Search NASA⌕ Search

SEARCH · Search NASA

Results for “Control Room Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Integrated emergency control board including design extended conditions for Krsko NPP - 297

In the aim of implementing post-Fukushima safety measures, Krsko Nuclear Power Plant is developing a Safety Upgrade Program. Krsko NPP is upgrading the remote shutdown capabilities and implementing ways to prevent and mitigate the consequences of potential Severe Accidents. This modification enhances remote shutdown capabilities of the plant to prevent potential severe accidents and improve the ways to mitigate their consequences. Within the set of plant design modifications, addressed the design, construction, and commissioning, of a new Emergency Control Room (EMCB. Tecnatom is the responsible of the design modification of the plant together with Idom, that participates with Tecnatom in the project as a joint venture, who provides a new set of field instrumentation, including its design and the corresponding wiring. EMCB integrates Human- System Interface throughout centralizing capabilities to safety shutdown and cooldown the plant as well as to control the new Design Extension Systems. The process relies on a Human Factors Engineering (HFE) analysis applying a specific methodology based on NUREG-0711 . Tecnatom has developed a specific HFE Program Management Plan to proceed with the analysis in a documented, traceable and reliable way. HFE activities ends with an Integrated System Validation in the actual full scope simulator involving MCR crews. This paper describes different phases of the project, the integrated schedule between HFE and I and C activities, benefits of upgrading main and emergency control rooms beyond design bases and addresses Tecnatom lessons learned obtained during the project execution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Migration to a fully-integrated control room - 349

The nuclear industry is faced with a pressing need to reduce operating costs in order to remain competitive with other forms of electric generation. While current industry initiatives are focused on incremental gains by streamlining work processes and reducing worker burdens, very few, if any, involve significant reductions in the base workload of a nuclear plant. Migration to a fully-integrated control room affords just such an opportunity. This report describes an NPP digital instrumentation and control (I and C) system design, along with its corresponding human systems interface (HSI) design, which achieves high plant availability, while selectively applying digital equipment redundancy and integrating traditional I and C system partitions, to minimize the digital equipment needed, and thereby minimize initial installation costs and ongoing operations and maintenance (O and M) costs. An additional key component of digital equipment minimization is optimization of the digital interface to conventional plant sensors and controlled plant devices (e.g., pumps, valves), which requires no disturbance to plant cables and results in eliminating thousands of electro-mechanical relay control components. The design is rooted in the highly integrated digital technology applied to the most recent advanced light water reactors under United States (U.S.) Nuclear Regulatory Commission (NRC) design certification review and approval. While this design employs technology from new plants, that technology has been adapted to the modernization of current operating NPPs. Hence, the highly integrated digital I and C and HSI design is referred to as the compact control room digital modernization (CDM). Along with minimal digital equipment, the corresponding HSI design employs compact operator workstations with visual display units (VDU) and soft controls for both the main control room (MCR) and remote shutdown room (RSR), to immediately improve human performance and ultimately facilitate operating staff reduction. Some advanced light water reactors have demonstrated this staff reduction through full scope simulator testing of normal and abnormal plant conditions, with U.S. licensed operating crews from currently-operating U.S. plants. Digital equipment minimization, compact operator workstations, and optimized plant component interfaces that require no disturbance to field cables, also facilitate implementation of the CDM over multiple phases, most of which can be conducted during normal refueling shutdown windows. This phased implementation method includes a novel transition of the I and C, MCR and RSR with an operations centered focus. This paper presents the CDM design, along with qualitative cost/benefit comparisons to currently operating plants with conventional analog I and C and HSI technology; this generation of I and C/HSI is referred to as a conventional control room (CCR). A CCR also includes NPPs that have been upgraded with digital systems, but retain the current partitions between plant I and C systems (i.e., no I and C integration) and retain the current plant system to control board configuration of current NPP control rooms. Even though these comparisons are qualitative, a compelling case is presented for the CDM. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human Factors Principles in Information Dashboard Design

When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state concepts for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.

3D Modeling↗

Advanced Control and Protection system Design Methods for Modular HTGRs

The project supported the Nuclear Regulatory Commission (NRC) in identifying and evaluating the regulatory implications concerning the control and protection systems proposed for use in the Department of Energy's (DOE) Next-Generation Nuclear Plant (NGNP). The NGNP, using modular high-temperature gas-cooled reactor (HTGR) technology, is to provide commercial industries with electricity and high-temperature process heat for industrial processes such as hydrogen production. Process heat temperatures range from 700 to 950 C, and for the upper range of these operation temperatures, the modular HTGR is sometimes referred to as the Very High Temperature Reactor or VHTR. Initial NGNP designs are for operation in the lower temperature range. The defining safety characteristic of the modular HTGR is that its primary defense against serious accidents is to be achieved through its inherent properties of the fuel and core. Because of its strong negative temperature coefficient of reactivity and the capability of the fuel to withstand high temperatures, fast-acting active safety systems or prompt operator actions should not be required to prevent significant fuel failure and fission product release. The plant is designed such that its inherent features should provide adequate protection despite operational errors or equipment failure. Figure 1 shows an example modular HTGR layout (prismatic core version), where its inlet coolant enters the reactor vessel at the bottom, traversing up the sides to the top plenum, down-flow through an annular core, and exiting from the lower plenum (hot duct). This research provided NRC staff with (a) insights and knowledge about the control and protection systems for the NGNP and VHTR, (b) information on the technologies/approaches under consideration for use in the reactor and process heat applications, (c) guidelines for the design of highly integrated control rooms, (d) consideration for modeling of control and protection system designs for VHTR, and (e) input for developing the bases for possible new regulatory guidance to assist in the review of an NGNP license application. This NRC project also evaluated reactor and process heat application plant simulation models employed in the protection and control system designs for various plant operational modes and accidents, including providing information about the models themselves, and the appropriateness of the application of the models for control and protection system studies. A companion project for the NRC focused on the potential for new instrumentation that would be unique to modular HTGRs, as compared to light-water reactors (LWRs), due to both the higher temperature ranges and the inherent safety features.

08 HYDROGEN↗

EARLY-STAGE DESIGN AND EVALUATION FOR NUCLEAR POWER PLANT CONTROL ROOM UPGRADES

As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate operator performance with these systems as part of a verification and validation process. While there is regulatory and industry guidance for some modernization activities, there are no well defined standard processes or predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages. This paper proposes a framework defining the design process and metrics for evaluating human system interfaces as part of control room modernization. The process and metrics are generalizable to other applications and serve as a guiding template for utilities undertaking their own control room modernization activities.

99 GENERAL AND MISCELLANEOUS↗

Human factors issues and approaches in the spatial layout of a space station control room, including the use of virtual reality as a design analysis tool

Human Factors Engineering support was provided for the 30% design review of the late Space Station Freedom Payload Control Area (PCA). The PCA was to be the payload operations control room, analogous to the Spacelab Payload Operations Control Center (POCC). This effort began with a systematic collection and refinement of the relevant requirements driving the spatial layout of the consoles and PCA. This information was used as input for specialized human factors analytical tools and techniques in the design and design analysis activities. Design concepts and configuration options were developed and reviewed using sketches, 2-D Computer-Aided Design (CAD) drawings, and immersive Virtual Reality (VR) mockups.

Hale, Joseph P., II↗

Nuclear Safety [Vol. 33, No. 4, October-December 1992]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 499 Technical Note: Nuclear Regulatory Commission’s Examination Question Bank System, C. L Jensen and N. L. Skinner; 506 Report on the Specialists’ Meeting on Passive and Active Safety Features of Liquid-Metal Fast Breeder Reactors Organized by the International Atomic Energy Agency at Oarai Engineering Centre of Power Reactor and Nuclear Development Corporation, Japan, November 5-7,1991, S. R. Paranjpe; ACCIDENT ANALYSIS: 514 A Review of Hydrogen Production During Melt/Water Interaction in LWRs, D. F. Fletcher, B. D. Turland, and S. P. A. Lawrence; 535 A Review of the U 3 0 8 -Al Reaction as a Potential Heat Source in Research and Test Reactor Accidents, J. L. Snelgrove; CONTROL AND INSTRUMENTATION: 543 Multilevel Interfaces for Power Plant Control Rooms II: A Preliminary Design Space, K. J. Vicente; DESIGN FEATURES: 549 Twenty-Second DOE/NRC Nuclear Air Cleaning and Treatment Conference, R. R. Bellamy, D. W. Moeller, and M. W. First; 562 Book Review: Safety Assessment of Unit 5 (WWER-440/W-213) of the Greifswald Nuclear Power Station, M. H. Fontana; WASTE AND SPENT FUEL MANAGEMENT: 576 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 586 Analysis of Corrective Actions Applied to Nuclear Power Plant Operations, A. E. Cross; 593 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 596 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; 609 Non-Commercial Power Operating Experience; 614 World Nuclear Performance, Compiled by M. D. Muhlheim; RECENT DEVELOPMENTS: 623 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 635 Reports, Standards, and Safety Guides, D. S. Queener; 639 Proposed Rule Changes as of June 30, 1992; ANNOUNCEMENTS: 513 Fourth International Conference on Nuclear Fuel Reprocessing and Waste Management RECOD '94; 585 International Topical Meeting on Advanced Reactors Safety; 622 International Workshop on Implementation of ALARA at Nuclear Power Plants; 648 Short Course on Nuclear Criticality Safety; 648 8th Topical Meeting on Problems in Reactor Physics MEPhi-VOLGA-93; 643 The Authors; 646 Reviewers of Nuclear Safety, Vol. 33

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Meta-Level Design Guidance and Operator Performance Measures for Hybrid Control Rooms

The purpose of this grant was to refine and test methods to evaluate digital human system interfaces (HSI) for existing largely analog nuclear power plant (NPP) control rooms (CRs). We hypothesized that CR operator performance (CROP) in hybrid NPP CRs will be improved if future digital HSI is designed based on: 1) more robust design guidelines for operator situation awareness (SA) and decision-making (DM); 2) enhanced CROP metrics during HSI evaluation; 3) an ontology for selecting simulation scenarios to evaluate digital HSI; and 4) a model to predict optimal HSI design attributes given CROP objectives. The team conducted numerous nuclear power plant site visits (e.g., to Brown’s Ferry, Palo Verde, Sequoyah and Vogtle) to study control room operations and crisis management and 3 visits to the NRC Chattanooga Training Center. We observed research studies at DC Cook and NRC Chattanooga in collaboration with the Halden Reactor Project. We collected operator performance and workload data in one NPP simulator. A comprehensive human (i.e., CROP) performance literature review was published in Applied Ergonomics. We obtained operator team performance data from CAER to produce our data fusion model and a paper delineating the results have been accepted (revision submitted) in Resilience Engineering and System Safety. We analyzed interview data related to scenario ontology development; a manuscript is still in preparation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The effect of support functions in a computerized procedure system on interface management tasks - 235

By adapting digital and computer technology, the design of main control rooms (MCR) in nuclear power plants has been changed. When operators operate a nuclear power plant, the tasks using soft controls in advanced MCRs include primary tasks and secondary tasks. Primary tasks are to control nuclear power plant devices and secondary tasks are to find appropriate screens or devices by screen navigations and selections before performing the primary task. The secondary task including interface management tasks is newly introduced in advanced MCRs. In this paper, the tasks are analyzed based on the simulation data of APR1400 which is one of the digitalized nuclear power plants. For analyzing tasks, the unit tasks are divided into three types: navigation, manipulation, and acknowledgement. The primary task represents the manipulation of devices and the secondary task indicates the navigating screens, opening control panels, closing control panels, and confirming the acknowledging alarms. To analyze the effect of support functions of a computerized procedure system (CPS), one of the functions which is expected to have a significant effect on the secondary tasks was considered, that is 'related screen link button.' Two factors, 'ratio of screen alteration' and 'ratio of using screen link button', were used to see the effect of 'related screen link button'. From the task analysis result, it was observed that the secondary tasks which is one of the unique features in advanced MCRs have a quite much portion than that of the primary tasks. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A human automation interaction concept for a small modular reactor control room - 101

Many advanced nuclear power plant (NPP) designs incorporate higher degrees of automation than the existing fleet of NPPs. Automation is being introduced or proposed in NPPs through a wide variety of systems and technologies, such as advanced displays, computer-based procedures, advanced alarm systems, and computerized operator support systems. Research consistently finds that there is a fundamental tradeoff between system performance with increased automation and reduced human performance. Idaho National Laboratory (INL) researchers and NuScale Power human factors and operations staff are working on a collaborative project to address the human performance challenges of increased automation and to determine the principles that lead to optimal performance in highly automated systems. This paper will describe this concept in detail and will describe an experimental test of the concept. The benefits and challenges of the approach will be discussed. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SU-E-T-373: A Motorized Stage for Fast and Accurate QA of Machine Isocenter

Purpose: Precision delivery of radiation dose relies on accurate knowledge of the machine isocenter under a variety of machine motions. This is typically determined by performing a Winston-Lutz test consisting of imaging a known object at multiple gantry/collimator/table angles and ensuring that the maximum offset is within specified tolerance. The first step in the Winston-Lutz test is careful placement of a ball bearing at the machine isocenter as determined by repeated imaging and shifting until accurate placement has been determined. Conventionally this is performed by adjusting a stage manually using vernier scales which carry the limitation that each adjustment must be done inside the treatment room with the risks of inaccurate adjustment of the scale and physical bumping of the table. It is proposed to use a motorized system controlled outside of the room to improve the required time and accuracy of these tests. Methods: The three dimensional vernier scales are replaced by three motors with accuracy of 1 micron and a range of 25.4mm connected via USB to a computer in the control room. Software is designed which automatically detects the motors and assigns them to proper axes and allows for small shifts to be entered and performed. Input values match calculated offsets in magnitude and sign to reduce conversion errors. Speed of setup, number of iterations to setup, and accuracy of final placement are assessed. Results: Automatic BB placement required 2.25 iterations and 13 minutes on average while manual placement required 3.76 iterations and 37.5 minutes. The average final XYZ offsets is 0.02cm, 0.01cm, 0.04cm for automatic setup and 0.04cm, 0.02cm, 0.04cm for manual setup. Conclusion: Automatic placement decreased time and repeat iterations for setup while improving placement accuracy. Automatic placement greatly reduces the time required to perform QA.

07 ISOTOPE AND RADIATION SOURCES↗

Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A HUMAN AUTOMATION INTERACTION CONCEPT FOR A SMALL MODULAR REACTOR CONTROL ROOM

Many advanced nuclear power plant (NPP) designs incorporate higher degrees of automation than the existing fleet of NPPs. Automation is being introduced or proposed in NPPs through a wide variety of systems and technologies, such as advanced displays, computer-based procedures, advanced alarm systems, and computerized operator support systems. Additionally, many new reactor concepts, both full scale and small modular reactors, are proposing increased automation and reduced staffing as part of their concept of operations. However, research consistently finds that there is a fundamental tradeoff between system performance with increased automation and reduced human performance. There is a need to address the question of how to achieve high performance and efficiency of high levels of automation without degrading human performance. One example of a new NPP concept that will utilize greater degrees of automation is the SMR concept from NuScale Power. The NuScale Power design requires 12 modular units to be operated in one single control room, which leads to a need for higher degrees of automation in the control room. Idaho National Laboratory (INL) researchers and NuScale Power human factors and operations staff are working on a collaborative project to address the human performance challenges of increased automation and to determine the principles that lead to optimal performance in highly automated systems. This paper will describe this concept in detail and will describe an experimental test of the concept. The benefits and challenges of the approach will be discussed.

99 GENERAL AND MISCELLANEOUS↗

The control room radiological habitability assessment of high temperature reactor pebble bed module (HTR-PM) - 18465

The control room radiological habitability is important for staff safety in nuclear power plant accident, which is also a licensing requirement of the High Temperature Reactor Pebble Bed Module (HTR-PM) in China. In this study, a comprehensive evaluation of the control room radiological habitability is performed for three design basis accident scenario of HTR-PM. For each scenario, three exposure pathways are taken into account, which includes the immersion external exposure, the inhalation exposure and the direct exposure from radioactive cloud in the environment. The atmospheric concentration is calculated using the NRC-recommended ARCON96 code, based on the two-year meteorological observation data at HTR-PM s site and the final building layout. The evaluation result demonstrates that the individual dose level of staffs in the control room is far below the requirement of the regulatory, which guarantees the radiological habitability of control room of HTR-PM. The contribution of each radionuclide has been analyzed, which suggests that iodine and metal radionuclides such as Cs-137 and Co-60 are primary contributor of the total dose, which are worthy of particular attention in the control room habitability design. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of an Assessment Methodology That Enables the Nuclear Industry to Evaluate Adoption of Advanced Automation

Nuclear power has a crucial role in providing safe, reliable, and economical carbon-free electricity for today and the future. For continued operation, many of the existing United States nuclear power plants will begin the subsequent license renewal process for extending their operating license periods. As plants extend their expected operating lifetimes, there is a significant opportunity to modernize. These plants have a much stronger business case with these extended mission periods to modernize and significantly enhance their economic viability in current and future energy markets by implementing digital technologies that support innovation, efficiency gains, and business-model transformation. Ensuring continued safety and reliability is crucial. Transformative digital technologies—including automation—that fundamentally change the concept of operation for the nuclear power plant operating model requires a critical focus on the human and technology integration element. Further, the nuclear industry has historically been reluctant to modernize due to having a risk adverse culture and lack of clarity for a transformative new state vision (Joe & Remer, 2019; Thomas et al., 2020). Common barriers include (1) the perceived value and return on investment (ROI) of digital technology, (2) the perceived risk associated with licensing, regulatory, and cybersecurity, and (3) insufficient guidance for performing digital modifications to power generation systems. This work presents a methodology to address these barriers and support the industry in adopting advanced automation and digital technology through developing a transformative vision and implementation strategy that will address the human and technology integration element. This research leverages previous LWRS Program and industry results. It draws specifically on previous LWRS Program research in the areas of advanced alarm systems, computer-based procedures, model informed decision support, and advanced human-system interface displays (e.g., overviews and task-based). The modernization methodology can be used to guide transformative thinking when integrating a set of vendor-specific capabilities to support a new concept of operations and a utility’s end-state vision. The results of this research are organized into six major sections: - Section 1 introduces the need for supporting large-scale digital modifications that will renew the technology base for extended operating life beyond 60 years - Section 2 describes the challenges that the nuclear industry is enduring with modernizing. - Section 3 summarizes the primary standards and guidance. - Section 4 presents earlier work from the LWRS Program regarding the development of a transformative conceptual design for an advanced control room of a hybrid plants. - Section 5 presents a methodology that is designed at addressing the challenges in the industry today in achieving a transformative new state vision and concept of operations. - Conclusions and next steps of this research are provided in Section 6.

99 GENERAL AND MISCELLANEOUS↗

Verification and Validation of Digitally Upgraded Control Rooms

As nuclear power plants undertake main control room modernization, a challenge is the lack of a clearly defined human factors process to follow. Verification and validation (V&V) as applied in the nuclear power community has tended to involve efforts such as integrated system validation, which comes at the tail end of the design stage. To fill in guidance gaps and create a step-by-step process for control room modernization, we have developed the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE). This approach builds on best practices in the software industry, which prescribe an iterative user-centered approach featuring multiple cycles of design and evaluation. Nuclear regulatory guidance for control room design emphasizes summative evaluation—which occurs after the design is complete. In the GONUKE approach, evaluation is also performed at the formative stage of design—early in the design cycle using mockups and prototypes for evaluation. The evaluation may involve expert review (e.g., software heuristic evaluation at the formative stage and design verification against human factors standards like NUREG-0700 at the summative stage). The evaluation may also involve user testing (e.g., usability testing at the formative stage and integrated system validation at the summative stage). An additional, often overlooked component of evaluation is knowledge elicitation, which captures operator insights into the system. In this report we outline these evaluation types across design phases that support the overall modernization process. The objective is to provide industry-suitable guidance for steps to be taken in support of the design and evaluation of a new human-machine interface (HMI) in the control room. We suggest the value of early-stage V&V and highlight how this early-stage V&V can help improve the design process for control room modernization. We argue that there is a need to overcome two shortcomings of V&V in current practice—the propensity for late-stage V&V and the use of increasingly complex psychological assessment measures for V&V.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Introduction of Diverse Manual Actuation Design for APR1400

APR1400 is an Advanced Light Water Reactor (ALWR) design with enhanced plant safety and advanced design features. One unit is in commercial operation and 11 are currently under construction, 4 abroad and 7 in Korea. APR1400 adopts full digitalized Man-Machine Interface System (MMIS) to perform the function of control, indication and alarming for safety and non-safety systems APR1400 MMIS is designed to operate the plant from the Main Control Room (MCR) under all anticipated operating conditions including design basis accidents. This advanced MMIS is designed to meet the latest codes, standards and regulatory requirements including the defense-in-depth and diversity requirements, which is intended to mitigate the consequence of a total failure of the digital safety system caused by a software Common Cause Failure (CCF) coupled with anyone of the Design Basis Events. The redundancy of the safety system could be defeated during this CCF condition and the protective function could be rendered inoperable.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Supporting the industry by developing a design guidance for computer-based procedures for field workers - 274

The paper-based procedures currently used for nearly all activities in the commercial nuclear power industry have a long history of ensuring safe operation of the plants. However, there is potential to greatly increase efficiency and safety by improving how the human interacts with the procedures, which can be achieved through the use of computer-based procedures (CBPs). A CBP system offers a vast variety of improvements, such as context driven job aids, integrated human performance tools and dynamic step presentation. As a step toward the goal of improving procedure use performance, the U.S. Department of Energy Light Water Reactor Sustainability Program researchers, together with the nuclear industry, have been investigating the feasibility of replacing current paper-based procedures with CBPs. The main purpose of the CBP research for nuclear field workers conducted at the Idaho National Laboratory was to provide design guidance to the nuclear industry to be used by both utilities and vendors. After studying existing design guidance for CBP systems, the researchers concluded that the majority of the existing guidance is intended for control room CBP systems, and does not necessarily address the challenges of designing CBP systems for instructions carried out in the field. Further, the guidance is often presented on a high level, which leaves the designer to interpret what is meant by the guidance and how to specifically implement it. The authors developed a design guidance to provide guidance specifically tailored to instructions that are carried out in the field based. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗