Search NASASearch

SEARCH · Search NASA

Results for “COUNTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Countdown to the Future

At the NASA Ames Research Center in California, the next generation of space biologists are working to understand the effects of long duration space flight on model organisms, and are developing ways to protect the health of future astronauts.

student researchers

Final-Approach Spacing Aids (FASA) evaluation for terminal-area, time-based air traffic control

A jointly funded (NASA/FAA) real-time simulation study was conducted at NASA Langley Research Center to gather comparative performance data among three candidate final-approach spacing aid (FASA) display formats. Several objective measures of controller performance and their display eye-scan behavior as well as subjective workload and rating questionnaires were used. For each of two representative pattern-speed procedures (a 170-knot procedure and a 210-knot procedure with speed control aiding), data were gathered, via twelve FAA controllers, using four final-controller display format conditions (manual/ARTS 3, graphic marker, DICE countdown, and centerline slot marker). Measured runway separations were more precise with both the graphic marker and DICE countdown formats than with the centerline slot marker and both (graphic and DICE) improved precision relative to the manual/ARTS 3 format. For three separate rating criteria, the subject controllers ranked the FASA formats in the same order: graphic marker, DICE countdown, and centerline slot marker. The increased precision measured with the 210-knot pattern-speed procedure may indicate the potential for the application of speed-control aiding where higher pattern speeds are practical after the base-to-final turn. Also presented are key FASA issues, a rationale for the formats selected for testing, and their description.

Credeur, Leonard

Atlas Centaur 77 GOES-J Wet Dress Rehearsal at Cape Canaveral Air Station

A Wet Dress Rehearsal (WDR) was successfully run on Atlas/Centaur 77 launch vehicle. The WDR verifies the launch readiness of the vehicle, the launch support equipment at the pad and in the blockhouse, the countdown procedure, and the launch countdown operations of the Eastern Range. During this countdown test liquid hydrogen, liquid oxygen and RP-1 propellants are aboard the vehicle, verifying the structural integrity of the Atlas first stage and Centaur upper stage tanks.

Source record

Launch Support Video Site

The goal of this project is to create a website that displays video, countdown clock, and event times to customers during launches, without needing to be connected to the internal operations network. The requirements of this project are to also minimize the delay in the clock and events to be less than two seconds. The two parts of this are the webpage, which will display the data and videos to the user, and a server to send clock and event data to the webpage. The webpage is written in HTML with CSS and JavaScript. The JavaScript is responsible for connecting to the server, receiving new clock data, and updating the webpage. JavaScript is used for this because it can send custom HTTP requests from the webpage, and provides the ability to update parts of the webpage without having to refresh the entire page. The server application will act as a relay between the operations network, and the open internet. On the operations network side, the application receives multicast packets that contain countdown clock and events data. It will then parse the data into current countdown times and events, and create a packet with that information that can be sent to webpages. The other part will accept HTTP requests from the webpage, and respond to them with current data. The server is written in C# with some C++ files used to define the structure of data packets. The videos for the webpage will be shown in an embedded player from UStream.

OFarrell, Zachary L.

Space Shuttle Launch Probability Analysis: Understanding History so We Can Predict the Future

The Space Shuttle was launched 135 times and nearly half of those launches required 2 or more launch attempts. The Space Shuttle launch countdown historical data of 250 launch attempts provides a wealth of data that is important to analyze for strictly historical purposes as well as for use in predicting future launch vehicle launch countdown performance. This paper provides a statistical analysis of all Space Shuttle launch attempts including the empirical probability of launch on any given attempt and the cumulative probability of launch relative to the planned launch date at the start of the initial launch countdown. This information can be used to facilitate launch probability predictions of future launch vehicles such as NASA's Space Shuttle derived SLS. Understanding the cumulative probability of launch is particularly important for missions to Mars since the launch opportunities are relatively short in duration and one must wait for 2 years before a subsequent attempt can begin.

Cates, Grant R.

Ambitious STS-7 mission to feature first landing at Kennedy

The STS-7 press briefing schedule, NASA select television schedule; launch preparations, countdown and liftoff; major countdown milestones; launch window; STS-7 flight sequence of events, landing timeline; STS-7 flight timeline; landing and post landing operations; flight objectives; Telesat's ANIK-C 2; PALAPA-B; STS-7 experiments; and spacecraft tracking and data network are presented.

Garrett, D.

Flight motor set 360T004 (STS-30R). Volume 1: System overview

The fourth NASA space shuttle flight incorporating redesigned solid rocket motors began on 4 May 1989. The flight motors were designated 360Q004A (left-hand) and 360H004B (right-hand); the mission was designated STS-30R. Overall engine performance was excellent. The low sample rate data that was available showed exceptional propulsion performance. All ballistic and mass property parameters closely matched the predicted values and were well within the required contract end item specification levels that could be assessed. No strain, vibration, or aft skirt heating environments could be addressed due to developmental flight instrumentation deletion. Infrared readings from the shuttle thermal imager were considered very good when compared with ground environment instrumentation readings taken during both the aborted and the actual countdowns. However, hand-held infrared gun reading/ground environment instrumentation comparisons were considered poor during both countdowns, with the exception of the T - 3 hour timeframe during the actual launch. Postflight inspection again verified superior performance of the insulation, phenolics, metal parts, and seals. All combustion gas was contained by the insulation in the field and case-to-nozzle joints. Inadequate parachute performance on the left-hand booster caused high splashdown loads, which resulted in a displaced nozzle and factory joint weatherseal unbond anomalies. Recommendations were made concerning improved thermal modeling and instruments. The rationale for these recommendations, the dispositions of all anomalies, and complete result details are given.

Ricks, Glenn A.

Apollo 11 Launch

This NASA Kennedy Space Center video release presents the countdown and liftoff of Apollo 11, the first manned journey to the Moon which began at Pad A, Launch Complex 39, Kennedy Space Center, Florida at 9:32 a.m. EDT on July 16, 1969. The crew of Apollo 11 included Commander Neil A. Armstrong, Command Module pilot Michael Collins, and Lunar Module pilot Edwin E. Aldrin, Jr. Several different camera viewpoints of the spacecraft as well as over-head shots of the Kennedy launch control center are presented prior to liftoff. Other footage includes shots of President Lyndon B. Johnson and his wife among the Florida audience viewing liftoff. During the countdown several audio updates from Kennedy launch control are presented as to the status of pre-launch testing and system readiness. Captivating footage from liftoff to the spacecraft nearing the outer Earth atmosphere is shown as the video ends with Neil Armstrong's confirmation of engine skirt separation and launch escape tower separation from the spacecraft.

Source record

STS-96 Press Briefing and MODE-1 Egress Training for TCDT

Live footage shows the members of the STS-96 crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette and Valery Ivanovich Tokarev participating in a Press Conference and Egress Training for a Terminal Countdown Demonstration Test. Scenes of Capt. Steve Kelly, Fire Services, explaining the emergency egress procedure to the STS-96 crew is presented. Mission Specialist Tokarev is shown releasing a slide-wire basket. Mission Specialist Barry is also seen in the evacuation seat with the Training Officer Gina Tucker behind him. The TCDT activities include simulated countdown exercises and inspection of the mission payloads in the orbiter's payload bay.

Source record

STS-50 TCDT Activities

Terminal Countdown and Demonstration Test (TCDT) activities are shown, such as the STS-50 crew (Commander Richards, Pilot Kenneth D. Bowersox, Payload Commander Bonnie J. Dunbar, Mission Specialists Ellen S. Baker and Carl J. Meade, and Payload Specialists Lawrence J. DeLucas and Eugene H. Trinh) emerging from T-38 aircraft and being introduced by Commander Richards. Emergency egress training is seen, as is the crew's departure from the Operations and Checkout (O&C) Building. Footage shows the launch pad and launch control room as the countdown nears the engine ignition simulation.

Source record

STS-52 Post Launch Press Conference

Dick Young, NASA Public Affairs, introduces Brewster Shaw, Deputy Program Manager Space Shuttle, and Bob Sieck, Launch Director, Kennedy Space Center, who give brief statements about the countdown and launch of the STS-52 Columbia Orbiter. The problems encountered during countdown are discussed, including details on the hydrogen leak in the ground umbilical carrier tank, the 100% exceedance of load on the external tank, and the reasons why the flight rule for an upper limit of cross winds was waived. The men then answered questions from the press.

Source record

Tropospheric Wind Monitoring During Day-of-Launch Operations for National Aeronautics and Space Administration's Space Shuttle Program

The Environments Group at the National Aeronautics and Space Administration's Marshall Space Flight Center (NASA/MSFC) monitors the winds aloft at Kennedy Space Center (KSC) during the countdown for all Space Shuttle launches. Assessment of tropospheric winds is used to support the ascent phase of launch. Three systems at KSC are used to generate independent tropospheric wind profiles prior to launch; 1) high resolution Jimsphere balloon system, 2) 50-MHz Doppler Radar Wind Profiler (DRWP) and 3) low resolution radiosonde system. Data generated by the systems are used to assess spatial and temporal wind variability during launch countdown to ensure wind change observed does not violate wind change criteria constraints.

Decker, Ryan K.

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record

Climatological Study of the Short-Term Variation of the 0 C, -10 C, AND -20 C Altitude Levels Over the Florida Spaceport

For evaluation of the potential of cloud electrification, it is necessary to know the altitude of the 0, -10 and -20 degree Celsius levels. Cape Canaveral Air Force Station has recorded balloon launch data back to 1989. In support of rocket launches, often multiple balloons are launched within minutes of each other in the 4-6 hours leading up to launch. In the past, temperature data from sondes was typically available every hour or so through the launch countdown, allowing for frequent updates of these critical temperature thresholds. Recently, launch customers are relying on jimsphere and wind profiler data that do not have a thermodynamic component in the latter 4-6 hours of a countdown. This study compares the altitude differences of the 0, -10 and -20 degree Celsius levels from GPS-tracked consecutive balloon pairs not to exceed 6 hours apart. The analysis uses 3,198 soundings from 2001 to 2013. Approximately 20, 17, and 13 percent of the time the altitude of the temperature level in question (0, -10, -20 degrees C respectively), varies by more than 500 feet (operationally significant threshold) within 6 hours. This study analyzes the altitude variability as a function of several meteorological parameters, such as dew point depression and solar zenith angle. Additionally, the study concludes with impacts to launch operations.

altitude of 0 degree C temperature level