Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Size”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Air Purification in Closed Environments: An Overview of Spacecraft Systems

The primary goal for a collective protection system and a spacecraft environmental control and life support system (ECLSS) are strikingly similar. Essentially both function to provide the occupants of a building or vehicle with a safe, habitable environment. The collective protection system shields military and civilian personnel from short-term exposure to external threats presented by toxic agents and industrial chemicals while an ECLSS sustains astronauts for extended periods within the hostile environment of space. Both have air quality control similarities with various aircraft and 'tight' buildings. This paper reviews basic similarities between air purification system requirements for collective protection and an ECLSS that define surprisingly common technological challenges and solutions. Systems developed for air revitalization on board spacecraft are discussed along with some history on their early development as well as a view of future needs. Emphasis is placed upon two systems implemented by the National Aeronautics and Space Administration (NASA) onboard the International Space Station (ISS): the trace contaminant control system (TCCS) and the molecular sieve-based carbon dioxide removal assembly (CDRA). Over its history, the NASA has developed and implemented many life support systems for astronauts. As the duration, complexity, and crew size of manned missions increased from minutes or hours for a single astronaut during Project Mercury to days and ultimately months for crews of 3 or more during the Apollo, Skylab, Shuttle, and ISS programs, these systems have become more sophisticated. Systems aboard spacecraft such as the ISS have been designed to provide long-term environmental control and life support. Challenges facing the NASA's efforts include minimizing mass, volume, and power for such systems, while maximizing their safety, reliability, and performance. This paper will highlight similarities and differences among air purification systems. Additional information is included in the original extended abstract.

Perry, Jay L.↗

Asteroid Crewed Segment Mission Lean Development

The next generation of human spaceflight missions presents numerous challenges to designers that must be addressed to produce a feasible concept. The specific challenges of designing an exploration mission utilizing the Space Launch System and the Orion spacecraft to carry astronauts beyond earth orbit to explore an asteroid stored in a distant retrograde orbit around the moon will be addressed. Mission designers must carefully balance competing constraints including cost, schedule, risk, and numerous spacecraft performance metrics including launch mass, nominal landed mass, abort landed mass, mission duration, consumable limits and many others. The Asteroid Redirect Crewed Mission will be described along with results from the concurrent mission design trades that led to its formulation. While the trades presented are specific to this mission, the integrated process is applicable to any potential future mission. The following trades were critical in the mission formulation and will be described in detail: 1) crew size, 2) mission duration, 3) trajectory design, 4) docking vs grapple, 5) extravehicular activity tasks, 6) launch mass and integrated vehicle performance, 7) contingency performance, 8) crew consumables including food, clothing, oxygen, nitrogen and water, and 9) mission risk. The additional Orion functionality required to perform the Asteroid Redirect Crewed Mission and how it is incorporated while minimizing cost, schedule and mass impacts will be identified. Existing investments in the NASA technology portfolio were leveraged to provide the added functionality that will be beneficial to future exploration missions. Mission kits are utilized to augment Orion with the necessary functionality without introducing costly new requirements to the mature Orion spacecraft design effort. The Asteroid Redirect Crewed Mission provides an exciting early mission for the Orion and SLS while providing a stepping stone to even more ambitious missions in the future.

Gard, Joe↗

The International Space Station as a Research Laboratory: A View to 2010 and Beyond

Assembly of International Space Station (ISS) is expected to be complete in 2010, with operations planned to continue through at least 2016. As we move nearer to assembly complete, replanning activities by NASA and ISS International Partners have been completed and the final complement of research facilities on ISS is becoming more certain. This paper will review pans for facilities in the US On-orbit Segment of ISS, including contributions from International Partners, to provide a vision of the research capabilities that will be available starting in 2010. At present, in addition to research capabilities in the Russian segment, the United States Destiny research module houses nine research facilities or racks. These facilities include five multi-purpose EXPRESS racks, two Human Research Facility (HRF) racks, the Microgravity Science Glovebox (MSG), and the Minus Eighty-degree Laboratory Freezer for ISS (MELFI), enabling a wide range of exploration-related applied as well as basic research. In the coming years, additional racks will be launched to augment this robust capability: Combustion Integrated Rack (CIR), Fluids Integrated Rack (FIR), Window Observation Rack Facility (WORF), Microgravity Science Research Rack (MSRR), Muscle Atrophy Research Exercise System (MARES), additional EXPRESS racks and possibly a second MELFI. In addition, EXPRESS Logistics Carriers (ELC) will provide attach points for external payloads. The European Space Agency s Columbus module will contain five research racks and provide four external attach sites. The research racks are Biolab, European Physiology Module (EPM), Fluid Science Lab (FSL), European Drawer System (EDS) and European Transport Carrier (ETC). The Japanese Kibo elements will initially support three research racks, Ryutai for fluid science, Saibo for cell science, and Kobairo for materials research, as well as 10 attachment sites for external payloads. As we look ahead to assembly complete, these new facilities represent a threefold increase from the current research laboratory infrastructure on ISS. In addition, the increase in resident crew size will increase from three to six in 2009, will provide the long-term capacity for completing research on board ISS. Transportation to and from ISS for crew and cargo will be provided by a fleet of vehicles from the United States, Russia, ESA and Japan, including accommodations for thermally-conditioned cargo. The completed ISS will have robust research accommodations to support the multidisciplinary research objective of scientists worldwide.

Uri, John J.↗

Mars transportation system synthesis

Performance and requirements synthesized to support the manned Mars mission of the Space Exploration Initiative (SEI) are presented. Emphasis is placed on the Mars transportation system (MTS), which uses nuclear thermal rocket (NTR) propulsion technology associated with accomplishing the manned Mars mission. Data are also presented for a propulsion system options comparison of chemical/aerobrake and nuclear electric propulsion systems. Vehicle- and weight-scaling are used to determine the MTS mass, size, and performance range required for different Mars mission durations. The split sprint, opposition, and conjunction class mission modes are employed to determine the MTS requirements envelope. MTS sensitivity to Mars surface payload, crew size, Mars orbit payload, NTR engine thrust level, engine specific impulse, and NTR engine thrust-to-weight ratio are synthesized. A suggested NTR technology level to accomplish both cargo and piloted Mars missions is discussed.

Young, Archie C.↗

Applying NASA’s Human Systems Integration Methodology in Implementing Voice-Control of Future Spacecraft Systems

Through the NASA Artemis program, a new era of space exploration will serve to lead humanity towards sustained lunar exploration in preparation for the next giant leap-human exploration of Mars. These crewed spacecraft and habitats will require more automation and autonomy to support these complex missions. Crew size will be small and therefore a more efficient command and control input method is desired. Speech recognition along with visual or auditory feedback is an alternative, providing an extra pair of hands and eyes for the crew. Yet, speech recognition demands a highly integrated development approach to ensure a successful system implementation. To ensure the voice control application is developed correctly will require a Human Systems Integration (HSI) approach. This paper provides an insight into the development of a speech/voice control application for a spacecraft system that encompasses automation and autonomy through an HSI approach. Results of the voice control experiment of the Space Shuttle camera system are provided as lessons learned about using voice control on a spacecraft. Limitations and challenges of the technology are addressed as well as how HSI along with Human Readiness Level can help successfully develop voice control command and control systems.

Systems Engineering↗

Effects of Communication Delay on Human Spaceflight Missions

Missions onboard the International Space Station rely on the real-time availability of a large ground team of system experts to command the vehicle, solve safety-critical problems, and guide the crew during complex operations. Also, in Low Earth Orbit (LEO), supplies can be sent and crews evacuated quite quickly if needed. Future missions Beyond Low Earth Orbit (BLEO) will not have this 24/7, real-time safety net as communication latency increases, resupply difficulty increases, and evacuation opportunities diminish. There are few, if any, terrestrial analogs for human spaceflight missions BLEO that reflect the conditions—including extreme environments, long mission durations, and small crew sizes – that make these missions so high risk. Studies on specific conditions, such as communication delays and asynchronous interactions, have been performed in NASA Earth-based analog missions and have found that communication delays can disrupt ground-crew interactions and adversely impact team performance. However, there are gaps and limitations in studies conducted to date, notably on human spacecraft system failure response and recovery, the impacts of shorter lunar-relevant communication delays on complex operations, and the effectiveness of countermeasures. The work presented here breaks down real anomalies that occurred on ISS and Apollo missions and creates example scenarios fort Lunar Surface and Mars missions to explore the impact of communication delays of varying length on onboard operations and mission outcomes. Our analyses indicate that short communication delays (e.g., seconds to a minute) adversely impact the ability for ground to provide real-time oversight and guidance and to catch quickly emerging problems in time. Longer communication delays (e.g., up to 40 minutes on Mars missions) call for a shift of responsibility for tactical operations from ground to crew; crew must make time-critical decisions independently and respond to time-critical vehicle anomalies to prevent consequences.

human-systems integration↗

Effects of Communication Delay on Human Spaceflight Missions

Missions onboard the International Space Station rely on the real-time availability of a large ground team of system experts to command the vehicle, solve safety-critical problems, and guide the crew during complex operations. Also, in Low Earth Orbit (LEO), supplies can be sent and crews evacuated quite quickly if needed. Future missions Beyond Low Earth Orbit (BLEO) will not have this 24/7, real-time safety net as communication latency increases, resupply difficulty increases, and evacuation opportunities diminish. There are few, if any, terrestrial analogs for human spaceflight missions BLEO that reflect the conditions—including extreme environments, long mission durations, and small crew sizes – that make these missions so high risk. Studies on specific conditions, such as communication delays and asynchronous interactions, have been performed in NASA Earth-based analog missions and have found that communication delays can disrupt ground-crew interactions and adversely impact team performance. However, there are gaps and limitations in studies conducted to date, notably on human spacecraft system failure response and recovery, the impacts of shorter lunar-relevant communication delays on complex operations, and the effectiveness of countermeasures. The work presented here breaks down real anomalies that occurred on ISS and Apollo missions and creates example scenarios fort Lunar Surface and Mars missions to explore the impact of communication delays of varying length on onboard operations and mission outcomes. Our analyses indicate that short communication delays (e.g., seconds to a minute) adversely impact the ability for ground to provide real-time oversight and guidance and to catch quickly emerging problems in time. Longer communication delays (e.g., up to 40 minutes on Mars missions) call for a shift of responsibility for tactical operations from ground to crew; crew must make time-critical decisions independently and respond to time-critical vehicle anomalies to prevent consequences.

human-systems integration↗

Development of a preprototype sabatier CO2 reduction subsystem

A preoprototype Sabatier CO2 Reduction Subsystem was successfully designed, fabricated and tested. The lightweight, quick starting reactor utilizes a highly active and physically durable methanation catalyst composed of ruthenium on alumina. The use of this improved catalyst permits a single straight through plug flow design with an average lean component H2/CO2 conversion efficiency of over 99% over a range of H2/CO2 molar ratios of 1.8 to 5 while operating with flows equivalent to a crew size of one person steadystate to 3 persons cyclical (equivalent to 5 persons steady state). The reactor requires no heater operation after start-up even during simulated 55 minute lightside/39 minute darkside orbital operation over the above range of molar ratios and crew loadings. The subsystem's operation and performance is controlled by a microprocessor and displayed on a nineteen inch multi-colored cathode ray tube.

Kleiner, G. N.↗

Preparing a health care delivery system for Space Station

NASA's Space Station is viewed as the beginning of man's permanent presence in space. This paper presents the guidelines being developed by NASA's medical community in preparing a quality, permanent health care delivery system for Space Station. The guidelines will be driven by unique Space Station requirements such as mission duration, crew size, orbit altitude and inclination, EVA frequency and rescue capability. The approach will emphasize developing a health care system that is modular and flexible. It will also incorporate NASA's requirements for growth capability, commonality, maintainability, and advanced technology development. Goals include preventing unnecessary rescue attempts, as well as maintaining the health and safety of the crew. Proper planning will determine the levels of prevention, diagnosis, and treatment necessary to achieve these goals.

Logan, J. S.↗

Human Exploration of Mars: Preliminary Lists of Crew Tasks

This is a preliminary report of ongoing research that has identified 1,125 tasks that are likely to be performed during initial human expeditions to Mars. The purpose of the report is to facilitate immediate access to the task inventory by researchers whose efforts might benefit from concrete examples of the work that will likely be performed by the first human explorers of Mars and the tasks for which crew members must be prepared to perform in response to emergencies. The research that led to the task lists is being conducted under Cooperative Agreement NNX15AW34G / NNX16AQ86G for the Human Factors and Behavioral Performance Element, Human Performance Program, NASA’s Johnson Space Center. The study is ongoing and will conclude with a final report that documents all research activities and presents the results of task and ability analyses and the implications of study results to crew size and composition, personnel selection and training, and design of equipment and procedures. The research addresses the Risk of Inadequate Mission, Process, and Task Design and the Risk of Performance Errors Due to Training Deficiencies by identifying the work that will be performed during an expedition to Mars and the abilities, skills, and knowledge that will be required of crew members. The study began by developing the comprehensive inventory of 1,125 tasks that are likely to be performed during the 12 phases of initial human expeditions to Mars, from launch to landing 30 months later. This full-mission task inventory was generated by a comprehensive review of documentation and concepts of operations with the understanding that plans and tasks might change in response to continuing technological development. Note: This interim report includes no discussion of analyses and has been prepared solely to facilitate dissemination of the task lists to others whose research might benefit from detailed information about the work and other activities that are likely to be performed during the human exploration of Mars.

Stuster, Jack W.↗

Common Habitat Base Camp for Moon and Mars Surface Operations

The Common Habitat uses the SLS Core Stage Liquid Oxygen tank as the primary structure (similar to Skylab) and has an internal architecture compatible with microgravity, lunar gravity, and Mars gravity, such that identical versions of the same design can be used in all three environments. Applying the large dimensions and eight-person crew size of the Common Habitat to a surface architecture leads to a unique base camp configuration. A notional such base camp is described in this analysis. The base camp includes four distributed zones – habitation, landing, power, and resource production. The base camp is deployed and assembled in three phases: site preparation, element staging, and habitat delivery, each of which are briefly discussed. Crew arrival and departure is discussed, including variations caused by orbital mechanics-induced differences between the Moon and Mars base camps. Trash and logistics operations are described. Finally, crew operations within the base camp are described.

Lunar Outpost↗

NASA's Orbital Space Plane Risk Reduction Strategy

This paper documents the transformation of NASA s Space Launch Initiative (SLI) Second Generation Reusable Launch Vehicle Program under the revised Integrated Space Transportation Plan, announced November 2002. Outlining the technology development approach followed by the original SLI, this paper gives insight into the current risk-reduction strategy that will enable confident development of the Nation s first orbital space plane (OSP). The OSP will perform an astronaut and contingency cargo transportation function, with an early crew rescue capability, thus enabling increased crew size and enhanced science operations aboard the International Space Station. The OSP design chosen for full-scale development will take advantage of the latest innovations American industry has to offer. The OSP Program identifies critical technologies that must be advanced to field a safe, reliable, affordable space transportation system for U.S. access to the Station and low-Earth orbit. OSP flight demonstrators will test crew safety features, validate autonomous operations, and mature thermal protection systems. Additional enabling technologies may be identified during the OSP design process as part of an overall risk-management strategy. The OSP Program uses a comprehensive and evolutionary systems acquisition approach, while applying appropriate lessons learned.

Dumbacher, Dan↗

A Crew and Logistics Lander for the Common Habitat Architecture

The Common Habitat Architecture is a conceptual study that explores the use of a large habitat derived from the Space Launch System (SLS) liquid oxygen tank as a core habitation element that can be used for crew missions or training in 0g, 1/6g, 3/8g, and 1g. This is not part of current NASA Artemis mission planning, but instead represents an architecture that could potentially follow after the Artemis missions and initial human Mars landings. This architecture leverages Starship-derived vehicles for crew landing on and ascent from the Moon and Mars in support of long-duration surface missions with pressurized crew transfer baselined as a nominal capability. This is not the Human Landing System variant of Starship but represents a number of modifications to enable long-duration surface missions with an eight-person crew size. A rapid brainstorming study was conducted in February of 2021, using only public data, to identify options to deliver the 90-ton Common Habitat to the surface and emplace it at the intended habitation site. This study compared three lunar lander concepts and three Mars lander concepts before ultimately selecting the SpaceX Starship as the most viable lander. The Common Habitat Architecture assumes that this Starship variant can further be modified for crew and cargo delivery, assuming that the use of a common system will lead to cost benefits. It is assumed that the Starship will expend too much propellant in landing crew and logistics to be able to launch, given the assumed absence of surface propellant production. Consequently, a separable ascent stage is used for crew ascent. The pressurized elements of this modified Starship are discussed: Starship Ascent Module, Airlock, Transfer Tunnel, Pressurized Crew Transfer Module, and Logistics Modules. For each element, a description, dimensions, rough mass estimates, core capabilities, and design features are presented. Key mechanisms and internal structures of the starship are also discussed. This will include flame diverters for the ascend module, the orbital docking hatch, Pressurized Crew Transfer Module Garage door, Starship Ascent Module fairing, flame diverter blow-out panels, Pressurized Crew Transfer Module lift system, logistics module lift system, contingency crew ascent via the logistics module lift system, internal catwalks, and structural interfaces. Concept of Operations will be discussed for both Moon and Mars. This will include in-space crew rendezvous and transfer, crewed landing, shirtsleeve crew transfer, crew departure, contingency surface operations, and final element disposition. Key differences for Mars will be discussed, such as the Martian atmosphere, dust storms, the absence of crew handover, and Deep Space Exploration Vehicle rendezvous. Contingency microgravity maintenance access will also be discussed. This work will demonstrate viable pressurized crew transfer with a Starship-based lander architecture. Forward work includes Garage lighting and camera systems, Starship Ascent Module propulsion system and docking port trades, contingency habitation trades, and mass/power equipment estimation. Finally, forward work includes developing a heavy cargo return system derived from the Crew and Logistics Starship. The goal of this system is the return of at least 10,000 kg payloads from the surfaces of the Moon and Mars.

Lunar Lander↗

Comparison of waste combustion and waste electrolysis - A systems analysis

A steady state model of a closed environmental system has been developed which includes higher plant growth for food production, and is designed to allow wastes to be combusted or electrolyzed. The stoichiometric equations have been developed to evaluate various trash compositions, food items (both stored and produced), metabolic rates, and crew sizes. The advantages of waste electrolysis versus combustion are: (1) oxygen is not required (which reduces the load on the oxygen producing system); (2) the CO2 and H2 products are produced in pure form (reducing the load on the separators); and (3) nitrogen is converted to nitrate (which is directly usable by plants). Weight tradeoff studies performed using this model have shown that waste electrolysis reduces the life support weight of a 4-person crew by 1000 to 2000 kg.

Holtzapple, Mark T.↗

Internal Architecture of the Common Habitat

The core stage liquid oxygen tank of the Space Launch System can be manufactured as a habitat instead of as a propellant tank, with a common design such that it is equally suitable for use in 0g, 1/6g, 3/8g, 1g, or variable artificial gravity. It is capable of sustaining a crew size of eight for missions up to 1200 days in duration. This Common Habitat can be the central element of a human spaceflight architecture that encompasses the Moon, Mars, and other destinations within the inner solar system. Within this archtiecture, the Common Habitat is specifically used as the core habitation element within a Lunar Base Camp, Mars Base Camp, and the Deep Space Exploration Vehicle. The Common Habitat internal architecture applies a design philosophy to separate crew functions according to deck. The lower deck is reserved for private functions. It includes eight private crew quarters and four waste and hygiene clusters – each with a private waste management compartment, private full body hygiene compartment, and private foyer/clothes changing area. The mid deck is primarily allocated to mission-related functions. It includes an exercise facility, fabrication / maintenance / repair facility, physical science laboratory (physics, geology, and remote sensing: astronomy, heliophysics, planetary science, and Earth science), and life science laboratory (biology and human research). The mid deck also has four external hatches, clocked one every 90 degrees, centered on the vehicle vertical centerline. Each hatch has a 60-inch tall by 40-inch wide opening with the mid deck floor 16 inches below the bottom lip of the hatch opening. The upper deck also includes some mission functions, but is primarily allocated to social functions. It includes a large galley, wardroom with projector and display screen, plant growth chambers, bulk stowage, command and control station, medical facility, hygiene compartment, and vehicle subsystems.

Habitability↗

Implications of Advanced Crew Escape Suit Transpiration for the Orion Program

Human testing was conducted to more fully characterize the integrated performance of the Advanced Crew Escape Suit (ACES) with liquid cooling provide by an Individual Cooling Unit (ICU) across a broad range of environmental conditions and metabolic rates. Together with a correlation for the ACES Liquid Cooling Garment as a function of inlet temperature, metabolic rate, and crew size, a reasonably conservative correlation for core temperature was achieved for the human thermal model applied to the ACES with ICU cooling. A key observation for this correlation was accounting for transpiration of evaporated sweat through the Gortex(Registered TradeMark) liner of the ACES indicated by as much as 0.6 lbm of sweat evaporated over the course of the 1 hour test profile, most of which could not be attributed to respiration or head sweat evaporation of the crew. Historically it has been assumed that transpiration was not an important design feature of the ACES suit. The correlated human thermal model will show transpiration to be highly useful in hot survival situations for the Orion Program when adequate liquid cooling is not available.

Bue, Grant↗

Assessing the Number of Crew for Mars Against Trade Space Parameters

Missions to Mars will differ from all previous human spaceflight missions in that the onboard crew of astronauts will be required to operate in an Earth-independent manner given the long communication delays on Mars missions. Without a systematic, repeatable process to determine the number and composition of crew necessary to successfully accomplish these missions, NASA increases the risk in that crew sizes may be too small to meet primary mission objectives under nominal conditions and, more consequentially, the crewmembers may not have the expertise needed to successfully respond to unforeseen failures without the real-time expertise in the Mission Control Central (MCC) team on which NASA has come to rely. We present a framework for trade space analysis along with results from human-performance models developed in IMPRINT. We discuss the implications of model results on the trade space for number of crew for missions to Mars. This work was funded by the NASA Engineering and Safety Center (NESC) with support from NASA’s Human Research Program (HRP).

Donna Dempsey↗

Breadboard CO2 and humidity control system

A regenerable CO2 and humidity control system is being developed for potential use on shuttle as an alternate to the baseline lithium hydroxide (LiOH)/condensing heat exchanger system. The system utilizes a sorbent material, designated HS-C, to adsorb CO2 and water vapor from the cabin atmosphere. The material is regenerated by exposing it to space vacuum. A half-size breadboard system, utilizing a flight representative HS-C canister, was designed, built, and performance tested to shuttle requirements for total CO2 and total humidity removal. The use of a new chemical matrix material allowed significant optimization of the system design by packing the HS-C chemical into the core of a heat exchanger which is manifolded to form two separate and distinct beds. Breadboard system performance was proven by parametric testing and simulated mission testing over the full range of shuttle crew sizes and metabolic loadings. Vacuum desorption testing demonstrated considerable savings in previously projected shuttle vacuum duct sizing.

Boehm, A. M.↗