Search NASA⌕ Search

SEARCH · Search NASA

Results for “DRILL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Drilling Automation Demonstrations in Subsurface Exploration for Astrobiology

This project proposes to study subsurface permafrost microbial habitats at a relevant Arctic Mars-analog site (Haughton Crater, Devon Island, Canada) while developing and maturing the subsurface drilling and drilling automation technologies that will be required by post-2010 missions. It builds on earlier drilling technology projects to add permafrost and ice-drilling capabilities to 5m with a lightweight drill that will be automatically monitored and controlled in-situ. Frozen cores obtained with this drill under sterilized protocols will be used in testing three hypotheses pertaining to near-surface physical geology and ground H2O ice distribution, viewed as a habitat for microbial life in subsurface ice and ice-consolidated sediments. Automation technologies employed will demonstrate hands-off diagnostics and drill control, using novel vibrational dynamical analysis methods and model-based reasoning to monitor and identify drilling fault states before and during faults. Three field deployments, to a Mars-analog site with frozen impact crater fallback breccia, will support science goals, provide a rigorous test of drilling automation and lightweight permafrost drilling, and leverage past experience with the field site s particular logistics.

Glass, Brian↗

Mars Science Laboratory Drill

This drill (see Figure 1) is the primary sample acquisition element of the Mars Science Laboratory (MSL) that collects powdered samples from various types of rock (from clays to massive basalts) at depths up to 50 mm below the surface. A rotary-percussive sample acquisition device was developed with an emphasis on toughness and robustness to handle the harsh environment on Mars. It is the first rover-based sample acquisition device to be flight-qualified (see Figure 2). This drill features an autonomous tool change-out on a mobile robot, and novel voice-coil-based percussion. The drill comprises seven subelements. Starting at the end of the drill, there is a bit assembly that cuts the rock and collects the sample. Supporting the bit is a subassembly comprising a chuck mechanism to engage and release the new and worn bits, respectively, and a spindle mechanism to rotate the bit. Just aft of that is a percussion mechanism, which generates hammer blows to break the rock and create the dynamic environment used to flow the powdered sample. These components are mounted to a translation mechanism, which provides linear motion and senses weight-on-bit with a force sensor. There is a passive-contact sensor/stabilizer mechanism that secures the drill fs position on the rock surface, and flex harness management hardware to provide the power and signals to the translating components. The drill housing serves as the primary structure of the turret, to which the additional tools and instruments are attached. The drill bit assembly (DBA) is a passive device that is rotated and hammered in order to cut rock (i.e. science targets) and collect the cuttings (powder) in a sample chamber until ready for transfer to the CHIMRA (Collection and Handling for Interior Martian Rock Analysis). The DBA consists of a 5/8-in. (.1.6- cm) commercial hammer drill bit whose shank has been turned down and machined with deep flutes designed for aggressive cutting removal. Surrounding the shank of the bit is a thick-walled maraging steel collection tube allowing the powdered sample to be augured up the hole into the sample chamber. For robustness, the wall thickness of the DBA was maximized while still ensuring effective sample collection. There are four recesses in the bit tube that are used to retain the fresh bits in their bit box. The rotating bit is supported by a back-to-back duplex bearing pair within a housing that is connected to the outer DBA housing by two titanium diaphragms. The only bearings on the drill in the sample flow are protected by a spring-energized seal, and an integrated shield that diverts the ingested powdered sample from the moving interface. The DBA diaphragms provide radial constraint of the rotating bit and form the sample chambers. Between the diaphragms there is a sample exit tube from which the sample is transferred to the CHIMRA. To ensure that the entire collected sample is retained, no matter the orientation of the drill with respect to gravity during sampling, the pass-through from the forward to the aft chamber resides opposite to the exit tube.

Okon, Avi B.↗

Utah FORGE: Well 16B(78)-32 Drilling Data

This drilling data for Utah FORGE well 16B(78)-32 include a well survey, core summary, mud and mud temperature logs, daily reports of the drilling process, and additional data from the Pason oil and gas company. Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The proposed total depth was 10,658 feet, which was exceeded. Spudding began on April 26th, 2023. As of June 20th, 2023, the total depth measured 10,947 feet and the vertical depth measured 8,357 feet. Drilling included the trial use of insulated drill pipe (IDP) from Eavor Technologies, which was considered a success. IDP restricts counter-current heat transfer between drilling fluid inside the drill string and hotter returning fluid in the annulus, thereby ensuring the bottomhole assembly (BHA) remains submerged in cool fluid. Eavor rented 350 joints of IDP to FORGE which were run in two consecutive BHAs at the well. The results of this trial are included here.

15 GEOTHERMAL ENERGY↗

Percussive Augmenter of Rotary Drills (PARoD)

A percussive augmenter is being developed and it is designed to add ultrasonic hammering to a conventional commercial rotary drill through an adapter using a piezoelectric actuator. The combination of ultrasonic hammering and rotation creates a drill that requires low power and low axial load while providing faster penetration than conventional rotary-only drills. These characteristics make percussive augmentation of rotary drills ideal for not only planetary exploration but commercial applications as well. The purpose of this internship was to produce, test, and optimize an augmenter that drives a 2 inch diameter bit. This task was part of the percussive augmenter's phase II of an ongoing contract and it involved increasing the capability of the .25 inch version of the augmenter prototype that was developed in phase I. Due to fabrication delays of the augmenter, an extensive part of the test effort was conducted using previous rotary and hammer drill prototypes. These tests focused on drilling deep over long periods of time to provide for effective stress test of the drill. Modifications were made to the drill, its components, and the testing procedure to achieve desired borehole depths. These results were used to start initial testing on the 2 inch augmenter and provide preliminary data on the augmenter's ability to significantly improve penetration rate over conventional rotary-only drills.

rotraty hammer↗

Impact of Drilling Operations on Lunar Volatiles Capture: Thermal Vacuum Tests

In Situ Resource Utilization (ISRU) enables future planetary exploration by using local resources to supply mission consumables. This idea of 'living off the land' has the potential to reduce mission cost and risk. On the moon, water has been identified as a potential resource (for life support or propellant) at the lunar poles, where it exists as ice in the subsurface. However, the depth and content of this resource has yet to be confirmed on the ground; only remote detection data exists. The upcoming Resource Prospector mission (RP) will 'ground-truth' the water using a rover, drill, and the RESOLVE science package. As the 2020 planned mission date nears, component level hardware is being tested in relevant lunar conditions (thermal vacuum). In August 2014 a series of drilling tests were performed using the Honeybee Robotics Lunar Prospecting Drill inside a 'dirty' thermal vacuum chamber at the NASA Glenn Research Center. The drill used a unique auger design to capture and retain the lunar regolith simulant. The goal of these tests was to investigate volatiles (water) loss during drilling and sample transfer to a sample crucible in order to validate this regolith sampling method. Twelve soil samples were captured over the course of two tests at pressures of 10(exp-5) Torr and ambient temperatures between -80C to -20C. Each sample was obtained from a depth of 40 cm to 50 cm within a cryogenically frozen bed of NU-LHT-3M lunar regolith simulant doped with 5 wt% water. Upon acquisition, each sample was transferred and hermetically sealed inside a crucible. The samples were later baked out to determine water wt% and in turn volatile loss by following ASTM standard practices. Of the twelve tests, four sealed properly and lost an average of 30% of their available water during drilling and transfer. The variability in the results correlated well with ambient temperature (lower the temperature lower volatiles loss) and the trend agreed with the sublimation rates for the same temperature. Moisture retention also correlated with quantity of sample: a larger amount of material resulted in less water loss. The drilling process took an average of 10 minutes to capture and transfer each sample. The drilling power was approximately 20 Watt with a Weight on Bit of approximately 30 N. The bit temperature indicated little heat input into formation during the drilling process.

drilling↗

Evaluation of Physics-Based Limiter Redesign Drilling and Alternative Bit Design at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC, an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration with increased time on bottom for each bit. The project will leverage advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate bit technologies. The first demonstration well has been completed, with a total of 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three hole sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges.

15 GEOTHERMAL ENERGY↗

Use of Rig Parameter Data in Bit Constraint Models for Improved Drilling Performance at The Geysers

Surface parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. However, these measurements are of reduced value without a standard to aid in evaluation and decision making. A method is demonstrated whereby drill bit constraint models are used to interpret drilling response parameters. Drill rig parameter data for well GDC-36 at the Geysers Geothermal Field Power were acquired by Geysers Power Company and drilling contractor Kenai Drilling using Pason US DataHub and evaluated. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) along with other model constraints in computational algorithms. The method is used to evaluate overall bit performance, monitor bit integrity, and detect the presence of drillstring vibrations and other conditions contributing to bit failure; comparisons are made to observations of bit wear and damage. The method will be applied in real-time to improve decision-making on subsequent wells and has applicability to development of advanced analytics on future geothermal wells using real-time electronic drilling recorder (EDR) data for improved performance and reduced drilling costs.

15 GEOTHERMAL ENERGY↗

High Temperature 300°C Measurement While Drilling System

Many countries around the world, including the USA, have untapped geothermal energy potential. Enhanced Geothermal Systems (EGS) technology is needed to economically utilize this resource. Temperatures in some EGS reservoirs can exceed 300°C. To effectively utilize EGS resources, an array of injection and production wells must be accurately placed in the formation fracture network. Therefore, EGS can greatly benefit from a high temperature directional drilling system. Most commercial services for directional drilling systems are rated for 175°C while geothermal wells require operation at much higher temperatures. Two U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO) projects have been initiated to develop a 300°C capable directional drilling system, the first developing a drill bit, directional motor, and drilling fluid (award number DE-EE0002782), and the second adding navigation and telemetry systems. This report is for the second project, “High Temperature 300°C Measurement While Drilling System”, award number DE-EE0005505. The “High Temperature 300°C Measurement While Drilling (MWD)” system complements the already developed drilling system with real time navigation capability. It is comprised of 175°C directional measurement electronics including the required sensors for measuring inclination and azimuth in 3 axes. It is embedded in a cooling and temperature isolation system to protect the electronics and sensors from the higher temperature outside the system, which can reach 300°C. Building the cooling and isolation system from non-magnetic materials and keeping a required distance to any magnetic component, such as alternator parts, ensures a high quality measurement of the earth’s magnetic field. This is required to achieve the specified navigation accuracy. The MWD system has a turbine driven alternator that is capable of delivering the required electrical energy to the electronic system at a 300°C borehole temperature. Measured data will be communicated to the surface by mud-pulse-telemetry. For this purpose the tool has a mud-pulse-valve that is controlled by the measurement electronics to establish a serial data communication via the mud stream. The mud-pulse-valve is also built to operate under 300°C borehole conditions. Three prototypes of the 300°C MWD were built and tested. These systems are available for a joint application with the previously developed 300°C drilling system, in a geothermal well.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 5: Utah FORGE Well 16B(78)-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 4: Utah FORGE Well 78B-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 3: Utah FORGE Well 56-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

Analysis of Rig Parameter Data Using Drilling Process Modeling Constraints, Volume 1: Summary of Utah FORGE Wells 16A(78)-32, 56-32, 78B-32 and 16B(78)-32

Drill rig parameter measurements are routinely used during deep well construction to monitor and guide drilling conditions for improved performance and reduced costs. While insightful into the drilling process, these measurements are of reduced value without a standard to aid in data evaluation and decision making. In the main body of this work (Volume 1), a method is demonstrated whereby rock reduction model constraints are used to interpret drilling response parameters; the method could be applied in real-time to improve decision-making in the field and to further discern technology performance during post-drilling evaluations. Drilling parameters are evaluated using laboratory-validated rock reduction models for predicting the phenomenological response of drag bits (Detournay and Defourny, 1992) in computational algorithms. The method presented has applicability to development of advanced analytics on future geothermal wells using real-time electronic data recording for improved performance and reduced drilling costs. A drilling cost model is also used to show the tradeoff between rate of penetration and bit life and the influence on interval drilling costs. Details of the bit specifications and performance are cataloged in an independent volume, documented under separate cover, for each of the four wells, and include Volume 2: Utah FORGE 16A(78)-32; Volume 3: Utah FORGE 56-32; Volume 4: Utah FORGE 78B-32 and Volume 5: Utah FORGE 16B(78)-32.

15 GEOTHERMAL ENERGY↗

lllinois Storage Corridor CarbonSAFE Phase III: Pre-drilling Site Assessment: Prairie State Generating Company

The Illinois Storage Corridor project will drill a stratigraphic test well as part of the Illinois Storage Corridor CarbonSAFE Phase 3 project near the Prairie State Generating Company coal-fired power plant near Marissa, Illinois. The pre-drilling site evaluation has considered the primary target reservoirs, the Potosi Dolomite and St. Peter Sandstone, and primary seal, the Maquoketa Group. Data to be collected from the well include core, fluid samples, in situ well tests, geophysical logs intended to provide information on lithologic, geomechanical, and geophysical characteristics to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The planned drilling site has been evaluated using available subsurface geologic data and analyses from the Illinois Basin. These data provide lithologic and structural information, shallow groundwater resource distribution, location of known nearby wellbores, and regional drilling characteristics. The data were used to generate geologic structure and isopach maps for the target reservoir and caprock strata and for prognosing the tops of major lithologic units to aid drilling and coring procedures. The regional analyses indicate that no known structural features are expected to negatively impact the target storage reservoir or caprock. No protected and sensitive areas, groundwater resources, or existing resource development are expected to be impacted by the proposed well drilling activities. The well is planned to be drilled to a total depth of approximately 5,600 feet (1,707 m) and terminate in the Precambrian. Cores (up to 5 intervals) will be collected from the Maquoketa Group, confining units above the St. Peter Sandstone, St. Peter Sandstone, confining units of the Potosi Dolomite and the Potosi Dolomite. Water samples will be attempted to be collected from the St. Peter Sandstone and Potosi Dolomite. Potential impact on drilling progress is a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification elsewhere in the Illinois Basin. This document also presents a preliminary coring and sampling program, proposed logging suite, and well testing program, all of which will be reviewed during drilling.

01 COAL, LIGNITE, AND PEAT↗

Super Hot EGS and the Newberry Deep Drilling Project

A productive geothermal well drilled into super-hot rock (SHR) with a temperature above 400°C will produce super-critical fluid. At a flow rate of 60 kg/s, a SHR well could produce 50 MWe compared to 5-7 MWe for the same flow at 200°C. Even though these deeper, super-hot wells will cost more, the high energy density means power produced by engineered geothermal systems (EGS) can meet the market ($46 MW-hr) by directly tapping the heat source. We propose a proof of concept where hot rock is close to the surface (~5 km), and the cost of drilling and EGS stimulation will be lowest. A suitable, ready-to-go SHR site is on Newberry Volcano, Oregon, one of the largest geothermal heat reservoirs in the USA, extensively studied for the last 40 years. Millions of dollars have already been invested in the site by private geothermal developers and the US Department of Energy (DOE), resulting in a ready-to-use facility with the necessary infrastructure, environmental permits, land commitments, and monitoring plans. The Newberry Deep Drilling Project (NDDP) will be located at an idle geothermal exploration well, NWG 46-16, drilled in 2008, 3500 m deep and 320°C at bottom, which will be deepened another 1000 to 1300 m to reach 500 °C. The original well was drilled with few lost circulation zones and the temperature profile indicates conductive heat flow. Compared to other SHR projects world-wide, this well would return more materials (cuttings, core and fluids) with more predictable drilling conditions, thus providing a suite of data near and across the brittle-ductile transition in silicarich rocks. After drilling, a hydraulic well stimulation will both change the pore pressure in fractures and cool the fracture walls resulting in permeability enhancement through both thermal fracturing, and hydro-shearing. The first step for the NDDP was an International Continental Drilling Program (ICDP) sponsored workshop held at the OSU-Cascades campus in Bend from Sept. 10-14, 2017. The workshop concluded by setting ambitious goals for NDDP: 1) test EGS above the critical point of water, 2) collect samples of rocks within the brittle-ductile transition, 3) investigate volcanic hazards, 4) study magmatic geomechanics, 5) calibrate geophysical imaging techniques, and 6) test technology for drilling, well completion, and geophysical monitoring in a very high temperature environment. The second step, completed January 15, 2018, was submitting a proposal to ICDP for 46-16 deepening. The next steps will be to continue building a team with project, technology, and investment partners to make NDDP a reality.

EGS, Geothermal, Newberry↗

Wabash CarbonSAFE Subtask 7.1 – Pre-drilling Site Assessment Topical Report: DOE-FE0031626-1

The Wabash CarbonSAFE project will drill a stratigraphic test well at the Wabash Valley Resources facility near Terre Haute, Indiana. Lithologic, geomechanical, and geophysical data collected from samples testing and an extensive geophysical logging suite will be used to determine the feasibility for the geologic sequestration of 50 million metric tons or more of injected carbon dioxide. The primary target reservoir and caprock to be investigated for the Wabash CarbonSAFE project are the Mt. Simon Sandstone and Eau Claire Shale, respectively. The project team has assessed the planned Wabash #1 drilling site using subsurface geologic data and analyses from both Illinois and Indiana. These data were used to generate geologic structure and isopach thickness maps for target reservoir and caprock layers which were incorporated into a detailed discussion of the nature of the Illinois Basin’s Cambro-Ordovician carbon dioxide storage complex at the drilling site. Formation tops were prognosed for 19 lithologic units to aid drilling and coring procedures. Additional GIS analysis indicates that no known structural features will negatively impact the target storage reservoir or caprock, nor will protected and sensitive areas, groundwater resources, or existing resource development be negatively affected by Wabash #1 drilling activities. The Wabash #1 Geologic/Structure Test well drilling permit was awarded by Indiana Department of Natural Resources (IN-DNR) – Division of Oil and Gas on November 12th, 2019, and the well is expected to be drilled to a total depth of approximately 8,350 feet. Potential impacts on drilling progress include abandoned underground coal mines which mined the Springfield and Survant coals until 1964 and 1954, respectively, and a lost circulation zone in the Potosi Dolomite, which has been demonstrated to have intermittent cavernous porosity from karstification. This document also details the coring and sampling program, proposed logging suite, and well testing program, all of which will be dynamically reviewed as drilling progresses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sulfide Stress Corrosion Cracking Behavior of G105 and S135 High-Strength Drill Pipe Steels in H{sub 2}S Environment

Slow strain rate testing was employed to investigate the sulfide stress corrosion cracking (SSCC) behavior of low-carbon high-strength drill pipe steels (G105 and S135) in the simulated drilling environment containing H{sub 2}S. Results reveal that both G105 and S135 steels have a high SSCC susceptibility in the simulated drilling environment containing H{sub 2}S. In the range of experimental slow strain rate, the SSCC sensitivity of drill pipe steel increases with the decrease in slow strain rate, and the ductility and fracture properties of drill pipe steels also decrease obviously. With the increase in the steel strength, the SSCC sensitivity of the drill pipe steel increases, and the S135 drill pipe steel has higher SSCC sensitivity than G105. There is no obvious plastic deformation on the fracture surface of G105 and S135 steels in H{sub 2}S solution. The cracks of fracture sprout on the surface of the specimen, the instantaneous fracture zone is in the middle, and the fracture can be divided into the cracking and the final fracture zone. The SSCC mechanisms of two drill pipe steels are hydrogen embrittlement. The hydrogen enters the steel and reduces the binding force of the iron atom, resulting in cleavage fracture.

36 MATERIALS SCIENCE↗

Geothermal Drilling and Completions: Petroleum Practices Technology Transfer

In the summer of 2013, members of the National Renewable Energy Laboratory (NREL) and Colorado School of Mines (CSM) identified an opportunity to improve geothermal drilling operations by transferring practices from the petroleum drilling field. The NREL/CSM group noted that significant changes in drilling efficiencies in petroleum operations have been made during the last decade. For example, five years ago, 14,000-foot wells in Wyoming took 60 days to drill. However, in September of 2015, these same wells were drilled in 7 days. This significant decrease in required drilling days resulted from analysis, goal setting, and management and technology improvements. The geothermal drilling industry can import these methods and technologies, where appropriate, with the possibility of similar improvements in drilling operations.

15 GEOTHERMAL ENERGY↗

Single Piezo-Actuator Rotary-Hammering (SPaRH) Drill

The search for present or past life in the Universe is one of the most important objectives of NASA's exploration missions. Drills for subsurface sampling of rocks, ice and permafrost are an essential tool for astrobiology studies on other planets. Increasingly, it is recognized that drilling via a combination of rotation and hammering offers an efficient and effective rapid penetration mechanism. The rotation provides an intrinsic method for removal of cuttings from the borehole while the impact and shear forces aids in the fracturing of the penetrated medium. Conventional drills that use a single actuator are based on a complex mechanism with many parts and their use in future mission involves greater risk of failure and/or may require lubrication that can introduce contamination. In this paper, a compact drill is reported that uses a single piezoelectric actuator to produce hammering and rotation of the bit. A horn with asymmetric grooves was design to impart a longitudinal (hammering) and transverse force (rotation) to a keyed free mass. The drill requires low axial pre-load since the hammering-impacts fracture the rock under the bit kerf and rotate the bit to remove the powdered cuttings while augmenting the rock fracture via shear forces. The vibrations 'fluidize' the powdered cuttings inside the flutes reducing the friction with the auger surface. This action reduces the consumed power and heating of the drilled medium helping to preserve the pristine content of the acquired samples. The drill consists of an actuator that simultaneously impacts and rotates the bit by applying force and torque via a single piezoelectric stack actuator without the need for a gearbox or lever mechanism. This can reduce the development/fabrication cost and complexity. In this paper, the drill mechanism will be described and the test results will be reported and discussed.

ultrasonic impacts↗