Search NASA⌕ Search

SEARCH · Search NASA

Results for “BLOWERS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Self-powered Heating: Efficiency Analysis

Conventional fuel-fired heating devices such as furnaces, boilers, and water heaters have fuel efficiency less than 100% on the basis of higher heating value. They also require electricity from the electric grid to power parasitic loads such as blowers, pumps, fans, and ignitors. The primary energy efficiency of the device accounts for both fuel used on-site and primary energy used off-site to produce electric power used by the device. This work compares conventional fuel-fired heating devices to two types of self-powered devices. A self-powered device (SPD) integrates a power cycle onboard to eliminate consumption of grid electricity. We assume that all heat rejected by the onboard power cycle is added to the process fluid, so that, compared with a conventional device, the same amount of heat is provided to the process fluid and the same amount of fuel is consumed, but grid electricity consumption is eliminated. The first SPD type is the basic one: exactly the electricity required is generated. The second type considered is the SPD with heat pump (SPD-HP), in which the power cycle generates more electricity than needed for parasitic loads, and the excess electricity is used to power a heat pump. The heat pump extracts additional heat from the ambient to boost efficiency. Both SPD and SPD-HP self-consume all the generated electricity, in contrast to combined heat and power (CHP) systems that export electricity. In this work, equations are derived to express the efficiency of three classes of heating devices: conventional (consuming grid electricity), self-powered (consuming no grid electricity), and self-powered with heat pump. The efficiency of each is derived as a function of up to six factors: (1) the fraction of combustion heat captured, (2) the rate of parasitic power consumption, (3) the fraction of electric energy dissipated as useful heat, (4) the power cycle conversion efficiency, (5) the grid efficiency, when applicable, and (6) the heat pump COP, when applicable. Scenarios are identified in which it is possible to achieve efficiency greater than 100% on a higher heating value basis. Plausible configurations using existing technology options are outlined.

Gluesenkamp, Kyle↗

What does it take to “see” air leakage through a building envelope?

Unwanted air leakage in buildings can cause health and comfort issues for the building occupants and contribute to rot and mold growth in building materials. Leakage also contributes to unnecessary energy consumption ~4 quads (1172 TWh) per year in the buildings sector in the United States. Finding and repairing leaks through the building envelope can improve the energy efficiency, comfort, air-quality, and moisture durability of the building stock. Typical methods of locating air leakage, such as infrared imaging or smoke tracing, rely on concurrent blower door operation which also measures the total leakage rate of the building. These methods can be disruptive to occupants and can’t measure the contribution of individual leaks to prioritize sealing efforts. ORNL is working on a refraction-based fluid flow imaging technique that can measure the leakage rate of individual leaks from the outside of the building. The working principle of this device is based on the refraction of light caused by the exfiltration because there is a small difference in density between the exfiltration and ambient air. We will discuss the operation of the air leak detector and key variables that affect its performance. We will also present preliminary results showing the visualization capability of this new air leak detector under different conditions. Experiments were completed with different claddings, air temperatures, and lighting conditions.

Boudreaux, Philip↗

COMPUTATION FLUID DYNAMICS ANALYSIS FOR GENERIC SMALL MODULAR REACTOR CONTAINMENT SEPARATE EFFECTS TEST

It is desirable for fourth-generation Small Modular Reactors to be passively cooled in standard and accident operations. Passive Containment Cooling Systems can reject heat from the containment structure, without using pumps or blowers. The targeted design containment structure is a large, domed, stainless steel, cylindrical vessel. In a postulated Design Basis Accident, steam will flash inside containment. Steam condensation occurs on the inner containment wall and transfers heat through the steel containment into a large body of water known as the annular reservoir (AR) surrounding the vessel serving as the ultimate heat sink. Natural circulation drives the flow in the AR and heat will be released to the environment by evaporation of water. Unique containment geometry requires a separate effects test (SET) facility for the verification and validation of the computer code and evaluation model development and assessment for reactor licensing efforts. In this study, STAR-CCM+, a computational fluid dynamics (CFD) code was used to inform the decision-making process on the design of the SET. The CFD simulation modeled, a two-phase turbulent flow with fluid film development and heat transfer for different containment geometries. The Reactor Excursion and Leak Analysis Program will also be used in a code-to-code verification against the CFD results.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Lessons Learned From the Prototypes of the MQXFA Low-Beta Quadrupoles for HL-LHC and Status of Production in the US

With the successful test of the first two pre-series magnets the US HL-LHC Accelerator Upgrade Project has started production of the MQXFA magnets to be used in Q1/Q3 inner triplet elements of the HL-LHC. This good start comes after the test of two prototypes with limited performance, and it demonstrates the importance of learning from past issues. Therefore, in this paper we want to share the most important lessons learned so far, focusing on those which may be more interesting for similar projects. Additionally, we will present the status of MQXFA fabrication in the US.

43 PARTICLE ACCELERATORS↗

Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

First results of AUP Nb3Sn quadrupole horizontal tests

The Large Hadron Collider will soon undergo an upgrade to increase its luminosity by a factor of ~10 [1]. A crucial part of this upgrade will be replacement of the NbTi focusing magnets with Nb3Sn magnets that achieve a ~50% increase in the field strength. This will be the first ever large-scale implementation of Nb3Sn magnets in a particle accelerator. The High-Luminosity LHC Upgrade, HL-LHC is a CERN project with a world-wide collaboration. It is under construction and utilizes Nb3Sn Magnets (named MQXF) as key ingredients to increase tenfold the integrated luminosity delivered to the CMS and ATLAS experiments in the next decade. The HL-LHC AUP is the US effort to contribute approximately 50% of the low-beta focusing magnets and crab cavities for the HL-LHC. This paper will present the program to fabricate the Nb3Sn superconducting magnets. We are reporting the status of the HL-LHC AUP project present the results from horizontal tests of the first fully assembled cryo-assembly.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗

APS-TD Quality Facilities and Tools

In the Applied Physics and Superconducting Technology Division the quality function resides within the Quality & Materials Department (QMD). QMD employs staff with expertise in quality-related fields.

43 PARTICLE ACCELERATORS↗

Multifamily Air Leakage Evaluation: A Modular Case Study

The purpose of this case study is to compare the air leakage rates of modular and site-built multifamily dwelling units. The methods, materials, and equipment were observed to be very similar in the modular and site-constructed units in this case study. The installation quality of building envelope measures such as insulation and air barrier appeared to be better for modular construction, because they were installed in a controlled, factory setting. Through field observations, we identified cosmetic damage to the envelope of modular units following transport to the building site, but with no resulting significant air leakage pathways. However, we did see air leakage pathways resulting from field modifications to the envelope of modular units to accommodate structural and mechanical connections. We found that the extensive use of through-wall HVAC systems, combined with the transport, placement, and rework of modular units may compromise the high-quality envelope installation and airtightness observed in the factory without careful planning and/or design. Opportunities for improvement identified from the tested modular dwelling units include minimizing and optimally locating penetrations, pre-cutting and detailing penetrations at the factory where possible, properly sealing field modifications, and using split HVAC systems in place of through-wall packaged systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis of MQXFA07 Test Non-Conformity

MQXFA07 did not meet acceptance requirement during vertical test. This report presents the analysis of MQXFA07 components related to the limited test performance, and the damage mechanism as it was understood by the MQXFA team.

43 PARTICLE ACCELERATORS↗

US HL-LHC Accelerator Upgrade Project: MQXFA11 shipping incident report

The truck transporting the MQXFA11 magnet from LBNL to BNL was involved in an accident on 7/20/22. It was rear ended by another truck. Drivers were not injured. The main hit took place on the right back corner. The truck with the MQXFA11 magnet was towed to a tow yard in Rockdale, IL (~50 min drive from Fermilab). Subsequently, it was moved on another truck and moved to Fermilab. Fermilab employees added 3 accelerometers on the crate before it was moved on the new truck and attended all loading/unloading operations at the tow yard and at FNAL. The magnet arrived at FNAL on July 28 th . Upon arrival a visual inspection was performed. Accelerometers were removed and shock data were analyzed. Electrical checkout and a metrology survey were carried out. Strain data were also collected from the fiber optics installed on two coils and compared with data obtained before shipment. This report presents a summary of results. More pictures and details can be found at: https://indico.fnal.gov/event/55698/

43 PARTICLE ACCELERATORS↗

MQXFA Series Magnet Production Specification: US HL-LHC Accelerator Upgrade Project

The purpose of this document is to define the specifications for the structure fabrication and assembly of MQXFA series magnets to be used by the US High-Luminosity LHC Accelerator Upgrade Project (AUP). Magnets fabricated according to these specifications are expected to allow MQXFA magnets to meet the MQXFA Functional Requirements Specification. These specifications for the fabrication of MQXFA series magnets are based on the R&D performed by the US LHC Accelerator Research Program (LARP) and the development performed by AUP, in collaboration with CERN, through fabrication and test of pre-series coils and magnets.

43 PARTICLE ACCELERATORS↗

MQXFA11 shipping incident report

The truck transporting the MQXFA11 magnet from LBNL to BNL was involved in an accident on 7/20/22. It was rear ended by another truck. The magnet arrived at FNAL on July 28th. Upon arrival a visual inspection was performed. Accelerometers were removed and shock data were analyzed. Electrical checkout and a metrology survey were carried out. Strain data were also collected from the fiber optics installed on two coils and compared with data obtained before shipment. This report presents a summary of results.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Status at Fermilab

The LCLS-II-HE project is an upgrade to the Linac Coherent Light Source facility at SLAC National Accelerator Laboratory. Fermilab is part of the LCLS-II-HE collaboration and will deliver 14 cryomodules to SLAC for LCLS-II-HE. These cryomodules consist of eight 1.3 GHz 9-cell cavities. Cryomodule production is in progress, and four cryomodules have been delivered to SLAC. One of the cryomodules already delivered is the verification cryomodule that reached 200 MV total voltage in continuous wave mode. Status of cryomodule production, and lessons learned will be presented. Fermilab is also designing a buncher cryomodule as part of a low emittance injector design for the project. The design is near completion, and status will be reported.

Kaluzny, Joshua↗

Analysis of the MQXFA Low Beta Quadrupoles for HL-LHC after 50% magnet assembly complete +

The US HL-LHC Accelerator Upgrade Project (AUP) is fabricating the MQXFA magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC (HL-LHC). This is the first production of Nb3Sn magnets for a particle accelerator, together with the MQXFB magnets for Q2a and Q2b. Here we show status and some results of MQXFA magnets fabrication and vertical test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RECORD FAST CYCLING ACCELERATOR MAGNET BASED ON HIGH TEMPERATURE SUPERCONDUCTOR

We report on the High Temperature Superconductor (HTS) based prototype accelerator magnet capable to operate at 12 T/s B-field ramping rate with a very low supporting cryogenic cooling power thus indicating a feasibility of its application in the accelerator requiring high repetition rate and high average beam power. The magnet is designed to simultaneously accelerate two particle beams in the separate beam gaps energized by a single conductor. The design, construction and the power test of the prototype fast-cycling HTS based accelerator magnet is presented while the more detailed description and power test data analysis s given in [1]. As example, the measured cryogenic power loss limit is discussed in terms of the feasibility of application of such a magnet for the construction of the 8 GeV dual proton beam Booster.

43 PARTICLE ACCELERATORS↗