Search NASA⌕ Search

SEARCH · Search NASA

Results for “Corrective Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

Concurrent Optimization of Capital Cost and Expected O&M

Concentrating solar power (CSP) technologies can utilize heat from concentrated sunlight from a field of tracking mirrors to generate electricity, reform fuel, provide process heat, or augment fossil plant heat sources. Electricity-generating power tower systems focus light from thousands of independent heliostats onto a thermal receiver, which uses the focused light to warm a heat transfer fluid (HTF), typically, a molten nitrate salt. The HTF is then sent to a power generation cycle or diverted into thermal energy storage (TES) for later use. Thermal storage is – in principle – a straightforward proposition. However, optimal utilization of a TES resource is complex and multi-faceted: thermal energy may be dispatched to produce electricity immediately upon first availability, or thermal energy may be reserved for next-day peak periods at risk of filling storage and dumping energy, or a portion of the thermal energy can be reserved to maintain equipment temperatures, reducing power cycle startup time, etc. Many possible dispatch permutations variously emphasize producing peak power, operating through transients, expediting daily startup, etc. The best operation strategy can change day-to-day throughout the year, depending on the weather and market pricing forecasts. The project we describe in this report develops a software package that allows users to explore design optimization, operations decisions, and performance characterization of concentrating solar power tower plants. Users interface with the tool through a scripting language, and results are reported in time series tables, plots, runtime logs, and design outputs. Users choose from a list of variables such as tower height, solar multiple, design-point irradiance, thermal storage size, etc., and specify information about the system using a list of parameters. The software can then optimize the specified variables to reduce the cost of energy produced by the system while meeting certain production requirements, accounting for uncertain weather and electricity price forecasts, and correcting for equipment failures or repair time. The software we develop is the first comprehensive design tool of its kind to incorporate all of these aspects while being deployed as open source.

14 SOLAR ENERGY↗

CCN data from TAMU TRACER campaign in the Houston TX region from July to September 2022

During TRACER, the Texas A&M Rapid Onsite Atmospheric Measurements Van (ROAM-V) was deployed to capture airmasses behind (maritime) and ahead (continental) of the passage of the sea-breeze front through Houston. On select sampling days, ROAM-V sampled in the morning/mid-day on the coast and then transited to a second inland site for the afternoon/evening. The suite of instruments deployed on ROAM-V included a Condensation Particle Counter (CPC; GRIMM Model 5.403 CPC), Scanning Mobility Particle Sizer (SMPS; TSI 3750 detector, TSI 3082 classifier, TSI 3088 neutralizer, TSI 3081A Differential Mobility Analyzer), Cloud Condensation Nuclei counter (Droplet Measurement Technologies CCN Counter), micro pulse lidar (Droplet Measurement Technologies Micro Pulse LiDAR (miniMPL)), and a Davis Rotating Uniform size-cut Monitor (DRUM; DRUMAir 4-DRUM). Before sampling at each location, the latitude and longitude were recorded using the GPS on the phone application “My Altitude”. Onboard the ROAM-V, aerosol samples are drawn through a shared isokinetic inlet at a flow rate ranging from 3.5 to 7.0 LPM. A portion of this flow is directed through a cyclone impactor (Brechtel, Inc. Model SCC 0.732) and 0.5 LPM is directed to the CCN. To calculate particle losses, we used a two-step method. First, the measured SMPS size distributions were used to calculate particle loss through the inlet during sampling. Second, the corrected SMPS data was used to calculate the average of the total losses per scan down the CCN line. Then, the correction was applied to the CCN data. This calculation was done separately for each deployment location due to changes in the measured size distributions between locations. Particle loss from diffusion (based on Kesten, 1991 and Gormley, 1949), inertial impaction in 90-degree bends (based on Aerosol Measurement, 2011 and Crane, 1977), and cyclone impactor efficiency (based on Dirgo, 1985) were included in the loss calculation. When the SMPS was not sampling at a location (in the case of an instrument malfunction or operator error), the reported CPC data was corrected with an average of the total losses for the entire campaign at the specified deployment location (e.g., if we needed to correct Galveston data, then the average of all calculated losses at Galveston was taken). These flatline corrections were used for all data on 22/07/13, 22/07/20, 22/07/22, and the data from Galveston on 22/08/09. The supersaturation uncertainty is estimated conservatively at +/- 0.03%, where variation in the inlet temperature, pressure, and calibration technique prevents a more accurate measurement. Confidence in the reported supersaturation measurements is based on a pre-campaign calibration (following the methods from our previous work and Deng, 2014 based on Rose, 2008) in addition to inter-comparisons with the DOE for two days (22/08/18 and 22/09/01) where TAMU was co-located with AMF1. The inter-comparisons show good agreement between our instrument and the DOEs instrument on both days at all supersaturations. After the last inter-comparison on 22/09/01, there was no indication of a malfunction by our instrument through the rest of the campaign. Unfortunately, the instrument was dropped during demobilization. A post-campaign calibration was conducted, which showed a substantial departure from the pre-campaign calibration. The drop may have damaged the instrument’s ability to produce the desired supersaturations. Therefore, we do consider the data after 22/09/01 to be correct, but it should be used with caution. The CCN counter sampled for 3 minutes at each supersaturation setpoint (0.2, 0.4, 0.6, 0.8, 1.0, and 1.2%). At the end of a cycle, the instrument was set to 0.01% supersaturation for 5 minutes. The data is comprised of the last 60 seconds of each supersaturation set point (0.2, 0.4, 0.6, 0.8, 1.0, and 1.2%) to ensure the instrument stabilized and was able to reach thermal equilibrium. We removed the data during the periods where there were operational difficulties, setup, or maintenance. This data was collected for ARM Field Campaign AFC07055 and supported by DOE ASR grant DE-SC0021047. For any further questions, please feel free to contact the instrument PI, Sarah D. Brooks, sbrooks@tamu.edu. Rose et. al. Calibration and Measurement Uncertainties of a Continuous-Flow Cloud Condensation Nuclei Counter (DMT-CCNC): CCN Activation of Ammonium Sulfate and Sodium Chloride Aerosol Particles in Theory and Experiment. Atmos. Chem. Phys., 8, 1153-1179, 2008. Deng et. al. Using Raman Microspectroscopy to Determine Chemical Composition and Mixing State of Airborne Marine Aerosols over the Pacific Ocean. Aerosol Science and Technology, Vol 48, Issue 2, 2014. Kesten et. al. Calibration of a TSI Model 3025 Ultrafine Condensation Particle Counter. Aerosol Science and Technology, 15:2, 107-111, 1991. Gormley et. al. Diffusion from a Stream Flowing through a Cylindrical Tube. Proceedings of the Royal Irish Academy, Vol 52, 163-169, 1948. Aerosol Measurement: Principles, Techniques, and Applications, Third Edition. John Wiley & Sons, Inc, 2011. Crane et. al. Inertial Deposition of Particles in a Bent Pipe. Journal of Aerosol Science, Vol 8, 161-170, 1977. Dirgo et. al. Cyclone Collection Efficiency: Comparison of Experimental Results with Theoretical Predictions. Aerosol Science and Technology, 4:4, 401-415, 1985.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

One-Step Ahead Prediction of Thermal Mixing Tee Sensors with Long Short Term Memory (LSTM) Neural Networks

High-temperature advanced reactors under development, such as sodium fast reactors (SFR) and molten salt cooled reactors (MSCR), are expected to offer lower levelized cost of energy (LCOE) compared to existing light water reactor (LWR’s). In the existing light water reactors (LWR’s), operation and maintenance (O&M) expenses constitute the largest fraction of the total operating cost. Some of the O&M costs are related maintenance of sensors which can fail due to exposure to harsh environment in a reactor. The O&M costs of Advanced Reactor (AR)’s are expected to constitute a significant fraction of the total cost as well, because of high temperature and radiation level in AR are likely to cause material fatigue and premature failure of sensors and components. The O&M costs in AR’s could be reduced through integration of advanced informatics of performance-related sensors into a digital twin designed for reactor monitoring. For example, machine learning (ML) could be employed for real-time validation and correction of performance-related sensors, and reducing the number of performance-related physical sensor units through virtual sensing. As part of the effort, we investigate real-time validation of thermal hydraulic sensors through one-step ahead forecasting of sensor values using long short-term memory (LSTM) recurrent neural networks (RNN). The sensors are installed in a flow loop containing a thermal mixing tee, which is a common experimental model to study thermal fatigue in a thermal hydraulic loop. In addition, nonlinear transients generated in a thermal mixing tee constitute a good challenge data set for training and validation of ML algorithms. Sensors in this study include thermocouples, flow meters, and optical fibers for distributed temperature sensing. In one experiment, measurement data sets were obtained for a loop was filled with water, and in another experiment, measurements were performed on a loop filled with liquid metal Galinstan. We have also conducted preliminary investigation of one-step ahead prediction of fiber optics-based distributed temperature sensing with LSTM networks. In predicting fiber-based temperature measurements, we treated each gauge pitch of the fiber as an independent sensor. Accuracy of one-step ahead forecasting was estimated by calculating root mean square error (RMSE) for the test segment of time series of each sensor. RMSE’s for temperature sensors in water loop were, for the most part, lower than for the same sensors in Galinstan loop. The RMSE’s for flow meters were similar for both loops. The RMSE’s for distributed temperature measured with the fiber optic sensor were similar to those of the point sensors. Results of this study demonstrated the capability of LSTM one-step ahead forecasting with RMSE comparable to uncertainty in sensor measurements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Temperature and Dynamic Strain Measurements Using a Single SAWR Sensor

Dynamic strain sensing is relevant in numerous applications involving structural health monitoring, condition-based maintenance, operation efficiency preservation, and work environment safety. These sensors are particularly critical for high-temperature (HT) harsh-environment (HE) industries such as aerospace, automotive, power plants, and advanced manufacturing. In HT/HE, sensor implementation and measurement present challenges such as maintaining sensor stability, accounting for temperature cross-sensitivity, providing HT attachment, and packaging of the sensors and system. Surface acoustic wave resonator (SAWR) sensors can address these needs and offer additional benefits such as compact size and wireless interrogation capability. The SAWR sensitivity to dynamic strain is temperature dependent, making it necessary to measure the sensor temperature in order to use the correct dynamic strain calibration curve. In this work, a method for determining the temperature, dynamic strain magnitude, and dynamic strain spectral components using a single SAWR sensor is presented. Here, the established technique for determining operational temperature and dynamic strain magnitude/spectral components using only one SAWR simplifies the sensor measurement system, thus being very attractive for HT /HE applications.

47 OTHER INSTRUMENTATION↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2020)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment. 2) CAU 91, Area 3 U-3fi Injection Well. 3) CAU 92, Area 6 Decon Pond Facility. 4)CAU 110, Area 3 WMD U-3ax/bl Crater. 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits. 6) CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2020 (Rev. 2)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment; 2) CAU 91, Area 3 U-3fi Injection Well; 3) CAU 92, Area 6 Decon Pond Facility; 4) CAU 110, Area 3 WMD U-3ax/bl Crater; 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits; 6) CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110, the site fence, gate, lock, and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Development of Analysis Methods that Integrate Numeric and Textual Equipment Reliability Data

Within the Light Water Reactor Sustainability (LWRS) program, the Risk-Informed Systems Analysis (RISA) Pathway is performing collaborative research on the development and deployment of technologies designed to assist operating nuclear power plants (NPPs) to reduce operating costs improve plant reliability and availability. One of the RISA research areas is focusing on the development of methods and tools designed to optimize plant operations (e.g., maintenance/replacement schedules, optimal maintenance postures for plant structures, systems, and components [SSCs]) in a manner that is more cost effective than current approaches and makes better use of available SSC health data. The Risk-Informed Asset Management (RIAM) project targets this research area by creating a direct bridge between component equipment reliability (ER) data and system engineer decision making regarding maintenance activity scheduling and component aging management. In this respect, one challenge that NPP system engineers are facing is that the amount of ER data being continuously generated is not only extremely large in size, but it comes in different forms: textual (e.g., condition or maintenance reports) and numeric (e.g., generated by monitoring systems). All these data elements provide them with valuable insights and information regarding: 1) the discovery of anomalous behaviors or degradation trends, 2) the identification of the possible causes behind such behaviors/trends, and 3) the prediction of their direct consequences. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers/databases), others are conceptual in nature: data elements come in different formats (e.g., numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). The activities performed by the RIAM project during FY23 directly tackles the need to simultaneously integrate the analysis of ER data in all its forms, numeric and textual. Note that such task has never been performed before due to the complexity of the systems under consideration but, most importantly, because of the technical challenges behind the harmonization of ER data formats and the lack of adequate computational methods to analyze them. Our approach borrows ideas and concepts from the medical field where integration of several data sources is vital to assist medical practitioners to perform correct diagnosis and indicate optimal treatments. In our view a NPP asset is equivalent to a patient in a medical context. The main difference is the complexity of a human body is a magnitude more complex when compared to typical assets commonly present in NPPs (e.g., centrifugal pumps, or motor operated valves). This simplifies our first requirement when analyzing heterogenous ER data formats: to put data into “context”. Context is here intended as the additional piece of information that is needed by ER data analysis tools to understand what these data elements are referring to, i.e., which king of knowledge they are generating. In our context, this knowledge can be translated into models that capture the form and functional architecture of assets/systems, their dependencies, and how they interact. These models actually emulate the knowledge that that NPP system engineers possess about assets and systems; this is their key of success when analyzing ER data, their challenge is ability to handle large amount of data. Here, we employ model-based system engineering (MBSE) models of systems and assets to represent and capture their architecture and functional, i.e. cause-effect, relations. Then, ER data elements are processed by identifying first of all which elements of the developed MBSE elements they are referring to. For numeric ER data this task is fairly easy since it is possible to precisely pinpoint what MBSE elements the corresponding sensor are observing (e.g., bearing temperature of a centrifugal pump). Task is much harder for textual data since the information contained in issue or maintenance reports needs to “be understood” by a computational tool. Here we called this process as “knowledge extraction”. Once again, we borrow the experience in the medical field where methods to extract knowledge from textual data have been developed in the past decade. The missing element for us is the availability of a complete dictionary of NPP related concepts (in addition to the MBSE models presented earlier) that can put “text into context”. In FY23, such dictionary has been developed along with all the computational elements required for knowledge extraction. Lastly, once numeric and textual ER data elements have been processed and “understood”, then the last step is the discovery of possible cause-effect relations among them. This is performed by observing if a logical connection through the MBSE models exists, and if the

97 MATHEMATICS AND COMPUTING↗

Design and Characterization of the 162.5 MHz RF Component Layout for Fermilab's PIP-II Reference Line

The Proton Improvement Plan II (PIP-II) Reference Line at Fermi National Accelerator Laboratory distributes phase-stable radio-frequency (RF) signals throughout the accelerator. PIP-II requires stable timing and phase reference signals so its accelerating cavities transfer energy to the particle beam at the correct point in each RF cycle. The full system includes 162.5, 325, and 650 MHz sections corresponding to the frequency sections of the PIP-II Linac, with this project focusing on the 162.5 MHz section. The Reference Line must provide a phase stable source signal while responding to phase changes caused by environmental conditions or system drift. Its RF components will be mounted on aluminum heat plates inside a temperature controlled enclosure to further limit temperature-driven phase changes. To prepare the system for manufacture, the project reviewed component functions and dimensions, developed a computer-aided design (CAD) model, and arranged the hardware to support short cable paths, grounding, fastener access, and maintenance. Several full scale, three dimensional printed prototypes allowed the available components to be mounted and inspected. These fit checks revealed mechanical conflicts and guided revisions to component placement, countersink geometry, labeling, and plate thickness. Electrical characterization was also performed on selected RF hardware to compare its measured behavior with the performance metrics that were set for our design. Overall, the project produced a manufacturable 162.5 MHz layout, physical fit-check prototypes, and documented electrical measurements that support review before metal fabrication. The 325 and 650 MHz layouts remain future work because they require additional minor mechanical changes.

Subedi, Harsheet [Unlisted, US, CA] (ORCID:0009000↗

Modernization efforts for the R -Matrix code SAMMY [Abstract]

The R-Matrix code SAMMY is a widely used nuclear data evaluation code focused on the resolved range, which includes corrections for experimental effects. The code is still mostly written in Fortran 77, and uses a memory management system suitable for the time of its initial writing (1984). A modernization effort is under way to bring the code in-line with modern software development practices. A continuous-integration testing framework was added, automating the large existing set of test cases. It is run on every commit. The memory management was updated to current standard practices suitable for modern software analysis tools. The code can be obtained from https://code.ornl.gov/RNSD/SAMMY. The resonance parameters and covariance information are now stored in C++ objects shared by SAMMY and AMPX, the processing code that generates nuclear data libraries for SCALE. This allows for easier maintenance and access to the resonance parameters inside and outside of SAMMY. This feature is already used by accessing and changing parameters in memory in the Bayesian Monte Carlo Evaluation Framework for Cross Sections Nuclear Data and Integral Benchmark Experiments project, Further plans include the switch to the ENDF reading and writing routines in AMPX, as these routines are more robust, easier to maintain, and support more features. Of note here is support for the new GNDS format. Previously it wasn’t easy to share the full covariance matrix for evaluations containing more than one isotope due to limitations on the ENDF format; this is now supported in GNDS. The data are currently available in a binary SAMMY format and can be exported to GNDS to make them more widely available and sharable. The next step will be to use the same resonance processing code at 0K in AMPX and SAMMY as one of the available Reich-Moore R-Matrix formalism. The first step toward this goal is to isolate the reconstruction into a module that takes resonance parameters as its input and does not depend on SAMMY global parameters. This goal has been achieved and it should now be possible to more easily change the resonance formalism and add enhancements as the Phenomenological R-Matrix parameterization of direct, doorway, and compound nuclear reactions discussed elsewhere on this conference. This concerted modernization and enhancement effort provides multiple advantages to the nuclear data community. It will allow parameter optimization using enhanced formalisms, including experimental effects, that better match complex experimental data. Then those evaluated parameters can immediately be passed off to AMPX to be reconstructed with the exact same cross section model and be put into a data library for subsequent testing using SCALE and the Valid Benchmark suite or other suitable benchmark suites.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

An in-depth field validation of “DUSST”: A novel low-maintenance soiling measurement device

This study presents indoor and field validation results for two versions of the “DUSST” optical soiling sensor, intended to be a low-cost and low-maintenance device for measuring photovoltaic soiling losses. Indoor testing covers irradiance calibration and temperature dependencies, which are necessary to achieve high accuracy, low uncertainty field measurements. Field testing includes an array of different environments including Saudi Arabia, California, Utah, and Colorado. DUSST versions include a configuration with a 530-nm light emitting diode (LED) (discussed in previous work) and a unit with seven white LEDs and a polycarbonate collimating optic. The new design increases light intensity fivefold and demonstrates a single linear calibration coefficient is effective to measure soiling losses as high as 75%. Field data from Utah and California demonstrate that daily soiling loss measurements and soiling rate calculations closely match both reference cell and full-size module measurements of soiling losses and soiling rates. Corrective methods employed on the Utah DUSST sensor suggest that it is possible to achieve measurement errors as low as ±0.1% at two standard deviations. Field data from both Colorado and Saudi Arabia demonstrate that LED lens soiling can occur and that further design optimizations are needed. The lesson learned from all the field deployment locations suggests directions for future design improvements.

14 SOLAR ENERGY↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PV Generation and Load Forecasting for Adjuntas PR Community Microgrids

Existing frameworks to forecast time-series photovoltaic (PV) output power and consumer load for microgrid operations and controls assume a near-continuous availability of real-time input features from the field assets such as PV inverters, energy meters, and weather station. These incoming data points are used to periodically retrain models and update forecast snapshots over a moving horizon window, be it one hour-ahead, one-day ahead, or one-week ahead. However, such frameworks are not resilient to disruptions in data availability caused by losses in communications between the field sensors and data loggers. Hence, there is a need for programs that assume no availability of real-time microgrid asset data and still make reliable forecasts that can be used for decision-making. Such programs would be apt to function in extreme weather events such as hurricanes and would use lightweight recursive time-series models to independently forecast solar irradiance and ambient temperature, then compute PV power from those forecasts, as well as independently forecast consumer load. The codebase performs forecasting for the scenario of when the microgrid does not have a reliable access to forecasts or real-time observations of solar irradiance (I) and ambient temperature (AT) and load (Load) to be able to adequately forecast, in real-time, the PV power production or a business' load. In this case, using historical values of PV power and load, a univariate forecasting of generation and consumption are respectively made. The use-case in particular has two sub-scenarios: one, a normal 7-day ahead forecast where the unavailability of real-time data is assumed due to infrastructure issues such as loss of communication or sensor maintenance or service downtimes. Whereas a hurricane-caused unavailability of real-time data requires a second model trained specifically on historical hurricane days to be able to capture the extreme day behavior of generation in particular, and load if applicable. A gradient boosted regression tree comprises an ensemble of additive models that map between the input of historical values (be it irradiance, temperature, or load) and their corresponding output forecasts of a given horizon such that the individual learner predictions are summed up over the total number of such learners in the ensemble to produce an aggregate forecast. A weighting mechanism is applied to the training data in each iteration, where actual and forecast values are compared to penalize incorrect forecasts by increasing the weight and reducing it to reward correct forecasts. The code's benefits are that it: (a) accounts for a contingency where communication loss renders newly measured real-time data unavailable for model tuning and snapshot updates; (b) presents blind forecasting that recursively determines the next time-step value in a horizon using the forecast of the same attribute from a prior step; and (c) employs lightweight models that, once trained, can reliably generalize for different horizons, which make them suitable for enhancing the resilience of field microgrids prone to extreme events that encounter disruptions to data availability.

Sundararajan, Aditya [Oak Ridge National Laborator↗

Evaluation of the Energy, Hygrothermal, and Thermal Capacity Performance of Cross-Laminated Timber

Cross-laminated timber (CLT) construction is gaining momentum in the US because it offers multiple advantages over traditional construction methods. Benefits that have received the most attention focus on constructability, the environment, and protection (e.g., blast resistance), although CLT construction is likely to offer other benefits, as well. Still, these have not been studied at length because such evaluations are costly, requiring long-term assessments in an actual building and specialized technical knowledge. Among the possible benefits, CLT construction likely provides a higher-performing building envelope. Using CLT panels to enclose a building means fewer joints in the opaque envelope than what is required in traditional stick-framed construction. Fewer joints mean fewer locations where the air- and water-resistive barrier (WRB) could be compromised; thus, a CLT building enclosure may require less maintenance and have a longer lifespan than a traditionally built structure because of fewer air and water leaks. In addition, CLT’s thermal mass moderates indoor temperatures, allowing the heating, ventilation, and air conditioning (HVAC) system to operate more efficiently during peak hours, reducing operational energy consumption throughout the lifetime of the CLT building (Salonvaara et al., 2022). Furthermore, more stable indoor temperatures can increase occupant comfort. The CLT’s thermal mass can also reduce energy costs by adjusting to utility time-of-use pricing without affecting occupant comfort. The ability of CLT buildings to bridge periods without HVAC operation prepares them for future grid interaction and provides a certain level of resilience against power outages. Researchers have attempted to quantify these benefits; however, their work is based on simplified simulations with numerous assumptions. To correctly understand the benefits, an actual building must be monitored. Therefore, information needs to be gathered on indoor and outdoor temperatures, HVAC energy consumption, thermostat setpoints, temperatures, and thermal transport in CLT components to comprehend how these parameters are affected by the CLT’s thermal mass. These data are needed to reduce the number of assumptions and calibrate simulation models to optimize HVAC controls to minimize overall energy consumption, reduce energy use and higher fees during peak demand, and maintain occupant comfort. Additionally, the calibrated simulation model allows the optimization exercise to be repeated in various US climates. Potential benefits can be tailored to buildings in various locations, and decisions can be made on where CLT construction could be most advantageous. Furthermore, monitoring and simulation results are needed to evaluate the durability of the CLT structures in different climates. This project’s researchers gathered information to help understand and quantify the benefits of CLT buildings concerning operational energy, moderated indoor temperatures, and comfort; the dynamic operation to provide grid services; and resilience in times of power outage. Through the corroboration of simulation models with real-world measurements, this study paves the way for extrapolating findings to other climatic zones and building typologies, thereby broadening the understanding of CLT’s multifaceted benefits and reinforcing its position as a material of choice in sustainable construction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operations, maintenance, and cost considerations for PV+Storage in the United States

Battery storage systems are increasingly being installed at photovoltaic (PV) sites to address supply-demand balancing needs. Although there is some understanding of costs associated with PV operations and maintenance (O&M), costs associated with emerging technologies such as PV plus storage lack details about the specific systems and/or activities that contribute to the cost values. This study aims to address this gap by exploring the specific factors and drivers contributing to utility-scale PV plus storage systems (UPVS) O&M activities costs, including how technology selection, data collection, and related and ongoing challenges. Specifically, we used semi-structured interviews and questionnaires to collect information and insights from utility-scale owners and operators. Data was collected from 14 semi-structured interviews and questionnaires representing 51.1 MW with 64.1 MWh of installed battery storage capacity within the United States (U.S.). Differences in degradation rate, expected life cycle, and capital costs are observed across different storage technologies. Most O&M activities at UPVS related to correcting under-performance. Fires and venting issues are leading safety concerns, and owner operators have installed additional systems to mitigate these issues. There are ongoing O&M challenges due the lack of storage-specific performance metrics as well as poor vendor reliability and parts availability. Insights from this work will improve our understanding of O&M consideration at PV plus storage sites.

14 SOLAR ENERGY↗

Meta-Analysis of Advanced Nuclear Reactor Cost Estimations

Supporting Data can be downloaded at: https://gain.inl.gov/content/uploads/4/2024/06/INL-RPT-24-77048-R1.xlsx Nuclear energy is a critical cornerstone of the current United States clean energy supply and may play a larger role in the future in support of a transition to a net-zero economy. The current fleet of nuclear reactors predominantly consists of large light-water reactors (LWRs), while many of the reactor designs under consideration are smaller and/or different technologies. Because these new designs have not yet been built, there is a high degree of uncertainty associated with their cost. This complicates energy-planning efforts because cost projections are not always standardized, consistent, and centralized in an easily accessible location. To help support energy planning in the US, this report provides advanced nuclear cost ranges using a transparent methodology along with other relevant information that can be used to help support decision making and energy planning. The purpose of this work was to conduct a methodical process for cost evaluation using only public information that was vetted with the end-goal to provide reference cost projections for nuclear energy. To provide a solid basis for these values, the approach and assumptions are explicitly laid out throughout the report allowing any user of the data to challenge or reconsider them. Because future US nuclear-reactor costs are still unknown due to little recent observed data, the report opted to compile a comprehensive list of bottom-up estimates and evaluate averages/trends within the data to identify reference ranges. This was deemed preferable to opining on the robustness or validity of one cost estimation versus another. To that end, the work evaluated thousands of lines of cost subaccounts from several bottom-up cost estimates. A wide variety of different reactor types captured in the data are of various sizes and technologies. Some of these reactors will be representative of advanced reactors under development while others will not. Thus, the results here are dependent on the data that are available and the accuracy of the estimates that are used. Each bottom-up estimate was reviewed to determine whether it was complete. Incomplete data sets were corrected to ensure an adequate basis of cross-comparison. The report is not without limitations and should be interpreted as an initial step to develop cost ranges for nuclear technology. Ultimately, future work can build upon the methodology with refined cost estimates to reduce uncertainty. US-based overnight capital cost (OCC) estimates were compiled from extensive data sets into ranges for both large and small reactor sizes for 2030. To project the cost declines over time, learning rates were sampled from literature sources. No SMRs were previously built; hence, learning rates based on bottom-up approaches (e.g., by quantifying the impact stemming from fabrication of different components, modular work, site construction, commissioning) were prioritized. For larger reactors, actual learning rates from deployments were used to project future costs (adjusted to account for standardization or lack thereof between designs). Other costs included are fixed and variable operations and maintenance costs. The final variables were capacity factors and ramp rates to support energy planning.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Rotor blade imbalance fault detection for variable-speed marine current turbines via generator power signal analysis

Marine hydrokinetic (MHK) turbines extract renewable energy from oceanic environments. However, due to the harsh conditions that these turbines operate in, system performance naturally degrades over time. Thus, ensuring efficient condition-based maintenance is imperative towards guaranteeing reliable operation and reduced costs for marine hydrokinetic power. This work proposes a novel framework aimed at identifying and classifying the severity of rotor blade pitch imbalance faults experienced by marine current turbines (MCTs). In the framework, a Continuous Morlet Wavelet Transform (CMWT) is first utilized to acquire the wavelet coefficients encompassed within the 1P frequency range of the turbine's rotor shaft. From these coefficients, several statistical indices are tabulated into a six-dimensional feature space. Next, Principle Component Analysis (PCA) is employed on the resulting feature space for dimensionality reduction, and then the application of a K-Nearest Neighbor (KNN) machine learning algorithm is utilized for fault detection and severity classification. The effectiveness of the proposed framework is validated using a high-fidelity MCT numerical simulation platform, where results demonstrate that the presence of a pitch imbalance fault can be accurately detected 100% of the time and correctly classified based upon severity more than 97% of the time.

42 ENGINEERING↗