technologies, there are likely many near-term opportunities for initial ISRU capabilities to significantly aid human habitation and increase self-sufficiency beyond Earth.

habitation↗

How Can Arc Support Cld Life Support Requirements

Through conversations with a commercial space flight system developer several areas of interest have become identified. Specifically: What are NASA’s plans for for life support on Gateway and Artemis surface missions? 1) Technology transfer of life support technologies. 2) Lesions learned from NASA system analysis and trade studies.

Life support CLD commercial space↗

NASA’s Space Launch System Progress Report

NASA’s Space Launch System (SLS) continues to achieve assembly and testing milestones on its way to the launch of the first human-rated spacecraft to the Moon since the Apollo Program. Major flight hardware for Artemis I (see Fig. 1), formerly known as Exploration Mission 1 (EM-1), is complete, including the liquid and solid main propulsion systems. The Artemis I core stage is fully assembled and engine integration and checkout is underway. Structural testing on the core stage engine and payload sections and intertank are complete. Liquid hydrogen tank structural testing is under way, and liquid oxygen tank structural testing will begin in fall 2019. Major structural components for the second and third flights are also in production; hardware has been fabricated for each element of the Artemis II vehicle. SLS and the Orion crew vehicle along with the Exploration Ground Systems (EGS) launch facilities at Kennedy Space Center are critical to the nation’s plans to return to the Moon to stay in a measured, sustainable fashion. Lunar exploration will expand our understanding of Earth’s formation, serve as a proving ground for technologies for pushing deeper into the solar system, and inspire a new generation. This paper will discuss details of 2018-2019 progress and the work ahead to ready SLS for launch.

Honeycutt, John↗

Artemis IV International Gateway Biological Payloads

1. Microbiology of the Built Environment (MoBE) - Sponsor: SMD Biological and Physical Science Division (BPS), Space Biology Program - Status as of 2021: - a. Paused in 2021, pending ESDMD’s Logistics Module Decision - b. Payload proposed by BPS and developed by the DWG and Partner Agencies - c. Submitted to Gateway Program Mission Integration and Utilization for feasibility review - d. GPCB ATP package produced and on pause - e. Research solicitation will be international 2. Gateway Research Accommodation Bag 1. Sponsor: ESA 2. BPS Space Biology Program intending to fly a passive experiment - Payload is TBD

Kevin Sato↗

CubeSat Payloads on NASA’s Space Launch System Pave the Way for Artemis Moon Missions

Preparing for first launch in 2021, NASA’s Space Launch System (SLS) super heavy-lift launch vehicle will usher in a new era of human spaceflight, returning astronauts to the Moon as part of the Artemis program. Although designed to send crew in the Orion spacecraft and large payloads to the Moon and beyond, SLS also provides CubeSats with rideshare opportunities for missions to deep space. The first launch of SLS and Orion, Artemis I, has 13 6U CubeSats manifested. The payloads have been tested and will soon ship to Kennedy Space Center (KSC) to be integrated into commercial off-the-shelf (COTS) dispensers and integrated into the SLS Block 1 vehicle. Leveraging launches for the Artemis program to deploy rideshare smallsats to deep space provides a low-cost opportunity to perform missions that previously would have required a larger spacecraft and a dedicated launch, and offers additional benefits to both NASA and the smallsat community. CubeSats, including those manifested on the Artemis I flight, have a valuable role to play in the Artemis program, providing data to address NASA’s identified Strategic Knowledge Gaps (SKGs) in its plans to permanently establish humanity in deep space. Payload sponsors and developers for the Artemis I CubeSats hail from a variety of NASA industry partners and mission directorates, as well as international space agencies and universities. Several payloads destined for cislunar space will demonstrate propulsion systems and other technologies useful to future exploration. Science missions manifested on the Artemis I flight include characterizing the effects of deep space radiation on living organisms, searching for hydrogen and other volatiles on the Moon’s South Pole, and studying the lunar radiation environment. Three of the payloads were selected through NASA’s Centennial Challenges Program. Those payloads are competing for prize money while meeting specific technical development goals, such as communication with Earth from millions of miles in space. Student involvement in almost half of the Artemis I payload development allows STEM engagement with SLS and NASA’s Artemis program. As the initial vehicle to fly, the SLS Block 1 vehicle will lay the foundation for a generation of human and robotic deep space exploration missions. The Block 1 core stage is undergoing final testing at Stennis Space Center in 2020 before transportation to KSC for integration and launch in 2021. Following the Block 1 vehicle, the Block 1B and Block 2 vehicles will incorporate propulsion system upgrades and other changes to increase lift capability. In addition to sending the Orion vehicle to TLI, SLS can also be outfitted with large-diameter fairings to send robotic probes to deep space. With unparalleled lift, volume and departure energy, SLS is poised to usher in a new generation of spaceflight. In addition to launching Orion and large-volume missions, CubeSats may also be a part of Artemis missions to deep space.

Kimberly Robinson↗

Update on NASA’s ISRU Development and Mission Plans for the Artemis Program

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. One was the release of the Artemis Architecture Definition Document Revision 1 that included ISRU as a sub-architecture. The second was the release of several STMD solicitations including the Announcement of Collaborative Opportunities (ACO) and Tipping Point (TP). The third was the release of a Request for Information for the Lunar Infrastructure Foundational Technology-1 (LIFT-1) mission with the primary objective of extracting oxygen from lunar regolith. The fourth was the release of STMD technology and capability Shortfalls, and the review, ranking by numerous stakeholders and individuals, and subsequent prioritization of the Shortfalls that will be utilized in future solicitation and development plans. This paper will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related mission, and the impacts of the Shortfall prioritization.

NASA↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

The Artemis era of human space exploration beyond low Earth orbit launched at 1:47 a.m. EST on November 16, 2022. Artemis I was the first integrated flight of the agency’s new super heavy-lift rocket, the Space Launch System (SLS), and the next-generation spacecraft for astronauts, Orion. The mission sent an uncrewed Orion spacecraft into a distant retrograde orbit about the Moon. During the 25-day mission, NASA collected valuable data on the performance of the launch vehicle and crew spacecraft and information on the deep space environment where crews will soon operate. Orion splashed down approximately 80 miles off the coast of Baja, California, at the conclusion of the mission December 11. This paper will provide a summary of the launch campaign from vehicle integration and testing through completion of the upper stage phase with primary emphasis on SLS. It will also discuss highlights of progress on manufacturing and testing of SLS hardware and software for upcoming Artemis missions.

John Honeycutt↗