Search NASA⌕ Search

SEARCH · Search NASA

Results for “Communication Network Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Optimizing End-to-End Big Data Transfers over Terabits Network Infrastructure

While future terabit networks hold the promise of significantly improving big-data motion among geographically distributed data centers, significant challenges must be overcome even on today's 100 gigabit networks to realize end-to-end performance. Multiple bottlenecks exist along the end-to-end path from source to sink, for instance, the data storage infrastructure at both the source and sink and its interplay with the wide-area network are increasingly the bottleneck to achieving high performance. In this study, we identify the issues that lead to congestion on the path of an end-to-end data transfer in the terabit network environment, and we present a new bulk data movement framework for terabit networks, called LADS. LADS exploits the underlying storage layout at each endpoint to maximize throughput without negatively impacting the performance of shared storage resources for other users. LADS also uses the Common Communication Interface (CCI) in lieu of the sockets interface to benefit from hardware-level zero-copy, and operating system bypass capabilities when available. It can further improve data transfer performance under congestion on the end systems using buffering at the source using flash storage. With our evaluations, we show that LADS can avoid congested storage elements within the shared storage resource, improving input/output bandwidth, and data transfer rates across the high speed networks. We also investigate the performance degradation problems of LADS due to I/O contention on the parallel file system (PFS), when multiple LADS tools share the PFS. We design and evaluate a meta-scheduler to coordinate multiple I/O streams while sharing the PFS, to minimize the I/O contention on the PFS. Finally, with our evaluations, we observe that LADS with meta-scheduling can further improve the performance by up to 14 percent relative to LADS without meta-scheduling.

97 MATHEMATICS AND COMPUTING↗

Fast DR: Controlling Small Loads over the Internet

Current state-of-the-art demand response systems are expensive due to extreme reliability constraints in telemetry, control, and metering. The typical cost of enabling a site for regulation services is between $50k and $80k. These costs are orders of magnitude too high for small loads to participate in high-value grid services. Traditional demand response (DR) schedules events in advance and provides basic on/off control. We developed fast DR measurement and communication technologies, which are scalable cost-effective demand response systems with sufficient reliability for real-time control and monitoring of loads over the internet, and we demonstrated an example system for under $100. We installed FastDR systems for lighting, motor, and thermostat control along with power metering at a total of 10 sites, including 6 commercial buildings and 4 residential buildings. This demonstration addressed the following important methodological questions: 1) Can we reliably control loads simultaneously and with low latency across multiple sites within a specified response time; 2) How reliable is using the internet or 4G cellular network as the mode of control and metering; and 3) Can existing Smart Meters provide data for real-time telemetry services. Testing shows fast DR is capable of control to response in 4 seconds and loads complete transition in seconds to less than one minute depending on load type. We demonstrated 4s regulation services and synchronized load control, and we successfully met specifications for ancillary services across the US. Telemetry via the 4G cellular network demonstrated 94.5% success rate, and residential Internet demonstrated a 98% success rate.

Kiliccote, Sila↗

Privacy-Preserving Control of Partitioned Energy Resources

Distributed energy resources are an increasingly important part of the electric grid. We examine the problem of partitioning a distributed energy resource among many users while providing privacy to them. In this model, clients can send requests to a server, the server can verify that the requests are valid and aggregate them, but it cannot see the actual values in the requests. Without privacy, each user is forced to reveal their daily schedule or energy use. Energy resources add a novel challenge that prior systems do not address: they require verifying limits on private power (a rate over time) and energy (a sum) values. Furthermore, the cryptographic mechanisms must run on embedded energy control systems. We describe Weft, a novel cryptographic system that verifies both power (rate) and energy (integral) constraints on private client values and aggregates them. The key insight behind the approach is to rely on additively homomorphic secret shares, which allows servers to compute sums from rates. We present 3 cryptographic proof systems with different system trade-off for embedded systems: bit-splitting proofs minimize memory use, sorting proofs minimize computation, and commitment proofs minimize network communication. Using bit-splitting proofs, it takes an IoT client using a CortexM microcontroller 4 minutes of compute time to privately control its share of an energy resource for a day at 20s granularity.

Laufer, Evan↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

Stackelberg Game Based on Supervised Charging Method and Pricing Strategy of Charging Service Providers

The charging of large-scale electric vehicles (EVs) brings about a large new load to the electricity network, while it is also a demand response resource. Smart charging equipment and patterns of charging service will be one of the research focuses at the next stage. Smart charging equipment schedules EV's charging on the basis of electricity price, and this method enables users to hold the right of controlling their own EV's charging procedure. Thus, there exists a Stackelberg game between charging service providers, who set the price, and independent EVs. The marginal charging price, which reflects properties of individual EV, and the pricing strategy of charging service providers can be derived through solving this game problem. A price based charging strategy is proposed, which is suitable for the dynamic electricity price mechanism because of its light communication burden. In a simulation of a charging service provider covering 200 smart devices, this real-time supervised charging strategy shows its advantages of curbing users' payment and guiding the charging load effectively.

33 ADVANCED PROPULSION SYSTEMS↗

LADS: Optimizing Data Transfers using Layout-Aware Data Scheduling

While future terabit networks hold the promise of signifi- cantly improving big-data motion among geographically distributed data centers, significant challenges must be overcome even on today s 100 gigabit networks to real- ize end-to-end performance. Multiple bottlenecks exist along the end-to-end path from source to sink. Data stor- age infrastructure at both the source and sink and its in- terplay with the wide-area network are increasingly the bottleneck to achieving high performance. In this paper, we identify the issues that lead to congestion on the path of an end-to-end data transfer in the terabit network en- vironment, and we present a new bulk data movement framework called LADS for terabit networks. LADS ex- ploits the underlying storage layout at each endpoint to maximize throughput without negatively impacting the performance of shared storage resources for other users. LADS also uses the Common Communication Interface (CCI) in lieu of the sockets interface to use zero-copy, OS-bypass hardware when available. It can further im- prove data transfer performance under congestion on the end systems using buffering at the source using flash storage. With our evaluations, we show that LADS can avoid congested storage elements within the shared stor- age resource, improving I/O bandwidth, and data transfer rates across the high speed networks.

Data Management↗

QoS-aware edge AI placement and scheduling with multiple implementations in FaaS-based edge computing

Resource constraints on the computing continuum require that we make smart decisions for serving AI-based services at the network edge. AI-based services typically have multiple implementations (e.g., image classification implementations include SqueezeNet, DenseNet, and others) with varying trade-offs (e.g., latency and accuracy). The question then is how should AI-based services be placed across Function-as-a-Service (FaaS) based edge computing systems in order to maximize total Quality-of-Service (QoS). To address this question, we propose a problem that jointly aims to solve (i) edge AI service placement and (ii) request scheduling. These are done across two time-scales (one for placement and one for scheduling). Here we first cast the problem as an integer linear program. We then decompose the problem into separate placement and scheduling subproblems and prove that both are NP-hard. We then propose a novel placement algorithm that places services while considering device-to-device communication across edge clouds to offload requests to one another. Our results show that the proposed placement algorithm is able to outperform a state-of-the-art placement algorithm for AI-based services, and other baseline heuristics, with regard to maximizing total QoS. Additionally, we present a federated learning-based framework, FLIES, to predict the future incoming service requests and their QoS requirements. Our results also show that our FLIES algorithm is able to outperform a standard decentralized learning baseline for predicting incoming requests and show comparable predictive performance when compared to centralized training.

97 MATHEMATICS AND COMPUTING↗

Predictive Model for Starlink Maritime Performance Using Multi-Horizon RandomForest

Low Earth orbit (LEO) satellite systems have become a crucial enabler of broadband access for maritime industries, where traditional networks are unavailable. However, the high mobility of LEO constellations and constantly changing weather conditions result in unpredictable link fluctuations, limiting the ability of maritime platforms to plan bandwidth usage proactively. To the best of our knowledge, no prior work has developed a short-term predictive model for maritime LEO connectivity using real experimental field measurements. This paper proposes a data-driven forecasting model that predicts future downlink throughput using multi-horizon RandomForest regression. The model is trained using real experimental coastal measurement data incorporating recent throughput history, network-layer indicators, and environmental variables. The proposed approach reduces mean absolute error by approximately 31% compared to a persistence baseline for 15-minute horizons. It maintains a measurable improvement at 30 minutes, despite increased stochasticity. These findings confirm that proactive bandwidth awareness is feasible on maritime platforms and can effectively support operational decisions such as adaptive streaming, routing, and resource scheduling. The performance gap between forecasting horizons also highlights the need for expanded offshore datasets to improve prediction robustness under harsher maritime environments.

97 MATHEMATICS AND COMPUTING↗

Decentralized Failure-Tolerant Optimization of Electric Vehicle Charging

We present a decentralized failure-tolerant algorithm for optimizing electric vehicle (EV) charging, using charging stations as computing agents. The algorithm is based on the alternating direction method of multipliers (ADMM) and it has the following features: (i) It handles capacity, peak demand, and ancillary services coupling constraints. (ii) It does not require a central agent collecting information and performing coordination (e.g. an aggregator), instead all agents exchange information and computations are carried out in a fully decentralized fashion. (iii) It can withstand the failure of any number of computing agents, as long as the remaining computing agents are in a connected communications network. We construct this algorithm by reformulating the optimal EV charging problem in a decomposable form, amenable to ADMM, and then developing efficient decentralized solution methods for the subproblems dealing with coupling constraints. We conduct numerical experiments on industry-scale synthetic EV charging datasets, with up to 1,152 charging stations, using a high performance computing cluster. The experiments demonstrate that the proposed algorithm can solve the optimal EV charging problem fast enough to permit the integration of EV charging with real-time electricity markets, even in the presence of failures.

42 ENGINEERING↗

Energy-Efficient and Comfortable Buildings through Multivariate Integrated Control (ECoMIC)

This project aims to develop an integrated control solution for enhanced energy efficiency and user comfort in commercial buildings. The developed technology is a zone-based control framework that minimizes energy usage while maintaining occupants’ visual and thermal comfort through control of electric lights, motorized venetian blinds and thermostats. The control framework is designed following a modular, scalable and flexible architecture to facilitate easy integration with exiting building management systems. The control framework contains two key algorithms: 1) the lighting load balancing algorithm and 2) the thermostat control algorithm. The lighting load balancing algorithm adopts a model-based closed-loop control approach to determine the optimal electric light and venetian blind settings. It is formulated into an optimization problem with minimizing lighting-related energy consumptions as the objective and delivering adequate task light and preventing daylight glare as the constraints. The thermostat control algorithm is based on a well-established thermal comfort model and formulated as a root-finding problem to dynamically determine the optimal thermostat setpoint for both energy savings and improved thermal comfort. To address building-wide scalability, a system architecture was developed for the zone-based control technology. Three levels of services are defined in the architecture: external services, facility level services and zone level services. The zone-level service includes the control algorithms described above as well as the corresponding interfaces, profiles, sensors and actuators to realize the zone controller. The facility level services connect to the zones through a backbone network, handle supervisory level information and controls, and thus facilitate building-wide scalability. The external services provide communication capability to entities outside of the building for grid interaction and remote access. Various aspects of the developed control technology were evaluated and verified through both simulations and testbed implementations. Simulations coupling a DOE medium office reference building in EnergyPlus building simulation software and a prototype controller in Matlab were performed. During summer time in a mixed-humid climate zone, the simulations revealed reductions of 27% and 42% in electric lighting load and cooling load, respectively, when compared to an advanced base case with daylight dimming and blinds automatically tilted to block direct sun. Two single-room testbeds were established. The testbed at Philips Lighting business building (Rosemont, IL) was designed for quantifying energy performance of integrated controls. This particular implementation achieved 40% and 79% savings on lighting and HVAC energy, respectively, compared to a relatively simple base case operated on predefined schedules. While the resulting energy savings was very encouraging, it should be noted that there may be several caveats associated with it. 1) The test was run during late spring and early summer, and the savings numbers might not be directly used to extrapolate the annual energy savings. 2) Due to the needs for separate control and metering of the small-scale demonstrator within a large building, the HVAC system, hence the corresponding savings, did not represent a typical energy code-compliant design. 3) The light level in the control case was regulated at a particular setpoint, which was lower than then the full-on light level in the base case, and the savings resulted from tuning down the light level to the setpoint was not attributable to the contribution of the developed technology. The testbed at the Lawrence Berkeley National Laboratory (Berkeley, CA) specifically focused on glare control integration, and has demonstrated the feasibility and capability of the glare detection and prevention technique. While the short one-month test in this testbed provided a functional indication of the developed technology, and it would require at least a full solstice-to-solstice cycle to ruinously quantify the performance, which was not possible within the project timeframe. There are certain limitations inherited from the operational assumptions, which could potentially affect the effectiveness and applicability of the developed control technologies. The system takes a typical ceiling-mounting approach for the photosensor locations, and therefore, the control performance relies on proper commissioning or the built-in intelligence of the photosensor for pertinent task light level estimations. For spaces where daylight penetration diminishes significantly deeper into the zone, certain modification to the control algorithms is required to accommodate multiple lighting control subzones and the corresponding sensors for providing a more uniform light level across the entire zone. Integrated control of visual and thermal comfort requires the lighting control zone and thermal control zone to coincide with each other. In other words, the area illuminated by a lighting circuit needs to be the same area served by the thermostat. Thus, the original zoning will potentially constrain the applicability of this technology in retrofitting projects. This project demonstrated the technical feasibility of a zone-based integrated control technology. From the simulation results and testbed implementations, up to 60% lighting energy savings in daylit areas relative to a “no-controls” case can easily be achieved. A 20% reduction of whole building energy consumption is also attainable. In the aspect of occupant comfort, the testbed demonstrated the ability to maintain specified light level on the workplane while promptly mitigate daylight glare 90% of the time. The control system also managed to maintain the thermal environment at a comfortable level 90% of the time. The aspect of system scalability was guaranteed by the system architecture design, based on which the testbeds were instantiated. Analysis on the aspect of economic benefit has yielded an about 6-year payback time for a medium-sized building, including the installation of all hardware and software, such as motorized blinds and LED luminaires. The payback time can be significantly reduced if part of the hardware is already in place for retrofitting projects. It needs to be noted that since the payback analysis was partly based on the testbed performance results, it is constrained by the caveats associated with the testbed implementations. The main uncertainty lies in the contribution from the space conditioning energy savings as it was non-trivial to realistically configure a room-size HVAC system for directly extrapolating whole-building HVAC energy savings. It is recommended to further evaluate the developed technology at a larger scale, where the lighting and HVAC energy consumption can be realistically measured at the building level, to more rigorously quantify the performance potentials.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Business Case for Advanced Outage Management

The Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops and validates technologies that will make the U.S. operating nuclear fleet more efficient and competitive. The program has developed a standard methodology for determining the impact of new technologies in order to assist nuclear power plant (NPP) operators in building sound business cases. This paper presents a generic business case for implementation of technology that supports Advanced Outage Management (AOM). The analysis presented demonstrates that advanced communication and networking and analytical technologies will allow NPP to conduct outages with fewer people in management roles and the remaining people can be more effective and more productive. The benefits are quantified with a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. Advanced Outage Management is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Mobile Work Packages (MWP) • Computer Based Procedures (CBP) • Personal Digital Assistants (PDA) also referred to as smart devices • Barcode readers • High bandwidth wireless networks • Collaboration software (i.e., OneNote) • Advanced digital displays • Advanced data analytics All the hardware necessary to implement AOM as envisioned in this report is readily available today. Configuration to perform within the plant systems and regulatory boundaries would need to be developed by the NPP. 1. The resulting business case demonstrates benefits in two major categories: 2. Reduction in resources required to manage the outage, a. Increased productivity in outage work that reduces the likelihood of schedule overruns: b. reduce likelihood of bulk work resulting in outage delays c. improved management of critical path single issues, d. improved management of emergent work (improve time to collect data and prepare response) It is important to note that in order to realize these benefits at the scale described in this report requires the plant to rethink how technologies can disrupt current processes; how data might be captured, processed, analyzed and presented with little or no human intervention. In many cases, technology be fully utilized in a way that not only aides productivity, but is utilized towards “work destruction” – elimination of work that is currently performed through a human interface.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of A Hardware-In-the-Loop (HIL) Testbed for Cyber-Physical Security in Smart Buildings

As smart buildings move towards open communication technologies, providing access to the Building Automation System (BAS) through the building's intranet, or even remotely through the Internet, has become a common practice. However, BAS was historically developed as a closed environment and designed with limited cyber-security considerations. Thus, smart buildings are vulnerable to cyber-attacks with the increased accessibility. This study introduces the development and capability of a Hardware-in-the-Loop (HIT) testbed for testing and evaluating the cyber-physical security of typical BASs in smart buildings. The testbed consists of three subsystems: (1) a real-time HIL emulator simulating the behavior of a virtual building as well as the Heating, Ventilation, and Air Conditioning (HVAC) equipment via a dynamic simulation in Modelica; (2) a set of real HVAC controllers monitoring the virtual building operation and providing local control signals to control HVAC equipment in the HIL emulator; and (3) a BAS server along with a web-based service for users to fully access the schedule, setpoints, trends, alarms, and other control functions of the HVAC controllers remotely through the BACnet network. The server generates rule-based setpoints to local HVAC controllers. Based on these three subsystems, the HIL testbed supports attack/fault-free and attack/fault-injection experiments at various levels of the building system. The resulting test data can be used to inform the building community and support the cyber-physical security technology transfer to the building industry.

Li, Guowen↗

DFSynthesizer: Dataflow-based Synthesis of Spiking Neural Networks to Neuromorphic Hardware

Spiking Neural Networks (SNNs) are an emerging computation model that uses event-driven activation and bio-inspired learning algorithms. SNN-based machine learning programs are typically executed on tile-based neuromorphic hardware platforms, where each tile consists of a computation unit called a crossbar, which maps neurons and synapses of the program. However, synthesizing such programs on an off-the-shelf neuromorphic hardware is challenging. This is because of the inherent resource and latency limitations of the hardware, which impact both model performance, e.g., accuracy, and hardware performance, e.g., throughput. We propose DFSynthesizer, an end-to-end framework for synthesizing SNN-based machine learning programs to neuromorphic hardware. The proposed framework works in four steps. First, it analyzes a machine learning program and generates SNN workload using representative data. Second, it partitions the SNN workload and generates clusters that fit on crossbars of the target neuromorphic hardware. Third, it exploits the rich semantics of the Synchronous Dataflow Graph (SDFG) to represent a clustered SNN program, allowing for performance analysis in terms of key hardware constraints such as number of crossbars, dimension of each crossbar, buffer space on tiles, and tile communication bandwidth. Finally, it uses a novel scheduling algorithm to execute clusters on crossbars of the hardware, guaranteeing hardware performance. We evaluate DFSynthesizer with 10 commonly used machine learning programs. Our results demonstrate that DFSynthesizer provides a much tighter performance guarantee compared to current mapping approaches.

Computer Science↗

Extreme-Scale Algorithms & Software Resilience (EASIR) Architecture-Aware Algorithms for Scalable Performance and Resilience on Heterogeneous Architectures

This project addresses both communication-avoiding algorithms, and reproducible floating-point computation. Communication, i.e. moving data, either between levels of memory or processors over a network, is much more expensive per operation than arithmetic (measured in time or energy), so we seek algorithms that greatly reduce communication. We developed many new algorithms for both dense and sparse, and both direct and iterative linear algebra, attaining new communication lower bounds, and getting large speedups in many cases. We also extended this work in several ways: (1) We minimize writes separately from reads, since writes may be much more expensive than reads on emerging memory technologies, like Flash, sometimes doing asymptotically fewer writes than reads. (2) We extend the lower bounds and optimal algorithms to arbitrary algorithms that may be expressed as perfectly nested loops accessing arrays, where the array subscripts may be arbitrary affine functions of the loop indices (eg A(i), B(i,j+k, k+3*m-7, …) etc.). (3) We extend our communication-avoiding approach to some machine learning algorithms, such as support vector machines. This work has won a number of awards. We also address reproducible floating-point computation. We define reproducibility to mean getting bitwise identical results from multiple runs of the same program, perhaps with different hardware resources or other changes that should ideally not change the answer. Many users depend on reproducibility for debugging or correctness. However, dynamic scheduling of parallel computing resources, combined with nonassociativity of floating point addition, makes attaining reproducibility a challenge even for simple operations like summing a vector of numbers, or more complicated operations like the Basic Linear Algebra Subprograms (BLAS). We describe an algorithm that computes a reproducible sum of floating point numbers, independent of the order of summation. The algorithm depends only on a subset of the IEEE Floating Point Standard 754-2008, uses just 6 words to represent a “reproducible accumulator,” and requires just one read-only pass over the data, or one reduction in parallel. New instructions based on this work are being considered for inclusion in the future IEEE 754-2018 floating-point standard, and new reproducible BLAS are being considered for the next version of the BLAS standard.

97 MATHEMATICS AND COMPUTING↗

Emulation and detection of physical faults and cyber-attacks on building energy systems through real-time hardware-in-the-loop experiments

The increasing use of remote or mobile access, integrated wearable technologies, data exchange, and cloud-based data analytics in modern smart buildings is steering the building industry towards open communication technologies. The increased connectivity and accessibility could lead to more cyber-attacks in smart buildings. On the other hand, physical faults (e.g., HVAC -heating, ventilation, and air-conditioning faults) may have similar adverse impacts as those from the cyber-attacks on building energy systems, such as occupant discomfort, energy wastage, and equipment downtime. However, current physical behavior-based anomaly detection methods fail to differentiate between cyber-attacks and physical faults in building energy systems. Moreover, the challenge in collecting real-world threat data with ground truth has led researchers to rely on numerical models with user-defined assumptions, which may not accurately reflect real-world conditions due to the lack of in-situ experimental datasets. To address these challenges and gaps, this paper presents a flexible hardware-in-the-loop (HIL) testbed for generating cyber-attack and physical fault datasets and demonstrating threat detection algorithms in a real building automation system (BAS) environment. This testbed combines hardware (i.e., real BAS with local HVAC controllers and a physical network) with software (i.e., high-fidelity models to represent behaviors of building envelope and HVAC energy systems), enabling emulations of realistic threats. Five HIL experiments, including one baseline without any threats, two with physical faults, and two with cyber-attacks, were conducted to generate datasets containing detailed network traffic and system states. A joint classification framework, incorporating a network analyzer and a physical HVAC fault detector, was proposed to automatically detect cyber-physical abnormalities on BAS at both the network and the physical HVAC levels. The network analyzer comprises a conditional random fields (CRF) based command validator and a statistics-based detection strategy. The fault detector employs a weather and schedule-based pattern matching and feature-based principal component analysis (WPM-FPCA) method. Evaluation of the classification using four metrics from the multi-class confusion matrix revealed an average accuracy of 90.2%, recall of 89.7%, precision of 88.5% and F1-score of 89.2%. Finally, these results demonstrate that the proposed joint classification framework can effectively differentiate between specific types of cyber-attacks (e.g., device reinitialization attack, network Denial-of-Service attack) and physical faults (e.g., air handling unit operational fault, cooling coil valve stuck) in real time for improved building energy management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SBIR Phase II Final Report - Multi-Protocol Energy Management Gateway for Home-Area Networks

Significant amounts of electricity, natural gas, and heating oil are wasted by homeowners due to inefficient operation and inadequate maintenance of heating, ventilation, and air conditioning (HVAC) equipment. Coincident’s work under this award reduces energy waste, saves consumers money, and reduces carbon emissions. It does so in three ways: First, Coincident’s approach replaces the traditional thermostat with a wireless network of sensors and controllers that measure temperature, humidity and occupancy in multiple rooms in the house. The “Internet of Things” is a technology trend holding the promise of ubiquitous inexpensive sensors. The reality, however, is that energy and HVAC monitoring and management is a patchwork of incompatible protocols and expensive proprietary technologies. Coincident’s multi-protocol architecture, developed in part under this award tackles this problem and brings low cost interoperable sensor and control devices to market. Second, the Coincident system eliminates hard-to-program and rigid thermostat schedules and instead provides automatic operation of heating and cooling by combining individual temperature and comfort preferences with energy-saving targets, real-time utility use information, weather data, and room utilization patterns. Energy efficiency technology must be appealing to consumers otherwise it will not be used. The Coincident user interface has engaging features such as remote control from any smart phone or web browser and per-room performance breakdowns. Expected energy savings resulting from more efficient operation of heating and air conditioning equipment are in the range of 10-20%. Third, the Coincident system provides heating and air-conditioning contractors with fine-grained performance data for every residence they support (subject to customer privacy controls). This data is integrated from diverse networks within the residence and includes HVAC performance and fuel use data. This information allows the partner to validate energy savings and identify potential system faults (whether from installation problems or maintenance issues). When combined with professional installation as part of high-efficiency HVAC upgrade, energy savings levels of 20-30% can be achieved. Economic feasibility of energy efficiency technology is one of the key challenges addressed in this award. The Coincident system is engineered to be delivered at a disruptive price point, making the system financially feasible for new and retrofit homes of all types and sizes. The Coincident system is intended to be sold through the HVAC professional—the industry most capable of improving HVAC efficiency. Providing HVAC contractors with detailed home performance data motivates them to sell the product, provides them with maintenance and upgrade revenue opportunities, and therefore delivers customer savings and environmental benefits. Having demonstrated technical and financial feasibility, Coincident has won additional grants and awards, participated in pilot projects, started partnership discussions with several HVAC equipment vendors, and has lined up several large channel partners ready to participate in large pilot rollouts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗