Search NASA⌕ Search

SEARCH · Search NASA

Results for “Barrier risks”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Strategic Qualitative Risk Assessment of Thousands of Legacy Wells within the Area of Review (AoR) of a Potential CO2 Storage Site

The subsurface confinement of anthropogenic carbon dioxide (CO2) demands robust risk assessment methodologies to identify potential leakage pathways. Legacy wells within the Area of Review (AoR) represent one potential leakage pathway. Robust methodologies require enormous amounts of data, which are not available for many old legacy wells. This study strategically categorizes 4386 legacy wells within the AoR of a potential CO2 storage site in the Illinois basin and identifies the high-risk wells by leveraging publicly available data—reports and well logs submitted to state regulatory agencies. Wells were categorized based on their proximity to the injection well location, depth, the mechanical integrity of well barriers, and the accessibility to these wells throughout the project lifecycle. Wells posing immediate risks were identified, guiding prioritized corrective actions and monitoring plans. Out of 4386 wells, 54 have high priority for corrective action, 10 have medium priority, and the remainder are of low priority. Case study results from the Illinois basin demonstrate the effectiveness and applicability of this approach, to assess the risk associated with legacy wells within the AoR of potential CO2 storage site, strategically categorizing over 4000 such wells despite data limitations.

Arbad, Nachiket (ORCID:0000000215353656)↗

Proactive Regulatory Approaches to Electrification and Load Growth: Pre-read Document to Support the July 10-11 th Workshop

This document summarizes objectives and context related to a DOE-funded workshop on proactive regulatory approaches to electrification and load growth. It briefly summarizes some of the regulatory barriers to pursuing a proactive approach and some of the risks associated with such an approach. It then summarizes a selection of recent utility proposals and public utility commission actions related to proactive approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A study of factors related to commercial space platform services

In the past four years, the issue of the commercial development of space has come to the forefront of the U. S. national space policy. Though the Administration, Congress and NASA have all shown strong support for encouraging the private sector to become more actively involved in the commercial utilization of space, the question remains whether they must do more to foster the creation and development of a viable U. S. commercial space industry. Marketing aspects, insurance and risk loss, tax related factors, space transportation, termination liability, institutional barriers, and procurement laws and regulations are discussed.

Hosenball, S. N.↗

Variants in the MS4A cluster interact with soluble TREM2 expression on biomarkers of neuropathology

Recent evidence suggests that Alzheimer’s disease (AD) genetic risk variants (rs1582763 and rs6591561) of the MS4A locus are genome-wide significant regulators of soluble TREM2 levels such that the minor allele of the protective variant (rs1582763) is associated with higher sTREM2 and lower AD risk while the minor allele of (rs6591561) relates to lower sTREM2 and higher AD risk. Our group previously found that higher sTREM2 relates to higher Aβ 40 , worse blood–brain barrier (BBB) integrity (measured with the CSF/plasma albumin ratio), and higher CSF tau, suggesting strong associations with amyloid abundance and both BBB and neurodegeneration complicate interpretation. We expand on this work by leveraging these common variants as genetic tools to tune the interpretation of high CSF sTREM2, and by exploring the potential modifying role of these variants on the well-established associations between CSF sTREM2 as well as TREM2 transcript levels in the brain with AD neuropathology. Biomarker analyses leveraged data from the Vanderbilt Memory & Aging Project (n = 127, age = 72 ± 6.43) and were replicated in the Alzheimer’s Disease Neuroimaging Initiative (n = 399, age = 73 ± 7.39). Autopsy analyses were performed leveraging data from the Religious Orders Study and Rush Memory and Aging Project (n= 577, age = 89 ± 6.46). We found that the protective variant rs1582763 attenuated the association between CSF sTREM2 and Aβ 40 (β= -0.44, p-value= 0.017) and replicated this interaction in ADNI (β = -0.27, p = 0.017). We did not observe this same interaction effect between TREM2 mRNA levels and Aβ peptides in brain (Aβ total β = -0.14, p = 0.629; Aβ 1-38 , β = 0.11, p = 0.200). In contrast to the effects on Aβ, the minor allele of this same variant seemed to enhance the association with blood–brain barrier dysfunction (β = 7.0e-4, p = 0.009), suggesting that elevated sTREM2 may carry a much different interpretation in carriers vs. non-carriers of this allele. When evaluating the risk variant (rs6591561) across datasets, we did not observe a statistically significant interaction against any outcome in VMAP and observed opposing directions of associations in ADNI and ROS/MAP on Aβ levels. Together, our results suggest that the protective effect of rs1582763 may act by decoupling the associations between sTREM2 and amyloid abundance, providing important mechanistic insight into sTREM2 changes and highlighting the need to incorporate genetic context into the analysis of sTREM2 levels, particularly if leveraged as a clinical biomarker of disease in the future.

59 BASIC BIOLOGICAL SCIENCES↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Geospatial analysis of preterm and small-for-gestational age births in Washington D.C.

Background: This study is based on the recognition that adverse pregnancy outcomes significantly affect maternal and infant health, leading to increased morbidity and mortality. These outcomes are shaped by a complex interplay of individual-level factors—like maternal age and education—and community-level influences, including socio-economic status and access to healthcare. Understanding these determinants is crucial for developing effective public health strategies, especially for marginalized populations, by identifying high-risk areas and informing targeted interventions that address both individual and structural barriers. Methods: We utilized geospatial analysis to explore the association between individual- and community-level factors and adverse pregnancy outcomes, specifically preterm birth (PTB) and small-for-gestational-age (SGA) birthweight in Washington, D.C. We used Empirical Bayes smoothing methods to calculate rates of adverse birth outcomes from 2010 to 2018 at the U.S. Census tract–level. Spatial scan statistics were used to investigate if adverse birth outcomes clustered in specific areas. ANOVA tests were conducted for individual- and community-level factors within identified clusters. Results: Spatial analysis identified significant high-risk clusters for PTB and SGA infants primarily in southeastern Washington, D.C., particularly in Wards 7 and 8. Individuals residing within these clusters experienced a 47% increased risk of PTB (RR = 1.467) and a 56% increased risk of SGA (RR = 1.560) compared to those outside clusters. Space–time analysis revealed temporal variation, with PTB clusters persisting from 2011 to 2014 and SGA clusters extending through 2017. Compared to low-risk clusters, high-risk clusters had younger birthing individuals (mean age ~26.5 vs. ~33 years), lower maternal college degree attainment (~20% vs. ~80%), higher rates of late or no prenatal care (~16% vs. 11%), and increased prevalence of smoking and hypertension (all P < 0.001). Community-level indicators showed lower median household incomes ($\$40,000$ vs. ~$\$105,000$), greater poverty (~16% vs. ~7% below $\$10,000$/year), higher public assistance use (~32% vs. ~5%), and reduced healthcare access (greater distances to emergency and specialty care) in high-risk areas (all P < 0.001). Neighborhood deprivation indices were significantly elevated, commutes were longer, and population density was lower in these clusters. These findings highlight that adverse birth outcomes cluster in neighborhoods with pronounced socioeconomic and health disparities. Conclusion: High-risk birth clusters highlight intertwined factors: individual, socio-economic, and geographic. Addressing these requires comprehensive interventions focusing on social and structural determinants of health.

Birth outcomes↗

Peridynamic modeling of cementitious materials for nuclear waste management

Radioactive and hazardous waste generated from fuel processing plants, nuclear reactors, and hospitals, requires effective management strategies. Cementitious materials are widely applied for these needs, serving as structural materials, reactive barriers, or waste forms. In these applications cracking poses a significant risk to performance, driven by inconsistent shrinkage of the components and the varying strength and permeability of their interfaces. Traditional modeling approaches face challenges in representing the complex fracture behavior of cementitious materials due to the reliance on spatial derivatives and difficulties with mesh generation. Here, to overcome these limitations, we employ peridynamics, a novel continuum mechanics formulation that uses integrals to describe mechanical equilibrium, avoiding discontinuities associated with traditional methods. Through incorporation of a bi-linear softening model and quasistatics, an experimentally validated model for Portland cement concrete samples was created. Mechanical parameters, including compressive strength and elastic modulus were validated and variation due to aggregate packing was evaluated. Additionally, sensitivity analysis of the peridynamic parameters to the bulk material properties was established. The results lay the groundwork for evaluating the impact of unique conditions of cementitious waste forms that can be assessed to improve the reliability of waste management strategies.

Aggregates↗

Determinants of rural-urban differences in health care provider visits among women of reproductive age in the United States

Background Rural health disparities and access gaps may contribute to higher maternal and infant morbidity and mortality. Understanding and addressing access barriers for specialty women’s health services is important in mitigating risks for adverse childbirth events. The objective of this study was to investigate rural-urban differences in health care access for women of reproductive age by examining differences in past-year provider visit rates by provider type, and quantifying the contributing factors to these findings. Methods and findings Using a nationally-representative sample of reproductive age women (n = 37,026) from the Medical Expenditure Panel Survey (2010–2015) linked to the Area Health Resource File, rural-urban differences in past-year office visit rates with health care providers were examined. Blinder-Oaxaca decomposition analysis quantified the portion of disparities explained by individual- and county-level sociodemographic and provider supply characteristics. Overall, there were no rural-urban differences in past-year visits with women’s health providers collectively (65.0% vs 62.4%), however differences were observed by provider type. Rural women had lower past-year obstetrician-gynecologist (OB-GYN) visit rates than urban women (23.3% vs. 26.6%), and higher visit rates with family medicine physicians (24.3% vs. 20.9%) and nurse practitioners/physician assistants (NPs/PAs) (24.6% vs. 16.1%). Lower OB-GYN availability in rural versus urban counties (6.1 vs. 13.7 providers/100,000 population) explained most of the rural disadvantage in OB-GYN visit rates (83.8%), and much of the higher family physician (80.9%) and NP/PA (50.1%) visit rates. Other individual- and county-level characteristics had smaller effects on rural-urban differences. Conclusion Although there were no overall rural-urban differences in past-year visit rates, the lower OB-GYN availability in rural areas appears to affect the types of health care providers seen by women. Whether rural women are receiving adequate specialized women’s health care services, while seeing a different cadre of providers, warrants further investigation and has particular relevance for women experiencing high-risk pregnancies and deliveries.

60 APPLIED LIFE SCIENCES↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Quantified, Localized Health Benefits of Accelerated Carbon Dioxide Emissions Reductions

Societal risks increase as Earth warms, and increase further for emissions trajectories accepting relatively high levels of near-term emissions while assuming future negative emissions will compensate, even if they lead to identical warming as trajectories with reduced near-term emissions. Accelerating carbon dioxide (CO2) emissions reductions, including as a substitute for negative emissions, hence reduces long-term risks but requires dramatic near-term societal transformations. A major barrier to emissions reductions is the difficulty of reconciling immediate, localized costs with global, long-term benefits. However, 2 C trajectories not relying on negative emissions or 1.5 C trajectories require elimination of most fossil-fuel-related emissions. This generally reduces co-emissions that cause ambient air pollution, resulting in near-term, localized health benefits. We therefore examine the human health benefits of increasing 21st-century CO2 reductions by 180 GtC, an amount that would shift a 'standard' 2 C scenario to 1.5 C or could achieve 2 C without negative emissions. The decreased air pollution leads to 153 +/- 43 million fewer premature deaths worldwide, with approx.40% occurring during the next 40 years, and minimal climate disbenefits. More than a million premature deaths would be prevented in many metropolitan areas in Asia and Africa, and greater than 200,000 in individual urban areas on every inhabited continent except Australia.

Atmospheric science↗

Assessment of Survey Results from Advanced Reactor Industry Domain Experts on Nonlinear Soil-Structure Interaction Analysis Software Verification and Validation

The seismic load case has a significant impact on the design and cost of nuclear power plants. Given the need to substantially reduce cost, advanced reactor designers are looking to leverage numerical tools that enable seismic analysis of an integrated vessel/support/structure/soil system. Modern nonlinear analysis tools provide a solution, capturing dynamic coupling between components (including soil-structure interaction (SSI)) concurrent with nonlinear behavior in one or more parts of the system. Although these methods have a rich history of technical development and implementation, software quality assurance (SQA) following nuclear industry standards remains a significant burden for those wishing to adopt such methods for advanced reactor design and licensing. To reduce the SQA burden, this project will develop the guidance for SQA verification and validation (V&V) of coupled nonlinear SSI analysis tools, to include a test matrix of software features and test problems to support commercial grade dedication (CGD). The guidance is intended to be technology-neutral: supporting designers of all advanced reactors. To maximize the value of the project to reactor designers, the project team performed focused surveys of and interviews with advanced reactor designers. Additionally, the project surveyed members of the broader industry involved in reactor design and licensing. The aggregated industry feedback consists of written survey responses, live polling responses, focused interviews, and informal feedback provided after outreach presentations, collectively referred to as “survey results”. Herein, the survey results are reported, reviewed, and assessed to inform follow-on project activities. The survey results confirmed the familiarity of the industry with the coupled nonlinear SSI analysis. They also affirm the project need based upon the expressed intent to (1) incorporate nonlinear features and (2) pursue the coupled nonlinear SSI analysis to reduce seismic demands and construction costs. All reactor designers indicated their intent to incorporate two or more nonlinear features, and all reactor designer respondents opined that the coupled nonlinear SSI analysis would allow for the optimization of the reactor design and construction. However, the programmatic challenges, whether real or perceived, present a significant barrier to reactor designers. The barrier most commonly identified by the reactor designer population was regulatory risk, with 70% citing this as a reason not to pursue the approach. The perceived regulatory risk identified by the reactor designers underscores the importance of regulator engagement and dialogue in this project. Additionally, half of the reactor designers identified cost and lack of guidance as a deterrent. The survey results also provide insights to tailor specific aspects of the guidance document and test matrix. The project plans to prepare both a formal referenceable guidance document and a collaborative, web-based test matrix and problem set. The project will focus on more complete test problem definitions for the prioritized nonlinear features over shallower problem descriptions for a larger set of features. The nonlinearities prioritized as high based upon survey feedback include fluid-structure interaction and seismic isolation and energy dissipation devices. The nonlinearities prioritized as intermediate include nonlinear geomaterials, nonlinear concrete, nonlinear steel, and interface/contact nonlinearity. Deep embedment and the associated nonlinear phenomena are assigned the lowest priority based upon survey feedback.

42 ENGINEERING↗

2020 Component Innovation Awardee: Windurance LLC

Currently, there is no wind system power-conversion component available to wind turbine OEMs that is certified to applicable standards for use in the U.S. distributed wind energy market. Off-the-shelf industrial drives have features that are not needed by distributed wind OEMs and lack other features that would be valuable for the operation and control of wind turbine generating systems. In addition to adding costs for OEMs, these industrial drives increase uncertainty and risk for project developers and prospective owners. All of this presents barriers and increases costs for the development of distributed wind in the United States. With funding from CIP, Windurance plans to develop an industry-specific power-conversion component that will offer application-specific features at lower cost for distributed wind OEMs.

CIP↗

Product Innovation to Increase Low-to-Moderate-Income Customers' Adoption of Community Solar PV

This study aims to comprehensively analyze community solar project preferences for consumers and suppliers by conducting three distinct analyses. First we analyze the predictors of community solar contract adoption to understand how individual priorities affect the probability of adoption. Using an original data set of survey responses from potential community solar customers, we analyzed the predictors of contract adoption by employing a weighted logit model. We find that individuals who were previously familiar with community solar projects were significantly more likely to adopt than those who were not familiar. Secondly, a survey of community solar developers and financiers identified industry perceived barriers to community solar access and inclusion. Thirdly, we gathered payment performance information from community solar initiatives to measure how financial risks are perceived and how they interact with customer demographics. Our study is beneficial to the public by providing insights into the drivers and barriers of community solar adoption and sheds light on the importance of understanding individual priorities in designing effective community solar policies. The community solar industry has changed significantly since the beginning of this project. The industry continues to grow at a rapid rate, with an additional 7 gigawatts expected to come online between 2022 and 2027. With federal pressure to meet climate goals, as the harms of climate change continue to impact everybody, legislators are looking to community solar as a method to achieving their states energy policy goals. These new policies that push for low-to-moderate inclusion, coupled with the increase in community solar capacity illustrate a new era for the community solar industry. A number of policies have arisen in the last few months that push for more inclusive practices including the groundbreaking Solar for All program run by the EPA. The research created a “best practice” contract that can then be used, in conjunction with the manuscript and validated study, to pitch the industry on a more inclusive community solar product.

14 SOLAR ENERGY↗

IMPACTing Medical System Design with a Risk Analysis Tool [“IMPACT” sur la Conception du Système Médical avec un Outil d'Analyse des Risques]

Background: Following the success of Artemis I, NASA is preparing for human extended duration missions. Ongoing efforts are focused on mitigating mission-related risks, including those affecting crew health and performance. Communication latency, logistics of resupply and time frame of medical evacuation are barriers to provision of healthcare for these missions, especially with respect to constraints in mass, volume, and crew training. An in-depth assessment of medical risks, capabilities and resources for a specific mission design is necessary to determine an optimal balance that maximizes likelihood of mission success. Overview: IMPACT (Informed Mission Planning via Analysis of Complex Tradespaces) is a dynamic tool designed to estimate medical risk and outcomes for a specific mission design. In its current iteration, a list of medical conditions selected based on likelihood of occurrence and/or consequence was linked to a set of clinical capabilities and resources necessary for diagnosis and management. A probabilistic risk analysis tool was then used to identify and estimate the likelihood and consequence of risks through the following outcome metrics: loss of crew life (inflight mortality due to medical conditions), need for medical evacuation (return to definitive care), and crew disability (task time affected based on how medical conditions influence the ability to perform specific exploration mission crew tasks). Finally, the model’s optimization algorithm provides recommendations for medical capabilities that maximize risk mitigation relative to mass and volume constraints. In the Spring of 2023, IMPACT was utilized to estimate outcome metrics for a design reference mission that would be representative of an extended duration Artemis mission. Notional data generated were then used to determine a recommended set of medical capabilities and resources relative to user-defined mass and volume constraints. A multidisciplinary team has also been updating IMPACT to strengthen the model’s fidelity. Figure 1 shows how updates to outcome metric inputs for the conditions resulted in different capability and resource allocation recommendations. Discussion: This presentation will discuss the IMPACT tool and share the latest data generated for a representative extended duration Artemis mission. Efforts to improve the fidelity of data generated by the model’s algorithm will also be discussed.

K A Shair↗

IMPACTing Medical System Design with a Risk Analysis Tool

Background: Following the success of Artemis I, NASA is preparing for human extended duration missions. Ongoing efforts are focused on mitigating mission-related risks, including those affecting crew health and performance. Communication latency, logistics of resupply and time frame of medical evacuation are barriers to provision of healthcare for these missions, especially with respect to constraints in mass, volume, and crew training. An in-depth assessment of medical risks, capabilities and resources for a specific mission design is necessary to determine an optimal balance that maximizes likelihood of mission success. Overview: IMPACT (Informed Mission Planning via Analysis of Complex Tradespaces) is a dynamic tool designed to estimate medical risk and outcomes for a specific mission design. In its current iteration, a list of medical conditions selected based on likelihood of occurrence and/or consequence was linked to a set of clinical capabilities and resources necessary for diagnosis and management. A probabilistic risk analysis tool was then used to identify and estimate the likelihood and consequence of risks through the following outcome metrics: loss of crew life (inflight mortality due to medical conditions), need for medical evacuation (return to definitive care), and crew disability (task time affected based on how medical conditions influence the ability to perform specific exploration mission crew tasks). Finally, the model’s optimization algorithm provides recommendations for medical capabilities that maximize risk mitigation relative to mass and volume constraints. In the Spring of 2023, IMPACT was utilized to estimate outcome metrics for a design reference mission that would be representative of an extended duration Artemis mission. Notional data generated were then used to determine a recommended set of medical capabilities and resources relative to user-defined mass and volume constraints. A multidisciplinary team has also been updating IMPACT to strengthen the model’s fidelity. Figure 1 shows how updates to outcome metric inputs for the conditions resulted in different capability and resource allocation recommendations. Discussion: This presentation will discuss the IMPACT tool and share the latest data generated for a representative extended duration Artemis mission. Efforts to improve the fidelity of data generated by the model’s algorithm will also be discussed.

K A Shair↗

Use of Flooding Probabilistic Risk Assessment

General slide information on using flooding Probabilistic Risk Assessment (PRA) taken from published INL reports or public Nuclear Regulatory Commission (NRC) information. Topics covered are: SDP related to flooding in US Door integrity tests at Idaho State University Smoothed Particle Hydrodynamics for external flooding NRC-INL Flood Barrier project

99 GENERAL AND MISCELLANEOUS↗

A census of fish passage facilities at US hydropower developments across the conterminous United States

Hydropower provides reliable and secure electricity and contributes significantly to the flexibility and stability of the US electricity grid. Hydropower dams generally are aquatic barriers and hazards to migratory fish in rivers. Fish passage facilities mitigate risks from hydropower to migratory fish, but information on these facilities is incomplete for the conterminous United States (CONUS). Here, we present the first CONUS-scale dataset of fish passage facilities at US hydropower developments in over 30 years. The existence of fish passage facilities (presence or absence) was specified for 1909 hydropower features, 390 of which had at least one facility. Most features had a single passage facility that provided passage in only one direction, with downstream being more common than upstream passage. Bypasses and ladders accounted for 60 % of the fish passage facility types. While we documented 659 fish passage facilities across CONUS, facilities were most common in the New England, Pacific Northwest, Mid-Atlantic, and Great Lakes regions. In general, fish passage facilities were more common at features that were closer to the ocean, at lower elevations, and at shorter dams, but not related to installed electrical generation capacity. Hydrologic sub-basins containing salmonids also contained the largest number of hydropower features, but the proportion of features with passage was generally higher in sub-basins containing multiple migratory taxa. This census provides valuable information on existing fish passage mitigation and is a benchmark to gauge progress toward a modernized hydropower fleet that provides affordable, reliable energy while protecting fishery resources and river ecosystems.

13 HYDRO ENERGY↗

Adoption Readiness Level Assessment of Redox Flow Batteries

Adoption readiness levels (ARLs) were developed by the Department of Energy’s Office of Technology Transitions (OTT) to holistically capture barriers to market adoption for a technology. The framework consists of 17 risk dimensions falling into 4 broad categories: Value Proposition, Market Acceptance, Resource Maturity, and License to Operate. OTT’s Commercial Adoption Readiness Assessment Tool (CARAT) can be used to evaluate a technology’s ARL. This work applies CARAT to redox flow batteries to evaluate the level of risk for this technology class across the 17 dimensions. Redox flow batteries were found to bear 1-2 high risk dimensions, 10-11 medium risk dimensions, 5 low risk dimensions, and scored an overall low readiness on the CARAT scoring scale (ranges reflect variation with flow battery chemistry). Herein, we describe the factors and evaluation across the dimensions leading to this score for redox flow batteries.

25 ENERGY STORAGE↗