Search NASA⌕ Search

SEARCH · Search NASA

Results for “BACKUP COMMUNICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Creating a Salt Batch: Challenges and Lessons Learned

CONCLUSION • The overall Salt Batch system has been honed through each iteration of the process • Increased communication across facilities and work groups has enabled the salt team to react swiftly to emergent items and identify improvement opportunities • Even the best plans require backup options – Emergent items can appear at any time during the process – Flexibility to adapt to the unexpected is a must-have team mindset • To date, every salt batch compiled has been qualified and approved as feed for SWPF – No feed break has occurred between the Tank Farm and SWPF

Goldblatt, Joshua B. [Savannah River National Labo↗

Reliable Broadcast under Cascading Failures in Interdependent Networks

Reliable broadcast is an essential tool to disseminate information among a set of nodes in the presence of failures. We present a novel study of reliable broadcast in interdependent networks, in which the failures in one network may cascade to another network. In particular, we focus on the interdependency between the communication network and power grid network, where the power grid depends on the signals from the communication network for control and the communication network depends on the grid for power. In this paper, we build a resilient solution to handle crash failures in the communication network that may cause cascading failures and may even partition the network. In order to guarantee that all the correct nodes deliver the messages, we use soft links, which are inactive backup links to non-neighboring nodes that are only active when failures occur. At the core of our work is a fully distributed algorithm for the nodes to predict and collect the information of cascading failures so that soft links can be maintained to correct nodes prior to the failures. In the presence of failures, soft links are activated to guarantee message delivery and new soft links are built accordingly for long term robustness. Our evaluation results show that the algorithm achieves low packet drop rate and handles cascading failures with little overhead.

cascading failures↗

Trajectory Specification Applied to Terminal Airspace

Despite major efforts to automate air traffic control (ATC), it is still performed by humans today. The complexity and safety-criticality of ATC makes it very difficult to safely automate, but it must be automated to increase airspace capacity (the density of traffic that can be safely managed) and airport throughput (the number of arrivals and departures that an airport can safely handle in a given period of time) beyond what is possible with human controllers. This paper presents the Trajectory Specification (TS) concept, which can help to safely automate ATC. TS is a method of specifying aircraft trajectories such that the position at any given time in flight is restricted to a precisely defined bounding space, removing all ambiguity as to where the flight is allowed to be. The bounding space or volume is determined by tolerances relative to a reference trajectory (position as a function of time). The tolerances are dynamic and are based on the aircraft navigation capabilities and the traffic situation. The tolerances can be a piecewise linear function of time or distance along the route, allowing the tolerances to vary as needed, typically increasing with time for departures and decreasing for arrivals. A Trajectory Specification Language (TSL) is proposed for communicating trajectories from aircraft to ATC as requests and from ATC to aircraft as assignments. The TS concept requires a new generation of airborne Flight Management Systems (FMS) that understand the TSL and can fly the assigned trajectories, but this paper focuses on the ATC functions and the prototype ATC algorithms and software that were developed to test the TS concept. Assuming conformance, TS can guarantee safe separation for an arbitrary length of time even in the event of an ATC system or communication outage. It can help to achieve the high level of safety and reliability needed for ATC automation, and it can also reduce the reliance on ATC backup systems for tactical conflict detection and resolution during normal operation. TS can be applied to any controlled airspace, including enroute, terminal, and urban airspace, but this paper presents algorithms and software for arrival spacing and conflict detection and resolution in the terminal airspace serving a major airport. In a fast-time simulation of a full day of traffic in a major terminal airspace, all conflicts were resolved in near real time, demonstrating the computational feasibility and the preliminary operational feasibility of the TS concept. This paper is a compilation of previous papers, and it adds significant information that was omitted from those papers due to length limitations. It also updates some of the results of those earlier papers due to algorithm refinements and corrections of minor software errors.

air traffic control, trajectory↗

Thomas Leps Internship Abstract

An optical navigation system is being flown as the backup system to the primary Deep Space Network telemetry for navigation and guidance purposes on Orion. This is required to ensure Orion can recover from a loss of communication, which would simultaneously cause a loss of DSN telemetry. Images taken of the Moon and Earth are used to give range and position information to the navigation computer for trajectory calculations and maneuver execution. To get telemetry data from these images, the size and location of the moon need to be calculated with high accuracy and precision. The reentry envelope for the Orion EM-1 mission requires the centroid and radius of the moon images to be determined within 1/3 of a pixel 3 sigma. In order to ensure this accuracy and precision can be attained, I was tasked with building precise dot grid images for camera calibration as well as building a hardware in the loop test stand for flight software and hardware proofing. To calibrate the Op-Nav camera a dot grid is imaged with the camera, the error between the image dot location and the actual dot location can be used to build a distortion map of the camera and lens system so that images can be fixed to display truth locations. To build the dot grid images I used the Electro Optics Lab optical bench Bright Object Simulator System, and gimbal. The gimbal was slewed to a series of elevations and azimuths. An image of the collimated single point light source was then taken at each position. After a series of 99 images were taken at different locations the single light spots were extracted from each image and added to a composite image containing all 99 points. During the development of these grids it was noticed that an intermittent error in the artificial "star" locations occurred. Prior to the summer this error was attributed to the gimbal having glitches in it's pointing direction and was going to be replaced, however after further examining the issue I determined it to be a software issue. I have since narrowed the likely source of the error down to a Software Development Kit released by the camera supplier PixeLink. I have since developed a workaround in order to build star grids for calibration until the software bug can be isolated and fixed. I was also tasked with building a Hardware in the Loop test stand in order to test the full Op-Nav system. A 4k screen displays simulated Lunar and Terrestrial images from a possible Orion trajectory. These images are then projected through a collimator and then captured with an Op-Nav camera controlled by an Intel NUC computer running flight software. The flight software then analyzes the images to determine attitude and position, this data is then reconstructed into a trajectory and matched to the simulated trajectory in order to determine the accuracy of the attitude and position estimates. In order for the system to work it needs to be precisely and accurately aligned. I developed an alignment procedure that allows the screen, collimator and camera to be squared, centered and collinear with each other within a micron spatially and 5 arcseconds in rotation. I also designed a rigid mount for the screen that was machined on site in Building 10 by another intern. While I was working in the EOL we received a $500k Orion startracker for alignment procedure testing. Due to my prior experience in electronics development, as an ancillary duty, I was tasked with building the cables required to operate and power the startracker. If any errors are made building these cables the startracker would be destroyed, I was honored that the director of the lab entrusted such a critical component with me. This internship has cemented my view on public space exploration. I always preferred public sector to privatization because, as a scientist, the most interesting aspects of space for me are not necessarily the most profitable. I was concerned that the public sector was faltering however, and that in order to improve human space exploration I would be forced into private sector. I now know that, at least at JSC, human spaceflight is still progressing, and exciting work is still being done. I am now actively seeking employment at JSC after I complete my Ph.D and have met with my branch chiefs and mentor to discuss transitioning to a grad Co-op position.

Leps, Thomas↗

Apollo 11 Telemetry Data Recordings: A Final Report

When astronauts landed on the moon on July 20, 1969, the Eagle lander carried a small, unconventional television camera affixed to the inside of the door. It had one mission. Once astronauts opened the door and activated the camera, it would begin shooting live images of the historic event, transmitting the raw footage by way of an antenna to Earth below. There, engineers at three tracking stations would tape the original signals onto one-inch telemetry tapes fpr backup and then also convert the raw feed into a conventional format compatible with American broadcast standards.

Apollo 11↗

Plans for a STRV-2 to AMOS High Data Rate Bi-Directional Optical Communications Link

The Ballistic Missile Defense Organization has developed a high-data rate (155 Mbps - 1 Gbps) optical communications terminal that will be flown on the STRV-2 satellite. The satellite is scheduled for launch in November 1999, and NASA/JPL has been asked to investigate the use of the AMOS facility as a backup ground terminal to a small transportable terminal constructed by Astroterra Corporation of San Diego. The ground terminal built by Astroterra is designed to support a links out to 2000 km, and will be located at the Table Mountain Facility in Wrightwood, California. Subject to BMDO approval, the demonstration from AMOS will begin in early 2000. For the demonstration, the beam-director tracker will serve as the uplink transmitter, and the 1.6-m telescope as the downlink receiver. It will support bi-directional links out to the 3500-km maximum slant range of the satellite's pass.

Wilson, K. E.↗

MSAT-X phased array antenna adaptions to airborne applications

The Mobile Satellite Experiment (MSAT-X) phased array antenna is being modified to meet future requirements. The proposed system consists of two high gain antennas mounted on each side of a fuselage, and a low gain antenna mounted on top of the fuselage. Each antenna is an electronically steered phased array based on the design of the MSAT-X antenna. A beamforming network is connected to the array elements via coaxial cables. It is essential that the proposed antenna system be able to provide an adequate communication link over the required space coverage, which is 360 degrees in azimuth and from 20 degrees below the horizon to the zenith in elevation. Alternative design concepts are suggested. Both open loop and closed loop backup capabilities are discussed. Typical antenna performance data are also included.

Sparks, C.↗

An Agile-Like Approach to Hardware Development: The Ejectable Data Recorder (EDR) for Orion's Ascent Abort 2 (AA-2) Test Flight

On July 2, 2019, the Ascent Abort 2 (AA-2) Flight Test Vehicle was launched from Cape Canaveral, with the goal of demonstrating the performance of Orion’s Launch Abort System (LAS) and collecting data from hundreds of sensors throughout the vehicle. The data collected during this test flight is of paramount importance, as it will be used to certify the Orion vehicle for human spaceflight. Originally, the data was to be downlinked via a single string network of antennas on the LAS, with the associated risk of potential data dropouts, as well as loss of data once the LAS was jettisoned. Thus, additional antennas were added onto the crew module (CM) to support data downlink post-LAS jettison, a buffer rebroadcast capability was added to fill in any gaps in data downlink transmissions, and an ejectable data recorder (EDR) subsystem was added to the CM as a redundant measure to collect all the instrumentation data. The EDR subsystem was added to the project about one year after the project commenced, which significantly reduced the available development time when compared with the other subsystems of the AA-2 Test Flight. The project was further accelerated by six months, around the critical design review gate. Due to the schedule compression challenge and the fact that the EDR subsystem was a backup system and not flight critical, the EDR subsystem was further challenged to find a new and more efficient way to develop hardware. Thus, the EDR subsystem experimented with different management and systems engineering processes, team sizes, communication methods, and tools. Some examples are novel uses of SharePoint as a Data-centric Project Management & Systems Engineering environment, a continuous testing approach through the lifecycle, and a Skunkworks approach to managing the team. The EDR subsystem blended Commercial Off The Shelf (COTS) hardware with in-house developed hardware and software to create a novel data retrieval capability. The capability evolved rapidly through a hardware in the loop simulation environment that enabled incremental component updates for not only the EDR subsystem but across the entire Crew Module. This paper will present an overview of how the EDR subsystem was managed and compare it to an Agile approach to managing projects. The paper will further provide a recommended approach to future Agile-like hardware development that incorporates lessons learned from the EDR experience.

Agile↗

Los Angeles Air Force Base Vehicle-to-Grid Demonstration (Final Project Report)

Electrification of non-tactical vehicle fleets represents a key efficiency and energy security objective for the United States Department of Defense. To achieve electrification, the department targeted vehicle-to-grid services as a way to decrease the overall cost of operating the vehicle fleet and achieve rough parity with traditional internal combustion engine vehicle fleets. This report describes efforts to aggregate a fleet of bi-directional electric vehicles and charging stations to provide regulation up and regulation down in the California Independent System Operator ancillary services market. A 29-vehicle electric vehicle demonstration fleet, consisting of mixed purpose and duty vehicles such as sedans, pickups, vans, and medium-duty trucks, was deployed at the Los Angeles Air Force base. The fleet provided frequency regulation to the California Independent System Operator’s wholesale electricity market to determine the capability of recouping some of the additional costs of procuring electric vehicles and their supporting infrastructure. Lawrence Berkeley National Laboratory, with its partner Kisensum, LLC, developed the fleet scheduling, optimization, and control software to allow the vehicle fleet at the air force base to participate in the ancillary services markets. This report focuses on the control software and market interactions, the significant challenges faced and solutions devised to address them, and examines the potential of using the electric vehicle fleet as an energy storage resource for the base buildings, an application known as vehicle-tobuilding, in providing demand response and emergency backup power. The report discusses key findings related to providing frequency regulation to the California Independent System Operator market, electric vehicle fleet performance, compatibility of varying resource parameters of vehicle fleet aggregation, the need for automated methods for communicating hour-ahead energy bidding, challenges related to battery capacity and charge/discharge rates, and monthly settlement revenue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Disaster-survivable cloud-network mapping

Cloud-computing services are provided to consumers through a network of servers and network equipment. Cloud-network (CN) providers virtualize resources [e.g., virtual machine (VM) and virtual network (VN)] for efficient and secure resource allocation. Disasters are one of the worst threats for CNs as they can causemassive disruptions and CN disconnection. A disaster may also induce post-disaster correlated, cascading failures which can disconnect more CNs. Survivable virtual-network embedding (SVNE) approaches have been studied to protect VNs against single physical-link/- node and dual physical-link failures in communication infrastructure, but massive disruptions due to a disaster and their consequences can make SVNE approaches insufficient to guarantee cloud-computing survivability. In this work, we study the problem of survivable CN mapping from disaster. We consider risk assessment, VM backup location, and post-disaster survivability to reduce the risk of failure and probability of CN disconnection and the penalty paid by operators due to loss of capacity.We formulate the proposed approach as an integer linear program and study two scenarios: a natural disaster, e.g., earthquake and a human-made disaster, e.g., weapons-of-mass-destruction attack. Finally, our illustrative examples show that our approach reduces the risk of CN disconnection and penalty up to 90% compared with a baseline CN mapping approach and increases the CN survivability up to 100% in both scenarios.

97 MATHEMATICS AND COMPUTING↗

A Robust Communication-Free Protection Scheme for Islanded Microgrids with Relay Logic and Hardware-in-the-Loop Validation

This paper presents the Imbalance Square Factor (ISF) detection algorithm, an effective, computationally lightweight method for detecting faults in inverter-based microgrids. ISF provides a high magnitude at the time of the fault, which allows for fast detection and coordination between primary and backup relays. The imbalance squared factor, calculated using local voltage and currents, is used for fault detection and coordination among three relays. ISF is validated in hardware-in-the-loop (HIL) implementation inside commercial-grade relay logic (SEL-751). The HIL validation shows that ISF can coordinate primary, secondary, and tertiary relays in the 13-bus system in islanded operation.

Ferrari Maglia, Max [ORNL]↗

Orion MPCV Touchdown Detection Threshold Development and Testing

A robust method of detecting Orion Multi ]Purpose Crew Vehicle (MPCV) splashdown is necessary to ensure crew and hardware safety during descent and after touchdown. The proposed method uses a triple redundant system to inhibit Reaction Control System (RCS) thruster firings, detach parachute risers from the vehicle, and transition to the post ]landing segment of the Flight Software (FSW). The vehicle crew is the prime input for touchdown detection, followed by an autonomous FSW algorithm, and finally a strictly time based backup timer. RCS thrusters must be inhibited before submersion in water to protect against possible damage due to firing these jets under water. In addition, neglecting to declare touchdown will not allow the vehicle to transition to post ]landing activities such as activating the Crew Module Up ]righting System (CMUS), resulting in possible loss of communication and difficult recovery. A previous AIAA paper gAssessment of an Automated Touchdown Detection Algorithm for the Orion Crew Module h concluded that a strictly Inertial Measurement Unit (IMU) based detection method using an acceleration spike algorithm had the highest safety margins and shortest detection times of other methods considered. That study utilized finite element simulations of vehicle splashdown, generated by LS ]DYNA, which were expanded to a larger set of results using a Kriging surface fit. The study also used the Decelerator Systems Simulation (DSS) to generate flight dynamics during vehicle descent under parachutes. Proto ]type IMU and FSW MATLAB models provided the basis for initial algorithm development and testing. This paper documents an in ]depth trade study, using the same dynamics data and MATLAB simulations as the earlier work, to further develop the acceleration detection method. By studying the combined effects of data rate, filtering on the rotational acceleration correction, data persistence limits and values of acceleration thresholds, an optimal configuration was determined. The lever arm calculation, which removes the centripetal acceleration caused by vehicle rotation, requires that the vehicle angular acceleration be derived from vehicle body rates, necessitating the addition of a 2nd order filter to smooth the data. It was determined that using 200 Hz data directly from the vehicle IMU outperforms the 40 Hz FSW data rate. Data persistence counter values and acceleration thresholds were balanced in order to meet desired safety and performance. The algorithm proved to exhibit ample safety margin against early detection while under parachutes, and adequate performance upon vehicle splashdown. Fall times from algorithm initiation were also studied, and a backup timer length was chosen to provide a large safety margin, yet still trigger detection before CMUS inflation. This timer serves as a backup to the primary acceleration detection method. Additionally, these parameters were tested for safety on actual flight test data, demonstrating expected safety margins.

Daum, Jared↗

Planning Space Shuttle's maiden voyage

NASA's first Space Shuttle, Columbia, whose technological advances include a space laboratory, navigational and communication satellites, and planetary explorers, is examined, and the first few flights, scheduled for 1980, are described. The Shuttle employs an all-digital, all-electronic, computer-operated avionics system. The onboard data processing and software subsystem, encompassing five computers (four online and one backup), a data-bus network, bus terminals, and software, is analyzed in detail. Attention is given to the basic structure of the Orbiter (37.19 m in length and 23.77 m wingspan), its main engines, and the payload and cargo capacities (29,500 kg). A two-step program that could increase the power and duration of spaceflights is presented. The first step is the creation of a power extension package, using solar arrays, generating electricity to extend the basic five-day flight to 20 days, while the second step uses the same design to create a 25-kW power model capable of providing energy for a 50-day flight. Plans for construction of a manned space construction base and a larger power platform of 250 kW are also presented.

Malkin, M. S.↗

Precursor Analysis Report: SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003

The SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003 Precursor Analysis Report leverages publicly available information about Davis-Besse’s 2003 cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. On 25 January 2003, the SQL Slammer worm infected more than 90% of vulnerable hosts and crashed the internet in 10 to 15 minutes, making it one of the fastest spreading worms in history. SQL Slammer is a fileless, memory-resident worm that remotely exploits a stack-based buffer overflow vulnerability on local hosts to intensively scan and rapidly self-propagate across the internet. The worm infected approximately 300,000 unpatched hosts running Microsoft Structured Query Language (SQL) Server 2000 or Microsoft Desktop Engine (MSDE) 2000 with SQL Server Resolution Service. The SQL Slammer worm indirectly infected FirstEnergy’s Davis-Besse nuclear power plant by first infecting a consultant’s company network server and then propagating through an external misconfigured connection into Davis-Besse’s site network. The infection caused major network congestion, slow performance, data overloads, and the inability of local hosts to communicate with each other, which eventually caused a loss of availability and a loss of view when the Safety Parameter Display System (SPDS) and Plant Process Computer (PPC) crashed. At the time of the infection, the plant was already offline, the digital monitoring systems had redundant analog backups, and the plant control and safety functions were not affected, so there were no concerns of a safety breach. However, this incident resulted in many lessons learned and spawned important discussions about cybersecurity’s role in nuclear safety and electric power reliability regulation, policy, and guidance. Researchers and analysts identified 10 unique techniques utilized during the attack with a total of 640 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Eight of the identified techniques used during Davis-Besse cyber attack were precursors to the triggering event. Analysis identified 596 observables associated with these precursor techniques, 428 of which were assessed to have an increased likelihood of being perceived in the 331 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Proposal for massively parallel data storage system

An architecture for integrating large numbers of data storage units (drives) to form a distributed mass storage system is proposed. The network of interconnected units consists of nodes and links. At each node there resides a controller board, a data storage unit and, possibly, a local/remote user-terminal. The links (twisted-pair wires, coax cables, or fiber-optic channels) provide the communications backbone of the network. There is no central controller for the system as a whole; all decisions regarding allocation of resources, routing of messages and data-blocks, creation and distribution of redundant data-blocks throughout the system (for protection against possible failures), frequency of backup operations, etc., are made locally at individual nodes. The system can handle as many user-terminals as there are nodes in the network. Various users compete for resources by sending their requests to the local controller-board and receiving allocations of time and storage space. In principle, each user can have access to the entire system, and all drives can be running in parallel to service the requests for one or more users. The system is expandable up to a maximum number of nodes, determined by the number of routing-buffers built into the controller boards. Additional drives, controller-boards, user-terminals, and links can be simply plugged into an existing system in order to expand its capacity.

Mansuripur, M.↗

Safety Case for Small Uncrewed Aircraft Systems (sUAS) Beyond Visual Line of Sight (BVLOS) Operations at NASA Langley Research Center

This Technical Memorandum (TM) is written to provide for dissemination of the methods and safety considerations for operations of small Uncrewed Aerial Systems (sUAS) Beyond Visual Line-of-Sight (BVLOS)at NASA Langley Research Center. It includes the Safety Case used to acquire a BVLOS Certificate of Authorization (COA) from the FAA and is being published to enable others to benefit from this work. The intended operations, subject to approval from the Federal Aviation Administration (FAA) and the National Aeronautics and Space Administration (NASA), will include a combination of Within Visual Line of Sight (WVLOS) and Beyond Visual Line of Sight (BVLOS) flights, comprising of at most five sUAS operating concurrently, with no more than three operating BVLOS. Flights will occur in a subset of the Langley Air Force Base (LAFB) Class D airspace (KLFI) at a maximum altitude of 400 ft AGL. Most operations within this subset will take place in the City Environment Range Testing for Autonomous Integrated Navigation (CERTAIN) Range. The CERTAIN Range includes airspace inside the borders of NASA Langley Research Center (LaRC). Additional airspace over the northern section of CERTAIN will be requested as part of the Certificate of Authorization (COA). NASA LaRC BVLOS operations on the CERTAIN Range can be broken down into five critical components needed to meet the 14 CFR § 91.113 see and avoid requirement: 1) procedural deconfliction with LAFB for UAS operations at or below 400 ft and manned aircraft at or above 900’ AGL; 2) ground equipment for detection of intruder aircraft and to support communications between crewmembers ; 3) sUAS vehicles with advanced onboard automation capable of autonomously maintaining safe separation; 4) BVLOS standardized operating procedures (SOPs); 5) and personnel to execute the flight operations in accordance with the SOPs and respond to airborne contingencies. The introduction of new ground equipment includes the use of the Remote Operations for Autonomous Missions (ROAM) UAS Operations Center, development and use of an Integrated Airspace Display (IAD), use of the L-STAR and GA-9120 radars, and the incorporation of standardized Vertiports. The ROAM Operations Center will be the central point for all BVLOS sUAS operations. All command and control (C2), voice communications and airspace awareness displays will reside inside ROAM. The IAD will provide raw data from ADS-B, FLARM, radar tracks and telemetered GPS vehicle positions for interpretation by an Airspace Monitor. The radars will search the class D airspace around the CERTAIN Range and serve as a backup to procedural deconfliction procedures coordinated with LAFB. In the event of a procedural deconfliction breakdown, radar detections of non-participating aircraft will be available so that the 91.113 see and avoid requirement can still be safely met. Finally, the incorporation of Vertiports will have video and network connectivity that enables large numbers of sUAS launches and recoveries from a single location. This is a continuation of the remote command and control of unpiloted aircraft component focused on evaluating unpiloted aircraft flight crew roles and responsibilities, control interfaces and the associated data links needed to operate a fleet of aircraft within a UAM Ecosystem. This work supports the development of future aviation operational concepts based on an Urban Air Mobility Maturity Level (UML) 4 environment (Patterson, 2020). It is assumed that future airspace will include hundreds of simultaneous aircraft operations within the airspace, therefore scalable operations are essential for enabling this future airspace to become a reality. Follow on work includes envisioned flights that expand operations beyond the CERTAIN range and lead to an effective Maritime Surveillance capability.

Matthew W Coldsnow↗

An Autonomous Autopilot Control System Design for Small-Scale UAVs

This paper describes the design and implementation of a fully autonomous and programmable autopilot system for small scale autonomous unmanned aerial vehicle (UAV) aircraft. This system was implemented in Reflection and has flown on the Exploration Aerial Vehicle (EAV) platform at NASA Ames Research Center, currently only as a safety backup for an experimental autopilot. The EAV and ground station are built on a component-based architecture called the Reflection Architecture. The Reflection Architecture is a prototype for a real-time embedded plug-and-play avionics system architecture which provides a transport layer for real-time communications between hardware and software components, allowing each component to focus solely on its implementation. The autopilot module described here, although developed in Reflection, contains no design elements dependent on this architecture.

Ippolito, Corey↗

The energy footprint of automotive electronic sensors

We discuss how Information and communication technologies (ICT) have emerged as one of the leading technologies to reduce global emissions, particularly in the mobility sector. Automotive electronics, such as sensors/actuators and microcontrollers (commonly known as electronic control units (ECU) which control one or more of the electrical systems or subsystems in a vehicle), play a key role in ICT. Sensors/actuators are key in electronic ICT devices, starting with the data collection and data communication with the internet. The latest two big trends of electrification and automation in vehicles, are projected to increase the use of worldwide automotive sensors from 7.5 billion units in 2017 to 11.0 billion units by the year 2024. A representative state-of-the art automotive sensor system, (i.e., an ultrasonic backup system), including the ECUs controlling the vehicle electrical systems/subsystems, has been considered to estimate the energy footprint in terms of manufacturing and operational energy of global automotive sensors use. A widely used life cycle energy assessment method (i.e., cumulative energy demand) was used as both direct and indirect (including the extraction, manufacturing, and disposal of the raw and auxiliary materials) energy use can be considered for the energy footprint estimation. The embodied manufacturing energy impacts of the system was estimated to be 559 MJ/system, compared to the 417 MJ/system for lifetime system power and additional gasoline use. The share of purchased energy to the embodied energy where the upstream energy isn't included in the former case, is less than 10% and ~ 85% for the component manufacturing and vehicle operation energy uses, respectively. As the purpose of this ultrasonic backup system is to prevent rear crashes, an estimated 1.0 MJ/system is avoided from reduced lifetime vehicular repairs (from an estimated 11% chance of requiring a rear bumper replacement). While all of this is small compared to the overall automotive manufacturing and use energy, the 11 billion automotive sensors expected to be produced in 2024 could require 1540 PJ for manufacturing and those sensors would require an additional 780–1150 PJ for lifetime energy use.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗