Search NASA⌕ Search

SEARCH · Search NASA

Results for “Capability Challenge”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

NASA’s Unsteady Pressure-Sensitive Paint Research and Operational Capability Developments

To address challenges in the field of unsteady aerodynamics, NASA has developed a new stateof-the-art capability called Unsteady Pressure-Sensitive Paint (uPSP). It has been developed as an operational surface-pressure measurement capability for deployment in NASA’s AETC ground test facilities. Offering unprecedented spatiotemporal resolution, uPSP is an extremely powerful tool for investigating unsteady separated flows. To accelerate scientific discovery, uPSP data is to be processed and distributed as rapidly as it is acquired. Several demonstrations of the technology collected valuable data that has been used to develop data products, a robust processing pipeline, and other computational capabilities. A collection of papers documents the most recent research and development work on the uPSP technology and capability. This paper summarizes the current state of this effort at NASA.

Pressure-Sensitive Paint↗

Interannual Variability of the Tropical Water Cycle: Capabilities in the TRMM Era and Challenges for GPM

Considerable uncertainty surrounds the issue of whether precipitation over the tropical oceans (30" NE) systematically changes with interannual sea-surface temperature (SST) anomalies that accompany El Nino (warm) and La Nina (cold) events. Although it is well documented that El Nino-Southern Oscillation (ENSO) events with marked SST changes over the tropical oceans, produce significant regional changes in precipitation, water vapor, and radiative fluxes in the tropics, we still cannot yet adequately quantify the associated net integrated changes to water and heat balance over the entire tropical oceanic or land sectors. Robertson et al., [2001 GRL] for example, showed that substantial disagreement exists among contemporary satellite estimates of interannual variations in tropical rainfall that are associated with SST changes. Berg et al., [2002 J. Climate] have documented the distinct differences between precipitation structure over the eastern and western Pacific ITCZ and noted how various satellite precipitation algorithms may respond quite differently to ENSO modulations of these precipitation regimes. Resolving this uncertainty is important since precipitation and latent heat release variations over land and ocean sectors are key components of the tropical heat balance in its most aggregated form. Rainfall estimates from the Tropical Rainfall Measuring Mission (TRMM) Precipitation Radar (PR) averaged over the tropical oceans have not solved this issue and, in fact, show marked differences with estimates from two TRMM Microwave Imager (TMI) passive microwave algorithms. In this paper we will focus on findings that uncertainties in microphysical assumptions necessitated by the single-frequency PR measurement pose difficulties for detecting climate-related precipitation signals. Recent work has shown that path-integrated attenuation derived from the effects of precipitation on the radar return from the ocean surface exhibits interannual variability that agrees closely with the TMI time series, yet the PR rainfall interannual variability (and attenuation derived predominantly from reflectivity) differs even in sign. We will explore these apparent inconsistencies and detail their impact on estimates of how ENSO events perturb the tropical rainfall. We will place these results in perspective by considering requirements for precipitation accuracy for global climate variability and change studies involving ENSO, monsoon dynamics and variations, and climate model improvement and validation. The discussion will conclude with an assessment of the implications of these findings for Global Precipitation Mission (GPM) requirements.

Robertson, Franklin R.↗

NASA’s Unsteady Pressure-Sensitive Paint Research and Operational Capability Developments

To address challenges in the field of unsteady aerodynamics, NASA has developed a new state-of-the-art capability called Unsteady Pressure-Sensitive Paint (uPSP). It has been developed as an operational surface-pressure measurement capability for deployment in NASA’s AETC ground test facilities. Offering unprecedented spatiotemporal resolution, uPSP is an extremely powerful tool for investigating unsteady separated flows. To accelerate scientific discovery, uPSP data is to be processed and distributed as rapidly as it is acquired. Several demonstrations of the technology collected valuable data that has been used to develop data products, a robust processing pipeline, and other computational capabilities. A collection of papers documents the most recent research and development work on the uPSP technology and capability. This paper summarizes the current state of this effort at NASA.

Pressure-Sensitive Paint↗

Deep Space Mission Trend Analyses: A Briefing to the Next Generation EBRE Study Team

Determination of stakeholder needs for next generation implementations necessitates a multi ]pronged approach. . Future mission set analyses provide a lower gbound h for some of these needs. . Earth ]based analogies provide an upper gbound h for some of these needs. . Interpreting the results requires being mindful of both the near ]term contextual factors and long ]term factors that are in play. . In the context of last year fs analyses, the current budget environment, the potential Pu ]238 shortage, and SMD fs gsingle 34m only h policy may, collectively, create a future deep space mission set that, from a capacity and end ]to ]end link difficulty standpoint, is no more challenging than it is today. . Nonetheless, data rates and volumes continue to increase, suggesting capability and spectrum challenges ahead. These results agree with the results from the Earthbased analogies. . Emerging developments such as smallsats and distributed spacecraft could significantly change the capacity and end ]to ]end link difficulty picture.

future mission analysis↗

A Case Study on the Challenges and Opportunities for the Deployment of PHM Capabilities in Existing Engineering Systems

The field of Prognostics and Health Management (PHM) of engineering systems has experienced considerable growth over the last decade. From benefits associated with faster and more powerful hardware in the form of wireless sensors, edge devices, and general computing capabilities (GPU’s and cloud computing), to development of powerful algorithms for anomaly detection and remaining useful life (RUL) estimation, the number of engineering systems featuring advanced diagnostics and prognostics capabilities continues to grow at an increasingly faster pace. However, the deployment of PHM capabilities as part of the upgrade of existing engineering systems presents multiple challenges to the PHM practitioner charged with retrofitting such systems. Issues include a lack of specific instrumentation needed to capture the signals of interest; insufficient data and sampling rates required for fault detection and diagnosis, and for detection of failure/degradation indicators; and difficulties in the identification of a system’s nominal behavior as a result of age induced degradation. Today’s PHM practitioner must be able to quickly identify and assess these types of issues to effectively evaluate and select the optimal PHM strategies required to achieve the desired results. This paper presents results from the preliminary evaluation of the High-Pressure Gas Facility (HPGF) infrastructure at NASA’s Stennis Space Center in Hancock County, Mississippi. This evaluation is part of a feasibility study conducted prior to the deployment of prognostics and diagnostics capabilities in the pumps skids of the liquid nitrogen (LN2) system of the HPGF.

Condition Based Maintenance↗

Technology Challenges in Small UAV Development

Development of highly capable small UAVs present unique challenges for technology protagonists. Size constraints, the desire for ultra low cost and/or disposable platforms, lack of capable design and analysis tools, and unique mission requirements all add to the level of difficulty in creating state-of-the-art small UAVs. This paper presents the results of several small UAV developments, the difficulties encountered, and proposes a list of technology shortfalls that need to be addressed.

Logan, Michael J.↗

Spacecraft Contamination Control Challenges for Space Missions with Organic Compound Detection Capabilities and for Potential Sample Return

Contamination control is critical to missions with organic compound detection capabilities, and for missions targeting acquisition of samples for potential return to Earth. Significant challenges are being addressed in the design of current flight projects and conceptual mission studies at JPL. These challenges extend to both orbiting spacecraft, as well as landed missions, for future missions to Mars and Europa, and potential missions to Titan and Enceladus. Contamination control during all phases of a mission, from preliminary design through operation, is fundamental to ensure that organic compounds of terrestrial origin are controlled to ensure successful completion of science objectives. This presentation summarizes contamination control challenges specific to landed missions (which include sample acquisition, encapsulation, caching, potential sample return, and UV instruments), and orbiting missions (modeling interactions between the spacecraft, and local exospheres and plumes).

Soares, Carlos↗

Spacecraft Contamination Control Challenges for Space Missions with Organic Compound Detection Capabilities and for Potential Sample Return

Spacecraft contamination control is critical to space exploration missions with organic compound detection capabilities, and also for missions targeting acquisition of samples for potential return to Earth. Significant challenges are being addressed and resolved in the design of current flight projects and conceptual mission studies at JPL. These challenges extend to both orbiting spacecraft, as well as landed missions, for future missions to Mars and Europa, and potential missions to Titan and Enceladus. Contamination control during all phases of a mission, from preliminary design through operation, is fundamental to ensure that organic compounds of terrestrial origin are controlled to ensure successful completion of science objectives. This paper examines contamination control challenges specific to landed missions (which include sample acquisition, encapsulation, caching, potential sample return, and UV instruments), and orbiting missions (modeling interactions between the spacecraft and local exospheres and plumes).

Sylvia, Margarite↗

CFD Vision 2030 Study: A Path to Revolutionary Computational Aerosciences

This report documents the results of a study to address the long range, strategic planning required by NASA's Revolutionary Computational Aerosciences (RCA) program in the area of computational fluid dynamics (CFD), including future software and hardware requirements for High Performance Computing (HPC). Specifically, the "Vision 2030" CFD study is to provide a knowledge-based forecast of the future computational capabilities required for turbulent, transitional, and reacting flow simulations across a broad Mach number regime, and to lay the foundation for the development of a future framework and/or environment where physics-based, accurate predictions of complex turbulent flows, including flow separation, can be accomplished routinely and efficiently in cooperation with other physics-based simulations to enable multi-physics analysis and design. Specific technical requirements from the aerospace industrial and scientific communities were obtained to determine critical capability gaps, anticipated technical challenges, and impediments to achieving the target CFD capability in 2030. A preliminary development plan and roadmap were created to help focus investments in technology development to help achieve the CFD vision in 2030.

Jeffrey P Slotnick↗

Conceptual design for aerospace vehicles

The designers of aircraft and more recently, aerospace vehicles have always struggled with the problems of evolving their designs to produce a machine which would perform its assigned task(s) in some optimum fashion. Almost invariably this involved dealing with more variables and constraints than could be handled in any computationally feasible way. With the advent of the electronic digital computer, the possibilities for introducing more variable and constraints into the initial design process led to greater expectations for improvement in vehicle (system) efficiency. The creation of the large scale systems necessary to achieve optimum designs has, for many reason, proved to be difficult. From a technical standpoint, significant problems arise in the development of satisfactory algorithms for processing of data from the various technical disciplines in a way that would be compatible with the complex optimization function. Also, the creation of effective optimization routines for multi-variable and constraint situations which could lead to consistent results has lagged. The current capability for carrying out the conceptual design of an aircraft on an interdisciplinary bases was evaluated to determine the need for extending this capability, and if necessary, to recommend means by which this could be carried out. Based on a review of available documentation and individual consultations, it appears that there is extensive interest at Langley Research Center as well as in the aerospace community in providing a higher level of capability that meets the technical challenges. By implication, the current design capability is inadequate and it does not operate in a way that allows the various technical disciplines to participate and cooperately interact in the design process. Based on this assessment, it was concluded that substantial effort should be devoted to developing a computer-based conceptual design system that would provide the capability needed for the near-term as well as framework for development of more advanced methods to serve future needs.

Gratzer, Louis B.↗

Using Unmanned Aircraft Systems (UAS) for Remote Sensing: Airspace Access Challenges

Several areas of scientific interest have been identified that would significantly benefit from using Unmanned Aircraft Systems (UAS) for gathering remote sensing data. UAS are uniquely suited for applications that require long dwell times and/or in locations that are generally too dangerous for manned aircraft. Sea ice characterization, mapping of fault lines, hurricane monitoring, and satellite validation are some examples of applications that are benefited by the use of UAS. UAS are not without their challenges, however. Instruments must be automated and miniaturized, and be able to operate in extreme conditions (i.e. high altitude environments). However, because UAS currently lack a see-and-avoid capability, the greatest challenge is getting access to the airspace required to accomplish science missions. The ability for UAS to access airspace varies from country to country. This paper will give a brief overview of different UAS remote sensing applications, and will address general world airspace issues and challenges with a specific look at the United States.

Mulac, Brenda L.↗

Sample Return Missions Where Contamination Issues are Critical: Genesis Mission Approach

The Genesis Mission, sought the challenging analytical goals of accurately and precisely measuring the elemental and isotopic composition of the Sun to levels useful for planetary science, requiring sensitivities of ppm to ppt in the outer 100 nm of collector materials. Analytical capabilities were further challenged when the hard landing in 2004 broke open the canister containing the super-clean collectors. Genesis illustrates that returned samples allow flexibility and creativity to recover from setbacks.

Allton, Judith H.↗

National security and national competitiveness: Open source solutions; NASA requirements and capabilities

Foreign competitors are challenging the world leadership of the U.S. aerospace industry, and increasingly tight budgets everywhere make international cooperation in aerospace science necessary. The NASA STI Program has as part of its mission to support NASA R&D, and to that end has developed a knowledge base of aerospace-related information known as the NASA Aerospace Database. The NASA STI Program is already involved in international cooperation with NATO/AGARD/TIP, CENDI, ICSU/ICSTI, and the U.S. Japan Committee on STI. With the new more open political climate, the perceived dearth of foreign information in the NASA Aerospace Database, and the development of the ESA database and DELURA, the German databases, the NASA STI Program is responding by sponsoring workshops on foreign acquisitions and by increasing its cooperation with international partners and with other U.S. agencies. The STI Program looks to the future of improved database access through networking and a GUI; new media; optical disk, video, and full text; and a Technology Focus Group that will keep the NASA STI Program current with technology.

Cotter, Gladys A.↗

Extravehicular Activity Asteroid Exploration and Sample Collection Capability

One of the challenging primary objectives associated with NASA's Asteroid Redirect Crewed Mission (ARCM) is to demonstrate deep space Extravehicular Activity (EVA) and tools and to obtain asteroid samples to return to Earth for further study. Prior Shuttle and International Space Station (ISS) spacewalks have benefited from engineered EVA interfaces which have been designed and manufactured on Earth. Rigid structurally mounted handrails, and tools with customized interfaces and restraints optimize EVA performance. For ARCM, EVA complexity increases due to the uncertainty of the asteroid properties. The variability of rock size, shape and composition, as well as behavior of the asteroid capture mechanism will complicate EVA translation, tool restraint, and body stabilization. The unknown asteroid hardness and brittleness will complicate tool use. The rock surface will introduce added safety concerns for cut gloves and debris control. Feasible solutions to meet ARCM EVA objectives were identified using experience gained during Apollo, Shuttle, and ISS EVAs, terrestrial mountaineering practices, NASA Extreme Environment Mission Operations (NEEMO) 16 mission, and during Neutral Buoyancy Laboratory testing in the Modified Advanced Crew Escape Suit (MACES) suit. This paper will summarize the overall operational concepts for conducting EVAs for the ARCM mission including translation paths and body restraint methods, potential tools used to extract the samples, design implications for the Asteroid Redirect Vehicle (ARV) for EVA, and the results of early development testing of potential EVA tasks.

Sipila, Stephanie A.↗

Extravehicular Activity Asteroid Exploration and Sample Collection Capability

One of the challenging primary objectives associated with NASA's Asteroid Redirect Crewed Mission (ARCM) is to demonstrate deep space Extravehicular Activity (EVA) and tools and to obtain asteroid samples to return to Earth for further study. Prior Shuttle and International Space Station (ISS) spacewalks have benefited from engineered EVA interfaces which have been designed and manufactured on Earth. Rigid structurally mounted handrails, and tools with customized interfaces and restraints optimize EVA performance. For ARCM, EVA complexity increases due to the uncertainty of the asteroid properties. The variability of rock size, shape and composition, as well as behavior of the asteroid capture mechanism will complicate EVA translation, tool restraint, and body stabilization. The unknown asteroid hardness and brittleness will complicate tool use. The rock surface will introduce added safety concerns for cut gloves and debris control. Feasible solutions to meet ARCM EVA objectives were identified using experience gained during Apollo, Shuttle, and ISS EVAs, terrestrial mountaineering practices, NASA Extreme Environment Mission Operations (NEEMO) 16 mission, and during Neutral Buoyancy Laboratory testing in the Modified Advanced Crew Escape Suit (MACES) suit. This paper will summarize the overall operational concepts for conducting EVAs for the ARCM mission including translation paths and body restraint methods, potential tools used to extract the samples, design implications for the Asteroid Redirect Vehicle (ARV) for EVA, and the results of early development testing of potential EVA tasks.

Sipila, Stephanie A.↗

History and Logic Model NASA Goddard Space Flight Center Instrument and Payload Systems Engineering Technical Performance Study

Historically, some NASA missions have exceeded schedule and cost commitments. Studies suggest technical performance is a contributor. The 1980 NASA Project Management Study concluded, "one of the most significant contributors to cost and schedule growth is inadequate definition of technical and management aspects of a program..." (as cited in GAO/NSIAD-93-97, p. 11). The 1991 NASA Roles and Missions Report identified a "need for increased emphasis on technological readiness and requirements on the front end of a program" (as cited in GAO/NSIAD-93-97, p. 11). The 1992 NASA Program Costs Report stated that NASA officials identified, among other things, "insufficient definition studies... [and] program redesigns and technical complexities" as reasons for cost and schedule overruns (GAO/NSAID-93-97, p. 11). The 2002 Task Force on Acquisition of National Security Space Programs found "requirements definition and control issues, unhealthy cost bias in proposal evaluation, widespread lack of budget reserves required to implement high risk programs on schedule, and an overall underappreciation of the importance of appropriately staffed and trained system engineering staff to manage the technologically demanding and unique aspects of space programs" (DoD, 2003, p.i.) In 2007, The NASA Office of the Chief Engineer chartered the NASA Instrument Capability Study (NICS) “to determine whether NASA instrument developers are facing challenges that impact the capability to design and build quality instruments or whether there are flaws in the acquisition strategy evidenced by schedule delays, cost overruns, and increased technical risk via design deficiencies. The... team was also chartered to determine if occurrences [are]... isolated cases or if there are generic issues... If the issues [are] found to be generic, the team [is] to offer solutions to recover such capability" (NICS Report, 2008, p. vi). The 2008 NICS Report, led by Goddard Space Flight Center (GSFC), identified challenges to instrument technical performance consistent with findings from previous reports. In 2017, the Instrument Project Division (IPD) Implementation Study was initiated to determine if there was a change in meeting schedule and cost commitments after implementing certain NICS recommendations. In 2018, the Instrument Technical Performance Study was initiated to determine the current state of Instrument Technical Performance in the GSFC Payload & Instrument Systems Engineering Branch. The purpose of the combined studies is to answer the question, "Is there a relationship between meeting NASA scientific instrument technical success and meeting schedule and cost commitments? If yes, what is the relationship?" References Department of Defense Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics. (2003). The report of the defense science board/ air force scientific advisory board joint task force on acquisition of national security space programs. Washington DC. Government Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated. GAO/NSIAD-93-97. Washington DC. National Aeronautics and Space Administration, National Oceanic and Atmospheric Agency, Department of Defense. (2008). The NASA instrument capability study final report. NP-2008-11-058-GSFC. Washington DC.

Robbins, Geraldine↗

Advancing Wildland Fire Response with NASA’s Second Shift Capabilities

Novel “Second-Shift” capabilities—leveraging Uncrewed Aerial Systems and Optionally Piloted Vehicles—are identified that could extend wildfire aerial logistics support into night or low-visibility conditions. Expert elicitations with subject-matter experts informed the development of these conceptual capabilities and identified key challenges in wildfire logistics operations. Furthermore, the potential of these capabilities could extend beyond aerial logistics support, encompassing aerial suppression, observation, and emergency extraction support for wildland firefighting. An approach to development, implementation and validation of the novel capabilities is described.

Wildfire logistics↗

Advancing Wildland Fire Response with NASA’s Second Shift Capabilities

Novel “Second-Shift” capabilities—leveraging Uncrewed Aerial Systems and Optionally Piloted Vehicles—are identified that could extend wildfire aerial logistics support into night or low-visibility conditions. Expert elicitations with subject-matter experts informed the development of these conceptual capabilities and identified key challenges in wildfire logistics operations. Furthermore, the potential of these capabilities could extend beyond aerial logistics support, encompassing aerial suppression, observation, and emergency extraction support for wildland firefighting. An approach to development, implementation and validation of the novel capabilities is described.

Wildfire logistics↗