Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

CTBTO Contractor Laboratory Test Sample Production Report

In October 2012 scientists from both Idaho National Laboratory (INL) and the CTBTO contact laboratory at Seibersdorf, Austria designed a system and capability test to determine if the INL could produce and deliver a short lived radio xenon standard in time for the standard to be measured at the CTBTO contact laboratory at Seibersdorf, Austria. The test included sample standard transportation duration and potential country entrance delays at customs. On October 23, 2012 scientists at the Idaho National Laboratory (INL) prepared and shipped a Seibersdorf contract laboratory supplied cylinder. The canister contained 1.0 scc of gas that consisted of 70% xenon and 30% nitrogen by volume. The t0 was October 24, 2012, 1200 ZULU. The xenon content was 0.70 +/ 0.01 scc at 0 degrees C. The 133mXe content was 4200 +/ 155 dpm per scc of stable xenon on t0 (1 sigma uncertainty). The 133Xe content was 19000 +/ 800 dpm per scc of stable xenon on t0 (1 sigma uncertainty).

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Information Products & Communications Materials for COR and Contractors' Meetings [Slides]

Contents include the following: 1) Large Scale CO 2 Storage in the Lower Tuscaloosa Massive Sand Formation, December 12, 2007; 2) CoalFleet Program Update and Workshops, July 26-28, 2005; 3) Regional Carbon Sequestration Partnership Annual Review Meeting, November 18, 2009; 4) SECARB U. S. Regional Partnerships from Pilot to Demonstration, November 5, 2009; 5) The SECARB Anthropogenic Test–CO 2 Capture/Transportation/Storage, August 21-23, 2012; 6) Citronelle Project–Experiences With Permitting and Regulations on CCS, August 21, 2013; 7) Partnering With Industry for Large Scale CCS Projects, August 22, 2013; 8) Plant Barry-Citronelle Field Project, August 13, 2104; 9) SECARB's Early Test at Cranfield, Mississippi; 10) SECARB Partnership Early Test at Cranfield Status, August 18-20, 2015; 11) Citronelle Project, August 18, 2015; 12) Plant Barry 25 MW Demo; 13) SECARB Phase III Citronelle Project (Anthropogenic Test) in Alabama, August 18, 2015; 14) SECARB Early Test Retrospective; 15) SECARB Anthropogenic Test Lessons Learned, August 16-18, 2016; 16) SECARB Early Test at Cranfield, August 1-3, 2017; 17) Carbon Storage and Oil and Natural Gas Technologies Review Meeting, August 1-3, 2017; 18) SECARB Partnership Early Test at Cranfield, August 13-16, 2018; 19) SECARB Anthropogenic Test Update, August 13-16, 2018; 20) SECARB Partnership Early Test at Cranfield, August 26-30, 2019; 21) SECARB (Citronelle) Phase III, August 27, 2019.

01 COAL, LIGNITE, AND PEAT↗