Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEMOLITION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada (Volume 1 of 3)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), and the U.S. Department of Energy Environmental Management Nevada Program (EM NV) plan to implement corrective action activities (under the Federal Facility Agreement and Consent Order, agreed to by the State of Nevada) and demolition of the Engine Maintenance, Assembly, and Disassembly (E-MAD) facility and the Test Cell C Historic District. These are major components of the unrecorded Nuclear Rocket Development Station (NRDS) Historic District, which is eligible for inclusion in the National Register of Historic Places (NRHP, National Register). The NRDS is in Area 25 of the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, in Nye County, Nevada. Demolition and removal of the buildings and accessories constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800.

54 ENVIRONMENTAL SCIENCES↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Session 077 - Panel: Wednesday US DOE Featured Site: Lexington, KY Office (Portsmouth and Paducah Sites) (R1.14)

This panel featured the DoE's Portsmouth Paducah Project Office (PPPO), which is responsible for the management and cleanup of at the Portsmouth, Ohio and Paducah, Kentucky former Gaseous Diffusion Plant sites. Portsmouth is primed for the first major skyline change at the site the upcoming demolition of the X-326 process building and initial operations of the Onsite Waste Disposal Facility. The Paducah site is working on the C-400 city block initiative allowing DOE to tackle the main source of groundwater contamination at the site, in conjunction with deactivation and demolition of the C-400 Cleaning Building. PPPO's DUF6 conversion plants have 7 lines in continuous operation at both sites providing the opportunity to ramp up cylinder processing. Panelists with presentations: DOE PPO Update (Robert Edwards, Joel Bradburne); Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, Robert Edwards); PADUCAH (Jennifer Woodard, Myrna Espinosa Redfield); Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, Zack Smith); Paducah Deactivation and Remediation Project (Myrna Espinosa Redfield); Mid-America Conversion Services - Seven Lines One Project (Zack Smith)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BRE‐X Emissions Database for End‐of‐Life Scenarios of Selective Building Construction Materials to Enable Circular Economy in Construction

In the United States, construction and demolition debris predominately end up in landfills with minimal end‐of‐life Re‐X (recover, recycle, reuse, etc.) scenarios, resulting in large environmental impacts and lost opportunities for material recovery. Except for concrete and metals, which seem to have a few well‐defined end‐of‐life pathways, there seems to be a lack of well‐documented end‐of‐life scenarios for other construction materials, let alone their emissions data. Hence, there is a need for documented end‐of‐life Re‐X scenarios and end‐of‐life data of more building materials to motivate widespread use of Re‐X strategies in building design. This paper outlines the efforts of the National Renewable Energy Laboratory, Carbon Leadership Forum, Building Transparency, and Skidmore, Owings & Merrill to (a) create an open‐access BRE‐X (Building Re‐X) end‐of‐life emissions database consisting of greenhouse gas emissions data associated with various end‐of‐life scenarios for a select list of high‐impact building construction materials, and (b) integrate the BRE‐X end‐of‐life emissions database with CAD/BIM/LCA tools for evaluating various end‐of‐life scenarios. The paper also presents a few existing life cycle inventory databases that contain sparse amounts of end‐of‐life data for a few construction materials and their limitations in terms of scaling and data consolidation. Finally, a sample of how the collected data can be ingested into whole‐building LCA tools using open data formats and a public access link to the BRE‐X end‐of‐life emissions database is also included.

36 MATERIALS SCIENCE↗

Microscopic characterization of alkali-silica reaction (ASR) affected recycled concrete mixtures induced by reactive coarse and fine aggregates

Alkali-silica reaction (ASR) is one of the most detrimental distress mechanisms leading to early deterioration of concrete infrastructure, creating large amounts of construction and demolition waste which however can be transformed into recycled concrete aggregates (RCA). Yet, as ASR is an ongoing distress mechanism, its potential of reoccurrence in RCA could cause adverse effects. Investigation of the crack propagation of RCA concrete revealed that the distress features vary widely thus, indicating different distress mechanisms in all RCA concrete. Concrete made of slightly damaged RCA shows the lease number of cracks yet, wider cracks at high expansion levels. Additionally, the distress in slightly damaged RCA concrete made of reactive coarse aggregate and RCA concrete made of reactive sand, regardless of original damage extent, is governed by cracks propagating through the residual cement paste whereas cracks propagate through the new cement paste in severely damaged RCA made of reactive coarse aggregate.

36 MATERIALS SCIENCE↗

Big Hole Drilling Support for Nuclear Testing, 1985-1992: An Architectural Survey of the Area 1 Subdock, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) planned to demolish two buildings at the Area 1 Subdock at the Nevada National Security Site (NNSS) in Nye County, Nevada, to meet environmental management mission requirements. A review was conducted under Title 54 United States Code (USC) § 306101 (commonly known as Section 106 of the National Historic Preservation Act) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. As a result, a Memorandum of Agreement (MOA) was developed to mitigate the effects of the building demolitions. Stipulation III.B of the MOA requires an architectural survey of the Area 1 Subdock. Prior to this survey, the Subdock had not been systematically recorded. Therefore, an area of approximately 33 hectares (81 acres) was surveyed for historic properties by Desert Research Institute personnel. This effort resulted in the identification, recording, and evaluation of the potential Area 1 Subdock Historic District (SHPO Resource No. D377), including the identification of its contributing components. This district is recommended as eligible for the National Register of Historic Places (NRHP) under Criteria A and C. It contains 14 primary resources which include individual buildings, structures, storage yards, and infrastructure. Of these resources, all except one are recommended as elements that contribute to the district during its period of significance corresponding to nuclear testing from 1985 through 1992. Four of the resources (B18847, B18848, S2772, S2773) are recommended as individually eligible for the NRHP.

54 ENVIRONMENTAL SCIENCES↗

Waste-to-Energy (WTE)-derived Low-Carbon-Footprint Concrete (LCFC)

The construction industry is estimated to generate around 600 million tons of concrete and demolition waste annually in the US. In comparison, Waste-To-Energy (WTE) plants generate about 6.6 million tons of ash from the combustion of municipal solid waste.1–4 Research has been ongoing for decades to upcycle WTE-ash and C&D waste.

36 MATERIALS SCIENCE↗

Panel Session 47: Decommissioning, Issues and Possibilities/Opportunities

This panel focused on decommissioning projects in the US and abroad. This interactive discussion between the audience and panelists included - 1) logistics (from cradle to grave); 2) organizational aspects of decommissioning; 3) regulatory aspects and issues; 4) definition of the back-end with regard to packages and Waste Acceptance Criteria (WAC); and 5) identification and management of difficult-to-handle decontamination and demolition (D and D) waste (e.g. damaged fuel, legacy/forgotten waste inside Nuclear Power Plants, etc.). Panelist with presentations: JCNPP Lessons Learned (Manuel Ondaro del Pino)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 2: Hot Topics in US DOE Environmental Management

The well-attended Panel Session was chaired by Martin Schneider. The four panelists did not provide presentations. Rather the session was a discussion focusing on pressing issues facing US DOE Environmental Management (EM) sites and how the program is moving forward. The session began by momentarily reflecting on a success: the three Tank Waste Treatment Facilities will soon be coming online. These three facilities will treat as much waste in two years as was treated in the past 30 years. That is a significant milestone in progress. Also, safety enhancements at WIPP are a big success. The panelists noted that there will be challenges with the victories of the startup of the Waste Treatment Facilities. Treating tank waste is the last EM mission and will help with the relationships with the stakeholders, regulators and Congress. One of the biggest challenges will be moving back to full operation mode. Although the operation will increase productivity of reducing/managing the tank waste, it will decrease life cycle cost and lessen years of cleanup. The challenge will be having people understand that EM will be operating 24/7 and that maintenance will be key in keeping the operations. EM will be working together with the regulators to show tangible progress that will be effective and efficient. By working together, they can find opportunities/technologies for streamlining and accelerating cleanup. Recent changes to the regulatory framework between DOE-EM Los Alamos Field Office and New Mexico Environmental Department have helped cleanup in Los Alamos. Every year EM and the agencies review progress and come to agreements on the next work priorities. At Savannah River Site, the Federal Facility Agreement among EM, South Carolina Department of Health and Environmental Control, and Environmental Protection Agency (EPA) has developed a small core team that work are shared by together in resolving issues that come up. The discussion moved on to how progress can be made by sharing lessons learned among the contractors. An example of how these learned lessons can be shared is that key representatives from projects across the EM sites participate in various forums to review/contribute to the work planned. Other opportunities can be by temporary assignments of DOE staff to gain experience and by monthly EM Headquarters report that provide the lessons learned across the EM sites. The panelists discussed how skyline changes are the best examples of tangible progress. Decontamination and Demolition (D and D) of structures are the easiest tangible progress that can be seen. Whereas tank waste cleanup is the hardest to see. Disposal of waste onsite versus offsite is another challenge, and timely discussions are necessary to get to the best value to the government.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Virtual and Augmented Realities to Support Development, Training, Deployment, and Operations of Remote Systems - 20516

Throughout the U.S. Department of Energy complex, there is a need to deploy new, unique equipment and systems for cleanup activities, waste processing, infrastructure repair, and decommissioning and demolition in radioactive and hazardous environments. The new equipment often consists of custom systems created by integrating and modifying commercial technologies. In addition, the systems are deployed in unique environments due to limited access, waste properties, and the presence of previously installed equipment or infrastructure that has been left in place. The deployment of custom systems that are 'turnkey' ready for first-time installation and application has its risks. Use of test platforms and mockups for cold (i.e., non-radioactive) testing is one method to mitigate that risk: however, full-scale test mockups for operations such as waste retrieval and tank inspection can be expensive and must be modified to incorporate the uniqueness of each application. An alternative to full-scale mockups is to use three-dimensional (3D) virtual environments and virtual reality (VR) technology to develop interactive virtual test beds. These can be used throughout the down-selection, development, system integration, operational planning, operator training, and mission execution phases of a task. Virtual test beds are readily reconfigured, can be used for multiple tasks, support multiple users in parallel, and can accommodate enhancements and changes not originally planned or conceived in the initial design. Virtual test beds also provide a platform for developing and testing augmented reality (AR) tools for improving operator efficiency. A VR experience has been generated for waste retrieval from a Hanford waste tank to present the potential applications of a virtual test bed. Features of the VR experience are presented, potential applications of VR and AR for remote applications are discussed, and development areas for improving future application are considered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The sponge effect and carbon emission mitigation potentials of the global cement cycle

Cement plays a dual role in the global carbon cycle like a sponge: its massive production contributes significantly to present-day global anthropogenic CO 2 emissions, yet its hydrated products gradually reabsorb substantial amounts of atmospheric CO 2 (carbonation) in the future. The role of this sponge effect along the cement cycle (including production, use, and demolition) in carbon emissions mitigation, however, remains hitherto unexplored. Here, we quantify the effects of demand- and supply-side mitigation measures considering this material-energy-emissions-uptake nexus, finding that climate goals would be imperiled if the growth of cement stocks continues. Future reabsorption of CO 2 will be significant (~30% of cumulative CO 2 emissions from 2015 to 2100), but climate goal compliant net CO 2 emissions reduction along the global cement cycle will require both radical technology advancements (e.g., carbon capture and storage) and widespread deployment of material efficiency measures, which go beyond those envisaged in current technology roadmaps.

54 ENVIRONMENTAL SCIENCES↗

Electron shelving of a superconducting artificial atom

Interfacing long-lived qubits with propagating photons is a fundamental challenge in quantum technology. Cavity and circuit quantum electrodynamics (cQED) architectures rely on an off-resonant cavity, which blocks the qubit emission and enables a quantum non-demolition (QND) dispersive readout. However, no such buffer mode is necessary for controlling a large class of three-level systems that combine a metastable qubit transition with a bright cycling transition, using the electron shelving effect. Here we demonstrate shelving of a circuit atom, fluxonium, placed inside a microwave waveguide. With no cavity modes in the setup, the qubit coherence time exceeds 50 μs, and the cycling transition’s radiative lifetime is under 100 ns. By detecting a homodyne fluorescence signal from the cycling transition, we implement a QND readout of the qubit and account for readout errors using a minimal optical pumping model. Our result establishes a resource-efficient (cavityless) alternative to cQED for controlling superconducting qubits.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

A dual-species Rydberg array

Large-scale Rydberg atom arrays are used for highly coherent analogue quantum simulations and for digital quantum computations. However, advanced quantum protocols, such as quantum error correction, require midcircuit qubit operations, including the replenishment, reset and read-out of a subset of qubits. A compelling strategy for unlocking these capabilities is a dual-species architecture in which a second atomic species is controlled independently and entangled with the first through Rydberg interactions. Here, we realize a dual-species Rydberg array consisting of rubidium and caesium atoms and explore regimes of interactions and dynamics not accessible in single-species architectures. We achieve enhanced interspecies interactions by electrically tuning the Rydberg states close to a Förster resonance. In this regime, we demonstrate an interspecies Rydberg blockade and implement a quantum state transfer from one species to another. We then generate a Bell state between Rb and Cs hyperfine qubits through an interspecies controlled-phase gate. Finally, we combine interspecies entanglement with a native midcircuit read-out to achieve quantum non-demolition measurements.

atomic and molecular interactions with photons↗

Universal control of a six-qubit quantum processor in silicon

Future quantum computers capable of solving relevant problems will require a large number of qubits that can be operated reliably. However, the requirements of having a large qubit count and operating with high fidelity are typically conflicting. Spins in semiconductor quantum dots show long-term promise but demonstrations so far use between one and four qubits and typically optimize the fidelity of either single- or two-qubit operations, or initialization and readout. Here, we increase the number of qubits and simultaneously achieve respectable fidelities for universal operation, state preparation and measurement. We design, fabricate and operate a six-qubit processor with a focus on careful Hamiltonian engineering, on a high level of abstraction to program the quantum circuits, and on efficient background calibration, all of which are essential to achieve high fidelities on this extended system. State preparation combines initialization by measurement and real-time feedback with quantum-non-demolition measurements. These advances will enable testing of increasingly meaningful quantum protocols and constitute a major stepping stone towards large-scale quantum computers.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Entanglement-enhanced matter-wave interferometry in a high-finesse cavity

An ensemble of atoms can operate as a quantum sensor by placing atoms in a superposition of two different states. Upon measurement of the sensor, each atom is individually projected into one of the two states. Creating quantum correlations between the atoms, that is entangling them, could lead to resolutions surpassing the standard quantum limit set by projections of individual atoms. Large amounts of entanglement involving the internal degrees of freedom of laser-cooled atomic ensembles have been generated in collective cavity quantum-electrodynamics systems, in which many atoms simultaneously interact with a single optical cavity mode. Here we report a matter-wave interferometer in a cavity quantum-electrodynamics system of 700 atoms that are entangled in their external degrees of freedom. In our system, each individual atom falls freely under gravity and simultaneously traverses two paths through space while entangled with the other atoms. In this work, we demonstrate both quantum non-demolition measurements and cavity-mediated spin interactions for generating squeezed momentum states with directly observed sensitivity $3.4^{+1.1}_{–0.9}$dB and $2.5^{+0.6}_{–0.6}$dB below the standard quantum limit, respectively. We successfully inject an entangled state into a Mach–Zehnder light-pulse interferometer with directly observed sensitivity $1.7^{+0.5}_{–0.5}$dB below the standard quantum limit. The combination of particle delocalization and entanglement in our approach may influence developments of enhanced inertial sensors, searches for new physics, particles and fields, future advanced gravitational wave detectors and accessing beyond mean-field quantum many-body physics.

74 ATOMIC AND MOLECULAR PHYSICS↗