Search NASA⌕ Search

SEARCH · Search NASA

Results for “CEBAF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of CEBAF, one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. Identifying an unstable cavity out of the hundreds of cavities installed at CEBAF is difficult and time-consuming. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities. A fast data acquisition system for the legacy SRF cavities is being developed which samples and reports at 5 kHz to allow for detection of transients. A prototype chassis has been installed and tested in CEBAF. An autoencoder based machine learning model is being developed to identify anomalous SRF cavity behavior. The model is presently being trained on the slow (1 Hz) data that is currently available, and a separate model will be developed and trained using the fast (5 kHz) DAQ data once it becomes available. This paper will discuss the present status of the new fast data acquisition system and results of testing the prototype chassis. This paper will also detail the initial performance metrics of the autoencoder model.

Carpenter, A.↗

Field Emission Mitigation in CEBAF SRF Cavities Using Deep Learning

The Continuous Electron Beam Accelerator Facility (CEBAF) operates hundreds of superconducting radio frequency (SRF) cavities in its two main linear accelerators. Field emission can occur when the cavities are set to high operating RF gradients and is an ongoing operational challenge. This is especially true in newer, higher gradient SRF cavities. Field emission results in damage to accelerator hardware, generates high levels of neutron and gamma radiation, and has deleterious effects on CEBAF operations. So, field emission reduction is imperative for the reliable, high gradient operation of CEBAF that is required by experimenters. Here we explore the use of deep learning architectures via multilayer perceptron to simultaneously model radiation measurements at multiple detectors in response to arbitrary gradient distributions. These models are trained on collected data and could be used to minimize the radiation production through gradient redistribution. This work builds on previous efforts in developing machine learning (ML) models, and is able to produce similar model performance as our previous ML model without requiring knowledge of the field emission onset for each cavity.

Ahammed, K.↗

Lifetime extension of legacy CEBAF LLRF hardware

A significant portion of the Low-Level Radio Frequency (LLRF) hardware in Jefferson Lab’s CEBAF is from the original construction of the facility using 1980’s CAMAC technology. Of the fifty-three zones in CEBAF, thirty-six of them are legacy hardware. The age of the legacy system has led to difficulties in maintaining the hardware due to parts going obsolete without suitable drop in replacements. Continued operation of the legacy system is required as the installation of LLRF 3.0 systems is costly and cannot be completed in a short period of time with the available resources. The most pressing failure in the legacy system was a failing buffer card, which is responsible for communication between the EPICs network and individual RF control modules. A new buffer card was designed as a transparent, drop in, replacement so that upgrades are simply a matter of swapping the existing legacy hardware. This buffer card upgrades a single point failure component and promises to extend the operable lifetime of CEBAF’s legacy systems.

Accelerator Physics↗

Multi-GeV FFA beam transport test at CEBAF

Jefferson National Lab plans an upgrade project to reach 22 GeV high polarization electron beam by using Fixed Field Alternating-gradient (FFA) magnets. The utilization of the FFA magnets for 10-22 GeV beam energy range is unexampled, therefore those magnets need an experimental validation before their full installation to form an arc in the Continuous Electron Beam Accelerator Facility (CEBAF). For this reason, JLAB is also considering the design of an FFA magnet test bench, i.e. a half or full FFA cell, that would be deployed in the current CEBAF in order to serve as the highest energy demonstration for the FFA field uniformity, permanent magnet resiliency with the beam as well as enabling beam optics measurements with the 5-11 GeV range highly polarized beams which closely resembles the full energy range of the 22 GeV upgrade. In this report, we present the status of the planned beamline for the FFA beam transport test at CEBAF.

Accelerator Physics↗

SRF Cavity Instability Detection with Machine Learning at CEBAF

During the operation of CEBAF, one or more unstable superconducting radio-frequency (SRF) cavities often cause beam loss trips while the unstable cavities themselves do not necessarily trip off. Identifying an unstable cavity out of the hundreds of cavities installed at CEBAF is difficult and time-consuming. The present RF controls for the legacy cavities report at only 1 Hz, which is too slow to detect fast transient instabilities. A fast data acquisition system for the legacy SRF cavities is being developed which samples and reports at 5 kHz to allow for detection of transients. A prototype chassis has been installed and tested in CEBAF. An autoencoder based machine learning model is being developed to identify anomalous SRF cavity behavior. The model is presently being trained on the slow (1 Hz) data that is currently available, and a separate model will be developed and trained using the fast (5 kHz) DAQ data once it becomes available. This paper will discuss the present status of the new fast data acquisition system and results of testing the prototype chassis. This paper will also detail the initial performance metrics of the autoencoder model.

Carpenter, A.↗

Field Emission Mitigation in CEBAF SRF Cavities Using Deep Learning

The Continuous Electron Beam Accelerator Facility (CEBAF) operates hundreds of superconducting radio frequency (SRF) cavities in its two main linear accelerators. Field emission can occur when the cavities are set to high operating RF gradients and is an ongoing operational challenge. This is especially true in newer, higher gradient SRF cavities. Field emission results in damage to accelerator hardware, generates high levels of neutron and gamma radiation, and has deleterious effects on CEBAF operations. So, field emission reduction is imperative for the reliable, high gradient operation of CEBAF that is required by experimenters. Here we explore the use of deep learning architectures via multilayer perceptron to simultaneously model radiation measurements at multiple detectors in response to arbitrary gradient distributions. These models are trained on collected data and could be used to minimize the radiation production through gradient redistribution. This work builds on previous efforts in developing machine learning (ML) models, and is able to produce similar model performance as our previous ML model without requiring knowledge of the field emission onset for each cavity.

Ahammed, K.↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

Status of CEBAF Upgrades

Extending CEBAF energy reach by increasing the number of recirculations, while using the existing SRF system is being explored. Proposed energy upgrade is based on a new approach to multi-pass acceleration of electrons in a single Fixed Field Alternating Gradient (FFA) beam line, configured with Halbach-style permanent magnets. Encouraged by recent success of CBETA, a proposal was formulated to nearly ?double? CEBAF energy by replacing the highest energy arcs with a pair of FFA arcs. The new non-scaling FFA arcs would support simultaneous transport of additional 6 passes with energies spanning a factor of two. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing in a vast range of energies, in a fixed field lattice. Here, we propose a triplet lattice that would provide a stable periodic solution covering energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac virtually impossible due to extremely high energy span ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate that problem. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. Presented scheme would promise to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and with a relative energy spread of 1×10-3. Further recirculation beyond 22 GeV is limited by large, 974 MeV per electron, energy loss due to synchrotron radiation

Bogacz, Alex↗

Graph Analytics for CEBAF Operations

We report on the progress achieved during a 2-year Laboratory Directed Research and Development (LDRD) project titled “Graph Analytics for CEBAF Operations”. The objective of this project is to leverage deep learning on graph representations of CEBAF’s injector beamline in order to create a tool for improving the efficiency of beam tuning tasks. Specifically, we use graphs to represent the injector beamline at any arbitrary date and time and invoke a graph neural network (GNN) to extract a low-dimensional, informative representation that can be visualized in two-dimensions. By analyzing years of operational data from the CEBAF archiver, good and bad regions of parameter space can be identified. The goal is to exercise this framework as a real-time tool to aid beam tuning, which represents the dominant source of machine downtime.

43 PARTICLE ACCELERATORS↗

Design Progress for the 22 GeV CEBAF Energy Upgrade

Extending the energy reach of CEBAF up to 22 GeV within the existing tunnel is being explored. Proposed energy upgrade can be achieved by increasing the number of recirculations, while using the existing CEBAF SRF cavity system. A proposal was formulated to raise CEBAF energy by replacing the highest-energy arcs with FFA arcs. The new pair of arcs configured with FFA (Fixed Field Alternating Gradient) lattice would support simultaneous transport of additional 6 passes with energies spanning a factor of two, using the non-scaling FFA principle implemented with Halbach-derived permanent magnets - a novel magnet technology that significantly saves energy and lowers operating costs. The design involves new optics for the linacs and remaining electromagnetic arcs, as well as new electromagnetic switchyard. These feed into the permanent magnet FFA arcs. We also report on ongoing beam dynamics studies and mitigating measures to alleviate energy loss and emittance dilution due to synchrotron radiation.

Bogacz, Alex [Thomas Jefferson National Accelerato↗

CEBAF 200 kV Inverted Electron Gun

Two DC high volt­age GaAs pho­to­guns have been built at Jef­fer­son Lab based on a com­pact in­vert­ed in­su­la­tor de­sign. One pho­to­gun pro­vides the po­lar­ized elec­tron beam at CEBAF and op­er­ates at 130 kV bias volt­age. The other gun is used for high av­er­age cur­rent life­time stud­ies at a ded­i­cat­ed test fa­cil­i­ty and has been op­er­at­ed at bias volt­age up to 225 kV. The ad­van­tages of high­er DC volt­age for CEBAF in­clude re­duced space-charge emit­tance growth and the po­ten­tial for pro­longed pho­to­cath­ode life­time. How­ev­er, a con­se­quence of op­er­at­ing at high­er volt­ages is the in­creased like­li­hood of field emis­sion or break­down, both of which are un­ac­cept­able. High­lights of the R&D stud­ies lead­ing to­ward a pro­duc­tion 200keV GaAs pho­to­gun for CEBAF will be pre­sent­ed.

43 PARTICLE ACCELERATORS↗

Simultaneous Four-Hall Operation for 12 GeV CEBAF

The CEBAF accelerator at Jefferson lab will have a new experimental hall, Hall D, added to its existing three halls as a part of the ongoing 12 GeV upgrade. Under the present CEBAF design, there is no option for sending beam to all four halls simultaneously. At least one hall has to stay down during the machine operation. A new pattern for interleaving the beam bunches is introduced that allows simultaneous operation of all four halls and provide opportunity for additional future experimental beams. The new configuration presents only a minimal change to the existing CEBAF extraction system. In fact all the lower pass extractions will stay as they are and only the frequency of 5th?pass horizontal RF separator will change. In order to make room for the new Hall D beam among the existing three beams, the beam repetition rate is reduced only for the halls taking beam at the highest pass. This and other details of the new configuration and beam pattern will be presented and discussed. A separate paper in this conference will cover the implementation choices including changes to the beam source and extraction region.*

43 PARTICLE ACCELERATORS↗

LLRF System for the CEBAF Separator Upgrade

The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

Plawski, Tomasz E.↗

The Role of the CEBAF Element Database in Commissioning the 12GeV Accelerator Upgrade

The CEBAF Element Database (CED) was first developed in 2010 as a resource to support model-driven configuration of the Jefferson Lab Continuous Electron Beam Accelerator (CEBAF). Since that time, its uniquely flexible schema design, robust programming interface, and support for multiple concurrent versions has permitted it to evolve into a more broadly useful operational and control system tool. The CED played a critical role before and during the 2013 startup and commissioning of CEBAF following its 18-month long shutdown and upgrade. Information in the CED about hardware components and their relations to one-another facilitated a thorough Hot Checkout process involving more than 18,000 system checks. New software relies on the CED to generate EDM screens for operators on-demand thereby ensuring that the information on those screens is correct and up-to-date. The CED also continues to fulfill its original mission of supporting model-driven accelerator setup. Using the new ced2elegant and eDT (elegant Download Tool), accelerator physicists have proven able to compute and apply energy-dependant set points with greater efficiency than ever before.

Larrieu, T.↗

Overview of the First Five Refurbished CEBAF Cryomodules

The Thomas Jefferson National Accelerator Facility is currently engaged in a cryomodule refurbishment project known as the C50 project. The goal of this project is robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project includes removing, refurbishing and replacing ten CEBAF cryomodules at a rate of three per year. Refurbishment includes reprocessing of SRF cavities to eliminate field emission and increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New "dogleg" couplers between the cavity and helium vessel flanges will intercept secondary electrons that produce arcing at the 2 K ceramic window in the fundamental Power Coupler (FPC). Modifications of the external Q (Qext) of the FPC will allow higher gradient operations. Other changes include new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Any damaged or worn components will be replaced as well. Currently, five refurbished cryomodules have been installed in CEBAF and are currently operational. This paper will summarize the test results and current operational experience.

Drury, Michael↗

Error and Correction Analysis for the FFA@CEBAF Energy Upgrade

An energy upgrade design for the Continuous Electron Beam Accelerator Facility (CEBAF) is under development, using fixed field alternating gradient (FFA) return arcs to recirculate electron beam up to an additional five times through the accelerating structures at CEBAF. A necessary component of any large accelerator is a beam steering and optical correction system. Small environmental changes and system errors can lower beam quality or even shut down the machine; and in pursuit of the scientific mission of JLab, high quality electron beams must be delivered to the experimental halls on a predictable schedule. Correction in the novel FFA arcs of the current upgrade design is complicated by several factors. These complexities inform the choice of correction algorithm structure and parameter values. A baseline algorithm in addition to diagnostic and correction hardware configuration is presented. The effect of this correction protocol is shown with respect to estimated errors, and several possible extensions of the algorithm are discussed. This work presents an important proof of concept for the FFA@CEBAF design effort, and provides a functional correction strategy which may be simply adjusted and optimized for future design changes.

Coxe, Alex [Old Dominion Univ., Norfolk, VA (Unite↗

ER@CEBAF: Modeling code developments

A proposal for a multiple-pass, high-energy, energy-recovery experiment using CEBAF is under preparation in the frame of a JLab-BNL collaboration. In view of beam dynamics investigations regarding this project, in addition to the existing model in use in Elegant a version of CEBAF is developed in the stepwise ray-tracing code Zgoubi, Beyond the ER experiment, it is also planned to use the latter for the study of polarization transport in the presence of synchrotron radiation, down to Hall D line where a 12 GeV polarized beam can be delivered. This Note briefly reports on the preliminary steps, and preliminary outcomes, based on an Elegant to Zgoubi translation.

43 PARTICLE ACCELERATORS↗

The CEBAF Master Oscillator and Distribution Remodeling

Jefferson Lab's CEBAF accelerator operation requires various frequency references to be distributed along the site. Three signals: 10 MHz, 70 MHz and 499 MHz are synthesized in the Machine Control Center (MCC) while 1427 MHz and 429 MHz are derived from 499 MHz and 70 MHz signals in four separate locations. We are replacing our obsolete 10 MHz, 70 MHz and 499 MHz sources with new sources that will incorporate a GPS receiver to discipline a 10 MHz reference. In addition the MO (Master Oscillator) system will be redundant (duplicate MO) and a third signal source will be used as a system diagnostic. Moreover, the 12 GeV Energy Upgrade for CEBAF accelerator will be adding 80 new RF systems. To support them the distribution of 1427 MHz and 70 MHz signals has to be extended and be able to deliver enough LO (Local Oscillator) and IF (Intermediate Frequency) power to 320 old and 80 new 80 RF systems. This paper discusses the new MO and the drive line extension.

43 PARTICLE ACCELERATORS↗