Search NASA⌕ Search

SEARCH · Search NASA

Results for “Asteroid encounter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

MW-Class Electric Propulsion System Designs

Electric propulsion systems are well developed and have been in commercial use for several years. Ion and Hall thrusters have propelled robotic spacecraft to encounters with asteroids, the Moon, and minor planetary bodies within the solar system, while higher power systems are being considered to support even more demanding future space science and exploration missions. Such missions may include orbit raising and station-keeping for large platforms, robotic and human missions to near earth asteroids, cargo transport for sustained lunar or Mars exploration, and at very high-power, fast piloted missions to Mars and the outer planets. The Advanced In-Space Propulsion Project, High Efficiency Space Power Systems Project, and High Power Electric Propulsion Demonstration Project were established within the NASA Exploration Technology Development and Demonstration Program to develop and advance the fundamental technologies required for these long-range, future exploration missions. Under the auspices of the High Efficiency Space Power Systems Project, and supported by the Advanced In-Space Propulsion and High Power Electric Propulsion Projects, the COMPASS design team at the NASA Glenn Research Center performed multiple parametric design analyses to determine solar and nuclear electric power technology requirements for representative 300-kW class and pulsed and steady-state MW-class electric propulsion systems. This paper describes the results of the MW-class electric power and propulsion design analysis. Starting with the representative MW-class vehicle configurations, and using design reference missions bounded by launch dates, several power system technology improvements were introduced into the parametric COMPASS simulations to determine the potential system level benefits such technologies might provide. Those technologies providing quantitative system level benefits were then assessed for technical feasibility, cost, and time to develop. Key assumptions and primary results of the COMPASS MW-class electric propulsion power system study are reported, and discussion is provided on how the analysis might be used to guide future technology investments as NASA moves to more capable high power in-space propulsion systems.

LaPointe, Michael R.↗

MW-Class Electric Propulsion System Designs for Mars Cargo Transport

Multi-kilowatt electric propulsion systems are well developed and have been used on commercial and military satellites in Earth orbit for several years. Ion and Hall thrusters have also propelled robotic spacecraft to encounters with asteroids, the Moon, and minor planetary bodies within the solar system. High power electric propulsion systems are currently being considered to support piloted missions to near earth asteroids, as cargo transport for sustained lunar or Mars exploration, and for very high-power piloted missions to Mars and the outer planets. Using NASA Mars Design Architecture 5.0 as a reference, a preliminary parametric analysis was performed to determine the suitability of a nuclear powered, MW-class electric propulsion system for Mars cargo transport. For this initial analysis, high power 100-kW Hall thrusters and 250-kW VASIMR engines were separately evaluated to determine optimum vehicle architecture and estimated performance. The DRA 5.0 cargo mission closed for both propulsion options, delivering a 100 t payload to Mars orbit and reducing the number of heavy lift launch vehicles from five in the baseline DRA 5.0 architecture to two using electric propulsion. Under an imposed single engine-out mission success criteria, the VASIMR system took longer to reach Mars than did the Hall system, arising from the need to operate the VASIMR thrusters in pairs during the spiral out from low Earth orbit.

Gilland, James H.↗

Dawn Orbit Determination Team: Modeling and Fitting of Optical Data at Vesta

The Dawn spacecraft was launched on September 27th, 2007. Its mission is to consecutively rendezvous with and observe the two largest bodies in the main asteroid belt, Vesta and Ceres. It has already completed over a year's worth of direct observations of Vesta (spanning from early 2011 through late 2012) and is currently on a cruise trajectory to Ceres, where it will begin scientific observations in mid-2015. Achieving this data collection required careful planning and execution from all Dawn operations teams. Dawn's Orbit Determination (OD) team was tasked with reconstruction of the as-flown trajectory as well as determination of the Vesta rotational rate, pole orientation and ephemeris, among other Vesta parameters. Improved knowledge of the Vesta pole orientation, specifically, was needed to target the final maneuvers that inserted Dawn into the first science orbit at Vesta. To solve for these parameters, the OD team used radiometric data from the Deep Space Network (DSN) along with optical data reduced from Dawn's Framing Camera (FC) images. This paper will de-scribe the initial determination of the Vesta ephemeris and pole using a combination of radiometric and optical data, and also the progress the OD team has made since then to further refine the knowledge of Vesta's body frame orientation and rate with these data.

imagery↗

Dawn Orbit Determination Team: Trajectory and Gravity Prediction Performance During Vesta Science Phases

The Dawn spacecraft was launched on September 27th, 2007. Its mission is to consecutively rendezvous with and observe the two largest bodies in the asteroid belt, Vesta and Ceres. It has already completed over a year's worth of direct observations of Vesta (spanning from early 2011 through late 2012) and is currently on a cruise trajectory to Ceres, where it will begin scientific observations in mid-2015. Achieving this data collection required careful planning and execution from all spacecraft teams. Dawn's Orbit Determination (OD) team was tasked with accurately predicting the trajectory of the Dawn spacecraft during the Vesta science phases, and also determining the parameters of Vesta to support future science orbit design. The future orbits included the upcoming science phase orbits as well as the transfer orbits between science phases. In all, five science phases were executed at Vesta, and this paper will describe some of the OD team contributions to the planning and execution of those phases.

gravity gradient torque↗

Satellite Dynamics about Asteroids

Current space goals for NASA include planned and proposed missions to asteroids. These missions generally call for a period of orbital operations in close proximity to the asteroid, in some cases coming within 2 radii of the asteroid. A challenge for the navigators of these missions is to predict the orbital environment about the asteroid and to derive pre-mission plans for the control of these orbits. This paper investigates the major perturbations asteroid orbiters will encounter over a range of relevant asteroid sizes.

asteroid↗

Bulk Oxygen Isotope Composition of Aggregate Samples From Asteroid Bennu Returned By OSIRIS-REx

On 24 September 2023, the OSIRIS-REx spacecraft delivered to Earth material collected from the surface of the B-type asteroid Bennu. During its ~2.5-year encounter with the asteroid, OSIRIS-REx made many important discoveries, including establishing its extremely primitive chemical composition, the presence of at least two lithologies, and evidence of fluid flow on its parent asteroid. One of the driving hypotheses of the Sample Analysis Plan is that Bennu’s dominant lithologies are comparable to the most aqueously altered carbonaceous chondrites. Oxygen three-isotope analysis is a powerful tool for defining the relationship between different meteorite groups and can be used to understand the nature of the returned Bennu samples. The O isotope signatures reflect the materials that parent asteroids accreted from and the geological processes that operated during asteroidal evolution. Aggregate samples of particles (typically <500 μm) likely sampled many different larger stones and boulders, and their composition may therefore represent the average composition of Bennu. Fractionation of the sample, e.g. comparison of aliquots of finer material with coarser particles within the aggregate samples, offers the opportunity to identify different isotopic reservoirs within the returned material. The average O isotope composition will also provide a baseline from which to identify and characterize any exogenous clasts present in the sample.

I. A. Franchi↗

Mission design for a 1980 Encke slow flyby using solar electric propulsion

The comet Encke at its apparition in 1980 is investigated as the target for a solar electric slow flyby mission having a flight time of approximately two years. Mission trade off studies are performed for two modes: namely the direct earth to Encke mode and the Venus gravity assist mode. Baseline missions for each mode are selected which flyby Encke at 4 km/s 30 days before perihelion. The direct mission baseline is investigated in detail for trajectory parameters related to spacecraft and science requirements. The Venus flyby mode can deliver the same payload with a total power requirement about 20% less than the direct mode. The cost is a longer flight time and a Venus flyby at about 500 km above the surface. One asteroid can be encountered at very close range on either mission. The asteroids available and the extra propellant required are determined.

Bender, D. F.↗

Galileo post-Gaspra cruise and Earth-2 encounter

This article documents DSN support for the Galileo cruise after the Oct. 1991 encounter with the asteroid Gaspra. This article also details the Earth-2 encounter and the special non-DSN support provided during the Earth-2 closest approach.

Beyer, P. E.↗

Asteroid density, porosity, and structure

New data from observations of asteroid mutural perturbation events, observations of asteroid satellites, and spacecraft encounters have revolutionized our understanding of asteroid bulk density.

densities↗

Project VESTA, exploratory mission to the asteroids: Scientific objectives and technical specifications

The VESTA project, a Franco-Soviet collaboration, is described. The VESTA probe will be launched and will pass through the asteroid belts before encountering comets. The probe will be an autonomous vehicle. The scientific objectives are to obtaining information on asteroids, comets, solar system formation, meteorites and other sources of extraterrestrial material. The surface morphology, mineral composition and internal structure of asteroids will be studied.

Source record↗

Geotechnical Tests on Asteroid Simulant Orgueil

In the last 100 years, the global population has more than quadrupled to over seven billion people. At the same time, the demand for food and standard of living has been increasing which has amplified the global water use by nearly eight times from approximately 500 to 4000 cu km per yr from 1900 to 2010. With the increasing concern to sustain the growing population on Earth it is necessary to seek other approaches to ensure that our planet will have resources for generations to come. In recent years, the advancement of space travel and technology has allowed the idea of mining asteroids with resources closer to becoming a reality. During the duration of the internship at NASA Kennedy Space Center, several geotechnical tests were conducted on BP-1 lunar simulant and asteroid simulant Orgueil. The tests that were conducted on BP-1 was to practice utilizing the equipment that will be used on the asteroid simulant and the data from those tests will be omitted from report. Understanding the soil mechanics of asteroid simulant Orgueil will help provide basis for future technological advances and prepare scientists for the conditions they may encounter when mining asteroids becomes reality in the distant future. Distinct tests were conducted to determine grain size distribution, unconsolidated density, and maximum density. Once the basic properties are known, the asteroid simulant will be altered to different levels of compaction using a vibrator table to see how compaction affects the density. After different intervals of vibration compaction, a miniature vane shear test will be conducted. Laboratory vane shear testing is a reliable tool to investigate strength anisotropy in the vertical and horizontal directions of a very soft to stiff saturated fine-grained clayey soil. This test will provide us with a rapid determination of the shear strength on the undisturbed compacted regolith. The results of these tests will shed light on how much torque is necessary to drill through the surface of an asteroid. Most of the known asteroids are believed to be left over material during the formation of the solar system that never accreted to form planets. Asteroids can be found in several groups such as Trojan Asteroids, Near Earth Asteroids (NEAs) and the main asteroid belt. The Trojan Asteroids orbit the 4th and 5th Lagrange points of major planets in the Solar System while the NEA's have orbits that are close to and sometimes intersect with Earths orbit and the Main Asteroid Belt which is found between the orbit of Mars and Jupiter. Gravitational perturbations can alter the orbit of asteroids in the Main Asteroid Belt causing them to move closer to earth causing them to become in the NEA class.

resources↗

Galileo completing VEEGA - A mid-term report

In December Galileo will complete its Venus-Earth-Earth-Gravity Assist (VEEGA) mission phase and will be placed on a direct trajectory to Jupiter arriving in December 1995. Galileo will be the first aircraft to orbit Jupiter and send a probe into its atmosphere and will perform an intensive and comprehensive investigation of the planet. Observations made during the October 1991 encounter with the asteroid Gaspra are discussed. The observation plan to be used for earth and moon observations during the December 1992 gravity assist encounter is described. The Galileo High-Gain Antenna (HGA) deployment anomaly status is reported and future corrective actions are outlined. The low-gain antenna contingency mission to be implemented if the HGA cannot be deployed is described and overall performance and status of the space craft are discussed. The selected tour for the Galileo Jupiter satellite-gravity-assist orbital tour is described and the decision rationale for performing the August 1993 asteroid Ida flyby option is presented.

O'Neil, William J.↗

Ion Thruster Used to Propel the Deep Space 1 Spacecraft to Comet Encounters

The NASA Solar Electric Propulsion Technology Applications Readiness (NSTAR) Project provided a xenon ion propulsion system to the Deep Space 1 (DS1) spacecraft to validate the propulsion system as well as perform primary propulsion for asteroid and comet encounters. The On-Board Propulsion Branch of the NASA Glenn Research Center at Lewis Field developed engineering model versions of the 30-cm-diameter ion thruster and the 2.5-kW power processor unit (PPU). Glenn then transferred the thruster and PPU technologies to Hughes Electron Dynamics and managed the contract, which supplied two flight sets of thrusters and PPU s to the Deep Space 1 spacecraft and to a ground-based life verification test at the Jet Propulsion Laboratory (JPL). In addition to managing the DS1 spacecraft development, JPL was responsible for the NSTAR Project management, thruster life tests, the feed system, diagnostics, and propulsion subsystem integration. The ion propulsion development team included NASA Glenn, JPL, Hughes Electronics, Moog Inc., and Spectrum Astro Inc. The overall NSTAR subsystem dry mass, including thruster, PPU, controller, cables, and the xenon storage and feed system, is 48 kg. The mass of the xenon stored onboard DS1 was about 81 kg, and the spacecraft wet mass was approximately 500 kg.The DS1 spacecraft was launched on October 24, 1998, and on July 29, 1999, it flew within 16 miles of the small asteroid Braille (formerly 1992KD) at a relative speed of 35,000 mph. As of November 1999, the ion propulsion system had performed flawlessly for nearly 149 days of thrusting. NASA has approved an extension to the mission, which will allow DS1 to continue thrusting to encounters with two comets in 2001. The DS1 optical and plasma diagnostic instruments will be used to investigate the comet and space environments. The spacecraft is scheduled to fly past the dormant comet Wilson- Harrington in January 2001 and the very active comet Borrelly in September 2001, at which time approximately 500 days of ion engine thrusting will have been completed.

Sovey, James S.↗

Reducing the Risk and Improving Mission Success for NASA's Human Mission to a Near-Earth Asteroid: How Many Robotic Surveyors?

NASA's recent attention and interest in sending a human mission to land on a Near-Earth asteroid raises the question of need for a robotic surveyor. This paper describes a Bayesian approach for comparing the productivity and cost-risk tradeoffs of sending (versus not sending) one or more robotic surveyor missions prior to a human mission to land on an asteroid. The probability of finding an asteroid suitable for landing was derived from an analysis of more than 1200 asteroids in order to define a quantitative estimate of suitability. The low cost of the surveyors relative to the human mission underlined the multi-surveyor strategy as relatively inexpensive insurance against the risks of encountering an unsuitable asteroid for landing on arrival by a human mission.

decision analysis↗