Search NASA⌕ Search

SEARCH · Search NASA

Results for “CAPE KENNEDY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Kennedy launch processing system

Airline operations approach to Cape Kennedy launch processing system for reduced hardware and operational costs of shuttle support

Parsons, W. E.↗

Comparison of Daily, Monthly (Lunar), Yearly, Decadal, Quarter-Century, Half-Century, and Centurial Shoreline Change Rates at the Kennedy Space Center, Cape Canaveral, Florida, USA

The Kennedy Space Center (KSC) is North America’s premier spaceport and provides crucial access to space for both government and private entities. The National Aeronautics and Space Administration (NASA) facilities are clustered along a 12 km active shoreline at Cape Canaveral, Florida, USA, with the entire NASA and US Space Force station (SF) shoreline stretching over 32 km (Figure 1). Several Launch Complexes (LC’s) including the modern heavy lift facilities are only a few tens of meters from the active shoreline and are imminently threatened by continued sea level rise and ongoing coastal erosion. The space center was built on the northern part of Cape Canaveral. Images collected in 1943 show that Apollo Heavy Lift Launch Complexes were built in swales on ground that was at or below sea level with Launch Complex 39B constructed on a paleo inlet (Figures 2 and 3). Today the Heavy Lift Launch Complexes are ~220 meters from the shoreline with the area between the complexes retreating at the highest rates along the cape (Figure 4). To better understand the intersection of environmental concerns, limited budgets for shoreline protection, and sheltering critical infrastructure; NASA, The University of Florida, United States Geological Survey (USGS), National Park Service (NPS) and contractors have and continue to conduct numerous studies to characterize and understand the shoreline evolution and rates of change at KSC. This project aims to better understand and visualize the temporal and spatial variability of change along the NASA shoreline beyond a simple point to point solution.

Richard MacKenzie III↗

Apollo 12 Mission Summary and Splashdown

This NASA Kennedy Space Center (KSC) video release presents footage of the November 14, 1969 Apollo-12 space mission begun from launch complex pad 39-A at Kennedy Space Center, Florida. Charles Conrad, Jr., Richard F. Gordon, Jr., and Alan L. Bean make up the three-man spacecrew. The video includes the astronaut's pre-launch breakfast, President Nixon, his wife, and daughter arriving at Cape Kennedy in time to see the launch, as well as countdown and liftoff. After the launch, President Nixon gives a brief congratulatory speech to the members of launch control at KSC. The video also presents views of the astronauts and spacecraft in space as well as splashdown of the command module on November 24, 1969. The video ends with the recovery, by helicopter and additional personnel, of the spacecrew from the command module floating in the waters of the Atlantic.

Source record↗

Corrosion study of bare and coated stainless steel

A program was conducted at Kennedy Space Center from February 1968 to February 1971 to evaluate the performance of austenitic stainless steel alloys used in fluid systems lines. For several years, there had been numerous failures of stainless steel hardware caused by pitting and stress corrosion cracking. Several alloys were evaluated for effectiveness of certain sacrificial-type protective coverings in preventing corrosion failures. Samples were tested in specially designed racks placed 91 meters (100 yards) above high-tide line at Cape Kennedy. It is concluded that: (1) unprotected tubing samples showed evidence of pitting initiation after 2 weeks; (2) although some alloys develop larger pits than others, it is probable that the actual pitting rate is independent of alloy type; (3) the deepest pitting occurred in the sheltered part of the samples; and (4) zinc-rich coatings and an aluminum-filled coating have afforded sacrificial protection against pitting for at least 28 months. It is believed that a much longer effective coating life can be expected.

Morrison, J. D.↗

Formational History and Geomorphic Preservation of Sea Level Highstands Over the Last 150 ky Near Cape Canaveral, Florida, USA

Cape Canaveral, Florida, is perhaps one of the most important stretches of coastline in the United States of America (USA) due to its critical strategic role in the pursuit of space exploration and as the locus of advanced technological innovation. Due to its geographical setting, the entirety of Cape Canaveral, including its infrastructure, facilities, and important natural habitats (e.g., wetlands, estuaries and dunes) is vulnerable to coastal hazards such as continued sea level rise, storm surges, erosion and flooding. As such, accurate sea level characterization and coastal resiliency predictions are essential to promoting long-term coastal planning and sustainability in the area. This study aims to better understand the temporal and spatial evolution of this area with the purpose of more accurately documenting historical sea level fluctuations and calibrating more localized projections at this site. The Cape Canaveral coastline is situated on a passive margin mostly affected by oceanic (sea level change and wave impact) and atmospheric (aeolian) alteration. This sector is part of the east Florida coast microtidal (1.2 m) setting and low wave energy (1.2-1.6 m and 6.1-8.2 sec for average significant waves) regime and is defined by a well delineated set of beach ridge or cape systems. While the name “Cape Canaveral” is often used as a generic term to describe the geographic area, it is actually an amalgamation or complex of multiple preserved capes. The preserved Cape Canaveral beach ridge plain has largely documented the paleo-sea level highstand history over the last 150 ky. High-resolution mapping of these beach ridges is completed using GPS, LiDAR, aerial, as well as satellite imagery. In order to reconstruct the formational history of the Cape Kennedy Complex and the preserved record of sea level highstands, these detailed geomorphological observations are integrated with OSL and C14 dating techniques. The chronological framework delineated by the OSL dates coupled with detailed geomorphological mapping allows for the creation of high-resolution calibrated site-specific sea level curves that reflect the local environmental and geological conditions. This refinement has the potential to improve the understanding of past sea level variability which is crucial for predicting future trends and assessing the impacts on coastal regions such as Cape Canaveral.

geomorphology↗

Gemini/apollo real-time telemetry system.

Gemini and Apollo data transmission procedures and equipment for linking worldwide tracking sites and Cape Kennedy with Houston mission control center

MANNED SPACE FLIGHT↗

Report from Mars - Mariner IV, 1964-1965

The successful mission of Mariner IV is a most gratifying conclusion to the first generation of lunar and planetary exploration, which has been based on lightweight automatic unmanned spacecraft in constant communication with Earth, designed for lunar impact or planetary encounter. The flight of this first Mars probe is noteworthy not only for the outstanding quantity and quality of scientific data but also as the verification of large and useful advances in a number of technological areas. The Mariner Mars Project of 1964-1965 was conducted for the National Aeronautics and Space Administration by the Jet Propulsion Laboratory; it was made possible by the valued assistance and support of many government agencies, scientific institutions, and industrial concerns. Among these are NASA's Lewis Research Center (Launch Vehicle Systems Manager) and their prime contractors, Lockheed Missiles and Space Corporation and General Dynamics/Convair; Goddard Space Flight Center (Launch Operations) and other agencies at Cape Kennedy; the agencies of the Australian, South African, and Spanish governments which operate overseas tracking stations; many hundreds of American industrial contractors and vendors; and a number of scientists in various fields of endeavor. The Project was established in late 1962 with the objective of conducting scientific observations near the planet Mars and returning the data to Earth for study and analysis; secondary objectives were to develop and study the equipment and techniques involved and to make certain scientific measurements of the interplanetary environment on the way to Mars. Successful accomplishment of these objectives under the severe constraints which were a part of the mission is a tribute to every single individual who shared in the preparation and execution of the Mariner Mars Project.

MARINER IV SPACE PROBE↗

Lunar Orbiter II - Photographic Mission Summary

Lunar Orbiter II photography of landing sites, and spacecraft systems performance. The second of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 23:21 GMT on November 6, 1966. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena spacecraft combination was maneuvered into a 100-nautical-mile-altitude Earth orbit by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver 1 and engine-bum period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the entire boost trajectory.

LUNAR ORBITER↗

Gemini Program Mission Report: Gemini IV

The second manned mission of the Gemini Program, Gemini IV, was launched from Complex 19 at Cape Kennedy, Florida, at 10:16 a.m. e.s.t. on June 3, 1965. The mission was successfully concluded on June 7, 1965, with the recovery of the spacecraft by the prime recovery ship, the aircraft carrier U.S.S. Wasp, at 27 deg 44' N. latitude, 74 deg 11' W. longitude at 2:28 p.m. e.s.t. This manned long-duration flight was accomplished 10 weeks after the three-orbit manned flight which qualified the Gemini spacecraft and systems for orbital flight. The spacecraft was manned by Astronaut James A. McDivitt, command pilot, and Astronaut Edward H. White II, pilot. The flight crew completed the 4-day mission in excellent physical condition, and demonstrated full control of the spacecraft and competent management of all aspects of the mission.

Source record↗

Lunar Orbiter 3 - Photographic Mission Summary

Systems performance, lunar photography, and launch operations of Lunar Orbiter 3 photographic mission. The third of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 01:17 GMT on February 5,1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final 1 maneuvering and acceleration to the velocity required to maintain the 100-nautical-milealtitude Earth orbit was controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-burn period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the entire boost trajectory.

Source record↗