Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities

Electricity demand from large load customers such as data centers is projected to grow significantly in the near term. While data centers play an important role in advancing technology innovation and economic growth in the United States, data center energy needs present challenges and opportunities for electricity supply and infrastructure. This technical brief serves as a foundation for the discussion of issues and sharing of perspectives among utilities, regulators, large load customers, and other stakeholders. As utilities and regulators explore rate structures to address growing data center electricity demand, several issues have emerged: -Fair allocation of electricity system costs to large-load customers without unfair shifting of costs to other customers -Appropriate mitigation of the financial risks associated with stranded assets from underutilized utility system investments -Mitigation of operational and resource adequacy risks if electricity demand exceeds supply -Appropriate risk-sharing in commercializing newer electricity technologies such as advanced geothermal, small modular reactors, and long duration energy storage -Accommodating the diverse needs of large-load customers, such as having the option to match electricity consumption with output from carbon-free resources or using onsite generation to provide system capacity The technical brief also identifies key design elements that aim to address these issues and uses leading examples from pending and approved rate structures, agreements, and special contracts to ground the elements in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reassessing Double-Ended Guillotine Break Requirements: Evidence-Based Analysis of Regulatory Assumptions After Five Decades of Nuclear Operation

After five decades of nuclear power operation encompassing more than 20,000 reactor-years across 35 countries and 647 reactors, zero double-ended guillotine breaks (DEGBs) have been documented in commercial reactor coolant systems—despite DEGB being the fundamental design-basis assumption driving Emergency Core Cooling System (ECCS) sizing, structural protection requirements, and containment design specifications. This report examines the basis for DEGB requirements in nuclear power plant design. The DEGB postulate assumes the instantaneous, complete circumferential severance of the largest diameter pipes in reactor coolant systems, driving major design requirements under 10 Code of Federal Regulations 50.46, General Design Criterion 4 and containment design specifications. The United States (4,880 reactor-years) and France (2,505 reactor-years) contribute the largest operational datasets. Probabilistic assessments estimate direct DEGB occurrence probabilities with extremely low event frequencies, far below the 10-5/reactor-year thresholds typically used to define non-credible events in nuclear-safety analyses; i.e., events with probability this low fall into beyond-design-basis events. Current material-science knowledge demonstrates that the ductile steel materials used in nuclear piping systems exhibit stable crack-growth behavior fundamentally incompatible with instantaneous severance. International regulatory experience, particularly Germany’s comprehensive break-preclusion implementation, and successful leak-before-break (LBB) applications in almost all of U.S. pressurized water reactor units validate that alternatives can maintain safety performance while reducing economic burden. Current DEGB protection systems impose estimated lifetime costs of hundreds of millions of dollars per unit, over the life of a plant across the nuclear industry (including ongoing costs), representing substantial resource allocation toward scenarios with extremely low probability. Although this report acknowledges uncertainties regarding long-term aging effects, potential synergistic degradation mechanisms, and site-specific seismic considerations that warrant continued evaluation as regulatory policy evolves, there remains no documented evidence that a DEGB has occurred as a consequence of the conditions or mechanisms described in this report. This report acknowledges the Nuclear Regulatory Commission’s (NRC’s) recent efforts—outlined in the draft Interim Staff Guidance (ISG) NRC-DSS-ISG-2025-XX (“Treatment of Certain Loss-of-Coolant Accident Locations as Beyond-Design-Basis Accidents Draft Interim Staff Guidance”)—to reduce overly conservative requirements for large-break loss of coolant accidents through technical justifications and exemptions. However, extensive operating experience and validated methodologies—such as LBB and in-service inspection programs—demonstrate that the probability of a DEGB in reactor coolant-loop piping is extremely low, even under seismic conditions. The authors and reviewers of this report recommend that DEGB be removed as a design-basis event through formal rulemaking, rather than case-by-case exemptions, to better reflect credible failure modes, align with current data, and align with modern, risk-informed safety analysis.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Stochastic ordering properties and optimal routing control for a class of finite capacity queueing systems

The problem of routing jobs to parallel queues with identical exponential servers and unequal finite buffer capacities is considered. Stochastic ordering and weak majorization properties on critical performance measures are established by means of event-driven inductions. In particular, it is shown that the intuitive 'join the shortest non-full queue' (SNQ) policy is optimal with respect to an overall function that accounts for holding and blocking costs. Moreover, the buffer allocation problem is solved by proving the intuitive result that, for a fixed total buffer capacity, the optimal allocation scheme is the one in which the difference between the maximum and minimum queue capacities is minimized, i.e., becomes either 0 or 1.

Towsley, Don↗

Integrated propulsion technology demonstrator. Program plan

NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

Source record↗

Frequency-Modulated, Continuous-Wave Laser Ranging Using Photon-Counting Detectors

Optical ranging is a problem of estimating the round-trip flight time of a phase- or amplitude-modulated optical beam that reflects off of a target. Frequency- modulated, continuous-wave (FMCW) ranging systems obtain this estimate by performing an interferometric measurement between a local frequency- modulated laser beam and a delayed copy returning from the target. The range estimate is formed by mixing the target-return field with the local reference field on a beamsplitter and detecting the resultant beat modulation. In conventional FMCW ranging, the source modulation is linear in instantaneous frequency, the reference-arm field has many more photons than the target-return field, and the time-of-flight estimate is generated by balanced difference- detection of the beamsplitter output, followed by a frequency-domain peak search. This work focused on determining the maximum-likelihood (ML) estimation algorithm when continuous-time photoncounting detectors are used. It is founded on a rigorous statistical characterization of the (random) photoelectron emission times as a function of the incident optical field, including the deleterious effects caused by dark current and dead time. These statistics enable derivation of the Cramér-Rao lower bound (CRB) on the accuracy of FMCW ranging, and derivation of the ML estimator, whose performance approaches this bound at high photon flux. The estimation algorithm was developed, and its optimality properties were shown in simulation. Experimental data show that it performs better than the conventional estimation algorithms used. The demonstrated improvement is a factor of 1.414 over frequency-domainbased estimation. If the target interrogating photons and the local reference field photons are costed equally, the optimal allocation of photons between these two arms is to have them equally distributed. This is different than the state of the art, in which the local field is stronger than the target return. The optimal processing of the photocurrent processes at the outputs of the two detectors is to perform log-matched filtering followed by a summation and peak detection. This implies that neither difference detection, nor Fourier-domain peak detection, which are the staples of the state-of-the-art systems, is optimal when a weak local oscillator is employed.

Erkmen, Baris I.↗

Exploring New Frontiers in Space Communications: Enhancing Delay Tolerant Networking through Cloud and Containerization

The High-rate Delay Tolerant Networking (HDTN) project at NASA Glenn Research Center has developed software that enables more flexible, reliable, and efficient space internetworking by using modern computing techniques such as cloud services, microservices, network function virtualization, software defined networking, and a distributed architecture. HDTN is built upon the Bundle Protocol and related convergence layers which have been developed to mitigate the challenges of the space networking environment including long delays, asymmetric data rates, and intermittent connectivity. The HDTN implementation employs asynchronous message processing tasks which allow for non-blocking operations as well as deployment in both centralized and distributed architectures. This paper investigates deploying HDTN in a containerized approach on the NASA Goddard’s Mission Cloud Platform using Amazon Web Services Elastic Compute Cloud (EC2). Commercial cloud computing will lower operating costs, provide flexible resource allocation, and allow for interconnectivity between multiple NASA centers as well as external partners. Containerization using Docker will enable greater portability and scalability for HDTN to be deployed into a variety of environments. We discuss possible NASA missions and use-cases such as the Laser Communications Relay Demonstration (LCRD) where the services provided by HDTN (reliable transport, high-rate message processing, and store-and-forward capabilities) will be enhanced through cloud computing and containerization. In addition, we describe the HDTN architecture and possible microservice-based networking approaches that can be obtained via HDTN’s configuration capabilities. Finally, we detail the EC2 specifications needed to achieve data rates greater than 1 Gbps to support optical communication missions such as LCRD.

Blake LaFuente↗

Cost analysis of water recovery systems

A methodology was developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware based on an extrapolation of past hardware development experience. Major items of costs within water recovery systems were identified and related to physical and/or performance criteria. Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced water recovery systems. The results of the study are expected to assist NASA in long-range planning and allocation of resources in a cost effective manner in support of earth orbital programs. This report deals with the cost analysis of the five leading water reclamation systems, namely: (1) RITE waste management-water system, (2) reverse osmosis system, (3) multifiltration system, (4) vapor compression system, and (5) closed air evaporation system with electrolytic pretreatment.

Yakut, M. M.↗

Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability

Cost control must be implemented through the establishment of requirements and controlled continually by managing to these requirements. Cost control of the non-recurring side of life cycle cost has traditionally been implemented in both commercial and government programs. The government uses the budget process to implement this control. The commercial approach is to use a similar process of allocating the non-recurring cost to major elements of the program. This type of control generally manages through a work breakdown structure (WBS) by defining the major elements of the program. If the cost control is to be applied across the entire program life cycle cost (LCC), the approach must be addressed very differently. A functional breakdown structure (FBS) is defined and recommended. Use of a FBS provides the visibifity to allow the choice of an integrated solution reducing the cost of providing many different elements of like function. The different functional solutions that drive the hardware logistics, quantity of documentation, operational labor, reliability and maintainability balance, and total integration of the entire system from DDT&E through the life of the program must be fully defined, compared, and final decisions made among these competing solutions. The major drivers of recurring cost have been identified and are presented and discussed. The LCC requirements must be established and flowed down to provide control of LCC. This LCC control will require a structured rigid process similar to the one traditionally used to control weight/performance for space transportation systems throughout the entire program. It has been demonstrated over the last 30 years that without a firm requirement and methodically structured cost control, it is unlikely that affordable and sustainable space transportation system LCC will be achieved.

Rhodes, Russel E.↗

Optimum allocation of redundancy among subsystems connected in series

This analysis considers the optimum allocation of redundancy in a system of serially connected subsystems in which each subsystem is of the k-out-of-n type. Redundancy is optimally allocated when: (1) reliability is maximized for given costs; or (2) costs are minimized for given reliability. Several techniques are presented for achieving optimum allocation and their relative merits are discussed. Approximate solutions in closed form were attainable only for the special case of series-parallel systems and the efficacy of these approximations is discussed.

Bien, D. D.↗

Overview of a new slicing method: Fixed Abrasive Slicing Technique (FAST)

The fixed abrasive slicing technique (FAST) was developed to slice silicon ingots more effectively. It was demonstrated that 25 wafers/cm can be sliced from 10 cm diameter and 19 wafers/cm from 15 cm diameter ingots. This was achieved with a combination of machine development and wire-blade development programs. Correlation was established between cutting effectiveness and high surface speeds. A high speed slicer was designed and fabricated for FAST slicing. Wirepack life of slicing three 10 cm diameter ingots was established. Electroforming techniques were developed to control widths and prolong life of wire-blades. Economic analysis indicates that the projected add-on price of FAST slicing is compatible with the DOE price allocation to meet the 1986 cost goals.

Schmid, F.↗

Economical Production of Pu-238: NIAC Phase I Final Report

All space exploration missions traveling beyond Jupiter must use radioisotopic power sources for electrical power. The best isotope to power these sources is plutonium-238 (Pu-238). The US supply of Pu-238 is almost exhausted and will be gone within the next decade. The Department of Energy has initiated a production program with a $10M allocation from NASA but the cost is estimated at over $100M to get to production levels. The Center for Space Nuclear Research (CSNR) has conceived of a potentially better process to produce Pu-238 earlier and for significantly less cost. Potentially, the front end capital costs could be provided by private industry such that the government only had to pay for the product produced. In the Phase I NIAC (NASA Innovative Advanced Concepts) grant, the CSNR has evaluated the feasibility of using a low power, commercially available nuclear reactor to produce 1.5 kg of Pu-238 per year. The impact on the neutronics of the reactor have been assessed, the amount of Neptunium target material estimated, and the production rates calculated. In addition, the size of the post-irradiation processing facility has been established. Finally, as the study progressed, a new method for fabricating the Pu-238 product into the form used for power sources has been identified to reduce the cost of the final product. In short, the concept appears to be viable, can produce the amount of Pu-238 needed to support the NASA missions, can be available within a few years, and will cost significantly less than the current DOE program.

Plutonium↗

10 meter Sub-Orbital Large Balloon Reflector (LBR)

The realization of a large, space-based 10 meter class telescope for far-infrared/THz studies has long been a goal of NASA. Such a telescope could study the origins of stars, planets, molecular clouds, and galaxies; providing a much needed means of following-up on tantalizing results from recent successful missions such as Spitzer, Herschel, and SOFIA. Indeed, Herschel began its life in the US space program as the Large Deployable Reflector (LDR) to be assembled in low Earth orbit by shuttle astronauts. Escalating costs and smaller federal budget allocations resulted in a downsizing of the mission. However, by combining successful suborbital balloon and ground-based telescope technologies, the dream of a 10 meter class telescope free of ~99% of the Earth's atmospheric absorption in the far-infrared can be realized. The same telescope can also be used to perform sensitive, high spectral and spatial resolution limb sounding studies of the Earth's atmosphere in greenhouse gases such as CO, ClO, O3, and water, as well as serve as a high flying hub for any number of telecommunications and surveillance activities. Flight times of 100+ days will be possible, with instruments having mass and power requirements in excess of ~500 kg and ~1 kW.Here we present the results of our NIAC Step 1, Phase B design study where each key aspect of the LBR concept is discussed and recommendations made for further study in Phase II.These aspects include realization of a large spherical reflecting surface, spherical corrector, pointing system, instrument module, and service module/gondola. Once each hardware component is introduced, a typical LBR Mission profile is described that enables the realization of a stratospheric 10 meter THz observatory and limb sounder. Verification of the design approach was achieved by using a combination of analytical modelling, lab testing of materials and techniques, and building a 3 meter rooftop LBR prototype.

Telescope↗

Investigation of test methods, material properties and processes for solar cell encapsulants

The goal of the program is to identify, test, evaluate and recommend encapsulation materials and processes for the fabrication of cost-effective and long life solar modules. Of the $18 (1948 $) per square meter allocated for the encapsulation components approximately 50% of the cost ($9/sq m) may be taken by the load bearing component. Due to the proportionally high cost of this element, lower costing materials were investigated. Wood based products were found to be the lowest costing structural materials for module construction, however, they require protection from rainwater and humidity in order to acquire dimensional stability. The cost of a wood product based substrate must, therefore, include raw material costs plus the cost of additional processing to impart hygroscopic inertness. This protection is provided by a two step, or split process in which a flexible laminate containing the cell string is prepared, first in a vacuum process and then adhesively attached with a back cover film to the hardboard in a subsequent step.

Willis, P. B.↗

System-Availability And Resource-Allocation Program

ACARA analyzes availability, life-cycle cost, and scheduling of resources. Uses statistical Monte Carlo method to simulate capacity states of system as well as failure and repair of components. Failures of components modeled mathematically by use of combination of exponential and Weibull probability distributions. Schedules replacement of components to optimize performance of system. Made to comply with any constraints on production of components, capacities of resupply vehicles, spares kept on site, crews, and/or equipment. Written in APL2.

Viterna, L. A.↗

Using Financial Contracts to Facilitate Informal Leases Within a Western United States Water Market Based on Prior Appropriation

The ability to reallocate water to higher-value uses during drought is an increasingly important “soft-path” tool for managing water resources in an uncertain future. In most of the Western United States, state-level water market institutions that enable reallocation also impose substantial transaction costs on market participants related to regulatory approval and litigation. These transaction costs can be prohibitive for many participants in terms of both costs and lengthy approval periods, limiting transfers and reducing allocation efficiency, particularly during drought crises periods. This manuscript describes a mechanism to reduce transaction costs by adapting an existing form of informal leases to facilitate quicker and less expensive transfers among market participants. Instead of navigating the formal approval process to lease a water right, informal leases are financial contracts for conservation that enable more junior holders of existing rights to divert water during drought, thereby allowing the formal transfer approval process to be bypassed. The informal leasing approach is tested in the Upper Colorado River Basin, where drought and institutional barriers to transfers lead to frequent shortages for urban rights holders along Colorado's Front Range. Informal leases are facilitated via option contracts that include adaptive triggers and that define volumes of additional, compensatory, releases designed to mitigate impacts to instream flows and third parties. Results suggest that more rapid reallocation of water via informal leases could have resulted in up to $222 million in additional benefits for urban rights holders during the historical period 1950–2013.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrating Shuttle payloads

The paper discusses the relationships that will develop among experimenters, mission managers, and operators when satellites, using equipment transported by the Space Shuttle, are constructed in space. Since these satellites do not have to be lifted and guided from the earth's surface, and since they are more accessible for maintenance, future hardware will be built to less demanding standards, which will permit a greater variety of research and more of it in terms of costs. Present and future interrelationships among management authority, interface documentation, accommodations allocation, experiment autonomy, and assembly and checkout are analyzed, so that less costly payload-integration procedures can be developed.

Jean, O. C.↗

Ka-band study: 1988

The Ka-band study team was chartered in late 1987 to bring together all the planning elements for establishing 32 GHz (Ka-band) as the primary downlink frequency for deep-space operation, and to provide a stable baseline from which to pursue that development. This article summarizes the results of that study at its conclusion in mid-1988, and corresponds to material presented to NASA's Office of Space Operations on July 14, 1988. For a variety of reasons, Ka-band is the right next major step in deep-space communications. It offers improved radio metric accuracy through reduced plasma sensitivity and increased bandwidth. Because of these improvements, it offers the opportunity to reduce costs in the flight radio system or in the DSN by allocating part of the overall benefits of Ka-band to this cost reduction. A mission scenario is being planned that can drive at least two and possibly all three of the DSN subnets to provide a Ka-band downlink capability by the turn of the century. The implementation scenario devised by the study team is believed to be feasible within reasonable resource expectations, and capable of providing the needed upgrade as a natural follow-on to the technology development which is already underway.

Layland, J. W.↗