Search NASA⌕ Search

SEARCH · Search NASA

Results for “Corrective Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Time maintenance system for the BMDO MSX spacecraft

The Johns Hopkins University Applied Physics Laboratory (APL) is responsible for designing and implementing a clock maintenance system for the Ballistic Missile Defense Organizations (BMDO) Midcourse Space Experiment (MSX) spacecraft. The MSX spacecraft has an on-board clock that will be used to control execution of time-dependent commands and to time tag all science and housekeeping data received from the spacecraft. MSX mission objectives have dictated that this spacecraft time, UTC(MSX), maintain a required accuracy with respect to UTC(USNO) of +/- 10 ms with a +/- 1 ms desired accuracy. APL's atomic time standards and the downlinked spacecraft time were used to develop a time maintenance system that will estimate the current MSX clock time offset during an APL pass and make estimates of the clock's drift and aging using the offset estimates from many passes. Using this information, the clock's accuracy will be maintained by uplinking periodic clock correction commands. The resulting time maintenance system is a combination of offset measurement, command/telemetry, and mission planning hardware and computing assets. All assets provide necessary inputs for deciding when corrections to the MSX spacecraft clock must be made to maintain its required accuracy without inhibiting other mission objectives. The MSX time maintenance system is described as a whole and the clock offset measurement subsystem, a unique combination of precision time maintenance and measurement hardware controlled by a Macintosh computer, is detailed. Simulations show that the system estimates the MSX clock offset to less than+/- 33 microseconds.

Hermes, Martin J.↗

2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from May 2019 through December 2019 at the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida.

MOBILE LAUNCH PLATFORM / VEHICLE ASSEMBLY BUILDING↗

2021 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2021 through December 2021 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

Randall K. Sillan↗

2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

VOCs↗

The Application of Acoustic Measurements and Audio Recordings for Diagnosis of In-Flight Hardware Anomalies

In many cases, an initial symptom of hardware malfunction is unusual or unexpected acoustic noise. Many industries such as automotive, heating and air conditioning, and petro-chemical processing use noise and vibration data along with rotating machinery analysis techniques to identify noise sources and correct hardware defects. The NASA/Johnson Space Center Acoustics Office monitors the acoustic environment of the International Space Station (ISS) through periodic sound level measurement surveys. Trending of the sound level measurement survey results can identify in-flight hardware anomalies. The crew of the ISS also serves as a "detection tool" in identifying unusual hardware noises; in these cases the spectral analysis of audio recordings made on orbit can be used to identify hardware defects that are related to rotating components such as fans, pumps, and compressors. In this paper, three examples of the use of sound level measurements and audio recordings for the diagnosis of in-flight hardware anomalies are discussed: identification of blocked inter-module ventilation (IMV) ducts, diagnosis of abnormal ISS Crew Quarters rack exhaust fan noise, and the identification and replacement of a defective flywheel assembly in the Treadmill with Vibration Isolation (TVIS) hardware. In each of these examples, crew time was saved by identifying the off nominal component or condition that existed and in directing in-flight maintenance activities to address and correct each of these problems.

Welsh, David↗

EPCAPE-PT-LANL Measurements: Scanning Mobility Particle Sizer

Coastal cities offer a unique environment for studying aerosol-cloud interactions and the effects of urban emissions on cloud properties. As part of the Eastern Pacific Cloud Aerosol Precipitation Experiment (EPCAPE), the Partitioning Thrust by Los Alamos National Laboratory (EPCAPE-PT-LANL) was conducted. Our campaign focused on measuring the optical and chemical properties of aerosols and their interactions within marine stratocumulus clouds in La Jolla, California. EPCAPE-PT-LANL enhances the primary goals of EPCAPE through innovative observations of vapor-phase transitions between aerosols and cloud droplets, the impact of black carbon on aerosol-cloud dynamics, and the effects of cloud processing on aerosol optical properties. Instrument: Scanning Mobility Particle Sizer (TSI), DMA Classifier Model 3082 + CPC Detector Model 3752. Data Notes: The SMPS dataset is limited due to necessary instrument maintenance and subsequent extensive downtime. Data is only available from October 21 to November 8, 2023. Post November 22, 2023, the NanoScan instrument provided coverage for the latter half of the campaign. To ensure consistency, the data was resampled into uniform size bins ranging from 15 nm to 667 nm. This adjustment was required due to changes in size bins and the maximum diameter that occurred after maintenance and repairs. Multiple Charge Correction applied, Nanoparticle Agglomerate Mobility Analysis not applied, and Diffusion Correction applied. Header: - List [15 nm to 667 nm] middle of the size bin in nanometers: Data reports the concentration particles in this size bin per cubic centimeter, dN/dLog(dp). - CVI_Flag[bool]: A boolean flag indicating whether the Counterflow Virtual Impactor (CVI) was active (true) or inactive (false) during the measurement.

54 ENVIRONMENTAL SCIENCES↗

NASA's post-Challenger safety program - Themes and thrusts

The range of managerial, technical, and procedural initiatives implemented by NASA's post-Challenger safety program is reviewed. The recommendations made by the Rogers Commission, the NASA post-Challenger review of Shuttle design, the Congressional investigation of the accident, the National Research Council, the Aerospace Safety Advisory Panel, and NASA internal advisory panels and studies are summarized. NASA safety initiatives regarding improved organizational accountability for safety, upgraded analytical techniques and methodologies for risk assessment and management, procedural initiatives in problem reporting and corrective-action tracking, ground processing, maintenance documentation, and improved technologies are discussed. Safety issues relevant to the planned Space Station are examined.

Rodney, G. A.↗

Ozone/Ultraviolet-Photo-Oxidation Reactor

Experimental chemical-processing system destroys waste hydrazine in water by use of ozone in ultraviolet-photo-oxidation reactor. New process reduces concentrations of hydrazines and intermediate decomposition products in effluent liquid and gas to below limit of detectability. Liquid sprayed in reaction chamber past ultraviolet lamps, against flow of oxygen and ozone. Hydrazines and intermediate decomposition products oxidized to harmless substances. Effectiveness and speed of process depends on maintenance of circulating liquid at correct pH, determines lower limit of oxidation by ozone.

Swartz, Ari Ben↗

Metering Characteristics of Carburetors

Report presents the results of an extensive experimental investigation of the performance of different types of carburetors as effecting the maintenance under all conditions of correct ratio between the weights of fuel and air. It also gives a description of the Bureau of Standards carburetor test plant, test equipment and measuring instruments used to determine the metering characteristics of carburetors.

Tice, Percival S↗

Can We Fix It Automatically? Development of Fault Auto-Correction Algorithms for HVAC and Lighting Systems

A fault detection and diagnostics (FDD) tool is a type of energy management and information system designed to continuously identify the presence of faults and efficiency improvement opportunities through a one-way interface to the building automation system and application of automated analytics. Building owners and operators at the leading edge of technology adoption are using FDD tools to enable average whole-building portfolio savings of 8 percent. Although FDD tools can inform building operators of operational faults, currently a manual action is always required to correct faults and generate the associated energy savings. A subset of faults, however, such as biased sensors and manual override, can be addressed automatically, removing the need for operations and maintenance staff intervention. Automating this fault “correction” can significantly increase the savings generated by FDD tools and reduce the reliance on human intervention. Doing so is expected to advance the usability, as well as the technical and economic performance, of FDD technologies. In this paper, we present the development of 10 innovative fault auto-correction algorithms for HVAC and lighting systems. When the auto-correction routine is triggered, it will overwrite the control setpoints or other variables (via BACnet or other protocol) to implement the intended changes. These algorithms are able to automatically correct the faults or improve the operation associated with an incorrectly programmed schedule, override manual control, sensor bias, control hunting, rogue zone, and less aggressive setpoints/setpoints setback. The paper will also discuss the implementation of the auto-correction algorithms in FDD software products.

Lin, Guanjing↗

A leading edge heating array and a flat surface heating array - operation, maintenance and repair manual

A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.

Source record↗

Record of Technical Change for Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

54 ENVIRONMENTAL SCIENCES↗

Extensions and improvements on XTRAN3S

Improvements to the XTRAN3S computer program are summarized. Work on this code, for steady and unsteady aerodynamic and aeroelastic analysis in the transonic flow regime has concentrated on the following areas: (1) Maintenance of the XTRAN3S code, including correction of errors, enhancement of operational capability, and installation on the Cray X-MP system; (2) Extension of the vectorization concepts in XTRAN3S to include additional areas of the code for improved execution speed; (3) Modification of the XTRAN3S algorithm for improved numerical stability for swept, tapered wing cases and improved computational efficiency; and (4) Extension of the wing-only version of XTRAN3S to include pylon and nacelle or external store capability.

Borland, C. J.↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Prognostics for Ground Support Systems: Case Study on Pneumatic Valves

Prognostics technologies determine the health (or damage) state of a component or sub-system, and make end of life (EOL) and remaining useful life (RUL) predictions. Such information enables system operators to make informed maintenance decisions and streamline operational and mission-level activities. We develop a model-based prognostics methodology for pneumatic valves used in ground support equipment for cryogenic propellant loading operations. These valves are used to control the flow of propellant, so failures may have a significant impact on launch availability. Therefore, correctly predicting when valves will fail enables timely maintenance that avoids launch delays and aborts. The approach utilizes mathematical models describing the underlying physics of valve degradation, and, employing the particle filtering algorithm for joint state-parameter estimation, determines the health state of the valve and the rate of damage progression, from which EOL and RUL predictions are made. We develop a prototype user interface for valve prognostics, and demonstrate the prognostics approach using historical pneumatic valve data from the Space Shuttle refueling system.

Daigle, Matthew↗

Photographic Mitigation Documentation Related to the Engine Assembly and Disassembly Facility, Area 25, Nevada National Security Site, Nye County, Nevada

This letter report provides documentation in partial fulfillment of the mitigation of adverse effects to the Engine Maintenance Assembly and Disassembly (E-MAD) facility, a major component of the Nuclear Rocket Development Station (NRDS) Historic District located in Area 25 of the Nevada National Security Site (NNSS). Construction of the E-MAD facility began in 1962 for the purpose of disassembling and maintaining nuclear-powered rocket engines. Once the building was complete in 1967, the E-MAD facility remained in continuous operation until the nuclear rocket program was terminated in 1973. The mothballed facility was repurposed in 1977 for spent nuclear fuel handling and packaging activities. By the mid-1980s, all activities at the E-MAD facility had ceased (Reno et al. 2019). This submission is intended to comply with Stipulation III.D.1 of the Memorandum of Agreement DE-GM58-20NA25534 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Corrective Action Activities and Demolition of the Engine Maintenance Assembly and Disassembly Facility and the Test Cell C Historic District, Major Components of the Nuclear Rocket Development Station Historic District Located in Area 25 at the Nevada National Security Site Nye County (hereafter referred to as the MOA). Stipulation III.D.1 states the U.S. Department of Energy (DOE) will submit the existing supplementary collection of the large-format, black-and-white photographic prints taken during the 1996 Historic American Engineering Record (HAER) documentation of the E-MAD facility to the Nuclear Testing Archive (NTA), located on the second floor of the Rogers Building at Desert Research Institute (DRI) in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada For Calendar Year 2024

This report includes visual inspection results, descriptions of maintenance and repair activities, and recommendations for calendar year 2024 for use restrictions at corrective action sites located on the Nevada National Security Site (NNSS) and on the Nevada Test and Training Range that are accessed through the NNSS Main Gate.

54 ENVIRONMENTAL SCIENCES↗

Non-Resource Conservation and Recovery Act Corrective Action Unit (CAU) Post-Closure Inspection Report, Nevada National Security Site, Nevada For Calendar Year 2025

This report includes visual inspection results, descriptions of maintenance and repair activities, and recommendations for CY 2025 for use restrictions (URs) at corrective action sites (CASs) located on the Nevada National Security Site and on the Nevada Test and Training Range (NTTR) that are accessed through the NNSS Main Gate. This document is arranged by project activity (i.e., Industrial Sites, Soils, and Defense Threat Reduction Agency [DTRA]); then by corrective action unit (CAU); and then by CAS. Post-closure UR inspections are performed on an annual basis, unless as noted in text. Post-closure UR inspections verify the condition of physical controls required by each UR, which may include the following activities: • Visual verification of the legibility of signs • Visual inspection of fencing, signs, monuments, and/or markers for indications of wear • Visual inspection of soil covers for indications of subsidence, erosion, or unauthorized use Deficiencies in UR requirements that were identified during CY 2024 inspections and not addressed in the CY 2024 report are addressed in this CY 2025 report.

54 ENVIRONMENTAL SCIENCES↗