Search NASA⌕ Search

SEARCH · Search NASA

Results for “Class VI”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storage (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.

58 GEOSCIENCES↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Financial Responsibility Pricing Foundations White Paper

This report presents and discusses the financial parameters incorporated in the financial instruments used to meet financial responsibility requirements per the U.S. Environmental Protection Agency’s Underground Injection Control Class VI well regulations. These financial instruments are: Trust Fund, Escrow Account, Insurance, Letter of Credit, Surety Bond, and Self-Insurance. They provide financial coverage to complete corrective action, injection well plugging, and post-injection site care and site closure and respond to incidents requiring emergency and remedial response should the operator fail to do so.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NETL CO 2 Injection and Storage Cost Model

The basic framework for this model provides costs for compliance with various sections of EPA's Class VI regulation and Subpart RR of the GHG Reporting Program. Cost analysis at two levels is provided by this model: site specific where the modeler can enter their own reservoir and cost data and regional in the form of cost supply curves. This model includes costs from initial regional geologic evaluation through site characterization, permitting, injection/MVA operations, post-injection site care to final site closure and transfer to long-term stewardship. A geologic and cost database was developed to support this model.

54 ENVIRONMENTAL SCIENCES↗

CarbonSAFE Rocky Mountain Phase I: Ensuring Safe Subsurface Storage of Carbon Dioxide in the Intermountain West

An integrated CCS pre-feasibility study, CarbonSAF E Rocky Mountain Phase I, was conducted by the U niversity of Utah and its partners as part of the US D epartment of Energy’s Carbon Storage Assurance a nd Facility Enterprise (CarbonSAFE) program. The a ssembled project team consisted of academic, indus try and governmental agencies covering the technic al and non- technical challenges of a commercial-sc ale CO 2 storage facility capable of storing 50 million tonnes of anthropogenically-sourced CO 2 . The Rock y Mountain CarbonSAFE team identified the Hunter Power Plant in central Utah as the primary source of CO 2 on which this study would be focused. The nea rby Huntington power plant, also operated by Rocky Mountain Power, was evaluated as a secondary sou rce of CO 2 . The Hunter plant was chosen because o f an interest in CO 2 capture technology by the plant operator, Rocky Mountain Power, and also because i t is a representative example of a typical coal-fired g enerating station in the Rocky Mountain west. Amine -based and cryogenic-based capture assessments w ere performed for approximately 3 million tonnes per year for one of the boiler units at the Hunter plant, yi elding cost of capture estimates of $\$56$/tonne and $\$4 1.50$/tonne. Transportation and intermediate compre ssion would increase the per tonne costs, but will be highly dependent on specific injection locations and available rights-of-way. A high-level technical sub-ba sinal evaluation was performed on the area surround ing the Hunter and Huntington power plants to verify CO 2 storage capacity and integrity. Initial geologic c haracterization efforts focused on sites immediately adjacent to the Hunter plant, including the deep eolia n Permian White Rim Sandstone, which in outcrop a nd core from other locations indicates high permeabi lity and high porosity. However, petrophysical logs fr om wells near Hunter indicate porosity of only 2-4%. As a result, potential injection sites were moved stru cturally down-dip (to the west), into the high permea bility (~200 mD) and high porosity (20%) Navajo san dstone. A comprehensive analysis of the reservoir a nd seals was conducted, providing data to the model , simulation and risk assessment groups on the proje ct. CO 2 capacity estimates for the Navajo Sandston e approximately 18 kilometers from the Hunter plant are well in excess of the 50 million tonnes goal of the project. Area of Review Delineation and Risk Asse ssment on the Navajo, associated seals and shallow groundwater aquifers identified the most significant risks and mitigation options. A non-technical assessment to a commercial-scale CO 2 storage facility in central Utah was conducted. EPA Underground Injection Control Class VI and National Environmental Policy Act permitting present particularly challenging issues related to the development of any saline aquifer for CO 2 storage, including the area around the Hunter plant. While surface and subsurface ownership and ri ghts are not straightforward, especially on any privat e land, many of the stakeholders in central Utah are accustomed and open to oil/gas/mineral-related activities similar to what would be required for CO 2 storage sites.

01 COAL, LIGNITE, AND PEAT↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Integrated Monitoring Volume: A Summary of Monitoring Studies Conducted in Niagaran Carbonate Pinnacle Reefs During Enhanced Oil Recovery with CO 2

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. During the MRCSP Phase III monitoring period, over 1 million metric tons of CO 2 was injected into ten Silurian-age (Niagaran) pinnacle reef reservoirs in Otsego County, Michigan that are operated by Core Energy, LLC. There are over 800 pinnacle reefs in northern Michigan, and collectively, these geologic features have sufficient capacity to store several hundred million metric tons of CO 2 . Moreover, most of the reefs are oil-bearing and went through primary production in the 1970s and 1980s; therefore, by injecting CO 2 into the reefs, there is a real opportunity to realize additional (enhanced) oil recovery (EOR) and to permanently store CO 2 after EOR. A key objective of the MRCSP Phase III project is to evaluate the effectiveness of various technologies for monitoring CO 2 that has been injected into deep geologic formations. Monitoring may be required at CO 2 storage sites for a variety of reasons, including to meet UIC Class II (EOR sites) or Class VI (storage only sites) permit requirements or EPA greenhouse gas reporting rule requirements or to qualify for tax credits under the 45Q tax credit rule. The results of this monitoring study should prove useful to operators considering using carbonate pinnacle reefs of Northern Michigan for CO 2 storage.

01 COAL, LIGNITE, AND PEAT↗

State Charlton & MRCSP 1 Characterization Well Report

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. This report describes the efforts to drill and complete a well in the St. Peter sandstone for characterization and evaluation of storage potential in norther Michigan. However, as presented in this report, the well was not drilled and completed up to the intended target intervals due to drilling related difficulties. While the drilling issues were being resolved, the new Class VI injection well regulations were finalized by the US EPA. MRCSP efforts focused on evaluating CO 2 storage and containment using site characterization, modeling, and monitoring in conjunction with the ongoing CO 2 -EOR operations in the same area. This report describes work associated with the initial test well, the State Chester and MRCSP Well No. 1, drilled to a depth of about 7,968 feet TVD, and subsequently plugged and designated as temporarily abandoned. A high-level overview of data collected and analyzed is provided for shallower units.

01 COAL, LIGNITE, AND PEAT↗

SECARB-USA: Needs Assessment Framework for Storage Complexes

The goal of this task is to develop an assessment to identify data needed to advance geologic storage projects, with a focus on the SECARB region. The GCCC team considers the needs of CO2 source, storage, and utilization operators and stakeholders, finance and insurance institutions, state and local government relators and agencies, property owners, local stakeholders at prospective storage complexes, and environmental non-governmental organizations (NGOs). Many of these needs are spelled out in the requirements of the Class VI permit. However, at the initial stages of project development, the workflow will not start with permit writing. A number of other factors must be evaluated prior to this major investment. The team’s goal in this report is to inventory the range of typical needs for a wide variety of projects. For subsequent tasks, the team will consider how these needs vary among projects and through the stages of investment, so that project developers can plan the early stages of capitalization.

54 ENVIRONMENTAL SCIENCES↗

Carbon Storage Site Mapping Inquiry Tool (MapIT)

The Carbon Storage Site Mapping Inquiry Tool (MapIT) is an online web mapping tool designed to help users discover available public-sourced data to facilitate data exploration in support of Underground Injection Control (UIC) Program Class VI Well Site permitting for the geologic sequestration of carbon dioxide.

Pantaleone, Scott↗

Spatial Seal Database for Prospective Storage Resources in the USA

The goal of the Spatial Seal Database for Prospective Storage Resources in the USA is to provide relevant information and spatial extents of caprock and seal rocks. A lack of aggregated information is readily available that focuses on the caprock and seal units within sedimentary basins. The EPA class VI permit requires an assessment of the confining zone as part of submitting a permit. The data catalog of seal unit names and relevant properties with the seal spatial extent database aims to help provided important data for carbon storage based assessments. The data catalog and database are designed to show what seal data is available in a sedimentary basin and guide stakeholders to the original data source for those datasets.

Pantaleone, Scott↗

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗

Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi: Project ECO 2 S (Phase III) (Final Progress Report)

“Establishing an Early CO 2 Storage Complex in Kemper County, Mississippi (Project ECO 2 S)” is an early mover project within the U.S. Department of Energy (DOE) and National Energy Technology Laboratory’s Carbon Storage Assurance Facility Enterprise, or CarbonSAFE, initiative. Phase III of Project ECO2S advanced the foundational work of Phase II, which confirmed the potential for safely, permanently, and economically storing commercial volumes of carbon dioxide (CO 2 ) in the regionally significant saline reservoir system near Mississippi Power Company’s (MPC) Kemper County Energy Facility. The primary objective of Phase III was to complete detailed site characterization necessary to obtain an Underground Injection Control (UIC) Class VI Permit to Construct from the U.S. Environmental Protection Agency. This involved transitioning from regional geologic assessments to high-resolution site-specific analyses.

03 NATURAL GAS↗

PCOR partnership initiative to accelerate CCCUS deployment

The Plains CO 2 Reduction (PCOR) Partnership Initiative, led by the Energy & Environmental Research Center (EERC), was a 5-year collaborative effort under the U.S. Department of Energy’s Regional Initiative to Accelerate CCUS (carbon capture, utilization, and storage). With support from the University of Wyoming School of Energy Resources (UW SER), the University of Alaska Fairbanks Institute of Northern Engineering (UAF INE), and a broad network of public and private stakeholders, the program focused on overcoming regional challenges to CCUS across ten U.S. states and four Canadian provinces. This report summarizes the notable findings of the EERC and its collaborators through the 5-year PCOR Partnership Initiative phase. The EERC developed and demonstrated a risk-based area of review (AOR) workflow for U.S. Environmental Protection Agency Class VI carbon dioxide (CO 2 ) storage permitting.

01 COAL, LIGNITE, AND PEAT↗

CarbonSAFE Phase II: Optimizing Alabama’s CO 2 Storage in Shelby County, Alabama (Project OASIS), Milestone M3 - Site Specific Drilling Report

The Phase II Storage Complex Feasibility project, entitled "Optimizing Alabama's CO 2 Storage in Shelby County, Alabama (Project OASIS)," is a part of the DOE/NETL's CarbonSAFE initiative. The Project is managed by the Southern States Energy Board (SSEB), and includes participation from Advanced Resources International, Inc. (ARI), Crescent Resource Innovation, Southern Company, Alabama A&M University, Auburn University, and Oklahoma State University. Project OASIS is working to establish the foundation for a commercial-scale geologic storage complex for CO 2 captured from Plant Gaston (home of the National Carbon Capture Center) and surrounding industrial sources of CO 2 located in Shelby County, Alabama. The Project objectives are: • Demonstrate that the subsurface saline formations at the storage complex can store commercial volumes of CO 2 safely and permanently. • Develop a comprehensive Community Benefits Plan. • Develop the infrastructure framework for a CO 2 storage hub. • Develop a rigorous risk registry and to conduct a comprehensive risk assessment. • Develop a monitoring plan. • Develop a comprehensive site characterization plan to support an Underground Injection Control Class VI Permit in a future Phase III program. • Evaluate the commercial viability of the project. Project OASIS is about 30 miles southeast of Birmingham, Alabama within a geologic province called the Valley and Ridge (Figure 1.1). The Valley and Ridge Province comprises a sequence of Paleozoic carbonate and clastic rocks that underwent structural deformation during the Alleghanian Orogeny. Storage prospects occur in relatively flat lying structural panels located between thrust faults. Available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage. This includes geological and geophysical evaluations, reservoir engineering analyses, and risk assessments.

20 FOSSIL-FUELED POWER PLANTS↗

Design of an AIM Network for Monitoring Carbon Storage Projects

Conference poster presented at Carbon Capture, Utilization, and Storage (CCUS) Conference 2024, Houston, Texas, March 11–13, 2024. The Energy & Environmental Research Center (EERC) is researching novel carbon storage-monitoring techniques at an approved North Dakota geologic carbon storage site. One of the research objectives is to design an autonomous, integrated, and modular (AIM) monitoring network that is compliant with monitoring requirements across multiple carbon capture and storage (CCS) policy frameworks, such as the U.S. Environmental Protection Agency’s (EPA) underground injection control (UIC) Class VI permitting program.

02 PETROLEUM↗