Application of Hybrid Optimization-Expert System for Optimal Power Management on Board Space Power Station

The space power system has two sources of energy: photo-voltaic blankets and batteries. The optimal power management problem on-board has two broad operations: off-line power scheduling to determine the load allocation schedule of the next several hours based on the forecast of load and solar power availability. The nature of this study puts less emphasis on speed requirement for computation and more importance on the optimality of the solution. The second category problem, on-line power rescheduling, is needed in the event of occurrence of a contingency to optimally reschedule the loads to minimize the 'unused' or 'wasted' energy while keeping the priority on certain type of load and minimum disturbance of the original optimal schedule determined in the first-stage off-line study. The computational performance of the on-line 'rescheduler' is an important criterion and plays a critical role in the selection of the appropriate tool. The Howard University Center for Energy Systems and Control has developed a hybrid optimization-expert systems based power management program. The pre-scheduler has been developed using a non-linear multi-objective optimization technique called the Outer Approximation method and implemented using the General Algebraic Modeling System (GAMS). The optimization model has the capability of dealing with multiple conflicting objectives viz. maximizing energy utilization, minimizing the variation of load over a day, etc. and incorporates several complex interaction between the loads in a space system. The rescheduling is performed using an expert system developed in PROLOG which utilizes a rule-base for reallocation of the loads in an emergency condition viz. shortage of power due to solar array failure, increase of base load, addition of new activity, repetition of old activity etc. Both the modules handle decision making on battery charging and discharging and allocation of loads over a time-horizon of a day divided into intervals of 10 minutes. The models have been extensively tested using a case study for the Space Station Freedom and the results for the case study will be presented. Several future enhancements of the pre-scheduler and the 'rescheduler' have been outlined which include graphic analyzer for the on-line module, incorporating probabilistic considerations, including spatial location of the loads and the connectivity using a direct current (DC) load flow model.

Momoh, James↗

Reflectance Experiment Laboratory (RELAB) Description and User's Manual

Spectroscopic data acquired in the laboratory provide the interpretive foundation upon which compositional information about unexplored or unsampled planetary surfaces is derived from remotely obtained reflectance spectra. The RELAB is supported by NASA as a multi-user spectroscopy facility, and laboratory time can be made available at no charge to investigators who are in funded NASA programs. RELAB has two operational spectrometers available to NASA scientists: 1) a near- ultraviolet, visible, and near-infrared bidirectional spectrometer and 2) a near- and mid- infrared FT-IR spectrometer. The overall purpose of the design and operation of the RELAB bidirectional spectrometer is to obtain high precision, high spectral resolution, bidirectional reflectance spectra of earth and planetary materials. One of the key elements of its design is the ability to measure samples using viewing geometries specified by the user. This allows investigators to simulate, under laboratory conditions, reflectance spectra obtained remotely (i.e., with spaceborne, telescopic, and airborne systems) as well as to investigate geometry dependent reflectance properties of geologic materials. The Nicolet 740 FT-IR spectrometer currently operates in reflectance mode from 0.9 to 25 Fm. Use and scheduling of the RELAB is monitored by a 4-member advisory committee. NASA investigators should direct inquiries to the Science Manager or RELAB Operator.

Pieters, Carle M.↗

International Life Sciences Research Announcement 'Pick and Eat' Project Contributions

The International Life Sciences Research Announcement (ILSRA) is a grant which focuses on 'Pick and Eat' salad-crop productivity, nutritional value, and acceptability to supplement the International Space Station (ISS) food system. My contributions into this project were to 1) manage the Veggie chambers to maintain optimal plant growth and attend to any plant needs, 2) analyze data for the VEG-04 Science Verification Test to create a water delivery schedule for the astronauts aboard the ISS, and 3) assume the role as a VEG-04 Experiment Verification Test (EVT) 'pseudonaut' to confirm that all schedules and flight procedures produce quality results. The VEG-04 EVT will continue up until the last day of my internship. Additionally, I'm currently working on two independent research projects, both of which provide insight to potential plant growth hardware options for lunar or Martian surfaces. One of which is a cable culture hydroponics system (favorable in areas with highly limited space), and the other are two aeroponic systems (a subset of hydroponics which uses no media and misting as its delivery for water and nutrients). All independent projects are still being tested and therefore results are not yet established. Lastly, I have been in charge of maintaining the AeroGarden (Registered Trademark), a hydroponic-aeroponic hybrid system which is currently being investigated as a concept to the potential for minimizing human involvement in the process of growing plants. This has the potential to play a major role in future technological project designs for spaceflight hardware. This system is an ongoing project that will continue once my internship ends.

Moore, Jessica↗

NASA Tech Briefs, March 2006

Topics covered include: Medical Signal-Conditioning and Data-Interface System; Instruments for Reading Direct-Marked Data-Matrix Symbols; Processing EOS MLS Level-2 Data; Ground Processing of Data From the Mars Exploration Rovers; Estimating Total Electron Content Using 1,000+ GPS Receivers; NASA Solar Array Demonstrates Commercial Potential; Improved Control of Charging Voltage for Li-Ion Battery; Programmable Pulse-Position-Modulation Encoder; Wavelength-Agile External-Cavity Diode Laser for DWDM; Pattern-Recognition Processor Using Holographic Photopolymer; Submicrosecond Power-Switching Test Circuit; Three-Function Logic Gate Controlled by Analog Voltage; Integrated System for Autonomous Science; Montage Version 3.0; Utilizing AI in Temporal, Spatial, and Resource Scheduling; Satellite Image Mosaic Engine; Architecture for Control of the K9 Rover; HFGMC Enhancement of MAC/GMC; Automated Activation and Deactivation of a System Under Test; Cleaning Carbon Nanotubes by Use of Mild Oxygen Plasmas; Generating Aromatics From CO2 on Mars or Natural Gas on Earth; Attaching Thermocouples by Peening or Crimping; Heat Treatment of Friction-Stir-Welded 7050 Aluminum Plates; Generating Breathable Air Through Dissociation of N2O; High-Performance Scanning Acousto-Ultrasonic System; Correction for Thermal EMFs in Thermocouple Feedthroughs; Using Quasiparticle Poisoning To Detect Photons; Estimating Resolution Lengths of Hybrid Turbulence Models; Education and Training Module in Alertness Management; Cargo-Positioning System for Next-Generation Spacecraft; Micro-Imagers for Spaceborne Cell-Growth Experiments; Holographic Solar Photon Thrusters; Plasma-Based Detector of Outer-Space Dust Particles; and Generation of Data-Rate Profiles of Ka-Band Deep-Space Links.

Source record↗

Ice storage model-predictive control in an office building with PV: scenario, error and sensitivity analysis

Thermal energy storage (TES) can enable more building-sited renewable electricity generation and lower utility bill costs for buildings owners and occupants, especially when there are high demand and variable time-of-use (TOU) charges. A model predictive control (MPC) strategy can offer additional savings over a schedule-based control with added complexity and reliance on forecasts. Here, this study examines savings for medium office buildings with chiller plants in three locations with building-installed solar photovoltaics (PV) to understand the impact of MPC. Control setpoints are fixed by a schedule-based control or optimized by nonlinear MPC. These control setpoints are actuated within EnergyPlus building models to simulate the utility cost of the chiller plant. NLP solutions can be unstable or unrealistic, but our results show that by regularizing the NLP, the solutions can be reasonably followed by the building model. MPC models make simplifications that lead to errors once the controller is participating in and changing the operation of the building. These errors average 9 % across the cases, showing that the most important parts of the system are represented. The no-thermal load costs are computed to show that the optimization can in some cases achieve both the minimum TOU and minimum monthly demand costs by demand management while reducing TOU energy costs by energy arbitrage. The MPC saves 35–66 % in the annual chiller plant operating costs, which is an additional savings above the schedule by 1–33 %. PV and TES are complementary and mostly independent, but a load with PV often results in better performance for the schedule. Our case study and sensitivity analysis show the importance of modeling and optimization for complex rates, but also the circumstances wherein a simpler strategy achieves the same performance with less potential for error.

14 SOLAR ENERGY↗

Sizing Energy Storage System for Energy Arbitrage in Extreme Fast Charging Station

This paper proposes a non-linear programming (NLP) model to optimally size the energy storage system (ESS) and obtain an optimal energy management for energy arbitrage of an extreme fast charging station (XFCS) for electric vehicles (EVs), with minimized total cost of XFCS operation and ESS investment. Different from most reported work on sizing the ESS for EV charging stations, this paper proposes a pragmatic approach to model the ESS life degradation and accurately count the ESS cycles. Moreover, this work incorporates the peak demand charges in the operational cost of the charging station which are often overlooked in the literature. The proposed model is formulated and solved using AIMMS. Finally, a thorough sensitivity analysis is performed to offer insights into how different input parameters impact the ESS sizing and savings from the energy arbitrage perspective.

25 ENERGY STORAGE↗

Quantification of Energy Savings and Demand Reduction for a Heat Pump Integrated with Thermal Energy Storage (Final Report)

To mitigate the variation in demand on the electric grid, thermal energy storage (TES) is an alternative to electric batteries or installing new peaking power plants. Stakeholders and policy makers across the United States have expressed interests in promoting TES, as demonstrated by the US Department of Energy’s Grid-Interactive Efficient Buildings program and the efforts of various state legislatures. However, the cost value provided by TES are unclear. If reliable cost benefits were determined, stakeholders would have a clearer picture of the financial returns that can be gained from their investment in TES. The study in this report is conducted by ORNL with collaboration with Emerson the Helix Innovation Center. In the first part of this report, EnergyPlus was used to perform whole-building simulations for two residential buildings in Indianapolis and Atlanta. The HVAC system in both buildings were equipped with phase change material TES. The TES tank was charged in off-peak hours and discharged in peak hours to perform load shifting. First, the economic value implied by existing time-of-use (TOU) rates offered by utility companies was analyzed via whole-building simulation. Second, existing demand reduction (DR) incentives sourced from 3 different electrical grid administrators (i.e., California, Texas, and New England region) were surveyed to determine their implied value. The study suggests that the traditional value analysis that focuses on ROI for the building owner significantly undervalues TES technology making economic viability difficult. A more comprehensive value analysis that includes peak demand management and deferred capital for peaking power plants shows that TES should be economically viable but here the value is greater for the utility and requires large market penetration and aggregation to fully realize the benefits. Therefore, to facilitate commercialization, new business models are needed that include a broader range of stakeholders and distribute the value of TES proportionally. In the 2 nd part of this project, the benefits of a novel phase change material (PCM) integrated heat pump configuration were evaluated via detailed component based simulation. A one-dimensional PCM heat exchanger model which discretizes the PCM tank and refrigerant tubes into small control volumes is developed. Each control volume can have different PCM temperatures, PCM properties, and heat transfer coefficients. The PCM tank is charged by a wrapped tank condenser and discharged by an internal refrigerant coil. The PCM heat exchanger model is integrated into DOE/ORNL Heat Pump Design Model for heat pump system simulation. To demonstrate the performance of the PCM integrated heat pump, a case study in Chicago was performed. A Time-of-Use utility structure-based control strategy is implemented to schedule the PCM tank charging and discharging mode switching. Compared with a conventional electric heat pump, the PCM integrated heat pump shows superior performance on load shifting and utility cost reduction. As a result, the proposed system demonstrates 24.6% utility saving for cooling application and 25.8% utility saving for heating application.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Oh! I Slipped the Surly Bounds of Earth....and Ran into Space Weather!

Over the past decade the concept of space weather has been introduced and matured in both the scientific community and popular press. Likewise the concept of space climatology recently also is being advanced. Closely linked to these concepts are their impacts on ground- and space-based technological systems; one such system commonly mentioned is manned space flight exemplified by the Space Shuttle and International Space Station (ISS). From a manned space flight perspective, space weather and space climatology have significant effects on the amount of radiation exposure received by humans in space from the ambient high-energy charged particles present in interplanetary space and trapped in the geomagnetosphere. Whereas the impact of space weather for most technological systems is usually discrete and well correlated in time, the principle impact of space weather and space climatology is to increase the probability of latent cancer formation in thetraveler cohort. In this regard, while space weather may be the dominating factor for a given mission, over the life of a long-term program such as the Space Shuttle or ISS space climatology is the controlling factor of latent cancer risk. Human radiation exposure enhancements associated with space weather disturbances has been a concern among scientist and mission controllers since the inception of manned spaceflight nearly forty years ago. This led NASA to develop, in conjunction with the Environmental Science Services Administration s Space Disturbance Forecast Center and the USAF/AWS, the Solar Particle Alert Network (SPAN)-the foundation of an initial U.S. space weather monitoring and forecasting service. Since Apollo, routine space flight operations have evolved to include the use of space weather and climatology data provided through a world-wide network of operational space weather data services to predict and recommend actions to minimize astronaut radiation exposures. NASA Space Radiation Analysis Group (SRAG) flight controllers use real-time space weather data to detect and assess the impact of solar particle events, outer electron belt enhancements, the formation of pseudo-stable additional trapped radiation belts, and the solar cycle modulation of trapped radiation belts and galactic cosmic rays. Energetic particle data from GOES spacecraft are automatically ingested from NOAA Space Environment Center data servers and used to drive a model for the estimating the exposure to astronauts from solar particle events. While adequate for current manned space flight support, the existing operational space weather support system requires improvements to address the anticipated evolution in both the character of manned missions as well as space flight operations management. Necessary space weather data improvements include: reliably available (near) real-time space weather data on a fixed schedule via redundant access methods that support autonomous data acquisition by computer systems behind enterprise firewalls; and rapid transition of promising research sensors into operational systems.

Golightly, Michael J.↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

BACKGROUND This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. METHODS Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. RESULTS The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. DISCUSSION These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

Background: This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. Methods: Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. Results: The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. Discussion: These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.