Search NASA⌕ Search

SEARCH · Search NASA

Results for “Current Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The ISIS Mission Concept: An Impactor for Surface and Interior Science

The Impactor for Surface and Interior Science (ISIS) mission concept is a kinetic asteroid impactor mission to the target of NASA's OSIRIS-REx (Origins-Spectral Interpretation-Resource Identification-Security-Regolith Explorer) asteroid sample return mission. The ISIS mission concept calls for the ISIS spacecraft, an independent and autonomous smart impactor, to guide itself to a hyper-velocity impact with 1999 RQ36 while the OSIRIS-REx spacecraft observes the collision. Later the OSIRIS-REx spacecraft descends to reconnoiter the impact site and measure the momentum imparted to the asteroid through the impact before departing on its journey back to Earth. In this paper we discuss the planetary science, human exploration and impact mitigation drivers for mission, and we describe the current mission concept and flight system design.

cratering experiment↗

Huntsville Operations Support Center

Information is given in viewgraph form on the Huntsville Operations Support Center (HOSC). The HOSC is a multi-mission control and support facility designed to provide simultaneous support to several diverse missions, using a common set of processing equipment and facilities. Information is given on the missions supported by the HOSC; facility layout; generic system goals; HOSC existing computer architecture; current mission requirements; currently employed hardware and software; front end processing; central processing; peripheral processors; audio and video communications; and upgrading plans.

Bailey, Darrell G.↗

Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew could effectively self-schedule. In parallel we have added in new features and functionality in the Playbook tool based off of our insights from crew self-scheduling in the NASA analogs. In particular this year we have added in the ability for the crew to add, edit, and remove their own activities in the Playbook tool, expanding the type of planning and re-planning possible in the tool and opening up the ability for more free form plan creation. The ability to group and manipulate groups of activities from the plan task list was also added, allowing crew members to add predefined sets of activities onto their mission timeline. In addition we also added a way for crew members to roll back changes in their plan, in order to allow an undo like capability. These features expand and complement the initial self-scheduling features added in year one with the goal of making crew autonomous planning more efficient. As part of this work we have also finished developing the first version of our Playbook Data Analysis Tool, a research tool built to interpret and analyze the unobtrusively collected data obtained during the NASA analog missions through Playbook. This data which includes user click interaction as well as plan change information, through the Playbook Data Analysis Tool, allows us to playback this information as if a video camera was mounted over the crewmember's tablet. While the primary purpose of this tool is to allow usability analysis of crew self-scheduling sessions used on the NASA analog, since the data collected is structured, the tool can automatically derive metrics that would be traditionally tedious to achieve without manual analysis of video playback. We will demonstrate and discuss the ability for future derived metrics to be added to the tool. In addition to the current data and results gathered in year two we will also discuss the preparation and goals of our International Space Station (ISS) onboard technology demonstration with Playbook. This technology demonstration will be preformed as part of the CAST payload starting in late 2016.

onboard planning↗

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reference Fuel Development for NonAluminum Spent Nuclear Fuel Management

Background – The L Area Facility was initially constructed as a nuclear reactor for nuclear material production in the 1950s – The reactor was shut down in the late 1980s: in the 1990s the mission changed to storing nuclear material • Current Mission – L Area provides for the safe receipt, storage, handling, and shipping of spent nuclear fuel (SNF) and other nuclear materials – Received more than 47,000 SNF assemblies since 1964 from power and research reactors (domestic and foreign)

Sifuentes, Christian A. [Savannah River Nuclear So↗

Estimation of solar gravitational harmonics with Starprobe radiometric tracking data

The potential gravitational science return of a proposed spacecraft mission, called Starprobe, is investigated. The current mission plan is to place a spacecraft in a highly eccentric, highly inclined solar orbit with a perihelion distance of four solar radii. A covariance analysis based on Kalman filtering theory is performed to predict the accuracies with which gravitational parameters associated with the nonsphericity of the sun and relativistic effects can be estimated with radiometric tracking data. The accuracies are computed as functions of the quality and quantity of the radiometric data, the orbital parameters, the magnitude and character of the nongravitational accelerations acting on the spacecraft, and the errors in the tracking station locations and the ephemeris of the earth relative to the sun.

Mease, K. D.↗

Lifetimes of lunar satellite orbits

The Space Exploration Initiative has generated a renewed interest in lunar mission planning. The lunar missions currently under study, unlike the Apollo missions, involve long stay times. Several lunar gravity models have been formulated, but mission planners do not have enough confidence in the proposed models to conduct detailed studies of missions with long stay times. In this report, a particular lunar gravitational model, the Ferrari 5 x 5 model, was chosen to determine the lifetimes for 100-km and 300-km perilune altitude, near-circular parking orbits. The need to analyze orbital lifetimes for a large number of initial orbital parameters was the motivation for the formulation of a simplified gravitational model from the original model. Using this model, orbital lifetimes were found to be heavily dependent on the initial conditions of the nearly circular orbits, particularly the initial inclination and argument of perilune. This selected model yielded lifetime predictions of less than 40 days for some orbits, and other orbits had lifetimes exceeding a year. Although inconsistencies and limitations are inherent in all existing lunar gravity models, primarily because of a lack of information about the far side of the moon, the methods presented in this analysis are suitable for incorporating the moon's nonspherical gravitational effects on the preliminary design level for future lunar mission planning.

Meyer, Kurt W.↗

Neutral Gas and Ion Measurements by the CONTOUR Mission

The Neutral Gas and Ion Mass Spectrometer (NGIMS) on the Comet Nucleus Tour (CONTOUR) Mission will measure the chemical and isotopic composition of neutral and ion species in the coma of comet Encke and the subsequent targets of this mission. Currently the second target of this mission is comet Schwassmann-Wachmann 3. This neutral gas and ion data together with complementary data from the dust analyzer and the imaging spectrometer is designed to allow a broad characterization of the molecular and elemental composition of each cometary nucleus. These experiments enable the study of the of the likely variations in chemical conditions present in different regions of the early solar nebula where the comets formed. With these experiments we will also test ideas about cometary contributions of organics, water, and other volatiles to the inner planets. The CONTOUR NGIMS data set from multiple comets is expected to provide an important extension of to the only other detailed in situ data set from a close flyby of a nucleus, that from Halley. CONTOUR will extend this measurement of an Oort cloud comet to the class of short period comets thought to originate in the Kuiper belt. This data will complement the detailed measurements to be carried out at a single nucleus by the Rosetta Mission.

Mahaffy, Paul R.↗

Rocket + Science = Dialogue

It's a cliche that rocket engineers and space scientists don t see eye-to-eye. That goes double for rocket engineers working on human spaceflight and scientists working on space telescopes and planetary probes. They work fundamentally different problems but often feel that they are competing for the same pot of money. Put the two groups together for a weekend, and the results could be unscientific or perhaps combustible. Fortunately, that wasn't the case when NASA put heavy lift launch vehicle designers together with astronomers and planetary scientists for two weekend workshops in 2008. The goal was to bring the top people from both groups together to see how the mass and volume capabilities of NASA's Ares V heavy lift launch vehicle could benefit the science community. Ares V is part of NASA's Constellation Program for resuming human exploration beyond low Earth orbit, starting with missions to the Moon. In the current mission scenario, Ares V launches a lunar lander into Earth orbit. A smaller Ares I rocket launches the Orion crew vehicle with up to four astronauts. Orion docks with the lander, attached to the Ares V Earth departure stage. The stage fires its engine to send the mated spacecraft to the Moon. Standing 360 feet high and weighing 7.4 million pounds, NASA's new heavy lifter will be bigger than the 1960s-era Saturn V. It can launch almost 60 percent more payload to translunar insertion together with the Ares I and 35 percent more mass to low Earth orbit than the Saturn V. This super-sized capability is, in short, designed to send more people to more places to do more things than the six Apollo missions.

Morris,Bruce↗

Mars Exploration Rovers: 4 Years on Mars

This January, the Mars Exploration Rovers "Spirit" and "Opportunity" are starting their fifth year of exploring the surface of Mars, well over ten times their nominal 90-day design lifetime. This lecture discusses the Mars Exploration Rovers, presents the current mission status for the extended mission, some of the most results from the mission and how it is affecting our current view of Mars, and briefly presents the plans for the coming NASA missions to the surface of Mars and concepts for exploration with robots and humans into the next decade, and beyond.

Landis, Geoffrey A.↗

Application of a Novel Long-Reach Manipulator Concept to Asteroid Redirect Missions

A high priority mission currently being formulated by NASA is to capture all or part of an asteroid and return it to cis-lunar space for examination by an astronaut crew. Two major mission architectures are currently being considered: in the first (Mission Concept A), a spacecraft would rendezvous and capture an entire free flying asteroid (up to 14 meters in diameter), and in the second (Mission Concept B), a spacecraft would rendezvous with a large asteroid (which could include one of the Martian moons) and retrieve a boulder (up to 4 meters in diameter). A critical element of the mission is the system that will capture the asteroid or boulder material, enclose it and secure it for the return flight. This paper describes the design concepts, concept of operations, structural sizing and masses of capture systems that are based on a new and novel Tendon- Actuated Lightweight In-Space MANipulator (TALISMAN) general-purpose robotic system. Features of the TALISMAN system are described and the status of its technology development is summarized. TALISMAN-based asteroid material retrieval system concepts and concepts-of-operations are defined for each asteroid mission architecture. The TALISMAN-based capture systems are shown to dramatically increase operational versatility while reducing mission risk. Total masses of TALISMAN-based systems are presented, reinforcing the mission viability of using a manipulator-based approach for the asteroid redirect mission.

Dorsey, John T.↗

Mars Trek: An Interactive Web Portal for Current and Future Missions to Mars

NASA's Mars Trek (https://marstrek.jpl.nasa.gov) provides a web-based Portal and a suite of interactive visualization and analysis tools to enable mission planners, lunar scientists, and engineers to access mapped data products from past and current missions to Mars. During the past year, the capabilities and data served by Mars Trek have been significantly expanded beyond its original design as a public outreach tool. At the request of NASA's Science Mission Directorate and Human Exploration Operations Mission Directorate, Mars Trek's technology and capabilities are now being extended to support site selection and analysis activities for the first human missions to Mars.

Mars Trek↗

Overview of the Capture, Containment, and Return System (CCRS)

The Mars Sample Return (MSR) campaign is one of the most ambitious and complex planetary exploration missions currently underway. With the participation of NASA, ESA, and a large number of industry partners, MSR aims to bring Martian soil, rock, and atmospheric samples back to Earth, in order to answer key questions about Mars’ biological evolution. To accomplish this goal the campaign relies on four coordinated missions, each fulfilling a fundamental role to bring the samples to Earth. The Mars Perseverance rover, the first of the four missions, landed safely on Mars on February 18, 2021 and has already acquired candidate samples for Earth return. A selection of the samples of Martian soil and atmosphere that Perseverance has captured during its mission will be recovered, launched into Mars orbit, and transported back to Earth. The Sample Fetch Rover and Mars Ascent System, both parts of the Sample Return Lander project, perform the Mars surface missions to retrieve the collected samples and launch them into Mars orbit. NASA’s Capture, Containment, and Return System (CCRS), hosted on ESA’s Earth Return Orbiter (ERO), brings the samples back to Earth from Mars orbit. These retrieval and return missions are currently in the planning and design stages of development. The NASA-provided CCRS is the payload of the ESA ERO and is the focus of this presentation. ERO will enter Mars orbit and provide communication relay to Earth for the other MSR elements. The Sample Return Lander systems will fetch the sample tubes and integrate them into a protective vessel – the Orbiting Sample (OS) system – which is then launched into low Mars orbit. ERO will perform rendezvous maneuvers, allowing its CCRS payload to capture the OS, contain it, and perform the first automated in-space assembly of a spacecraft, the Earth Entry System (EES), while in Mars orbit. ERO will then begin its journey back to Earth, with CCRS and its assembled EES spacecraft. Three days prior to arrival, CCRS will release the EES on an Earth entry trajectory from a distance beyond the orbit of the Moon. The passive EES spacecraft will then enter Earth’s atmosphere, flying on a ballistic trajectory, followed by a terminal descent (without a parachute) and landing at the Utah Test and Training Range (UTTR). This presentation will show the current design of the CCRS system and its concept of operations. ERO and CCRS will perform several firsts in planetary exploration: (a) orbital rendezvous and capture in Mars orbit, (b) in-space sterilization and containment, (c) on-orbit spacecraft assembly at Mars, and (d) fully-passive entry, descent, and landing sequence for sample return.

Carlie H. Zumwalt↗

The O sub 2/H sub 2 propulsion module for planetary spacecraft injection energy augmentation

A propulsion module to augment the Centaur G-Prime and the Aerobraked OTV (AOTV) injection energy (C sub 3) was studied. The characteristics and performance of a variety of Earth-storable and cryogenic propulsion systems are presented. A pump-fed, cryogenic O2/H2 propulsion system enables the elimination of a three-year delta V Earth gravity assist (delta VEGA) maneuver for several planetary missions currently under consideration by the NASA. This trip time reduction can significantly reduce mission support costs, reduce spacecraft (S/C) life requirements and potentially increase the probability of mission success. This study also shows that an O2/H2 propulsion module, developed for Centaur C sub 3 augmentation can be used with a space-based AOTV in the return mode, allowing the reuse of the high-value AOTV while still delivering the required high-injection energy for direct planetary missions. The propulsion module performance was estimated for a space shuttle delivery capability to LEO of 65,000 lb sub m and 75,000 lb sub m. The required minimum thrust level to minimize gravity losses was also determined. For several currently planned NASA planetary missions, the Centaur G-Prime injection energy is augmented by a delta VEGA maneuver. For these missions, direct injection by the Centaur cannot provide a shorter trip time than the delta VEGA injection trip time.

Palaszewski, B. A.↗

Trash to Supply Gas (TtSG) Project Overview

Technologies that reduce logistical needs are a key to long term space missions. Currently, trash and waste generated during a mission is carried during the entire roundtrip mission or stored inside a logistic module which is de-orbited into Earth's atmosphere for destruction. The goal of the Trash to Supply Gas (TtSG) project is to develop space technology alternatives for converting trash and other waste materials from human spaceflight into high-value products that might include propellants or power system fuels in addition to life support oxygen and water. In addition to producing a useful product from waste, TtSG will decrease the volume needed to store waste on long term space missions. This paper presents an overview of the TtSG technologies and future plans for the project.

Hintze, Paul↗

Solar Electric Propulsion for Primitive Body Science Missions

This paper describes work that assesses the performance of solar electric propulsion (SEP) for three different primitive body science missions: 1) Comet Rendezvous 2) Comet Surface Sample Return (CSSR), and 3) a Trojan asteroid/Centaur object Reconnaissance Flyby. Each of these missions launches from Earth between 2010 and 2016. Beginning-of-life (BOL) solar array power (referenced at 1 A.U.) varies from 10 to 18 kW. Launch vehicle selections range from a Delta II to a Delta IV medium-class. The primary figure of merit (FOM) is net delivered mass (NDM). This analysis considers the effects of imposing various mission constraints on the Comet Rendezvous and CSSR missions. Specifically, the Comet Rendezvous mission analysis examines an arrival date constraint with a launch year variation, whereas the CSSR mission analysis investigates an Earth entry velocity constraint commensurate with past and current missions. Additionally, the CSSR mission analysis establishes NASA's New Frontiers (NF) Design Reference Mission (DRM) in order to evaluate current and future SEP technologies. The results show that transfer times range from 5 to 9 years (depending on the mission). More importantly, the spacecraft's primary propulsion system performs an average 5-degree plane change on the return leg of the CSSR mission to meet the previously mentioned Earth entry velocity constraint. Consequently, these analyses show that SEP technologies that have higher thrust-to-power ratios can: 1) reduce flight time, and 2) change planes more efficiently.

Witzberger, Kevin E.↗